ML082410200: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML082410200
| number = ML082410200
| issue date = 09/16/2008
| issue date = 09/16/2008
| title = Palo Verde Nuclear Generating Station, Units 1, 2, and 3 - Completion of Actions for Unit 2 and Closure of Confirmatory Action Letter NRR-07-004 (TAC No. MD7291)
| title = Completion of Actions for Unit 2 and Closure of Confirmatory Action Letter NRR-07-004
| author name = Giitter J G
| author name = Giitter J
| author affiliation = NRC/NRR/DORL
| author affiliation = NRC/NRR/DORL
| addressee name = Edington R K
| addressee name = Edington R
| addressee affiliation = Arizona Public Service Co
| addressee affiliation = Arizona Public Service Co
| docket = 05000528, 05000529, 05000530
| docket = 05000528, 05000529, 05000530
| license number = NPF-041, NPF-051, NPF-074
| license number = NPF-041, NPF-051, NPF-074
| contact person = Giitter J G, NRR/DORL, 415-1453
| contact person = Giitter J, NRR/DORL, 415-1453
| case reference number = TAC MD7291, NRR-07-004
| case reference number = TAC MD7291, NRR-07-004
| document type = Letter, Confirmatory Action Letter (CAL)
| document type = Letter, Confirmatory Action Letter (CAL)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:September 16, 2008  
{{#Wiki_filter:September 16, 2008 Mr. Randall K. Edington Executive Vice President Nuclear/CNO Mail Station 7602 Arizona Public Service Company P. O. Box 52034 Phoenix, AZ 85072-2034
 
Mr. Randall K. Edington Executive Vice President Nuclear/CNO Mail Station 7602 Arizona Public Service Company P. O. Box 52034 Phoenix, AZ 85072-2034  


==SUBJECT:==
==SUBJECT:==
PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2 AND 3 - CLOSURE OF CONFIRMATORY ACTION LETTER NRR-07-004 (TAC NO. MD7291)  
PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2 AND 3 -
CLOSURE OF CONFIRMATORY ACTION LETTER NRR-07-004 (TAC NO. MD7291)


==Dear Mr. Edington:==
==Dear Mr. Edington:==
Line 31: Line 30:
In letters dated October 31, 2007, and March 18, 2008 (ADAMS Accession Nos. ML072820001 and ML080520180, respectively), the NRC noted the completion of all commitments regarding NRR-07-004 for PVNGS Units 1 and 3, respectively. Therefore, based on these letters and the August 4, 2008, letter, the NRC has found that all the commitments listed in the CAL and supporting commitment letters have been met for PVNGS Units 1, 2, and 3. No further response is required regarding the CAL. We consider the CAL closed.
In letters dated October 31, 2007, and March 18, 2008 (ADAMS Accession Nos. ML072820001 and ML080520180, respectively), the NRC noted the completion of all commitments regarding NRR-07-004 for PVNGS Units 1 and 3, respectively. Therefore, based on these letters and the August 4, 2008, letter, the NRC has found that all the commitments listed in the CAL and supporting commitment letters have been met for PVNGS Units 1, 2, and 3. No further response is required regarding the CAL. We consider the CAL closed.
Thank you for informing us of the actions documented in your letter. These actions may be examined during a future NRC inspection of your facility.
Thank you for informing us of the actions documented in your letter. These actions may be examined during a future NRC inspection of your facility.
Current NRC guidance regarding CALs is contained in the NRC Enforcement Policy and the NRC Enforcement Manual, which are available at the NRC web site at http://www.nrc.gov/about-nrc/regulatory/enforcement.html (click on Enforcement Policy or Enforcement Guidance) or by contacting the Government Printing Office (GPO) toll-free at R. Edington 1-888-293-6498. The GPO is open from 7:00 a.m. to 9:00 p.m. EST, Monday through Friday (except Federal holidays).
Current NRC guidance regarding CALs is contained in the NRC Enforcement Policy and the NRC Enforcement Manual, which are available at the NRC web site at http://www.nrc.gov/about-nrc/regulatory/enforcement.html (click on Enforcement Policy or Enforcement Guidance) or by contacting the Government Printing Office (GPO) toll-free at
In accordance with Section 2.390 of Title 10 of the Code of Federal Regulations of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRC
=s document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm.html. Sincerely, 
  /RA by Robert A. Nelson for/
 
