Category:Report
MONTHYEARML24136A1352024-07-30030 July 2024 LRA - Record of Decision ML23355A2682023-12-21021 December 2023 NRC Comments - Comanche Peak LRA Supplement 3 (1) CP-202300566, (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation2023-12-12012 December 2023 (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation CP-202300401, 10CFR50.59 Evaluation Summary Report 024, 10CFR72.48 Evaluation Summary Report 009, and Commitment Material Change Evaluation Report 0182023-08-15015 August 2023 10CFR50.59 Evaluation Summary Report 024, 10CFR72.48 Evaluation Summary Report 009, and Commitment Material Change Evaluation Report 018 L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments CP-202300285, Response to Request for Additional Information Regarding Review of the License Renewal Application - Set 12023-07-12012 July 2023 Response to Request for Additional Information Regarding Review of the License Renewal Application - Set 1 CP-202300263, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements2023-06-15015 June 2023 Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements CP-202200419, (CPNPP) - Unit 1 Refueling Outage 22 (1RF22) Steam Generator 180 Day Report2022-11-0303 November 2022 (CPNPP) - Unit 1 Refueling Outage 22 (1RF22) Steam Generator 180 Day Report CP-202200247, (CPNPP) - 10CFR50.59 Evaluation Summary Report 023, 10CFR72.48 Evaluation Summary Report 008 and Commitment Material Change Evaluation Report 0172022-06-30030 June 2022 (CPNPP) - 10CFR50.59 Evaluation Summary Report 023, 10CFR72.48 Evaluation Summary Report 008 and Commitment Material Change Evaluation Report 017 ML22020A1792021-11-0404 November 2021 Fall 2021 Steam Generator Tube Inspections Discussion Input CP-202100127, Transmittal of Pressure and Temperature Limits Report, ERX-07-003, Revision 62021-03-16016 March 2021 Transmittal of Pressure and Temperature Limits Report, ERX-07-003, Revision 6 CP-202000462, Submittal of 10CFR50.59 Evaluation Summary Report 022, 007, and Commitment Material Change Evaluation Report 0162020-09-29029 September 2020 Submittal of 10CFR50.59 Evaluation Summary Report 022, 007, and Commitment Material Change Evaluation Report 016 ML20153A7442020-06-0404 June 2020 Review of the Fall 2018 Steam Generator Tube Inspection Report CP-201900467, (CPNPP) - Biennial Review of Procedures and Station Operations Review Committee Meetings2019-08-14014 August 2019 (CPNPP) - Biennial Review of Procedures and Station Operations Review Committee Meetings CP-201900378, Transmittal of Seventeenth Refueling Outage (2RF17) Steam Generator 180 Day Report2019-06-10010 June 2019 Transmittal of Seventeenth Refueling Outage (2RF17) Steam Generator 180 Day Report CP-201900126, Special Report 2-SR-19-001-00, Inoperable Post Accident Monitoring Instrumentation Report.2019-02-25025 February 2019 Special Report 2-SR-19-001-00, Inoperable Post Accident Monitoring Instrumentation Report. CP-201800652, Special Report 1-SR-18-001-00, Inoperable Post Accident Monitoring Instrumentation Report2018-09-12012 September 2018 Special Report 1-SR-18-001-00, Inoperable Post Accident Monitoring Instrumentation Report ML18044A0982018-02-0808 February 2018 Solid Waste Registration Number: 33306; Texas Waste Code: 37043902; Reference Number: 15749 CP-201700805, Sixteenth Refueling Outage (2RF16) Steam Generator 180 Day Report2017-10-30030 October 2017 Sixteenth Refueling Outage (2RF16) Steam Generator 180 Day Report CP-201700223, Decommissioning Funding Status Report for Financial Assurance as of 12/31/20162017-03-30030 March 2017 Decommissioning Funding Status Report for Financial Assurance as of 12/31/2016 CP-201700033, Mitigating Strategies Assessment Flood Report, NEI 12-06, Appendix G, Revision 2, G.4.1 Path2017-02-0909 February 2017 Mitigating Strategies Assessment Flood Report, NEI 12-06, Appendix G, Revision 2, G.4.1 Path CP-201600097, Westinghouse LTR-PAFM-16-2-NP, Technical Justification to Support Extended Volumetric Examination Interval for Comanche Peak Unit 1 Reactor Vessel Inlet Nozzle to Safe End Dissimilar Metal Welds.2016-02-29029 February 2016 Westinghouse LTR-PAFM-16-2-NP, Technical Justification to Support Extended Volumetric Examination Interval for Comanche Peak Unit 