|
|
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:}} | | {{#Wiki_filter:5501 North State Route 2 Oak Harbor, Ohio 43449 419-32 1-8 199 March 16,2007 Mr. Robert Jickling United States Nuclear Regulatory Commission Region I11 2443 Warrenville Road, Suite 2 10 Lisle, Illinois 60532-4352 |
| | |
| | ==Subject:== |
| | Davis-Besse Nuclear Power Station NRC Emergency Response Evaluated Exercise |
| | |
| | ==Dear Bob:== |
| | Enclosed you will find two (2) Condition Report (CR) listings related to your request for previous Davis-Besse drill, exercise, and other "training opportunities" related to Davis- Besse's emergency response functions since the May 17,2005 Evaluated Exercise (Inspection Report 2005-011). |
| | The package contains a hard copy of the CR listings and also an "electronic copy" provided on a Compact Disc (CD) readable with Adobe Acrobat. |
| | One (1) CR listing contains CRs categorized as Significant Conditions Adverse to Quality (SCAQ) and Conditions Adverse to Quality (CAQ). |
| | Davis-Bases' Corrective Action Program procedure defines SCAQ/CAQ CRs as Adverse Conditions that are: Failures, malhctions, deficiencies, deviations, defective hardware and non-conformances, or human performance, programmatic, organizational, or management weaknesses that adversely affect Quality(Q), Augmented Quality(AQ), or nuclear safety related equipment, programs, or processes. The other CR listing contains CRs categorized as Conditions Not Adverse to Quality (NCAQ), whch don't rise to the level of significance of a CAQ. This NCAQ listing contains items such as "procedure enhancements" and EOF/TSC equipment problems (ex., fax machine not working). |
| | We wanted to give you the opportunity to review thls NCAQ CR listing to decide if you wanted to review any of the NCAQ CRs in detail. Let me know which CRs you would like to review in detail. We can provide them to you before you arrive on-site or have them available for your review during the week of the inspection. Inspection Requested Documents |
| | \ Sincerely yours, qd !foe Sturdavant Davis-Besse Nuclear Power Station Regulatory Compliance Senior Specialist (419) 321-8199 RECEIVED MAR 2 0 2007}} |
Revision as of 02:59, 11 November 2018
|
---|
Category:Letter
MONTHYEARML24281A0662024-10-0404 October 2024 EN 57363 - MPR Associates, Inc. Report in Accordance with 10 CFR Part 21 on Incomplete Dedication of Contactors Supplied as Basic Components IR 05000346/20244032024-09-27027 September 2024 Security Baseline Inspection Report 05000346/2024403 ML24269A0552024-09-25025 September 2024 Submittal of the Updated Final Safety Analysis Report, Revision 35 05000346/LER-2021-001-01, Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground2024-09-19019 September 2024 Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter ML24260A2382024-09-16016 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24255A8032024-09-11011 September 2024 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1602024-09-0505 September 2024 Information Request to Support Upcoming Material Control and Accounting Inspection at Davis-Besse Nuclear Power Station L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000346/20240052024-08-22022 August 2024 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2024005) L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000346/20240022024-08-0101 August 2024 Integrated Inspection Report 05000346/2024002 IR 05000346/20244012024-07-30030 July 2024 Security Baseline Inspection Report 05000346/2024401 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification L-24-032, Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report2024-07-15015 July 2024 Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report L-24-063, License Amendment Request to Remove the Table of Contents from the Technical Specifications2024-07-0808 July 2024 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-24-024, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-19019 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-214, Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements2024-06-0505 June 2024 Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements L-24-019, Unit No.1 - Report of Facility Changes, Tests, and Experiments2024-05-22022 May 2024 Unit No.1 - Report of Facility Changes, Tests, and Experiments ML24142A3532024-05-21021 May 2024 Station—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-111, Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-05-15015 May 2024 Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations L-24-072, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 20232024-05-15015 May 2024 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 2023 L-24-031, Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage2024-05-14014 May 2024 Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage IR 05000346/20240012024-05-0303 May 2024 Integrated Inspection Report 05000346/2024001 L-24-069, Occupational Radiation Exposure Report for Year 20232024-04-30030 April 2024 Occupational Radiation Exposure Report for Year 2023 L-24-018, Submittal of Core Operating Limits Report, Cycle 24, Revision 02024-04-16016 April 2024 Submittal of Core Operating Limits Report, Cycle 24, Revision 0 ML24089A2582024-04-0101 April 2024 Request for Information for the NRC Quuadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000346/2024010 L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage ML24036A3472024-03-0707 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0076 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24057A0752024-03-0101 March 2024 the Associated Independent Spent Fuel Storage Installations IR 05000346/20230062024-02-28028 February 2024 Re-Issue Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) ML24057A3362024-02-28028 February 2024 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee IR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant ML24045A0322023-10-26026 October 2023 L-23-221 Proposed Exam Submittal Cover Letter L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure 2024-09-06
[Table view] |
Text
5501 North State Route 2 Oak Harbor, Ohio 43449 419-32 1-8 199 March 16,2007 Mr. Robert Jickling United States Nuclear Regulatory Commission Region I11 2443 Warrenville Road, Suite 2 10 Lisle, Illinois 60532-4352
Subject:
Davis-Besse Nuclear Power Station NRC Emergency Response Evaluated Exercise
Dear Bob:
Enclosed you will find two (2) Condition Report (CR) listings related to your request for previous Davis-Besse drill, exercise, and other "training opportunities" related to Davis- Besse's emergency response functions since the May 17,2005 Evaluated Exercise (Inspection Report 2005-011).
The package contains a hard copy of the CR listings and also an "electronic copy" provided on a Compact Disc (CD) readable with Adobe Acrobat.
One (1) CR listing contains CRs categorized as Significant Conditions Adverse to Quality (SCAQ) and Conditions Adverse to Quality (CAQ).
Davis-Bases' Corrective Action Program procedure defines SCAQ/CAQ CRs as Adverse Conditions that are: Failures, malhctions, deficiencies, deviations, defective hardware and non-conformances, or human performance, programmatic, organizational, or management weaknesses that adversely affect Quality(Q), Augmented Quality(AQ), or nuclear safety related equipment, programs, or processes. The other CR listing contains CRs categorized as Conditions Not Adverse to Quality (NCAQ), whch don't rise to the level of significance of a CAQ. This NCAQ listing contains items such as "procedure enhancements" and EOF/TSC equipment problems (ex., fax machine not working).
We wanted to give you the opportunity to review thls NCAQ CR listing to decide if you wanted to review any of the NCAQ CRs in detail. Let me know which CRs you would like to review in detail. We can provide them to you before you arrive on-site or have them available for your review during the week of the inspection. Inspection Requested Documents
\ Sincerely yours, qd !foe Sturdavant Davis-Besse Nuclear Power Station Regulatory Compliance Senior Specialist (419) 321-8199 RECEIVED MAR 2 0 2007