Joseph G. Giitter, Director  Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.:  50-528, 50-529, and 50-530
 
cc:  See next page
 
ML082410200 OFFICE DCI/CPNB DCI/CPNB LPL4/PM LPL4/LA NAME JCollins TChan BSingal JBurkhardt DATE    9/9/08 9/9 /08 9/4/08 9/4/08 OFFICE LPL4/BC DCI/D DRP/D RIV DORL/D NAME MMarkley MEvans DChamberlain RCaniano for JGiitter Robert A Nelson for DATE 9/4/08 9/10/08 9 /11/08 9/16/08 Palo Verde Nuclear Generating Station      7/2/2008 cc: Mr. Steve Olea Arizona Corporation Commission 1200 W. Washington Street Phoenix, AZ  85007 Mr. Douglas Kent Porter Senior Counsel Southern California Edison Company Law Department, Generation Resources P.O. Box 800 Rosemead, CA  91770 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 40 Buckeye, AZ  85326 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 612 E. Lamar Blvd., Suite 400 Arlington, TX  76011-4125 Chairman Maricopa County Board of Supervisors 301 W. Jefferson, 10th Floor Phoenix, AZ  85003 Mr. Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 S. 40th Street Phoenix, AZ  85040 Mr. Scott Bauer, Director Regulatory Affairs Palo Verde Nuclear Generating Station Mail Station 7636 P.O. Box 52034 Phoenix, AZ  85072-2034 Mr. Dwight C. Mims, Vice President Regulatory Affairs and Plant Improvement Palo Verde Nuclear Generating Station Mail Station 7605 P.O. Box 52034 Phoenix, AZ  85072-2034 Mr. John C. Taylor Director, Nuclear Generation  El Paso Electric Company 340 E. Palm Lane, Suite 310 Phoenix, AZ  85004 Mr. James Ray Public Service Company of New Mexico 2401 Aztec NE, MS Z110 Albuquerque, NM  87107-4224 Mr. Geoffrey M. Cook Southern California Edison Company 5000 Pacific Coast Hwy., Bldg. D21 San Clemente, CA  92672


Mr. Robert Henry Salt River Project 6504 E. Thomas Road Scottsdale, AZ  85251
R. Edington                                      1-888-293-6498. The GPO is open from 7:00 a.m. to 9:00 p.m. EST, Monday through Friday (except Federal holidays).
In accordance with Section 2.390 of Title 10 of the Code of Federal Regulations of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm.html.
Sincerely,
                                                        /RA by Robert A. Nelson for/
Joseph G. Giitter, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.: 50-528, 50-529, and 50-530 cc: See next page