1 Reactor Vessel Inlet Nozzle to Safe End Dissimilar Metal Welds. CP-201600093, Transmittal of 10CFR50.59 Evaluation Summary Report 019, 10CFR72.48 Evaluation Summary Report 004, and Commitment Material Change Evaluation Report 0132016-02-24024 February 2016 Transmittal of 10CFR50.59 Evaluation Summary Report 019, 10CFR72.48 Evaluation Summary Report 004, and Commitment Material Change Evaluation Report 013 ML16014A1252016-01-22022 January 2016 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50 Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force ML16047A3302016-01-20020 January 2016 NEI 12-01 Phase 2 Staffing Assessment, Revision 1 ML15062A0302015-02-25025 February 2015 Work Plan for Completing a Once Through Cooling Water Study for Total Dissolved Solids, Chlorides, and Sulfates CP-201401268, Fourteenth Refueling Outage (2RF14) Steam Generator 180 Day Report2014-10-21021 October 2014 Fourteenth Refueling Outage (2RF14) Steam Generator 180 Day Report CP-201401027, 10CFR50.59 Evaluation Summary Report 018, 10CFR72.48 Evaluation Summary Report 003 and Commitment Material Change Evaluation Report 0122014-08-27027 August 2014 10CFR50.59 Evaluation Summary Report 018, 10CFR72.48 Evaluation Summary Report 003 and Commitment Material Change Evaluation Report 012 ML14189A5432014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 ML14189A4982014-06-19019 June 2014 Stars Response to Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program - Vendor Information Request ML14189A5002014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 5 ML14189A5312014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5 ML14189A5332014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5 ML14189A5372014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 CP-201400335, . Pressure and Temperature Limits Report2014-04-0808 April 2014 . Pressure and Temperature Limits Report CP-201400324, Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(0 Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2014-03-27027 March 2014 Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(0 Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML14036A0362014-03-0707 March 2014 Staff Assessments of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant Accident ML13225A5752013-12-19019 December 2013 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies ML13338A6612013-12-18018 December 2013 Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Comanche Peak Nuclear Power Plant, TAC Nos.: MF0860 and MF0861 ML13309A0272013-10-31031 October 2013 WCAP-17728-NP, Rev. 1, Comanche Peak Nuclear Power Plant Units 1 and 2 Spent Fuel Pool Criticality Safety Analysis CP-201301238, Sixteenth Refueling Outage (1RF16) Steam Generator 180 Day Report2013-10-15015 October 2013 Sixteenth Refueling Outage (1RF16) Steam Generator 180 Day Report ML12159A2882012-06-11011 June 2012 Review of 60-day Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near Term Task Force Related to Fukushima Dai-ichi Accident ML12080A1432012-03-0606 March 2012 CPNPP Systems Annual Operator Employment Notices ML12080A1502012-03-0606 March 2012 Submittal of Stc Annual Operator Employment Notices CP-201101257, Submittal of Operator Licensing Examination Data2011-09-21021 September 2011 Submittal of Operator Licensing Examination Data 2024-07-30
[Table view] Category:Technical
MONTHYEARML23355A2682023-12-21021 December 2023 NRC Comments - Comanche Peak LRA Supplement 3 (1) CP-202300285, Response to Request for Additional Information Regarding Review of the License Renewal Application - Set 12023-07-12012 July 2023 Response to Request for Additional Information Regarding Review of the License Renewal Application - Set 1 CP-202200419, (CPNPP) - Unit 1 Refueling Outage 22 (1RF22) Steam Generator 180 Day Report2022-11-0303 November 2022 (CPNPP) - Unit 1 Refueling Outage 22 (1RF22) Steam Generator 180 Day Report CP-202100127, Transmittal of Pressure and Temperature Limits Report, ERX-07-003, Revision 62021-03-16016 March 2021 Transmittal of Pressure and Temperature Limits Report, ERX-07-003, Revision 6 CP-201900467, (CPNPP) - Biennial Review of Procedures and Station Operations Review Committee Meetings2019-08-14014 August 2019 (CPNPP) - Biennial