ML121080614: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:DRAFT OUTLINE COMMENTS Facility: PVNGS First Exam Date: 3/2012 Written Exam Outline (9/21/2011) | ||
Comment Resolution The SRO-only outline does not reflect This will be on Rev 1 of the 401-2. | |||
1 the changes described in the ES-401-4 Rejected KAs document. | |||
RO Tier 1 / Group 2: CE/A11 RCS The error was corrected and subsequently 2 Overcooling - PTS, EK3.1 should read this KA was rejected. | |||
AK3.1 RO Tier 1 / Group 2: CE/A13 Natural This is Correct and will be changed to reflect Circ., EK1.2 - Normal, abnormal and AK1.2 Natural Circulation Operations. | |||
emergency operating procedures associated with (Natural Selection 3 | |||
Operations). SHOULD READ AK1.2 - | |||
Normal, abnormal and emergency operating procedures associated with (Natural Circulation Operations) 4 5 | |||
Administrative JPM Outline (11/9/11) | |||
Comment Resolution Label the JPMs A-1 through A-9 starting Done 1 | |||
with the RO JPMs. | |||
2 Control Room / In-Plant System JPM Outline (11/9/11) | |||
Comment Resolution 1 JPM e., should RDT read RTD? No, RDT is correct for Reactor Drain Tank. | |||
Label the JPMs S-1, S-2, P-1, etc., and Done as much as practical. | |||
make the JPMs line up between RO, 2 SRO-I, and SRO-U so that its easily identified which ones are common among all applicants. | |||
JPM g on the SRO-I outline (JPM c This is correct. The g JPM on the SRO-I will 3 on SRO-U) does not appear on the RO not be done by the ROs. | |||
outline. Clarify if this is intentional or not. OBDI 202 - ILE Process | |||
Simulator Scenario Outline Comments (11/9/11) | |||
Comment Resolution On final D-1s, include the chart of Done Target Quantity Attributes found at the 1 | |||
bottom of Form ES-301-4 as an examiners aid. | |||
Scenario 1, should there be a Critical No, SBCS is available so this would not 2 Task to commence cooldown prior to happen without a SBCS failure. | |||
lifting the SG Safety Valve? | |||
Scenario 2 Event 5 could be a Changed (also changed on 301-5) 3 Component Malfunction instead of Normal Evolution. | |||
Scenario 2 Events 8 and 9, the word Fixed 4 | |||
CRITICAL is misspelled. | |||
5 Scenario 4 Event 8 is a Major transient. Changed to a major (also changed on 301-5) | |||
When the D-2s are generated, for each Done 6 scenario, include a one page synopsis of how each event will play out. | |||
General Outline Comments (9/21/11) | |||
Need to send the original copy of draft Received with Operating Test outline 1 outline quality checklist ES-201-2 (may submittal. | |||
send it with the draft op test outline) | |||
What plant-specific priorities (including Aux Feed and Class electrical power issues PRA and IPE insights) are covered in the are covered on the exam. These are 2 major appropriate exam sections? inputs to PRA. | |||
2 Will add to comment section of appropriate question. | |||
RO#s 12,14,15,48,49 Any recent OE included (plant specific or Yes. Previous site specific OE has been other)? incorporated into written and operating exams. | |||
Will add to comment section of appropriate question. | 3 Will add to comment section of appropriate question. | ||
RO#s 18,50,51 Are differences between units being Yes, Unit differences are slight at PVNGS but tested on? a sampling of topics will address this. | |||
RO#s 12,14,15,48,49 | 4 Will add to comment section of appropriate question. | ||
Will add to comment section of appropriate question. | RO# 14 OBDI 202 - ILE Process | ||
RO#s 18,50,51 | |||
Will add to comment section of appropriate question. | |||
RO# 14 | |||
Are they any operationally-important, No, PVNGS has not added any systems or site-specific systems/evolutions which evolutions that meet this criterion. | |||
5 are not included on form ES-401-2 that should be? | |||
Outline Generation Methodology: This is the Westinghouse KA exam generator Describe how the program functions, program. The suppression list is incorporated how it ensures a random and systematic by manually deselecting the KA from the sampling, and how the K/A Suppression programs database as a suppressed KA. | |||
List is incorporated into it. Also, the The list of suppressed KAs was generated by document provided describes the 2010 the Westinghouse program and sent as such. | |||
