{{Adams | |||
| number = ML13119A189 | |||
| issue date = 04/29/2013 | |||
| title = Notification of NRC Initial Operator Licensing Examination 05000416-13-302 | |||
| author name = Gaddy V | |||
| author affiliation = NRC/RGN-IV/DRS/OB | |||
| addressee name = Mulligan K | |||
| addressee affiliation = Entergy Operations, Inc | |||
| docket = 05000416 | |||
| license number = NPF-029 | |||
| contact person = | |||
| document report number = IR-13-302 | |||
| document type = Letter | |||
| page count = 3 | |||
}} | |||
See also: [[see also::IR 05000416/2013302]] | |||
=Text= | |||
{{#Wiki_filter:UNITE D S TATE S | |||
NUC LEAR RE GULATOR Y C OMMI S SI ON | |||
R E G IO N I V | |||
1600 EAST LAMAR BLVD | |||
AR L I NGTON , TEXAS 7 601 1- 4511 | |||
April 29, 2013 | |||
Kevin Mulligan | |||
Vice President Operations | |||
Entergy Operations, Inc. | |||
Grand Gulf Nuclear Station | |||
P.O. Box 756 | |||
Port Gibson, MS 39150 | |||
SUBJECT: GRAND GULF NUCLEAR STATION - NOTIFICATION OF NRC INITIAL | |||
OPERATOR LICENSING EXAMINATION 05000416/2013302 | |||
Dear Mr. Mulligan: | |||
In a telephone conversation on April 25, 2013, between Messrs. Steve Reeves, Exam | |||
Developer and Steve Garchow, Chief Examiner, arrangements were made for the | |||
administration of licensing examinations at Grand Gulf Nuclear Generating Station during the | |||
week of November 11, 2013. | |||
As agreed during the telephone conversation, the NRC will provide the written examination | |||
outlines and your staff will prepare the examinations based on the guidelines in NUREG-1021, | |||
Operator Licensing Examination Standards for Power Reactors, Revision 9, Supplement 1, | |||
and NUREG-1123, Knowledge and Abilities Catalog for Nuclear Power Plant Operators, | |||
Revision 2, Supplement 1. The NRCs regional office will discuss with your staff any changes | |||
that might be necessary before the examinations are administered. | |||
To meet the above schedule, it will be necessary for your staff to furnish the Operating Test | |||
outlines by August 23, 2013. The written examinations, operating tests, and supporting | |||
reference materials identified in Attachment 3 to ES-201 will be due by September 20, 2013. | |||
Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations | |||
(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the | |||
outlines, examinations, and tests before they are submitted to the NRC for review and approval. | |||
All materials shall be complete and ready-to-use. We request that any personal, proprietary, | |||
sensitive unclassified, or safeguards information in your response be contained in a separate | |||
enclosure and appropriately marked. Any delay in receiving the required examinations and | |||
reference materials, or the submittal of inadequate or incomplete materials, may cause the | |||
examinations to be rescheduled. In addition, your support for on-site validation of the | |||
examinations is required during the week of October 7, 2013. | |||
In order to conduct the requested written examinations and operating tests, it will be necessary | |||
for your staff to provide adequate space and accommodations in accordance with ES-402, and | |||
to make the simulation facility available on the dates noted above. In accordance with ES-302, | |||
your staff should retain the original simulator performance data (e.g., system pressures, | |||
temperatures, and levels) generated during the dynamic operating tests until the examination | |||
results are final. | |||
K. Mulligan -2- | |||
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in | |||
effect while the written examinations and operating tests are being administered. | |||
To permit timely NRC review and evaluation, your staff should submit preliminary operator and | |||
senior operator license applications (Office of Management and Budget (OMB) approval | |||
number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver | |||
requests (if any) (OMB approval number 3150-0090) at least 30 days before the first | |||
