ML21147A536
| ML21147A536 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 04/26/2021 |
| From: | Heather Gepford Operations Branch IV |
| To: | Arizona Public Service Co |
| References | |
| Download: ML21147A536 (2) | |
Text
Attachment 6 OBDI 202 - IOLE Process Rev 3 PROPOSED OUTLINE COMMENTS Facility:
Palo Verde First Exam Date:
4/26/2021 Written Exam Outline Comment Resolution 1 NRC Generated 2
3 4
5 Administrative JPM Outline Comment Resolution 1 None 2
3 4
5 Control Room / In-Plant System JPM Outline Comment Resolution 1
P2: Is it possible to obtain a mock-up such that the student can actually perform this JPM?
Possible - working on logisitics.
2 3
4 5
Simulator Scenario Outline Comments Comment Resolution 1 Sc. 1: Low power None (just note for tracking purposes) 2 Sc. 1: CT 2: During prep week discuss alternatives to bounding criteria other than before exiting procedure.
OBDI 202 - IOLE Process Rev 3 3 Sc. 2: No EOP Contingency None (just note for tracking purposes) 4 Sc. 2: Missing initial conditions and turnover information Information added.
5 Sc. 2: CT 1: Discuss 30 minute bounding criteria Based on 2X safety function status check time of 15 minutes 6
Sc. 2: CT 2: During prep week discuss possible alternatives to bounding criteria other than before completing step 10 of procedure 7 Sc. 3: CT 1: Discuss 30 minute bounding criteria Based on 2X safety function status check time of 15 minutes 8 Sc. 3: CT 2: Discuss 30 minute bounding criteria Based on 2X safety function status check time of 15 minutes 9 Sc. 4 No EOP Contingency None (just note for tracking purposes) 10 Sc. 4 CT 2: Discuss 30 minute bounding criteria Based on 2X safety function status check time of 15 minutes