ML12170B104: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Updated 6/11/12 WORKSHOP #4, Issue Compilation Davis-Besse Loss of Feedwater Event You have been provided with a description of a loss of feedwater event that occurred at the Davis-Besse plant in 1985. This material was extracted in its entirety from NUREG-1154 (Loss of Main and Auxiliary Feedwater at the Davis-Besse Plant on June 9, 1985). | {{#Wiki_filter:Updated 6/11/12 WORKSHOP #4, Issue Compilation Davis-Besse Loss of Feedwater Event You have been provided with a description of a loss of feedwater event that occurred at the Davis-Besse plant in 1985. This material was extracted in its entirety from NUREG-1154 (Loss of Main and Auxiliary Feedwater at the Davis-Besse Plant on June 9, 1985). | ||
Your TEAM assignment | Your TEAM assignment | ||
* After considering the event, compile a list of issues that, in your judgment, warrant further evaluation (i.e., what piqued your regulatory interest). | * After considering the event, compile a list of issues that, in your judgment, warrant further evaluation (i.e., what piqued your regulatory interest). | ||
* Prepare a presentation of your results and be ready to discuss the technical logic of your selections as directed by the instructor.}} | * Prepare a presentation of your results and be ready to discuss the technical logic of your selections as directed by the instructor.}} |
Latest revision as of 03:01, 12 November 2019
ML12170B104 | |
Person / Time | |
---|---|
Site: | Davis Besse |
Issue date: | 06/18/2012 |
From: | Office of the Chief Human Capital Officer |
To: | |
References | |
Download: ML12170B104 (1) | |
Text
Updated 6/11/12 WORKSHOP #4, Issue Compilation Davis-Besse Loss of Feedwater Event You have been provided with a description of a loss of feedwater event that occurred at the Davis-Besse plant in 1985. This material was extracted in its entirety from NUREG-1154 (Loss of Main and Auxiliary Feedwater at the Davis-Besse Plant on June 9, 1985).
Your TEAM assignment
- After considering the event, compile a list of issues that, in your judgment, warrant further evaluation (i.e., what piqued your regulatory interest).
- Prepare a presentation of your results and be ready to discuss the technical logic of your selections as directed by the instructor.