ML092440533: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML092440533
| number = ML092440533
| issue date = 09/01/2009
| issue date = 09/01/2009
| title = North Anna Inspection/Activity Plan 09/01/2009 - 12/31/2010
| title = Inspection/Activity Plan 09/01/2009 - 12/31/2010
| author name =  
| author name =  
| author affiliation = NRC/RGN-II
| author affiliation = NRC/RGN-II
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Inspection / Activity PlanPage 1 of 209/01/200907:52:15Report 2209/01/2009
{{#Wiki_filter:Page 1 of 2                                                                                North Anna 09/01/2009    07:52:15                                                          Inspection / Activity Plan Report 22 09/01/2009 - 12/31/2010 Unit        Planned Dates                                                                                                                  No. of Staff Number        Start      End    Inspection Activity                                                                Title                        on Site ISFSI          - ISFSI OPERATIONAL INSPECTION                                                                         2 1, 2       07/01/2009  10/15/2009  IP 60855.1              Operation of an Independent Spent Fuel Storage Installation at Operating Plants TFPI          - TRIENNIEL FIRE PROTECTION INSPECTION                                                                 7 1, 2       09/14/2009  09/18/2009  IP 7111105T              Fire Protection [Triennial]
-12/31/2010UnitNumberPlanned DatesStart          EndInspection ActivityTitleNo. of Staffon SiteNorth AnnaISFSI-ISFSI OPERATIONAL INSPECTION 21, 2 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants60855.107/01/200910/15/2009TFPI-TRIENNIEL FIRE PROTECTION INSPECTION 71, 2 IPFire Protection [Triennial]7111105T09/14/200909/18/20091, 2 IPFire Protection [Triennial]7111105T09/28/200910/02/2009EB1-CDBI-COMPONENT DESIGN BASIS INSPECTION 61, 2 IPComponent Design Bases Inspection711112110/19/200910/23/20091, 2 IPComponent Design Bases Inspection711112111/02/200911/06/20091, 2 IPComponent Design Bases Inspection711112111/16/200911/20/20091, 2 IPComponent Design Bases Inspection711112112/07/200912/11/2009OL RQ-REQUAL INSPECTION 31, 2 IPLicensed Operator Requalification Program7111111B01/11/201001/15/2010EB3ISI-UNIT 1 ISI 11 IPInservice Inspection Activities - PWR7111108P03/22/201003/26/2010EB3TI172-EB3 RCS DM BUTT WELDS 11, 2 IPReactor Coolant System Dissimiliar Metal Butt Welds2515/17203/22/201003/26/2010OL EXAM-INITIAL EXAM PREP 41 NORTH ANNA/JUNE 2010 EXAM AT POWER FACILITIESV2333305/17/201005/21/2010OL EXAM-INITIAL EXAM - WEEK 1 41 NORTH ANNA/JUNE 2010 EXAM AT POWER FACILITIESV2333306/07/201006/11/2010OL EXAM-INITIAL EXAM - WEEK 2 41 NORTH ANNA/JUNE 2010 EXAM AT POWER FACILITIESV2333306/21/201006/25/2010PSB1EP-EMERGENCY PREPARENESS EXERCISE 31, 2 IPExercise Evaluation711140107/19/201007/23/20101, 2 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140507/19/201007/23/20101, 2 IPPerformance Indicator Verification7115107/19/201007/23/2010PSB1-RP-RP OCCUPATIONAL BASELINE WEEK1 21, 2 IPAccess Control to Radiologically Significant Areas711210109/13/201009/17/20101, 2 IPALARA - Required7112102-7112102R09/13/201009/17/20101, 2 IPRadioactive Material Processing and Transportation711220209/13/201009/17/20101, 2 IPPerformance Indicator Verification7115109/13/201009/17/2010EB3ISI-UNIT 2 INSERVICE INSPECTION 12 IPInservice Inspection Activities - PWR7111108P09/20/201009/24/2010EB3TI172-EB3 RX COOLANT SYS DM BUTT WELDS 12 IPReactor Coolant System Dissimiliar Metal Butt Welds2515/17209/20/201009/24/2010This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
1, 2      09/28/2009  10/02/2009  IP 7111105T              Fire Protection [Triennial]
Inspection / Activity PlanPage 2 of 209/01/200907:52:15Report 2209/01/2009
