ML21147A536

From kanterella
Jump to navigation Jump to search
04 Draft Outline Comments
ML21147A536
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/26/2021
From: Heather Gepford
Operations Branch IV
To:
Arizona Public Service Co
References
Download: ML21147A536 (2)


Text

Attachment 6 OBDI 202 - IOLE Process Rev 3 PROPOSED OUTLINE COMMENTS Facility:

Palo Verde First Exam Date:

4/26/2021 Written Exam Outline Comment Resolution 1 NRC Generated 2

3 4

5 Administrative JPM Outline Comment Resolution 1 None 2

3 4

5 Control Room / In-Plant System JPM Outline Comment Resolution 1

P2: Is it possible to obtain a mock-up such that the student can actually perform this JPM?

Possible - working on logisitics.

2 3

4 5

Simulator Scenario Outline Comments Comment Resolution 1 Sc. 1: Low power None (just note for tracking purposes) 2 Sc. 1: CT 2: During prep week discuss alternatives to bounding criteria other than before exiting procedure.

OBDI 202 - IOLE Process Rev 3 3 Sc. 2: No EOP Contingency None (just note for tracking purposes) 4 Sc. 2: Missing initial conditions and turnover information Information added.

5 Sc. 2: CT 1: Discuss 30 minute bounding criteria Based on 2X safety function status check time of 15 minutes 6

Sc. 2: CT 2: During prep week discuss possible alternatives to bounding criteria other than before completing step 10 of procedure 7 Sc. 3: CT 1: Discuss 30 minute bounding criteria Based on 2X safety function status check time of 15 minutes 8 Sc. 3: CT 2: Discuss 30 minute bounding criteria Based on 2X safety function status check time of 15 minutes 9 Sc. 4 No EOP Contingency None (just note for tracking purposes) 10 Sc. 4 CT 2: Discuss 30 minute bounding criteria Based on 2X safety function status check time of 15 minutes