exam, not the 2012 exam. | |||
6 Less than 2.5 has been evaluated per our previous correspondence. | |||
See attached documentation provided by Westinghouse. | |||
XXI. Random Selection Methodology For the random selection of both the RO and SRO exam, the random number generator is seeded with the ticks from the system clock. This helps to ensure a different seed every time an exam outline is generated. | |||
Random Selection: RO Exam Create two identical lists of systems for Tier, ROGroup, Category Generate Random Number Between 1 and number of systems in the list. | Random Selection: RO Exam Create two identical lists of systems for Tier, ROGroup, Category Generate Random Number Between 1 and number of systems in the list. | ||
Begin Loop | Begin Loop | ||
: 1) Look for available system number in first system list in the same row as the random number. If system number is found, use it and blank out entry in first list. If a blank is found at that row number, then try to find system number in second list at same row number. If found, | : 1) Look for available system number in first system list in the same row as the random number. If system number is found, use it and blank out entry in first list. If a blank is found at that row number, then try to find system number in second list at same row number. If found, then use it and blank out entry in second list. If not found in second list, then generate another random number and go back to first list and look for new system. | ||
: 3) Create list of KAs for Tier, ROGroup, and randomly selected system number. | : 2) Select the system in the same row as the random number. | ||
: 4) Generate a random number | : 3) Create list of KAs for Tier, ROGroup, and randomly selected system number. | ||
: 5) Pick KA from KA list at the row designated by the random number. | : 4) Generate a random number between 1 and number of KAs in KA list. | ||
: 6) Check to see if KA is in master list of KAs already selected. If it is in master list, then select another random number and | : 5) Pick KA from KA list at the row designated by the random number. | ||
: 7) Add KA To RO outline. | : 6) Check to see if KA is in master list of KAs already selected. If it is in master list, then select another random number and select KA at that row number. If not selected, then add to master KA list. | ||
: 7) Add KA To RO outline. | |||
Loop Back (until number of required KAs have been selected for specific tier, group, and category) | Loop Back (until number of required KAs have been selected for specific tier, group, and category) | ||
Go back to top of list until all tiers, groups, and categories have been cycled through. | Go back to top of list until all tiers, groups, and categories have been cycled through. | ||
36 Random Selection: SRO Exam | 36 Random Selection: SRO Exam OBDI 202 - ILE Process | ||
25 SRO Only KAs are first selected for the following categories: | |||
Tier 1: A2 and G (10 KAs are selected) | Tier 1: A2 and G (10 KAs are selected) | ||
Tier 2 A2, G, and Fuel Handling KAs (8 KAs are selected) | Tier 2 A2, G, and Fuel Handling KAs (8 KAs are selected) | ||
Tier 3 (7 KAs are selected, at least one for each category) | |||
Tier 3 (7 KAs are selected, at least one for each category) | System lists are generated based upon the following criteria: | ||
Tier, SROGroup, Category, SROOnly = True in tblCFRs Then 25 KAs are selected based upon systems selected with the following criteria: | |||
System lists are generated based upon the following criteria: Tier, SROGroup, Category, SROOnly = True in tblCFRs | Tier, SROGroup, Category Select Tier, Group, and Category to add KAs to. | ||
Then 25 KAs are selected based upon systems selected with the | |||
Tier, SROGroup, Category | |||
Select Tier, Group, and Category to add KAs to. | |||
Generate Random Number Between 1 and number of systems in the list. | Generate Random Number Between 1 and number of systems in the list. | ||
Begin Loop | Begin Loop | ||