Mr. Jeffrey T. Weikert Assistant General Counsel El Paso Electric Company Mail Location 167 123 W. Mills El Paso, TX 79901 Mr. Eric Tharp Los Angeles Department of Water & Power Southern California Public Power Authority P.O. Box 51111, Room 1255-C Los Angeles, CA 90051-0100 Mr. Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 N. Congress Avenue Austin, TX 78701-3326 Ms. Karen O'Regan Environmental Program Manager City of Phoenix Office of Environmental Programs 200 W. Washington Street Phoenix, AZ 85003}}
ML082410200 OFFICE DCI/CPNB                  DCI/CPNB                  LPL4/PM                LPL4/LA NAME        JCollins            TChan                      BSingal                JBurkhardt DATE          9/9/08            9/9 /08                    9/4/08                  9/4/08 OFFICE      LPL4/BC            DCI/D                      DRP/D RIV              DORL/D NAME        MMarkley            MEvans                    DChamberlain            JGiitter Robert A RCaniano for            Nelson for DATE        9/4/08              9/10/08                    9 /11/08                9/16/08 Palo Verde Nuclear Generating Station                                7/2/2008 cc:
Mr. Steve Olea                          Mr. John C. Taylor Arizona Corporation Commission          Director, Nuclear Generation 1200 W. Washington Street                El Paso Electric Company Phoenix, AZ 85007                        340 E. Palm Lane, Suite 310 Phoenix, AZ 85004 Mr. Douglas Kent Porter Senior Counsel                          Mr. James Ray Southern California Edison Company      Public Service Company of New Mexico Law Department, Generation Resources    2401 Aztec NE, MS Z110 P.O. Box 800                            Albuquerque, NM 87107-4224 Rosemead, CA 91770 Mr. Geoffrey M. Cook Senior Resident Inspector                Southern California Edison Company U.S. Nuclear Regulatory Commission      5000 Pacific Coast Hwy., Bldg. D21 P.O. Box 40                              San Clemente, CA 92672 Buckeye, AZ 85326 Mr. Robert Henry Regional Administrator, Region IV        Salt River Project U.S. Nuclear Regulatory Commission      6504 E. Thomas Road 612 E. Lamar Blvd., Suite 400            Scottsdale, AZ 85251 Arlington, TX 76011-4125 Mr. Jeffrey T. Weikert Chairman                                Assistant General Counsel Maricopa County Board of Supervisors    El Paso Electric Company 301 W. Jefferson, 10th Floor            Mail Location 167 Phoenix, AZ 85003                        123 W. Mills El Paso, TX 79901 Mr. Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency      Mr. Eric Tharp 4814 S. 40th Street                      Los Angeles Department of Water & Power Phoenix, AZ 85040                        Southern California Public Power Authority P.O. Box 51111, Room 1255-C Mr. Scott Bauer, Director                Los Angeles, CA 90051-0100 Regulatory Affairs Palo Verde Nuclear Generating Station    Mr. Brian Almon Mail Station 7636                        Public Utility Commission P.O. Box 52034                          William B. Travis Building Phoenix, AZ 85072-2034                  P.O. Box 13326 1701 N. Congress Avenue Mr. Dwight C. Mims, Vice President      Austin, TX 78701-3326 Regulatory Affairs and Plant Improvement Palo Verde Nuclear Generating Station    Ms. Karen O'Regan Mail Station 7605                        Environmental Program Manager P.O. Box 52034                          City of Phoenix Phoenix, AZ 85072-2034                  Office of Environmental Programs 200 W. Washington Street Phoenix, AZ 85003}}

Latest revision as of 23:01, 12 March 2020

Completion of Actions for Unit 2 and Closure of Confirmatory Action Letter NRR-07-004
ML082410200
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 09/16/2008
From: Giitter J
Division of Operating Reactor Licensing
To: Edington R
Arizona Public Service Co
Giitter J, NRR/DORL, 415-1453
References
TAC MD7291, NRR-07-004
Download: ML082410200 (4)


Text

September 16, 2008 Mr. Randall K. Edington Executive Vice President Nuclear/CNO Mail Station 7602 Arizona Public Service Company P. O. Box 52034 Phoenix, AZ 85072-2034

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2 AND 3 -

CLOSURE OF CONFIRMATORY ACTION LETTER NRR-07-004 (TAC NO. MD7291)

Dear Mr. Edington:

On March 15, 2007, the U.S. Nuclear Regulatory Commission (NRC) issued Confirmatory Action Letter (CAL) No. NRR-07-004 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML070660298) regarding dissimilar metal welds in the pressurizers at Palo Verde Nuclear Generating Station (PVNGS), Units 1, 2, and 3. This letter acknowledges receipt of Arizona Public Service (APS) letter dated August 4, 2008 (ADAMS Accession No. ML082250351), informing the NRC of actions taken in response to this CAL.

In this letter, APS stated that structural weld overlays were installed on the pressurizer surge, spray, safety, and relief nozzles at PVNGS Unit 2, and all required non-destructive examinations were completed satisfactorily without any unacceptable indications. This activity completes the mitigation of all pressurizer dissimilar metal welds at PVNGS Unit 2. Based on this letter, the NRC has found that all the commitments listed in the CAL and supporting commitment letters dated January 31, 2007 (ADAMS Accession No. ML070430378), and February 16, 2007 (ADAMS Accession No. ML070590212), have been met for PVNGS Unit 2. As such, it is no longer necessary to implement enhanced inspection and leakage monitoring requirements for the reactor coolant system at PVNGS Unit 2. Technical Assignment Control (TAC) No. MD7291 has been closed.