Review of Procedures and Station Operations Review Committee Meetings CP-201900378, Transmittal of Seventeenth Refueling Outage (2RF17) Steam Generator 180 Day Report2019-06-10010 June 2019 Transmittal of Seventeenth Refueling Outage (2RF17) Steam Generator 180 Day Report CP-201900126, Special Report 2-SR-19-001-00, Inoperable Post Accident Monitoring Instrumentation Report.2019-02-25025 February 2019 Special Report 2-SR-19-001-00, Inoperable Post Accident Monitoring Instrumentation Report. CP-201800652, Special Report 1-SR-18-001-00, Inoperable Post Accident Monitoring Instrumentation Report2018-09-12012 September 2018 Special Report 1-SR-18-001-00, Inoperable Post Accident Monitoring Instrumentation Report ML18044A0982018-02-0808 February 2018 Solid Waste Registration Number: 33306; Texas Waste Code: 37043902; Reference Number: 15749 CP-201700805, Sixteenth Refueling Outage (2RF16) Steam Generator 180 Day Report2017-10-30030 October 2017 Sixteenth Refueling Outage (2RF16) Steam Generator 180 Day Report CP-201600097, Westinghouse LTR-PAFM-16-2-NP, Technical Justification to Support Extended Volumetric Examination Interval for Comanche Peak Unit 1 Reactor Vessel Inlet Nozzle to Safe End Dissimilar Metal Welds.2016-02-29029 February 2016 Westinghouse LTR-PAFM-16-2-NP, Technical Justification to Support Extended Volumetric Examination Interval for Comanche Peak Unit 1 Reactor Vessel Inlet Nozzle to Safe End Dissimilar Metal Welds. ML16047A3302016-01-20020 January 2016 NEI 12-01 Phase 2 Staffing Assessment, Revision 1 ML14189A4982014-06-19019 June 2014 Stars Response to Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program - Vendor Information Request CP-201400335, . Pressure and Temperature Limits Report2014-04-0808 April 2014 . Pressure and Temperature Limits Report ML13225A5752013-12-19019 December 2013 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies ML13338A6612013-12-18018 December 2013 Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Comanche Peak Nuclear Power Plant, TAC Nos.: MF0860 and MF0861 ML13309A0272013-10-31031 October 2013 WCAP-17728-NP, Rev. 1, Comanche Peak Nuclear Power Plant Units 1 and 2 Spent Fuel Pool Criticality Safety Analysis ML1029201602010-09-30030 September 2010 WCAP-17269-NP, Revision 0, Analysis of Capsule W from the Comanche Peak Unit No. 2 Reactor Vessel Radiation Surveillance Program. ML0930800082009-10-13013 October 2009 Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Attachment D, Page 57 of 99 Through Page 89 of 99 ML0930800102009-10-13013 October 2009 Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Attachment E, Page 23 of 49 Through Attachment F CP-200901403, Comanche Peak - Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Cover Page Through Attachment a, Page 30 of 452009-10-13013 October 2009 Comanche Peak - Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Cover Page Through Attachment a, Page 30 of 45 CP-200901403, Comanche Peak - Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Attachment a, Page 31 of 45, Through Attachment B2009-10-13013 October 2009 Comanche Peak - Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Attachment a, Page 31 of 45, Through Attachment B CP-200901403, Comanche Peak - Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Attachment C Through Attachment D, Page 20 of 992009-10-13013 October 2009 Comanche Peak - Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Attachment C Through Attachment D, Page 20 of 99 CP-200901403, Comanche Peak - Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Attachment D, Page 21 of 99 Through Page 56 of 992009-10-13013 October 2009 Comanche Peak - Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Attachment D, Page 21 of 99 Through Page 56 of 99 CP-200901403, Comanche Peak - Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Attachment D, Page 57 of 99 Through Page 89 of 992009-10-13013 October 2009 Comanche Peak - Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Attachment D, Page 57 of 99 Through Page 89 of 99 CP-200901403, Comanche Peak - Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Attachment D, Page 90 of 99 Through Attachment E, Page 22 of 492009-10-13013 October 2009 Comanche Peak - Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Attachment D, Page 90 of 99 Through Attachment E, Page 22 of 49 ML0930800092009-10-13013 October 2009 Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Attachment D, Page 90 of 99 Through Attachment E, Page 22 of 49 ML0930800072009-10-13013 October 2009 Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Attachment D, Page 21 of 99 Through Page 56 of 99 ML0930800062009-10-13013 October 2009 Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Attachment C Through Attachment D, Page 20 of 99 ML0930800052009-10-13013 October 2009 Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Attachment a, Page 31 of 45, Through Attachment B CP-200901403, Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Cover Page Through Attachment a, Page 30 of 452009-10-13013 October 2009 Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Cover Page Through Attachment a, Page 30 of 45 CP-200801606, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Introduction Through Attachment a2008-11-26026 November 2008 Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Introduction Through Attachment a ML0835004682008-11-26026 November 2008 Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment B Through Attachment D, Page 20 ML0835004702008-11-26026 November 2008 Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment D, Page 21 Through 57 CP-200801606, Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment D, Page 58 Through 952008-11-26026 November 2008 Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment D, Page 58 Through 95 CP-200801606, Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment D, Page 21 Through 572008-11-26026 November 2008 Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment D, Page 21 Through 57 CP-200801606, Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment B Through Attachment D, Page 202008-11-26026 November 2008 Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment B Through Attachment D, Page 20 CP-200801606, Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Introduction Through Attachment a2008-11-26026 November 2008 Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Introduction Through Attachment a ML0835004722008-11-26026 November 2008 Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment E ML0835004712008-11-26026 November 2008 Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment D, Page 58 Through 95 ML0815600282008-09-0909 September 2008 Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems, Proposed Alternative Course of Action ML0821900132008-08-0707 August 2008 Monthly Operating Reports Second Quarter 2008 ML0826102862008-06-30030 June 2008 WCAP-16827-NP, Addendum 1, Revision 0, Supplement to Comanche Peak, Units 1 and 2, Spent Fuel Pool Criticality Safety Analysis. CP-200800265, Transmittal of Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2008-02-29029 February 2008 Transmittal of Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML0734401502007-12-0303 December 2007 Drill Report 11/06/2007, Final Report - Radiological Emergency Preparedness (REP) Program, 12/03/2007. Draft CPSES-200701238, Submittal of the CPSES Units 1 and 2 Large and Small Break LOCA Analyses2007-07-31031 July 2007 Submittal of the CPSES Units 1 and 2 Large and Small Break LOCA Analyses CPSES-200700708, Evaluation of Pressurizer Weld Overlay Confirmatory Analyses2007-04-0505 April 2007 Evaluation of Pressurizer Weld Overlay Confirmatory Analyses CPSES-200700346, Guarantees of Payment of Deferred Premiums, Submits Form 10-Q for the Period Ending September 30, 20062007-02-0808 February 2007 Guarantees of Payment of Deferred Premiums, Submits Form 10-Q for the Period Ending September 30, 2006 CPSES-200602196, WCAP-16610-NP, Rev. 0, Analysis of Capsule X from the Txu Energy Company Comanche Peak Unit 1 Reactor Vessel Radiation Surveillance Program.2006-09-30030 September 2006 WCAP-16610-NP, Rev. 0, Analysis of Capsule X from the Txu Energy Company Comanche Peak Unit 1 Reactor Vessel Radiation Surveillance Program. CPSES-200600269, Eighth Refueling Outage (2RF08) Steam Generator Twelve Month Report2006-02-14014 February 2006 Eighth Refueling Outage (2RF08) Steam Generator Twelve Month Report 2023-07-12
[Table view] |