ML121080614: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Attachment 6  OBDI 202 - ILE Process DRAFT OUTLINE COMMENTS Facility: PVNGS First Exam Date:3/2012 Written Exam Outline (9/21/2011) Comment Resolution 1 The SRO-only outline does not reflect the changes described in the ES-401-4  
{{#Wiki_filter:DRAFT OUTLINE COMMENTS Facility:   PVNGS                                       First Exam Date:           3/2012 Written Exam Outline (9/21/2011)
Comment                                             Resolution The SRO-only outline does not reflect           This will be on Rev 1 of the 401-2.
the changes described in the ES-401-4 Rejected KAs document.
RO Tier 1 / Group 2: CE/A11 RCS                The error was corrected and subsequently 2  Overcooling - PTS, EK3.1 should read          this KA was rejected.
AK3.1 RO Tier 1 / Group 2: CE/A13 Natural            This is Correct and will be changed to reflect Circ., EK1.2 - Normal, abnormal and            AK1.2 Natural Circulation Operations.
emergency operating procedures associated with (Natural Selection 3
Operations). SHOULD READ AK1.2 -
Normal, abnormal and emergency operating procedures associated with (Natural Circulation Operations) 4 5
Administrative JPM Outline (11/9/11)
Comment                                            Resolution Label the JPMs A-1 through A-9 starting Done 1
with the RO JPMs.
2 Control Room / In-Plant System JPM Outline (11/9/11)
Comment                                            Resolution 1  JPM e., should RDT read RTD?                No, RDT is correct for Reactor Drain Tank.
Label the JPMs S-1, S-2, P-1, etc., and        Done as much as practical.
make the JPMs line up between RO, 2  SRO-I, and SRO-U so that its easily identified which ones are common among all applicants.
JPM g on the SRO-I outline (JPM c          This is correct. The g JPM on the SRO-I will 3  on SRO-U) does not appear on the RO            not be done by the ROs.
outline. Clarify if this is intentional or not.                                                              OBDI 202 - ILE Process


Rejected KAs document. This will be on Rev 1 of the 401-2.
Simulator Scenario Outline Comments (11/9/11)
2 RO Tier 1 / Group 2:  CE/A11 RCS Overcooling - PTS, "EK3.1" should read "AK3.1" The error was corrected and subsequently this KA was rejected.
Comment                                         Resolution On final D-1s, include the chart of         Done Target Quantity Attributes found at the 1
3 RO Tier 1 / Group 2:  CE/A13 Natural Circ., EK1.2 - Normal, abnormal and emergency operating procedures associated with (Natural Selection Operations). SHOULD READ "AK1.2 - Normal, abnormal and emergency operating procedures associated with (Natural Circulation Operations) This is Correct and will be changed to reflect AK1.2 Natural Circulation Operations. 4  5 Administrative JPM Outline (11/9/11) Comment Resolution 1 Label the JPMs A-1 through A-9 starting with the RO JPMs.
bottom of Form ES-301-4 as an examiners aid.
Done 2    Control Room / In-Plant System JPM Outline (11/9/11) Comment Resolution 1 JPM e., should "RDT" read "RTD"? No, RDT is correct for Reactor Drain Tank.
Scenario 1, should there be a Critical       No, SBCS is available so this would not 2  Task to commence cooldown prior to          happen without a SBCS failure.
2 Label the JPMs S-1, S-2, P-1, etc., and make the JPMs line up between RO, SRO-I, and SRO-U so that it's easily identified which ones are common among all applicants. Done as much as practical.
lifting the SG Safety Valve?
3 JPM "g" on the SRO-I outline (JPM "c" on SRO-U) does not appear on the RO outline. Clarify if this is intentional or not.This is correct. The 'g' JPM on the SRO-I will not be done by the ROs.
Scenario 2 Event 5 could be a               Changed (also changed on 301-5) 3  Component Malfunction instead of Normal Evolution.
 
Scenario 2 Events 8 and 9, the word         Fixed 4
Attachment 6  OBDI 202 - ILE Process Simulator Scenario Outline Comments (11/9/11) Comment Resolution 1 On final D-1s, include the chart of "Target Quantity Attributes" found at the bottom of Form ES-301-4 as an  
CRITICAL is misspelled.
 