In letters dated October 31, 2007, and March 18, 2008 (ADAMS Accession Nos. ML072820001 and ML080520180, respectively), the NRC noted the completion of all commitments regarding NRR-07-004 for PVNGS Units 1 and 3, respectively. Therefore, based on these letters and the August 4, 2008, letter, the NRC has found that all the commitments listed in the CAL and supporting commitment letters have been met for PVNGS Units 1, 2, and 3. No further response is required regarding the CAL. We consider the CAL closed.

Thank you for informing us of the actions documented in your letter. These actions may be examined during a future NRC inspection of your facility.

Current NRC guidance regarding CALs is contained in the NRC Enforcement Policy and the NRC Enforcement Manual, which are available at the NRC web site at http://www.nrc.gov/about-nrc/regulatory/enforcement.html (click on Enforcement Policy or Enforcement Guidance) or by contacting the Government Printing Office (GPO) toll-free at

R. Edington 1-888-293-6498. The GPO is open from 7:00 a.m. to 9:00 p.m. EST, Monday through Friday (except Federal holidays).

In accordance with Section 2.390 of Title 10 of the Code of Federal Regulations of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm.html.

Sincerely,

/RA by Robert A. Nelson for/

Joseph G. Giitter, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.: 50-528, 50-529, and 50-530 cc: See next page

ML082410200 OFFICE DCI/CPNB DCI/CPNB LPL4/PM LPL4/LA NAME JCollins TChan BSingal JBurkhardt DATE 9/9/08 9/9 /08 9/4/08 9/4/08 OFFICE LPL4/BC DCI/D DRP/D RIV DORL/D NAME MMarkley MEvans DChamberlain JGiitter Robert A RCaniano for Nelson for DATE 9/4/08 9/10/08 9 /11/08 9/16/08 Palo Verde Nuclear Generating Station 7/2/2008 cc:

Mr. Steve Olea Mr. John C. Taylor Arizona Corporation Commission Director, Nuclear Generation 1200 W. Washington Street El Paso Electric Company Phoenix, AZ 85007 340 E. Palm Lane, Suite 310 Phoenix, AZ 85004 Mr. Douglas Kent Porter Senior Counsel Mr. James Ray Southern California Edison Company Public Service Company of New Mexico Law Department, Generation Resources 2401 Aztec NE, MS Z110 P.O. Box 800 Albuquerque, NM 87107-4224 Rosemead, CA 91770 Mr. Geoffrey M. Cook Senior Resident Inspector Southern California Edison Company U.S. Nuclear Regulatory Commission 5000 Pacific Coast Hwy., Bldg. D21 P.O. Box 40 San Clemente, CA 92672 Buckeye, AZ 85326 Mr. Robert Henry Regional Administrator, Region IV Salt River Project U.S. Nuclear Regulatory Commission 6504 E. Thomas Road 612 E. Lamar Blvd., Suite 400 Scottsdale, AZ 85251 Arlington, TX 76011-4125 Mr. Jeffrey T. Weikert Chairman Assistant General Counsel Maricopa County Board of Supervisors El Paso Electric Company 301 W. Jefferson, 10th Floor Mail Location 167 Phoenix, AZ 85003 123 W. Mills El Paso, TX 79901 Mr. Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency Mr. Eric Tharp 4814 S. 40th Street Los Angeles Department of Water & Power Phoenix, AZ 85040 Southern California Public Power Authority P.O. Box 51111, Room 1255-C Mr. Scott Bauer, Director Los Angeles, CA 90051-0100 Regulatory Affairs Palo Verde Nuclear Generating Station Mr. Brian Almon Mail Station 7636 Public Utility Commission P.O. Box 52034 William B. Travis Building Phoenix, AZ 85072-2034 P.O. Box 13326 1701 N. Congress Avenue Mr. Dwight C. Mims, Vice President Austin, TX 78701-3326 Regulatory Affairs and Plant Improvement Palo Verde Nuclear Generating Station Ms. Karen O'Regan Mail Station 7605 Environmental Program Manager P.O. Box 52034 City of Phoenix Phoenix, AZ 85072-2034 Office of Environmental Programs 200 W. Washington Street Phoenix, AZ 85003