: 1. Look for available system number in first system list in the same row as the random number. If system number is found, use it and blank out entry in first list. If a blank is found at that row number, then try to find system number in second list at same row number. If found, then use it and blank out entry in second list. If not found in second list, then generate another random number and go back to first list and look for new system. | : 1. Look for available system number in first system list in the same row as the random number. If system number is found, use it and blank out entry in first list. If a blank is found at that row number, then try to find system number in second list at same row number. If found, then use it and blank out entry in second list. If not found in second list, then generate another random number and go back to first list and look for new system. | ||
: 2. Select the system in the | : 2. Select the system in the same row as the random number. | ||
: 3. Create list of KAs for Tier, SROGroup, and randomly selected system number. | : 3. Create list of KAs for Tier, SROGroup, and randomly selected system number. | ||
: 4. Generate a random number | : 4. Generate a random number between 1 and number of KAs in KA list. | ||
: 5. Pick KA from KA list at the row designated by the random number. | : 5. Pick KA from KA list at the row designated by the random number. | ||
: 6. Check to see if KA is in master list of KAs already selected. If it is in master list, then select another random number and | : 6. Check to see if KA is in master list of KAs already selected. If it is in master list, then select another random number and select KA at that row number. If not selected, then add to master KA list. | ||
7.Add KA To SRO outline. | 7.Add KA To SRO outline. | ||
Loop Back (until number of required KAs have been selected for specific tier, group, and category) | |||
Loop Back (until number of required KAs have been selected for specific tier, group, and category) Go back to top of list until all | Go back to top of list until all tiers, groups, and categories have been cycled through. OBDI 202 - ILE Process}} |
Latest revision as of 04:52, 12 November 2019
ML121080614 | |
Person / Time | |
---|---|
Site: | Palo Verde |
Issue date: | 03/16/2012 |
From: | Division of Reactor Safety IV |
To: | Arizona Public Service Co |
Thomas Farina | |
References | |
Download: ML121080614 (4) | |
Text
DRAFT OUTLINE COMMENTS Facility: PVNGS First Exam Date: 3/2012 Written Exam Outline (9/21/2011)
Comment Resolution The SRO-only outline does not reflect This will be on Rev 1 of the 401-2.
1 the changes described in the ES-401-4 Rejected KAs document.
RO Tier 1 / Group 2: CE/A11 RCS The error was corrected and subsequently 2 Overcooling - PTS, EK3.1 should read this KA was rejected.
AK3.1 RO Tier 1 / Group 2: CE/A13 Natural This is Correct and will be changed to reflect Circ., EK1.2 - Normal, abnormal and AK1.2 Natural Circulation Operations.
emergency operating procedures associated with (Natural Selection 3
Operations). SHOULD READ AK1.2 -
Normal, abnormal and emergency operating procedures associated with (Natural Circulation Operations) 4 5
Administrative JPM Outline (11/9/11)
Comment Resolution Label the JPMs A-1 through A-9 starting Done 1
2 Control Room / In-Plant System JPM Outline (11/9/11)
Comment Resolution 1 JPM e., should RDT read RTD? No, RDT is correct for Reactor Drain Tank.
Label the JPMs S-1, S-2, P-1, etc., and Done as much as practical.
make the JPMs line up between RO, 2 SRO-I, and SRO-U so that its easily identified which ones are common among all applicants.
JPM g on the SRO-I outline (JPM c This is correct. The g JPM on the SRO-I will 3 on SRO-U) does not appear on the RO not be done by the ROs.
outline. Clarify if this is intentional or not. OBDI 202 - ILE Process
Simulator Scenario Outline Comments (11/9/11)
Comment Resolution On final D-1s, include the chart of Done Target Quantity Attributes found at the 1
bottom of Form ES-301-4 as an examiners aid.
Scenario 1, should there be a Critical No, SBCS is available so this would not 2 Task to commence cooldown prior to happen without a SBCS failure.
lifting the SG Safety Valve?
Scenario 2 Event 5 could be a Changed (also changed on 301-5) 3 Component Malfunction instead of Normal Evolution.
Scenario 2 Events 8 and 9, the word Fixed 4
CRITICAL is misspelled.