5   Scenario 4 Event 8 is a Major transient. Changed to a major (also changed on 301-5)
examiner's aid.
When the D-2s are generated, for each       Done 6  scenario, include a one page synopsis of how each event will play out.
Done 2 Scenario 1, should there be a Critical Task to commence cooldown prior to lifting the SG Safety Valve? No, SBCS is available so this would not happen without a SBCS failure.
General Outline Comments (9/21/11)
3 Scenario 2 Event 5 could be a Component Malfunction instead of Normal Evolution. Changed (also changed on 301-5) 4 Scenario 2 Events 8 and 9, the word "CRITICAL" is misspelled.
Need to send the original copy of draft     Received with Operating Test outline 1  outline quality checklist ES-201-2 (may submittal.
Fixed 5 Scenario 4 Event 8 is a Major transient. Changed to a major (also changed on 301-5) 6 When the D-2s are generated, for each scenario, include a one page synopsis of how each event will play out.
send it with the draft op test outline)
Done  General Outline Comments (9/21/11) 1 Need to send the original copy of draft outline quality checklist ES-201-2 (may send it with the draft op test outline) Received with Operating Test outline submittal.
What plant-specific priorities (including   Aux Feed and Class electrical power issues PRA and IPE insights) are covered in the are covered on the exam. These are 2 major appropriate exam sections?                  inputs to PRA.
2 What plant-specific priorities (including PRA and IPE insights) are covered in the appropriate exam sections? Aux Feed and Class electrical power issues are covered on the exam. These are 2 major inputs to PRA.  
2 Will add to comment section of appropriate question.
 
RO#s 12,14,15,48,49 Any recent OE included (plant specific or Yes. Previous site specific OE has been other)?                                      incorporated into written and operating exams.
Will add to comment section of appropriate question.  
3 Will add to comment section of appropriate question.
 
RO#s 18,50,51 Are differences between units being         Yes, Unit differences are slight at PVNGS but tested on?                                  a sampling of topics will address this.
RO#s 12,14,15,48,49 3 Any recent OE included (plant specific or other)? Yes. Previous site specific OE has been incorporated into written and operating exams.
4 Will add to comment section of appropriate question.
Will add to comment section of appropriate question.  
RO# 14                                                           OBDI 202 - ILE Process
 
RO#s 18,50,51 4 Are differences between units being tested on? Yes, Unit differences are slight at PVNGS but a sampling of topics will address this.
 
Will add to comment section of appropriate question.
RO# 14 Attachment 6  OBDI 202 - ILE Process 5 Are they any operationally-important, site-specific systems/evolutions which are not included on form ES-401-2 that should be? No, PVNGS has not added any systems or evolutions that meet this criterion.
6 Outline Generation Methodology:  Describe how the program functions, how it ensures a random and systematic sampling, and how the K/A Suppression List is incorporated into it. Also, the document provided describes the 2010 exam, not the 2012 exam. This is the Westinghouse KA exam generator program. The suppression list is incorporated by manually deselecting the KA from the programs database as a suppressed KA.
The list of suppressed KAs was generated by the Westinghouse program and sent as such.
Less than 2.5 has been evaluated per our
 
previous correspondence.
 
See attached documentation provided by Westinghouse.
 
XXI. Random Selection Methodology For the random selection of both the RO and SRO exam, the random number generator is seeded with the ticks from the system clock. This helps to ensure a different seed every time an exam outline is generated.


