| issue date = 06/12/2009
| issue date = 06/12/2009
| title = Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Byron Station
| title = Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Byron Station
| author name = Skokowski R A
| author name = Skokowski R
| author affiliation = NRC/RGN-III/DRP/B3
| author affiliation = NRC/RGN-III/DRP/B3
| addressee name = Pardee C G
| addressee name = Pardee C
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| docket = 05000454, 05000455
| docket = 05000454, 05000455
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 June 12, 2009  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 June 12, 2009 Mr. Charles G. Pardee Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville IL 60555
 
Mr. Charles G. Pardee Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville IL 60555  


==SUBJECT:==
==SUBJECT:==
INFORMATION REQUEST TO SUPPORT UPCOMING PROBLEM IDENTIFICATION AND RESOLUTION (PI&R) INSPECTION AT BYRON STATION  
INFORMATION REQUEST TO SUPPORT UPCOMING PROBLEM IDENTIFICATION AND RESOLUTION (PI&R) INSPECTION AT BYRON STATION


==Dear Mr. Pardee:==
==Dear Mr. Pardee:==
Line 28: Line 26:
The documents requested are copies of condition reports and lists of information, necessary to ensure the inspection team is adequately prepared for the inspection. The information may be provided in either CD-ROM or hard copy format and should be ready for NRC review by July 27, 2009. Mr. Raymond Ng, the Lead Inspector, will contact your staff to determine the best method of providing the requested information.
The documents requested are copies of condition reports and lists of information, necessary to ensure the inspection team is adequately prepared for the inspection. The information may be provided in either CD-ROM or hard copy format and should be ready for NRC review by July 27, 2009. Mr. Raymond Ng, the Lead Inspector, will contact your staff to determine the best method of providing the requested information.
If there are any questions about the material requested, or the inspection in general, please do not hesitate to call Mr. Ng at 630-829-9574 or raymond.ng@nrc.gov.
If there are any questions about the material requested, or the inspection in general, please do not hesitate to call Mr. Ng at 630-829-9574 or raymond.ng@nrc.gov.
C. Pardee In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
      /RA by M. Kunowski, Acting For/
Richard A. Skokowski, Chief Branch 3 Division of Reactor Projects


Docket No. 50-454; 50-455 License No. NPF-37; NPF-66  
C. Pardee                                      In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
                                                /RA by M. Kunowski, Acting For/
Richard A. Skokowski, Chief Branch 3 Division of Reactor Projects Docket No. 50-454; 50-455 License No. NPF-37; NPF-66


==Enclosure:==
==Enclosure:==
Requested Information to Support PI&R Inspection  
Requested Information to Support PI&R Inspection cc w/encl:      Site Vice President - Byron Station Plant Manager - Byron Station Manager Regulatory Assurance - Byron Station Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Braidwood, Byron, and LaSalle Associate General Counsel Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency J. Klinger, State Liaison Officer, Illinois Emergency Management Agency P. Schmidt, State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission B. Quigley, Byron Station


cc w/encl: Site Vice President - Byron Station  Plant Manager - Byron Station  Manager Regulatory Assurance - Byron Station  Senior Vice President - Midwest Operations Senior Vice President - Operations Support  Vice President - Licensing and Regulatory Affairs  Director - Licensing and Regulatory Affairs  Manager Licensing - Braidwood, Byron, and LaSalle  Associate General Counsel Document Control Desk - Licensing  Assistant Attorney General  Illinois Emergency Management Agency  J. Klinger, State Liaison Officer,      Illinois Emergency Management Agency P. Schmidt, State Liaison Officer, State of Wisconsin  Chairman, Illinois Commerce Commission  B. Quigley, Byron Station C. Pardee In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
C. Pardee                                           In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,  
Sincerely,
      /RA by M. Kunowski, Acting For/
                                                    /RA by M. Kunowski, Acting For/
Richard A. Skokowski, Chief Branch 3 Division of Reactor Projects  
Richard A. Skokowski, Chief Branch 3 Division of Reactor Projects Docket No. 50-454; 50-455 License No. NPF-37; NPF-66
 