examination date. If the applications are not received at least 30 days before the examination | |||
date, a postponement may be necessary. Signed applications certifying that all training has | |||
been completed should be submitted at least 14 days before the first examination date. | |||
This letter contains information collections that are subject to the Paperwork Reduction Act of | |||
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under | |||
approval number 3150-0018, which expires on February 28, 2013. The public reporting burden | |||
for this collection of information is estimated to average 50 hours per response, including the | |||
time for reviewing instructions, gathering and maintaining the data needed, and completing and | |||
reviewing the collection of information. Send comments regarding this burden estimate or any | |||
other aspect of these information collections, including suggestions for reducing the burden, to | |||
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory | |||
Commission, Washington, DC 20555-0001, or by Internet electronic mail to | |||
INFOCOLLECTS@NRC.GOV. | |||
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an | |||
information collection, unless it displays a currently valid OMB control number. | |||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be | |||
available electronically for public inspection in the NRCs Public Document Room or from the | |||
Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access | |||
and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room | |||
page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html. | |||
Thank you for your cooperation in this matter. Mr. Reeves has been advised of the policies and | |||
guidelines referenced in this letter. If you have any questions regarding the NRCs examination | |||
procedures and guidelines, please contact Mr. Garchow, Chief Examiner at 817-200-1426, or | |||
myself at 817-200-1159. | |||
Sincerely, | |||
/RA/ | |||
Vincent Gaddy, Chief | |||
Operations Branch | |||
Division of Reactor Safety | |||
Docket: 50-416 | |||
License: NPF-29 | |||
K. Mulligan -3- | |||
DISTRIBUTION: | |||
Director (Art.Howell@nrc.gov) | |||
Acting Deputy Regional Administrator (Robert.Lewis@nrc.gov) | |||
DRP Director (Kriss.Kennedy@nrc.gov) | |||
Acting DRP Deputy Director (Michael.Scott@nrc.gov) | |||
DRS Director (Tom.Blount@nrc.gov) | |||
Acting DRS Deputy Director (Jeff.Clark@nrc.gov) | |||
Senior Resident Inspector (Rich.Smith@nrc.gov) | |||
Resident Inspector (Blake.Rice@nrc.gov) | |||
Branch Chief, DRP/C (David.Proulx@nrc.gov) | |||
Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov) | |||
Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov) | |||
GG Administrative Assistant (Alley.Farrell@nrc.gov) | |||
Public Affairs Officer (Victor.Dricks@nrc.gov) | |||
Public Affairs Officer (Lara.Uselding@nrc.gov) | |||
Project Manager (Alan.Wang@nrc.gov) | |||
Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov) | |||
RITS Coordinator (Marisa.Herrera@nrc.gov) | |||
ACES (R4Enforcement.Resource@nrc.gov) | |||
Regional Counsel (Karla.Fuller@nrc.gov) | |||
Technical Support Assistant (Loretta.Williams@nrc.gov) | |||
Congressional Affairs Officer (Jenny.Weil@nrc.gov) | |||
RIV/ETA: OEDO (Doug.Huyck@nrc.gov) | |||
S:\DRS\REPORTS\Reports Drafts\GG-2013-11-Exam Notification Ltr.docx ML13119A189 | |||
ADAMS: No Yes SUNSI Review Complete Reviewer Initials: VGG | |||
Publicly Available Non-Sensitive | |||
Non-publicly Available Sensitive | |||
OB/SOE OB/C | |||
SGarchow VGaddy | |||
/RA/ /RA/ | |||
4/29/13 4/29/13 | |||
}} |
Latest revision as of 20:10, 4 November 2019
ML13119A189 | |
Person / Time | |
---|---|
Site: | Grand Gulf |
Issue date: | 04/29/2013 |
From: | Vincent Gaddy Operations Branch IV |
To: | Kevin Mulligan Entergy Operations |
References | |
IR-13-302 | |
Download: ML13119A189 (3) | |
See also: IR 05000416/2013302
Text
UNITE D S TATE S
NUC LEAR RE GULATOR Y C OMMI S SI ON
R E G IO N I V
1600 EAST LAMAR BLVD
AR L I NGTON , TEXAS 7 601 1- 4511
April 29, 2013
Vice President Operations
Entergy Operations, Inc.