Are they any operationally-important,      No, PVNGS has not added any systems or site-specific systems/evolutions which      evolutions that meet this criterion.
5 are not included on form ES-401-2 that should be?
Outline Generation Methodology:            This is the Westinghouse KA exam generator Describe how the program functions,        program. The suppression list is incorporated how it ensures a random and systematic      by manually deselecting the KA from the sampling, and how the K/A Suppression      programs database as a suppressed KA.
List is incorporated into it. Also, the    The list of suppressed KAs was generated by document provided describes the 2010        the Westinghouse program and sent as such.
exam, not the 2012 exam.
6 Less than 2.5 has been evaluated per our previous correspondence.
See attached documentation provided by Westinghouse.
XXI. Random Selection Methodology For the random selection of both the RO and SRO exam, the random number generator is seeded with the ticks from the system clock. This helps to ensure a different seed every time an exam outline is generated.
Random Selection: RO Exam Create two identical lists of systems for Tier, ROGroup, Category Generate Random Number Between 1 and number of systems in the list.
Random Selection: RO Exam Create two identical lists of systems for Tier, ROGroup, Category Generate Random Number Between 1 and number of systems in the list.
Begin Loop  
Begin Loop
: 1) Look for available system number in first system list in the same row as the random number. If system number is found, use it and blank out entry in first list. If a blank is found at that row number, then try to find system number in second list at same row number. If found, t hen use it and blank out entry in second list. If not found in second list, then generate another random number and go back to first list and look for new system. 2) Select the system in the sa me row as the random number.  
: 1) Look for available system number in first system list in the same row as the random number. If system number is found, use it and blank out entry in first list. If a blank is found at that row number, then try to find system number in second list at same row number. If found, then use it and blank out entry in second list. If not found in second list, then generate another random number and go back to first list and look for new system.
: 3) Create list of KAs for Tier, ROGroup, and randomly selected system number.  
: 2) Select the system in the same row as the random number.
: 4) Generate a random number betw een 1 and number of KAs in KA list.  
: 3) Create list of KAs for Tier, ROGroup, and randomly selected system number.
: 5) Pick KA from KA list at the row designated by the random number.  
: 4) Generate a random number between 1 and number of KAs in KA list.
: 6) Check to see if KA is in master list of KAs already selected. If it is in master list, then select another random number and sele ct KA at that row number. If not selected, then add to master KA list.  
: 5) Pick KA from KA list at the row designated by the random number.
: 7) Add KA To RO outline.  
: 6) Check to see if KA is in master list of KAs already selected. If it is in master list, then select another random number and select KA at that row number. If not selected, then add to master KA list.
 
: 7) Add KA To RO outline.
Loop Back (until number of required KAs have been selected for specific tier, group, and category)
Loop Back (until number of required KAs have been selected for specific tier, group, and category)
Go back to top of list until all tiers, groups, and categories have been cycled through.
Go back to top of list until all tiers, groups, and categories have been cycled through.
36 Random Selection: SRO Exam Attachment 6  OBDI 202 - ILE Process 25 SRO Only KAs are first select ed for the followin g categories:
36 Random Selection: SRO Exam                                                           OBDI 202 - ILE Process
 
25 SRO Only KAs are first selected for the following categories:
Tier 1: A2 and G (10 KAs are selected)
Tier 1: A2 and G (10 KAs are selected)
Tier 2 A2, G, and Fuel Handling KAs (8 KAs are selected)  
Tier 2 A2, G, and Fuel Handling KAs (8 KAs are selected)
 
Tier 3 (7 KAs are selected, at least one for each category)
Tier 3 (7 KAs are selected, at least one for each category)  
System lists are generated based upon the following criteria:
 
Tier, SROGroup, Category, SROOnly = True in tblCFRs Then 25 KAs are selected based upon systems selected with the following criteria:
System lists are generated based upon the following criteria: Tier, SROGroup, Category, SROOnly = True in tblCFRs  
Tier, SROGroup, Category Select Tier, Group, and Category to add KAs to.
 
Then 25 KAs are selected based upon systems selected with the fo llowing criteria:
Tier, SROGroup, Category  
 
Select Tier, Group, and Category to add KAs to.  
 
