ML083500470

From kanterella
Jump to navigation Jump to search
Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment D, Page 21 Through 57
ML083500470
Person / Time
Site: Comanche Peak  
Issue date: 11/26/2008
From:
Luminant Generation Co, Luminant Power
To:
Office of Nuclear Reactor Regulation
References
CP-200801606, GL-04-002, TXX-08141 ENR-2007-002743-20-01, ER-ESP-001, Rev 1
Download: ML083500470 (37)


Text

Attachment D Page 21 of 95 Series 1000 Electromark labels - 6"x6" white vinyl ER-ESP-001 Revision 1 Test 3 Labels ENR-2007-002743-20-01

Attachment D Page 22 of 95 ER-ESP-O01 Revision 1 Series 1000 Electromark labels - 6"x6" white vinyl Test 3 Labels ENR-2007-002743-20-01

]Page 23 of 95 ER--S1P-0 R Re~vision Ii zl c rka, 1 Q00 0 kFE r~

6 p I ýXVY w/'Nit's Ykniv/

FastL 3 ENR-207-02743-0-0

Attachment D ER-ESP-001 Page 24 of 95 Revision 1 Precipitate only bypass - 6 mil chips Test 3 Particulate Only ENR-2007-002743-20-01

ae25 of 95RvsoR pl 1

-`

I ff /<-`

I I L H

-L-->D<.>&

I V RII

)ý p 14 7R 2~H~7 HY0274 29 9i

Attachment D Page 26 of 95 ER-ESP-001 Revision 1 LDFG (Nukon) smalls (3.24.Ibm) and Min-K fiber fines (0.025 Ibm)

Test 4 Headloss ENR-2007-002743-20-01

Attachment D Page 27 of 95 ER-ESP-00 1 Revision 1 Coatings chips 1/8 inch to 11/4 inch (6.54 Ibm)

Test 4 Headloss ENR-2007-002743-20-01

Attachment D Page 28 of 95 Tin Powder - surrogate for inorganic zinc coatings (510 Ibm)

ER-ESP-001 Revision 1 Test 4 Headloss ENR-2007-002743-20-01

Attachment D Page 29 of 95 Nukon LDFG fines - from chipper to blender, stirred in water ER-ESP-00 1 Revision 1 Test 4 Headloss ENR-2007-002743-20-01

Attachment D Page 30 of 95 ER-ESP-001 Revision 1 Min-K fiber and particulate, Coatings fines - pulverized acrylic chips Test 4 Headloss ENR-2007-002743-20-01

Attachment D Page 31 of 95 Paint chips - 1/64 inch (69.96 Ibm)

ER-ESP-O01 Revision 1 Test 4 Headloss ENR-2007-002743-20-01

Attachment D Page 32 of 95 ER-ESP-O0 1 Revision 1 Paint chips - 1/64 inch Test 4 Headloss ENR-2007-002743-20-01

Atachm, ietD Pae33 of 95 BID IDP c~:

1ID~viisio~ I llý L

ENRID20UM0ID2743-20= ID

Attach-m t P~age 34 of 95 ER_7ES1PCC Reiio1 Hr~-,,IJ, knm-Om fHlFIG e

c-ENR-20733702743-2O=O ¶

Attachment D ER-ES Page 35 of 95 Revisi WCAP surrogate production - particulate generator used to create prototypical solid chemical products (precipitates) for sump screen performance testing

P-00 I on 1 Test 4 Headloss ENR-2007-002743-20-01

Attachment D Page 36 of 95 ER-ESP-001 Revision 1 For aluminum oxyhydroxide precipitate, aluminum nitrate (AI(NO3)3.9H20) is combined with sodium hydroxide (NaOH).

I Test 4 Headloss ENR-2007-002743-20-01

Attachment D Page 37 of 95 ER-ESP-001 Revision 1 Aluminum oxyhydroxide also used in lieu of sodium aluminum silicate which avoids use of sodium silicate, which may be considered hazardous.

Test 4 Headloss ENR-2007-002743-20-01

Attachment D ER-ESP-00 1 Page 38 of 95 Revision 1 WCAP surrogate characteristics verified prior to use Test 4 Headloss ENR-2007-002743-20-01

Attachment D Page 39 of 95 WCAP surrogate insertion - batched to maintain ppm ER-ESP-00 1 Revision I i est 4 Headloss ENR-2007-002743-20-01

Attachment D Page 40 of 95 Chemical precipitate introduction every 2 pool turnovers ER-ESP-001 Revision 1 Test 4 Headloss ENR-2007-002743-20-01

1-tacnment DI Page 41 of 95 ER-ESP-001 Revision I After chemical addition, full debris load maintained for 15 pool turnovers Test 4 Headloss ENR-2007.-002743-2 0 -0 1

Attachment D Page 42 of 95 Headloss test - near completion ER-ESP-00 1 Revision 1 Test 4 Headloss ENR-2007-002743-20-01

Attachment D Page 43 of 95 Headloss test - completion flow sweep ER-ESP-00 I Revision 1 Test 4 Headloss ENR-2007-002743-20-01

Attachment D Page 44 of 95 ER-ESP-00 1 Revision 1 Headloss test - Debris head loss stable at approximately 0.6 ft Test 4 Design Basis Test Head Loss 0.7 i.

I.

0.6 0.5 0.4 0.3 0.2 0.1 Head Loss 0

0.00 100.00 200.00 300.00 400.00 500.00 Time (min) 600.00 700.00 ENR-2007-002743-20-01

Attachment D Page 45 of 95 ER-ESP-001 Headloss test - drain down with flow Revision 1 Test 4 Headloss ENR-2007-00 2 74 3-2 0 -0 1

Attachment D ER-ESP-00 1 Page 46 of 95 Revision 1 Headloss test - drain down with flow IJ LI II LI Illl I~I 01.

Test 4 Headloss ENR-2007-002743-20-01

Attachment D Page 47 of 95 Headloss test - drain down with flow ER-ESP-O0 1 Revision 1 Test 4 Headloss ENR-2007-002743-20-01

Attachment D Page 48 of 95 Headloss test - drain down with flow ER-ESP-00 1 Revision 1 Test 4 Headloss ENR-2007-002743-20-01

Attachment D Page 49 of 95 ER-ESP-001 Revision 1 Headloss test - drain down with flow Test 4 Headloss ENR-2007-002743-20-01

Attachment D Page 50 of 95 Headloss test - drain down after pump stop ER-ESP-00 1 Revision 1

.0ýý Test 4 Headloss ENR-2007-002743-20-01

Attachment D Page 51 of 95 ER-ESP-001 Revision 1 Headloss test - drain down without flow Test 4 Headloss ENR-2007-002743-20-01

Attachment D Page 52 of 95 Headloss test - drain down without flow ER-ESP-00 1 Revision 1 Test 4 Headloss ENR-2007-002743-20-01

Attac Page 5 iment D ER-ESP-001 3 of 95 Revision 1 Headloss test - drain down without flow ENR-2007-002743-20-O1

Attachment D Page 54 of 95 Headloss test - drain down without flow ER-ESP-O01 Revision 1 Test 4 Headloss ENR-2007-002743-20-01

Attachment D Page 55 of 95 ER-ESP-00 1 Revision 1 Headloss test - drain down without flow Test 4 Headloss ENR-2007-002743-20-01

Attachment D Page 56 of 95 ER-ESP-00 1 Revision 1 Headloss test - drain down without flow Test 4 Headloss ENR-2007-002743-20-01

Attachment D ER-ESP-001 Page 57 of 95 Revision 1 Headloss test - drain down without flow Test 4 Headloss ENR-2007-002743-20-01