Grand Gulf Nuclear Station
P.O. Box 756
Port Gibson, MS 39150
SUBJECT: GRAND GULF NUCLEAR STATION - NOTIFICATION OF NRC INITIAL
OPERATOR LICENSING EXAMINATION 05000416/2013302
Dear Mr. Mulligan:
In a telephone conversation on April 25, 2013, between Messrs. Steve Reeves, Exam
Developer and Steve Garchow, Chief Examiner, arrangements were made for the
administration of licensing examinations at Grand Gulf Nuclear Generating Station during the
week of November 11, 2013.
As agreed during the telephone conversation, the NRC will provide the written examination
outlines and your staff will prepare the examinations based on the guidelines in NUREG-1021,
Operator Licensing Examination Standards for Power Reactors, Revision 9, Supplement 1,
and NUREG-1123, Knowledge and Abilities Catalog for Nuclear Power Plant Operators,
Revision 2, Supplement 1. The NRCs regional office will discuss with your staff any changes
that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the Operating Test
outlines by August 23, 2013. The written examinations, operating tests, and supporting
reference materials identified in Attachment 3 to ES-201 will be due by September 20, 2013.
Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations
(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the
outlines, examinations, and tests before they are submitted to the NRC for review and approval.
All materials shall be complete and ready-to-use. We request that any personal, proprietary,
sensitive unclassified, or safeguards information in your response be contained in a separate
enclosure and appropriately marked. Any delay in receiving the required examinations and
reference materials, or the submittal of inadequate or incomplete materials, may cause the
examinations to be rescheduled. In addition, your support for on-site validation of the
examinations is required during the week of October 7, 2013.
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
K. Mulligan -2-
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary operator and
senior operator license applications (Office of Management and Budget (OMB) approval
number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver
requests (if any) (OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
approval number 3150-0018, which expires on February 28, 2013. The public reporting burden
for this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the
time for reviewing instructions, gathering and maintaining the data needed, and completing and
reviewing the collection of information. Send comments regarding this burden estimate or any
other aspect of these information collections, including suggestions for reducing the burden, to
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, or by Internet electronic mail to
INFOCOLLECTS@NRC.GOV.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRCs Public Document Room or from the
Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access
and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room
page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Mr. Reeves has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRCs examination
procedures and guidelines, please contact Mr. Garchow, Chief Examiner at 817-200-1426, or
myself at 817-200-1159.
Sincerely,
/RA/
Vincent Gaddy, Chief
Operations Branch
Division of Reactor Safety
Docket: 50-416
License: NPF-29
K. Mulligan -3-
DISTRIBUTION:
Director (Art.Howell@nrc.gov)
Acting Deputy Regional Administrator (Robert.Lewis@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
Acting DRP Deputy Director (Michael.Scott@nrc.gov)
DRS Director (Tom.Blount@nrc.gov)
Acting DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Rich.Smith@nrc.gov)
Resident Inspector (Blake.Rice@nrc.gov)
Branch Chief, DRP/C (David.Proulx@nrc.gov)
Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov)
Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov)
GG Administrative Assistant (Alley.Farrell@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Alan.Wang@nrc.gov)
Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV/ETA: OEDO (Doug.Huyck@nrc.gov)
S:\DRS\REPORTS\Reports Drafts\GG-2013-11-Exam Notification Ltr.docx ML13119A189
ADAMS: No Yes SUNSI Review Complete Reviewer Initials: VGG
Publicly Available Non-Sensitive
Non-publicly Available Sensitive
OB/SOE OB/C
SGarchow VGaddy
/RA/ /RA/
4/29/13 4/29/13