Generate Random Number Between 1 and number of systems in the list.
Generate Random Number Between 1 and number of systems in the list.
Begin Loop  
Begin Loop
: 1. Look for available system number in first system list in the same row as the random number. If system number is found, use it and blank out entry in first list. If a blank is found at that row number, then try to find system number in second list at same row number. If found, then use it and blank out entry in second list. If not found in second list, then generate another random number and go back to first list and look for new system.  
: 1. Look for available system number in first system list in the same row as the random number. If system number is found, use it and blank out entry in first list. If a blank is found at that row number, then try to find system number in second list at same row number. If found, then use it and blank out entry in second list. If not found in second list, then generate another random number and go back to first list and look for new system.
: 2. Select the system in the sa me row as the random number.  
: 2. Select the system in the same row as the random number.
: 3. Create list of KAs for Tier, SROGroup, and randomly selected system number.  
: 3. Create list of KAs for Tier, SROGroup, and randomly selected system number.
: 4. Generate a random number betw een 1 and number of KAs in KA list.  
: 4. Generate a random number between 1 and number of KAs in KA list.
: 5. Pick KA from KA list at the row designated by the random number.  
: 5. Pick KA from KA list at the row designated by the random number.
: 6. Check to see if KA is in master list of KAs already selected. If it is in master list, then select another random number and sele ct KA at that row number. If not selected, then add to master KA list.
: 6. Check to see if KA is in master list of KAs already selected. If it is in master list, then select another random number and select KA at that row number. If not selected, then add to master KA list.
7.Add KA To SRO outline.  
7.Add KA To SRO outline.
 
Loop Back (until number of required KAs have been selected for specific tier, group, and category)
Loop Back (until number of required KAs have been selected for specific tier, group, and category) Go back to top of list until all tier s, groups, and categories have been cycled through.}}
Go back to top of list until all tiers, groups, and categories have been cycled through.                                                       OBDI 202 - ILE Process}}

Latest revision as of 04:52, 12 November 2019

PVNGS-2012-03-DRAFT-Outline Comments
ML121080614
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/16/2012
From:
Division of Reactor Safety IV
To:
Arizona Public Service Co
Thomas Farina
References
Download: ML121080614 (4)


Text

DRAFT OUTLINE COMMENTS Facility: PVNGS First Exam Date: 3/2012 Written Exam Outline (9/21/2011)

Comment Resolution The SRO-only outline does not reflect This will be on Rev 1 of the 401-2.

1 the changes described in the ES-401-4 Rejected KAs document.

RO Tier 1 / Group 2: CE/A11 RCS The error was corrected and subsequently 2 Overcooling - PTS, EK3.1 should read this KA was rejected.

AK3.1 RO Tier 1 / Group 2: CE/A13 Natural This is Correct and will be changed to reflect Circ., EK1.2 - Normal, abnormal and AK1.2 Natural Circulation Operations.

emergency operating procedures associated with (Natural Selection 3

Operations). SHOULD READ AK1.2 -

Normal, abnormal and emergency operating procedures associated with (Natural Circulation Operations) 4 5

Administrative JPM Outline (11/9/11)

Comment Resolution Label the JPMs A-1 through A-9 starting Done 1

with the RO JPMs.

2 Control Room / In-Plant System JPM Outline (11/9/11)

Comment Resolution 1 JPM e., should RDT read RTD? No, RDT is correct for Reactor Drain Tank.

Label the JPMs S-1, S-2, P-1, etc., and Done as much as practical.

make the JPMs line up between RO, 2 SRO-I, and SRO-U so that its easily identified which ones are common among all applicants.

JPM g on the SRO-I outline (JPM c This is correct. The g JPM on the SRO-I will 3 on SRO-U) does not appear on the RO not be done by the ROs.

outline. Clarify if this is intentional or not. OBDI 202 - ILE Process

Simulator Scenario Outline Comments (11/9/11)

Comment Resolution On final D-1s, include the chart of Done Target Quantity Attributes found at the 1

bottom of Form ES-301-4 as an examiners aid.

Scenario 1, should there be a Critical No, SBCS is available so this would not 2 Task to commence cooldown prior to happen without a SBCS failure.

lifting the SG Safety Valve?

Scenario 2 Event 5 could be a Changed (also changed on 301-5) 3 Component Malfunction instead of Normal Evolution.

Scenario 2 Events 8 and 9, the word Fixed 4

CRITICAL is misspelled.

5 Scenario 4 Event 8 is a Major transient. Changed to a major (also changed on 301-5)

When the D-2s are generated, for each Done 6 scenario, include a one page synopsis of how each event will play out.