Docket No. 50-454; 50-455 License No. NPF-37; NPF-66  


==Enclosure:==
==Enclosure:==
Requested Information to Support PI&R Inspection  
Requested Information to Support PI&R Inspection cc w/encl:       Site Vice President - Byron Station Plant Manager - Byron Station Manager Regulatory Assurance - Byron Station Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Braidwood, Byron, and LaSalle Associate General Counsel Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency J. Klinger, State Liaison Officer, Illinois Emergency Management Agency P. Schmidt, State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission B. Quigley, Byron Station DOCUMENT NAME: G:\BYRO\Byron PIR 2009008 Info Request.doc G Publicly Available           G Non-Publicly Available     G Sensitive   G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" =
 
Copy with attach/encl "N" = No copy OFFICE       RIII                 N RIII                 N NAME         RNg:dtp                 MKunowski for RSkokowski DATE         06/12/09                 06/12/09 OFFICIAL RECORD COPY
cc w/encl: Site Vice President - Byron Station   Plant Manager - Byron Station   Manager Regulatory Assurance - Byron Station   Senior Vice President - Midwest Operations Senior Vice President - Operations Support   Vice President - Licensing and Regulatory Affairs   Director - Licensing and Regulatory Affairs   Manager Licensing - Braidwood, Byron, and LaSalle   Associate General Counsel Document Control Desk - Licensing   Assistant Attorney General   Illinois Emergency Management Agency   J. Klinger, State Liaison Officer,     Illinois Emergency Management Agency P. Schmidt, State Liaison Officer, State of Wisconsin   Chairman, Illinois Commerce Commission   B. Quigley, Byron Station DOCUMENT NAME: G:\BYRO\Byron PIR 2009008 Info Request.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" =
Copy with attach/encl "N" = No copy OFFICE RIII N RIII N       NAME RNg:dtp MKunowski for RSkokowski  
 
DATE 06/12/09 06/12/09 OFFICIAL RECORD COPY


Letter to C. Pardee from R. Skokowski dated June 12, 2009  
Letter to C. Pardee from R. Skokowski dated June 12, 2009


==SUBJECT:==
==SUBJECT:==
INFORMATION REQUEST TO SUPPORT UPCOMING PROBLEM IDENTIFICATION AND RESOLUTION (PI&R) INSPECTION  
INFORMATION REQUEST TO SUPPORT UPCOMING PROBLEM IDENTIFICATION AND RESOLUTION (PI&R) INSPECTION DISTRIBUTION:
 
Tamara Bloomer RidsNrrDorlLpl3-2 Resource RidsNrrPMByron Resource RidsNrrDirsIrib Resource Patrick Hiland Kenneth OBrien Jared Heck Allan Barker Jeannie Choe Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource
DISTRIBUTION:
Tamara Bloomer RidsNrrDorlLpl3-2 Resource RidsNrrPMByron Resource RidsNrrDirsIrib Resource Patrick Hiland Kenneth O'Brien Jared Heck Allan Barker Jeannie Choe Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource  
 
1 Enclosure Requested Information to Support Problem Identification and Resolution (PI&R) Inspection
: 1. A copy of administrative procedure(s) for the corrective action program (CAP), trending program, quality assurance audit program, self-assessment program, corrective action effectiveness review program, and industry experience review program.
: 2. A copy of the Employee Concerns Program/Ombudsman administrative procedure.
: 3. A copy of Quality Assurance (QA) audits of the corrective action program completed since July 1, 2007.
: 4. The plan for self-assessments of the corrective action program and a copy of self-assessments of the corrective action program completed since July 1, 2007.
: 5. A list of self-assessments completed since July 1, 2007, with a brief description of areas where findings were identified.
: 6. A list of QA audits completed since July 1, 2007, with a brief description of areas where findings were identified.
: 7. A list of root cause evaluations completed since July 1, 2007, with a brief description of the issue.
: 8. A list of apparent cause evaluations completed since July 1, 2007, with a brief description of the issue.
: 9. A list of all open condition reports sorted by significance level and then initiation date. Include the date initiated, a description of the issue, system affected, significance level, and priority level.
: 10. A list of condition reports closed since July 1, 2007, sorted by significance level and then initiation date. Include a description, the significance level, the priority level, the date initiated and closed, system affected and whether there was an associated operability evaluation.
: 11. A list of effectiveness reviews completed since July 1, 2007, with a brief description of areas where findings were identified.
: 12. A list of condition reports initiated since July 1, 2007, that involve inadequate or ineffective corrective actions. Include the date initiated, a brief description, status, significance level of the issue, system affected and priority level to correct.
: 13. A list of condition reports initiated since July 1, 2007, that identify trends of conditions adverse to quality. Include the date initiated, a brief description, status, significance level, and priority level for each item.
: 14. A copy of any performance reports for the past two years used to track the corrective action program effectiveness.


