September 16, 2008 Mr. Randall K. Edington Executive Vice President Nuclear/CNO Mail Station 7602 Arizona Public Service Company P. O. Box 52034 Phoenix, AZ 85072-2034

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2 AND 3 -

CLOSURE OF CONFIRMATORY ACTION LETTER NRR-07-004 (TAC NO. MD7291)

Dear Mr. Edington:

On March 15, 2007, the U.S. Nuclear Regulatory Commission (NRC) issued Confirmatory Action Letter (CAL) No. NRR-07-004 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML070660298) regarding dissimilar metal welds in the pressurizers at Palo Verde Nuclear Generating Station (PVNGS), Units 1, 2, and 3. This letter acknowledges receipt of Arizona Public Service (APS) letter dated August 4, 2008 (ADAMS Accession No. ML082250351), informing the NRC of actions taken in response to this CAL.

In this letter, APS stated that structural weld overlays were installed on the pressurizer surge, spray, safety, and relief nozzles at PVNGS Unit 2, and all required non-destructive examinations were completed satisfactorily without any unacceptable indications. This activity completes the mitigation of all pressurizer dissimilar metal welds at PVNGS Unit 2. Based on this letter, the NRC has found that all the commitments listed in the CAL and supporting commitment letters dated January 31, 2007 (ADAMS Accession No. ML070430378), and February 16, 2007 (ADAMS Accession No. ML070590212), have been met for PVNGS Unit 2. As such, it is no longer necessary to implement enhanced inspection and leakage monitoring requirements for the reactor coolant system at PVNGS Unit 2. Technical Assignment Control (TAC) No. MD7291 has been closed.

In letters dated October 31, 2007, and March 18, 2008 (ADAMS Accession Nos. ML072820001 and ML080520180, respectively), the NRC noted the completion of all commitments regarding NRR-07-004 for PVNGS Units 1 and 3, respectively. Therefore, based on these letters and the August 4, 2008, letter, the NRC has found that all the commitments listed in the CAL and supporting commitment letters have been met for PVNGS Units 1, 2, and 3. No further response is required regarding the CAL. We consider the CAL closed.

Thank you for informing us of the actions documented in your letter. These actions may be examined during a future NRC inspection of your facility.

Current NRC guidance regarding CALs is contained in the NRC Enforcement Policy and the NRC Enforcement Manual, which are available at the NRC web site at http://www.nrc.gov/about-nrc/regulatory/enforcement.html (click on Enforcement Policy or Enforcement Guidance) or by contacting the Government Printing Office (GPO) toll-free at

R. Edington 1-888-293-6498. The GPO is open from 7:00 a.m. to 9:00 p.m. EST, Monday through Friday (except Federal holidays).

In accordance with Section 2.390 of Title 10 of the Code of Federal Regulations of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm.html.

Sincerely,

/RA by Robert A. Nelson for/

Joseph G. Giitter, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.: 50-528, 50-529, and 50-530 cc: See next page

ML082410200 OFFICE DCI/CPNB DCI/CPNB LPL4/PM LPL4/LA NAME JCollins TChan BSingal JBurkhardt DATE 9/9/08 9/9 /08 9/4/08 9/4/08 OFFICE LPL4/BC DCI/D DRP/D RIV DORL/D NAME MMarkley MEvans DChamberlain JGiitter Robert A RCaniano for Nelson for DATE 9/4/08 9/10/08 9 /11/08 9/16/08 Palo Verde Nuclear Generating Station 7/2/2008 cc:

Mr. Steve Olea Mr. John C. Taylor Arizona Corporation Commission Director, Nuclear Generation 1200 W. Washington Street El Paso Electric Company Phoenix, AZ 85007 340 E. Palm Lane, Suite 310 Phoenix, AZ 85004 Mr. Douglas Kent Porter Senior Counsel Mr. James Ray Southern California Edison Company Public Service Company of New Mexico Law Department, Generation Resources 2401 Aztec NE, MS Z110 P.O. Box 800 Albuquerque, NM 87107-4224 Rosemead, CA 91770 Mr. Geoffrey M. Cook Senior Resident Inspector Southern California Edison Company U.S. Nuclear Regulatory Commission 5000 Pacific Coast Hwy., Bldg. D21 P.O. Box 40 San Clemente, CA 92672 Buckeye, AZ 85326 Mr. Robert Henry Regional Administrator, Region IV Salt River Project U.S. Nuclear Regulatory Commission 6504 E. Thomas Road 612 E. Lamar Blvd., Suite 400 Scottsdale, AZ 85251 Arlington, TX 76011-4125 Mr. Jeffrey T. Weikert Chairman Assistant General Counsel Maricopa County Board of Supervisors El Paso Electric Company 301 W. Jefferson, 10th Floor Mail Location 167 Phoenix, AZ 85003 123 W. Mills El Paso, TX 79901 Mr. Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency Mr. Eric Tharp 4814 S. 40th Street Los Angeles Department of Water & Power Phoenix, AZ 85040 Southern California Public Power Authority P.O. Box 51111, Room 1255-C Mr. Scott Bauer, Director Los Angeles, CA 90051-0100 Regulatory Affairs Palo Verde Nuclear Generating Station Mr. Brian Almon Mail Station 7636 Public Utility Commission P.O. Box 52034 William B. Travis Building Phoenix, AZ 85072-2034 P.O. Box 13326 1701 N. Congress Avenue Mr. Dwight C. Mims, Vice President Austin, TX 78701-3326 Regulatory Affairs and Plant Improvement Palo Verde Nuclear Generating Station Ms. Karen O'Regan Mail Station 7605 Environmental Program Manager P.O. Box 52034 City of Phoenix Phoenix, AZ 85072-2034 Office of Environmental Programs 200 W. Washington Street Phoenix, AZ 85003