General Outline Comments (9/21/11)

Need to send the original copy of draft Received with Operating Test outline 1 outline quality checklist ES-201-2 (may submittal.

send it with the draft op test outline)

What plant-specific priorities (including Aux Feed and Class electrical power issues PRA and IPE insights) are covered in the are covered on the exam. These are 2 major appropriate exam sections? inputs to PRA.

2 Will add to comment section of appropriate question.

RO#s 12,14,15,48,49 Any recent OE included (plant specific or Yes. Previous site specific OE has been other)? incorporated into written and operating exams.

3 Will add to comment section of appropriate question.

RO#s 18,50,51 Are differences between units being Yes, Unit differences are slight at PVNGS but tested on? a sampling of topics will address this.

4 Will add to comment section of appropriate question.

RO# 14 OBDI 202 - ILE Process

Are they any operationally-important, No, PVNGS has not added any systems or site-specific systems/evolutions which evolutions that meet this criterion.

5 are not included on form ES-401-2 that should be?

Outline Generation Methodology: This is the Westinghouse KA exam generator Describe how the program functions, program. The suppression list is incorporated how it ensures a random and systematic by manually deselecting the KA from the sampling, and how the K/A Suppression programs database as a suppressed KA.

List is incorporated into it. Also, the The list of suppressed KAs was generated by document provided describes the 2010 the Westinghouse program and sent as such.

exam, not the 2012 exam.

6 Less than 2.5 has been evaluated per our previous correspondence.

See attached documentation provided by Westinghouse.

XXI. Random Selection Methodology For the random selection of both the RO and SRO exam, the random number generator is seeded with the ticks from the system clock. This helps to ensure a different seed every time an exam outline is generated.

Random Selection: RO Exam Create two identical lists of systems for Tier, ROGroup, Category Generate Random Number Between 1 and number of systems in the list.

Begin Loop

1) Look for available system number in first system list in the same row as the random number. If system number is found, use it and blank out entry in first list. If a blank is found at that row number, then try to find system number in second list at same row number. If found, then use it and blank out entry in second list. If not found in second list, then generate another random number and go back to first list and look for new system.
2) Select the system in the same row as the random number.
3) Create list of KAs for Tier, ROGroup, and randomly selected system number.
4) Generate a random number between 1 and number of KAs in KA list.
5) Pick KA from KA list at the row designated by the random number.
6) Check to see if KA is in master list of KAs already selected. If it is in master list, then select another random number and select KA at that row number. If not selected, then add to master KA list.
7) Add KA To RO outline.

Loop Back (until number of required KAs have been selected for specific tier, group, and category)

Go back to top of list until all tiers, groups, and categories have been cycled through.

36 Random Selection: SRO Exam OBDI 202 - ILE Process

25 SRO Only KAs are first selected for the following categories:

Tier 1: A2 and G (10 KAs are selected)

Tier 2 A2, G, and Fuel Handling KAs (8 KAs are selected)

Tier 3 (7 KAs are selected, at least one for each category)

System lists are generated based upon the following criteria:

Tier, SROGroup, Category, SROOnly = True in tblCFRs Then 25 KAs are selected based upon systems selected with the following criteria:

Tier, SROGroup, Category Select Tier, Group, and Category to add KAs to.

Generate Random Number Between 1 and number of systems in the list.

Begin Loop

1. Look for available system number in first system list in the same row as the random number. If system number is found, use it and blank out entry in first list. If a blank is found at that row number, then try to find system number in second list at same row number. If found, then use it and blank out entry in second list. If not found in second list, then generate another random number and go back to first list and look for new system.
2. Select the system in the same row as the random number.
3. Create list of KAs for Tier, SROGroup, and randomly selected system number.
4. Generate a random number between 1 and number of KAs in KA list.
5. Pick KA from KA list at the row designated by the random number.
6. Check to see if KA is in master list of KAs already selected. If it is in master list, then select another random number and select KA at that row number. If not selected, then add to master KA list.

7.Add KA To SRO outline.

Loop Back (until number of required KAs have been selected for specific tier, group, and category)

Go back to top of list until all tiers, groups, and categories have been cycled through. OBDI 202 - ILE Process