2 Enclosure 15. A list of operating experience documents received since July 1, 2007, and any associated condition reports.  
Requested Information to Support Problem Identification and Resolution (PI&R) Inspection
: 16. A list of test failures (IST or Technical Specifications surveillances) since July 1, 2007, with a brief description of component/system, which failed.  
: 1. A copy of administrative procedure(s) for the corrective action program (CAP), trending program, quality assurance audit program, self-assessment program, corrective action effectiveness review program, and industry experience review program.
: 17. A list of condition reports issued during the past two refueling outages sorted by system and component, including a brief description, status, significance level, and priority level for each item.  
: 2. A copy of the Employee Concerns Program/Ombudsman administrative procedure.
: 18. A list of Maintenance Rule (a)(1) systems and components, and the associated health reports since July 1, 2007.  
: 3. A copy of Quality Assurance (QA) audits of the corrective action program completed since July 1, 2007.
: 19. A list of rework items and repeat failures since July 1, 2007.  
: 4. The plan for self-assessments of the corrective action program and a copy of self-assessments of the corrective action program completed since July 1, 2007.
: 20. Copies of corrective actions taken for issues identified in NRC findings since July 1, 2007.  
: 5. A list of self-assessments completed since July 1, 2007, with a brief description of areas where findings were identified.
: 21. A copy of the most recent operating experience program effectiveness review.  
: 6. A list of QA audits completed since July 1, 2007, with a brief description of areas where findings were identified.
: 22. A list of the top ten risk significant systems and top ten risk significant components.  
: 7. A list of root cause evaluations completed since July 1, 2007, with a brief description of the issue.
: 23. A list of the dates, times, and location for all scheduled meetings associated with the implementation of the CAP.  
: 8. A list of apparent cause evaluations completed since July 1, 2007, with a brief description of the issue.
: 24. A list of current operability determinations.  
: 9. A list of all open condition reports sorted by significance level and then initiation date.
: 25. A copy of the latest Byron Station organizational chart and phone listing.  
Include the date initiated, a description of the issue, system affected, significance level, and priority level.
: 26. Results of any safety culture/safety conscious work environment survey or self-assessment completed since January 2007.  
: 10. A list of condition reports closed since July 1, 2007, sorted by significance level and then initiation date. Include a description, the significance level, the priority level, the date initiated and closed, system affected and whether there was an associated operability evaluation.
: 11. A list of effectiveness reviews completed since July 1, 2007, with a brief description of areas where findings were identified.
: 12. A list of condition reports initiated since July 1, 2007, that involve inadequate or ineffective corrective actions. Include the date initiated, a brief description, status, significance level of the issue, system affected and priority level to correct.
: 13. A list of condition reports initiated since July 1, 2007, that identify trends of conditions adverse to quality. Include the date initiated, a brief description, status, significance level, and priority level for each item.
: 14. A copy of any performance reports for the past two years used to track the corrective action program effectiveness.
1                                    Enclosure
: 15. A list of operating experience documents received since July 1, 2007, and any associated condition reports.
: 16. A list of test failures (IST or Technical Specifications surveillances) since July 1, 2007, with a brief description of component/system, which failed.
: 17. A list of condition reports issued during the past two refueling outages sorted by system and component, including a brief description, status, significance level, and priority level for each item.
: 18. A list of Maintenance Rule (a)(1) systems and components, and the associated health reports since July 1, 2007.
: 19. A list of rework items and repeat failures since July 1, 2007.
: 20. Copies of corrective actions taken for issues identified in NRC findings since July 1, 2007.
: 21. A copy of the most recent operating experience program effectiveness review.
: 22. A list of the top ten risk significant systems and top ten risk significant components.
: 23. A list of the dates, times, and location for all scheduled meetings associated with the implementation of the CAP.
: 24. A list of current operability determinations.
: 25. A copy of the latest Byron Station organizational chart and phone listing.
: 26. Results of any safety culture/safety conscious work environment survey or self-assessment completed since January 2007.
: 27. Description of changes made to the corrective action program since the last PI&R Inspection.
: 27. Description of changes made to the corrective action program since the last PI&R Inspection.
Documents requested to be available on-site during the inspection
Documents requested to be available on-site during the inspection:
:
: a. Updated Final Safety Analysis Report.
: a. Updated Final Safety Analysis Report.  
: b. Technical Specifications.
: b. Technical Specifications.  
: c. Procedures and procedure index.
: c. Procedures and procedure index.  
: d. Copies of any self-assessments and associated condition reports generated in preparation for the inspection.
: d. Copies of any self-assessments and associated condition reports generated in preparation for the inspection.  
: e. A copy of the QA manual.
: e. A copy of the QA manual.  
: f. A list of issues brought to the ECP/ombudsman and the actions taken for resolution.
: f. A list of issues brought to the ECP/ombudsman and the actions taken for resolution.  
: g. A list of the organization codes used in the CAP.
: g. A list of the organization codes used in the CAP.}}
2                                  Enclosure}}

Latest revision as of 05:55, 14 November 2019

Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Byron Station
ML091630461
Person / Time
Site: Byron  Constellation icon.png
Issue date: 06/12/2009
From: Richard Skokowski
Region 3 Branch 3
To: Pardee C
Exelon Generation Co, Exelon Nuclear
References
Download: ML091630461 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 June 12, 2009 Mr. Charles G. Pardee Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville IL 60555

SUBJECT:

INFORMATION REQUEST TO SUPPORT UPCOMING PROBLEM IDENTIFICATION AND RESOLUTION (PI&R) INSPECTION AT BYRON STATION

Dear Mr. Pardee:

This letter is to request information to support our PI&R inspection beginning August 10, 2009, at Byron Station. This inspection will be performed in accordance with the NRC baseline Inspection Procedure 71152.

Experience has shown that these inspections are extremely resource intensive both for the NRC inspectors and the utility staff. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents required for the inspection.

The documents requested are copies of condition reports and lists of information, necessary to ensure the inspection team is adequately prepared for the inspection. The information may be provided in either CD-ROM or hard copy format and should be ready for NRC review by July 27, 2009. Mr. Raymond Ng, the Lead Inspector, will contact your staff to determine the best method of providing the requested information.

If there are any questions about the material requested, or the inspection in general, please do not hesitate to call Mr. Ng at 630-829-9574 or raymond.ng@nrc.gov.

C. Pardee In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA by M. Kunowski, Acting For/

Richard A. Skokowski, Chief Branch 3 Division of Reactor Projects Docket No. 50-454; 50-455 License No. NPF-37; NPF-66

Enclosure:

Requested Information to Support PI&R Inspection cc w/encl: Site Vice President - Byron Station Plant Manager - Byron Station Manager Regulatory Assurance - Byron Station Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Braidwood, Byron, and LaSalle Associate General Counsel Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency J. Klinger, State Liaison Officer, Illinois Emergency Management Agency P. Schmidt, State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission B. Quigley, Byron Station

C. Pardee In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA by M. Kunowski, Acting For/

Richard A. Skokowski, Chief Branch 3 Division of Reactor Projects Docket No. 50-454; 50-455 License No. NPF-37; NPF-66

Enclosure:

Requested Information to Support PI&R Inspection cc w/encl: Site Vice President - Byron Station Plant Manager - Byron Station Manager Regulatory Assurance - Byron Station Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Braidwood, Byron, and LaSalle Associate General Counsel Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency J. Klinger, State Liaison Officer, Illinois Emergency Management Agency P. Schmidt, State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission B. Quigley, Byron Station DOCUMENT NAME: G:\BYRO\Byron PIR 2009008 Info Request.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" =

Copy with attach/encl "N" = No copy OFFICE RIII N RIII N NAME RNg:dtp MKunowski for RSkokowski DATE 06/12/09 06/12/09 OFFICIAL RECORD COPY

Letter to C. Pardee from R. Skokowski dated June 12, 2009

SUBJECT:

INFORMATION REQUEST TO SUPPORT UPCOMING PROBLEM IDENTIFICATION AND RESOLUTION (PI&R) INSPECTION DISTRIBUTION:

Tamara Bloomer RidsNrrDorlLpl3-2 Resource RidsNrrPMByron Resource RidsNrrDirsIrib Resource Patrick Hiland Kenneth OBrien Jared Heck Allan Barker Jeannie Choe Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource

Requested Information to Support Problem Identification and Resolution (PI&R) Inspection

1. A copy of administrative procedure(s) for the corrective action program (CAP), trending program, quality assurance audit program, self-assessment program, corrective action effectiveness review program, and industry experience review program.
2. A copy of the Employee Concerns Program/Ombudsman administrative procedure.
3. A copy of Quality Assurance (QA) audits of the corrective action program completed since July 1, 2007.
4. The plan for self-assessments of the corrective action program and a copy of self-assessments of the corrective action program completed since July 1, 2007.
5. A list of self-assessments completed since July 1, 2007, with a brief description of areas where findings were identified.
6. A list of QA audits completed since July 1, 2007, with a brief description of areas where findings were identified.
7. A list of root cause evaluations completed since July 1, 2007, with a brief description of the issue.
8. A list of apparent cause evaluations completed since July 1, 2007, with a brief description of the issue.
9. A list of all open condition reports sorted by significance level and then initiation date.

Include the date initiated, a description of the issue, system affected, significance level, and priority level.

10. A list of condition reports closed since July 1, 2007, sorted by significance level and then initiation date. Include a description, the significance level, the priority level, the date initiated and closed, system affected and whether there was an associated operability evaluation.
11. A list of effectiveness reviews completed since July 1, 2007, with a brief description of areas where findings were identified.
12. A list of condition reports initiated since July 1, 2007, that involve inadequate or ineffective corrective actions. Include the date initiated, a brief description, status, significance level of the issue, system affected and priority level to correct.
13. A list of condition reports initiated since July 1, 2007, that identify trends of conditions adverse to quality. Include the date initiated, a brief description, status, significance level, and priority level for each item.
14. A copy of any performance reports for the past two years used to track the corrective action program effectiveness.

1 Enclosure

15. A list of operating experience documents received since July 1, 2007, and any associated condition reports.
16. A list of test failures (IST or Technical Specifications surveillances) since July 1, 2007, with a brief description of component/system, which failed.
17. A list of condition reports issued during the past two refueling outages sorted by system and component, including a brief description, status, significance level, and priority level for each item.
18. A list of Maintenance Rule (a)(1) systems and components, and the associated health reports since July 1, 2007.
19. A list of rework items and repeat failures since July 1, 2007.
20. Copies of corrective actions taken for issues identified in NRC findings since July 1, 2007.
21. A copy of the most recent operating experience program effectiveness review.
22. A list of the top ten risk significant systems and top ten risk significant components.
23. A list of the dates, times, and location for all scheduled meetings associated with the implementation of the CAP.
24. A list of current operability determinations.
25. A copy of the latest Byron Station organizational chart and phone listing.
26. Results of any safety culture/safety conscious work environment survey or self-assessment completed since January 2007.
27. Description of changes made to the corrective action program since the last PI&R Inspection.

Documents requested to be available on-site during the inspection:

a. Updated Final Safety Analysis Report.
b. Technical Specifications.
c. Procedures and procedure index.
d. Copies of any self-assessments and associated condition reports generated in preparation for the inspection.
e. A copy of the QA manual.
f. A list of issues brought to the ECP/ombudsman and the actions taken for resolution.
g. A list of the organization codes used in the CAP.

2 Enclosure