EB1-CDBI       - COMPONENT DESIGN BASIS INSPECTION                                                                   6 1, 2       10/19/2009  10/23/2009  IP 7111121              Component Design Bases Inspection 1, 2       11/02/2009  11/06/2009  IP 7111121              Component Design Bases Inspection 1, 2       11/16/2009  11/20/2009  IP 7111121              Component Design Bases Inspection 1, 2       12/07/2009  12/11/2009  IP 7111121              Component Design Bases Inspection OL RQ         - REQUAL INSPECTION                                                                                   3 1, 2       01/11/2010  01/15/2010  IP 7111111B              Licensed Operator Requalification Program EB3ISI        - UNIT 1 ISI                                                                                           1 1          03/22/2010  03/26/2010  IP 7111108P              Inservice Inspection Activities - PWR EB3TI172      - EB3 RCS DM BUTT WELDS                                                                               1 1, 2       03/22/2010  03/26/2010  IP 2515/172              Reactor Coolant System Dissimiliar Metal Butt Welds OL EXAM       - INITIAL EXAM PREP                                                                                   4 1          05/17/2010  05/21/2010      V23333                NORTH ANNA/JUNE 2010 EXAM AT POWER FACILITIES OL EXAM       - INITIAL EXAM - WEEK 1                                                                               4 1          06/07/2010  06/11/2010      V23333                NORTH ANNA/JUNE 2010 EXAM AT POWER FACILITIES OL EXAM       - INITIAL EXAM - WEEK 2                                                                               4 1          06/21/2010  06/25/2010      V23333                NORTH ANNA/JUNE 2010 EXAM AT POWER FACILITIES PSB1EP        - EMERGENCY PREPARENESS EXERCISE                                                                       3 1, 2       07/19/2010  07/23/2010  IP 7111401              Exercise Evaluation 1, 2       07/19/2010  07/23/2010  IP 7111405              Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2       07/19/2010  07/23/2010  IP 71151                Performance Indicator Verification PSB1-RP       - RP OCCUPATIONAL BASELINE WEEK1                                                                       2 1, 2       09/13/2010  09/17/2010  IP 7112101              Access Control to Radiologically Significant Areas 1, 2       09/13/2010  09/17/2010  IP 7112102-7112102R ALARA - Required 1, 2       09/13/2010  09/17/2010  IP 7112202              Radioactive Material Processing and Transportation 1, 2       09/13/2010  09/17/2010  IP 71151                Performance Indicator Verification EB3ISI        - UNIT 2 INSERVICE INSPECTION                                                                         1 2      09/20/2010  09/24/2010  IP 7111108P              Inservice Inspection Activities - PWR EB3TI172      - EB3 RX COOLANT SYS DM BUTT WELDS                                                                     1 2      09/20/2010  09/24/2010  IP 2515/172              Reactor Coolant System Dissimiliar Metal Butt Welds This report does not include INPO and OUTAGE activities.
-12/31/2010UnitNumberPlanned DatesStart          EndInspection ActivityTitleNo. of Staffon SiteNorth AnnaPSB1-RP-RP OCCUPATIONAL BASELINE WEEK2 21, 2 IPAccess Control to Radiologically Significant Areas711210109/27/201010/01/20101, 2 IPALARA - Required7112102-7112102R09/27/201010/01/20101 IPRadioactive Material Processing and Transportation711220209/27/201010/01/20101, 2 IPOccupational Exposure Control Effectiveness71151-OR0109/27/201010/01/20101, 2 IPRETS/ODCM Radiological Effluent71151-PR0109/27/201010/01/2010This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.                           Enclosure
 