5 Scenario 4 Event 8 is a Major transient. Changed to a major (also changed on 301-5)
When the D-2s are generated, for each Done 6 scenario, include a one page synopsis of how each event will play out.
General Outline Comments (9/21/11)
Need to send the original copy of draft Received with Operating Test outline 1 outline quality checklist ES-201-2 (may submittal.
send it with the draft op test outline)
What plant-specific priorities (including Aux Feed and Class electrical power issues PRA and IPE insights) are covered in the are covered on the exam. These are 2 major appropriate exam sections? inputs to PRA.
2 Will add to comment section of appropriate question.
RO#s 12,14,15,48,49 Any recent OE included (plant specific or Yes. Previous site specific OE has been other)? incorporated into written and operating exams.
3 Will add to comment section of appropriate question.
RO#s 18,50,51 Are differences between units being Yes, Unit differences are slight at PVNGS but tested on? a sampling of topics will address this.
4 Will add to comment section of appropriate question.
RO# 14 OBDI 202 - ILE Process
Are they any operationally-important, No, PVNGS has not added any systems or site-specific systems/evolutions which evolutions that meet this criterion.
5 are not included on form ES-401-2 that should be?
Outline Generation Methodology: This is the Westinghouse KA exam generator Describe how the program functions, program. The suppression list is incorporated how it ensures a random and systematic by manually deselecting the KA from the sampling, and how the K/A Suppression programs database as a suppressed KA.
List is incorporated into it. Also, the The list of suppressed KAs was generated by document provided describes the 2010 the Westinghouse program and sent as such.
exam, not the 2012 exam.
6 Less than 2.5 has been evaluated per our previous correspondence.
See attached documentation provided by Westinghouse.
XXI. Random Selection Methodology For the random selection of both the RO and SRO exam, the random number generator is seeded with the ticks from the system clock. This helps to ensure a different seed every time an exam outline is generated.
Random Selection: RO Exam Create two identical lists of systems for Tier, ROGroup, Category Generate Random Number Between 1 and number of systems in the list.
Begin Loop
- 1) Look for available system number in first system list in the same row as the random number. If system number is found, use it and blank out entry in first list. If a blank is found at that row number, then try to find system number in second list at same row number. If found, then use it and blank out entry in second list. If not found in second list, then generate another random number and go back to first list and look for new system.
- 2) Select the system in the same row as the random number.
- 3) Create list of KAs for Tier, ROGroup, and randomly selected system number.
- 6) Check to see if KA is in master list of KAs already selected. If it is in master list, then select another random number and select KA at that row number. If not selected, then add to master KA list.
Loop Back (until number of required KAs have been selected for specific tier, group, and category)
Go back to top of list until all tiers, groups, and categories have been cycled through.
36 Random Selection: SRO Exam OBDI 202 - ILE Process
25 SRO Only KAs are first selected for the following categories:
Tier 1: A2 and G (10 KAs are selected)
Tier 2 A2, G, and Fuel Handling KAs (8 KAs are selected)
Tier 3 (7 KAs are selected, at least one for each category)
System lists are generated based upon the following criteria:
Tier, SROGroup, Category, SROOnly = True in tblCFRs Then 25 KAs are selected based upon systems selected with the following criteria:
Tier, SROGroup, Category Select Tier, Group, and Category to add KAs to.
Generate Random Number Between 1 and number of systems in the list.
Begin Loop
- 1. Look for available system number in first system list in the same row as the random number. If system number is found, use it and blank out entry in first list. If a blank is found at that row number, then try to find system number in second list at same row number. If found, then use it and blank out entry in second list. If not found in second list, then generate another random number and go back to first list and look for new system.
- 2. Select the system in the same row as the random number.
- 3. Create list of KAs for Tier, SROGroup, and randomly selected system number.
- 6. Check to see if KA is in master list of KAs already selected. If it is in master list, then select another random number and select KA at that row number. If not selected, then add to master KA list.
Loop Back (until number of required KAs have been selected for specific tier, group, and category)
Go back to top of list until all tiers, groups, and categories have been cycled through. OBDI 202 - ILE Process