Page 2 of 2                                                                            North Anna 09/01/2009    07:52:15                                                        Inspection / Activity Plan Report 22 09/01/2009 - 12/31/2010 Unit        Planned Dates                                                                                              No. of Staff Number        Start      End    Inspection Activity                                                            Title      on Site PSB1-RP       - RP OCCUPATIONAL BASELINE WEEK2                                                   2 1, 2       09/27/2010  10/01/2010  IP 7112101              Access Control to Radiologically Significant Areas 1, 2      09/27/2010  10/01/2010  IP 7112102-7112102R ALARA - Required 1          09/27/2010  10/01/2010  IP 7112202              Radioactive Material Processing and Transportation 1, 2      09/27/2010  10/01/2010  IP 71151-OR01          Occupational Exposure Control Effectiveness 1, 2       09/27/2010  10/01/2010  IP 71151-PR01          RETS/ODCM Radiological Effluent This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.       Enclosure}}

Latest revision as of 03:38, 14 November 2019

Inspection/Activity Plan 09/01/2009 - 12/31/2010
ML092440533
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 09/01/2009
From:
NRC/RGN-II
To:
Virginia Electric & Power Co (VEPCO)
References
Download: ML092440533 (2)


Text

Page 1 of 2 North Anna 09/01/2009 07:52:15 Inspection / Activity Plan Report 22 09/01/2009 - 12/31/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site ISFSI - ISFSI OPERATIONAL INSPECTION 2 1, 2 07/01/2009 10/15/2009 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants TFPI - TRIENNIEL FIRE PROTECTION INSPECTION 7 1, 2 09/14/2009 09/18/2009 IP 7111105T Fire Protection [Triennial]

1, 2 09/28/2009 10/02/2009 IP 7111105T Fire Protection [Triennial]

EB1-CDBI - COMPONENT DESIGN BASIS INSPECTION 6 1, 2 10/19/2009 10/23/2009 IP 7111121 Component Design Bases Inspection 1, 2 11/02/2009 11/06/2009 IP 7111121 Component Design Bases Inspection 1, 2 11/16/2009 11/20/2009 IP 7111121 Component Design Bases Inspection 1, 2 12/07/2009 12/11/2009 IP 7111121 Component Design Bases Inspection OL RQ - REQUAL INSPECTION 3 1, 2 01/11/2010 01/15/2010 IP 7111111B Licensed Operator Requalification Program EB3ISI - UNIT 1 ISI 1 1 03/22/2010 03/26/2010 IP 7111108P Inservice Inspection Activities - PWR EB3TI172 - EB3 RCS DM BUTT WELDS 1 1, 2 03/22/2010 03/26/2010 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds OL EXAM - INITIAL EXAM PREP 4 1 05/17/2010 05/21/2010 V23333 NORTH ANNA/JUNE 2010 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 1 4 1 06/07/2010 06/11/2010 V23333 NORTH ANNA/JUNE 2010 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 2 4 1 06/21/2010 06/25/2010 V23333 NORTH ANNA/JUNE 2010 EXAM AT POWER FACILITIES PSB1EP - EMERGENCY PREPARENESS EXERCISE 3 1, 2 07/19/2010 07/23/2010 IP 7111401 Exercise Evaluation 1, 2 07/19/2010 07/23/2010 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 07/19/2010 07/23/2010 IP 71151 Performance Indicator Verification PSB1-RP - RP OCCUPATIONAL BASELINE WEEK1 2 1, 2 09/13/2010 09/17/2010 IP 7112101 Access Control to Radiologically Significant Areas 1, 2 09/13/2010 09/17/2010 IP 7112102-7112102R ALARA - Required 1, 2 09/13/2010 09/17/2010 IP 7112202 Radioactive Material Processing and Transportation 1, 2 09/13/2010 09/17/2010 IP 71151 Performance Indicator Verification EB3ISI - UNIT 2 INSERVICE INSPECTION 1 2 09/20/2010 09/24/2010 IP 7111108P Inservice Inspection Activities - PWR EB3TI172 - EB3 RX COOLANT SYS DM BUTT WELDS 1 2 09/20/2010 09/24/2010 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 North Anna 09/01/2009 07:52:15 Inspection / Activity Plan Report 22 09/01/2009 - 12/31/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PSB1-RP - RP OCCUPATIONAL BASELINE WEEK2 2 1, 2 09/27/2010 10/01/2010 IP 7112101 Access Control to Radiologically Significant Areas 1, 2 09/27/2010 10/01/2010 IP 7112102-7112102R ALARA - Required 1 09/27/2010 10/01/2010 IP 7112202 Radioactive Material Processing and Transportation 1, 2 09/27/2010 10/01/2010 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 09/27/2010 10/01/2010 IP 71151-PR01 RETS/ODCM Radiological Effluent This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure