ML13262A190: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML13262A190
| number = ML13262A190
| issue date = 09/18/2013
| issue date = 09/18/2013
| title = Ltr 09/18/13 Davis-Besse Notification of Inspection (Meb)
| title = Notification of Inspection (Meb)
| author name = Peterson H
| author name = Peterson H
| author affiliation = NRC/RGN-III/DRS/OB
| author affiliation = NRC/RGN-III/DRS/OB
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 18, 2013 Mr. Raymond Lieb Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760
-4352 September 18, 2013 Mr. Raymond Lieb Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A
-DB-3080 Oak Harbor, OH 43449
-9760


==SUBJECT:==
==SUBJECT:==
DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1, NOTIFICATION OF NRC INSPECTION  
DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1, NOTIFICATION OF NRC INSPECTION


==Dear Mr. Lieb:==
==Dear Mr. Lieb:==
In a telephone conversation on September 9, 2013 , Mr. M. Bielby , Operator Licensing Branch , and M r. R. Lakis, Operations Shift Manager
, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to conduct an inspection using Temporary Instruction (TI) 2515-186 , "Inspection of Procedures and Processes for Responding to Potential Aircraft Threats ," at Davis-Besse Nu c l ear Power Station, Unit 1
. Th i s inspection is planned for the week of October 7 , 2013. The NRC inspector will require a shift manager
-qualified individual , a unit supervisor individual, and a qualified security shift supervisor for a table
-top scenario to allow inspection of TI 2515-186 attributes
. Additionally, in order to minimize the impact to your onsite resources and to ensure a productive inspection for both sides, please have available the procedures that would be followed when responding to an aircraft threat and any related lesson plans pertinent to the inspection
. Additionally, the inspector needs to review your aircraft threat procedure and a list of corrective action reports regarding security and licensed operator issues
, the week before the inspection.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).
Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number
.
R. Lieb      In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
If there are any questions about this inspection or the material requested, please contact the lead inspector , Mr. M. Bielby at (630) 829
-9 7 62 , or I can be reached at (630) 829-9 707. Sincerely,  /RA/  Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50
-346 License No. NPF-3  cc: Distribution via ListServ
Ž R. Lieb      In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
If there are any questions about this inspection or the material requested, please contact the lead inspector , Mr. M. Bielby at (630) 829
-9 762 , or I can be reached at (630) 829-9 707. Sincerely, 
/RA/  Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50
-346 License No. NPF-3  cc: Distribution via ListServŽ DISTRIBUTION
: Daniel Rich RidsNrrDorlLpl3
-2 Resource RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource Cynthia Pederson Anne Boland Steven Orth Allan Barker Carole Ariano


Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak John McHale DOCUMENT NAME: Ltr 091813 Davis
In a telephone conversation on September 9, 2013, Mr. M. Bielby, Operator Licensing Branch, and Mr. R. Lakis, Operations Shift Manager, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to conduct an inspection using Temporary Instruction (TI) 2515-186, Inspection of Procedures and Processes for Responding to Potential Aircraft Threats, at Davis-Besse Nuclear Power Station, Unit 1. This inspection is planned for the week of October 7, 2013.
-Besse Notification of Inspection (MEB).docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME MBielby:bl HPeterson   DATE 09/18/13 09/18/13   OFFICIAL RECORD COPY}}
The NRC inspector will require a shift manager-qualified individual, a unit supervisor individual, and a qualified security shift supervisor for a table-top scenario to allow inspection of TI 2515-186 attributes. Additionally, in order to minimize the impact to your onsite resources and to ensure a productive inspection for both sides, please have available the procedures that would be followed when responding to an aircraft threat and any related lesson plans pertinent to the inspection. Additionally, the inspector needs to review your aircraft threat procedure and a list of corrective action reports regarding security and licensed operator issues, the week before the inspection.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.
 
R. Lieb                                        In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If there are any questions about this inspection or the material requested, please contact the lead inspector, Mr. M. Bielby at (630) 829-9762, or I can be reached at (630) 829-9707.
Sincerely,
                                                /RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc:      Distribution via ListServ'
 
R. Lieb                                        In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If there are any questions about this inspection or the material requested, please contact the lead inspector, Mr. M. Bielby at (630) 829-9762, or I can be reached at (630) 829-9707.
Sincerely,
                                                /RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc:      Distribution via ListServ' DISTRIBUTION:
Daniel Rich RidsNrrDorlLpl3-2 Resource RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource Cynthia Pederson Anne Boland Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak John McHale DOCUMENT NAME: Ltr 091813 Davis-Besse Notification of Inspection (MEB).docx Publicly Available         Non-Publicly Available     Sensitive     Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII                         RIII               RIII               RIII NAME         MBielby:bl             HPeterson DATE         09/18/13               09/18/13 OFFICIAL RECORD COPY}}

Latest revision as of 10:08, 17 November 2019

Notification of Inspection (Meb)
ML13262A190
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/18/2013
From: Hironori Peterson
Operations Branch III
To: Lieb R
FirstEnergy Nuclear Operating Co
Michael Bielby
References
Download: ML13262A190 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 18, 2013 Mr. Raymond Lieb Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1, NOTIFICATION OF NRC INSPECTION

Dear Mr. Lieb:

In a telephone conversation on September 9, 2013, Mr. M. Bielby, Operator Licensing Branch, and Mr. R. Lakis, Operations Shift Manager, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to conduct an inspection using Temporary Instruction (TI) 2515-186, Inspection of Procedures and Processes for Responding to Potential Aircraft Threats, at Davis-Besse Nuclear Power Station, Unit 1. This inspection is planned for the week of October 7, 2013.

The NRC inspector will require a shift manager-qualified individual, a unit supervisor individual, and a qualified security shift supervisor for a table-top scenario to allow inspection of TI 2515-186 attributes. Additionally, in order to minimize the impact to your onsite resources and to ensure a productive inspection for both sides, please have available the procedures that would be followed when responding to an aircraft threat and any related lesson plans pertinent to the inspection. Additionally, the inspector needs to review your aircraft threat procedure and a list of corrective action reports regarding security and licensed operator issues, the week before the inspection.

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.

R. Lieb In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If there are any questions about this inspection or the material requested, please contact the lead inspector, Mr. M. Bielby at (630) 829-9762, or I can be reached at (630) 829-9707.

Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc: Distribution via ListServ'

R. Lieb In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If there are any questions about this inspection or the material requested, please contact the lead inspector, Mr. M. Bielby at (630) 829-9762, or I can be reached at (630) 829-9707.

Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc: Distribution via ListServ' DISTRIBUTION:

Daniel Rich RidsNrrDorlLpl3-2 Resource RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource Cynthia Pederson Anne Boland Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak John McHale DOCUMENT NAME: Ltr 091813 Davis-Besse Notification of Inspection (MEB).docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME MBielby:bl HPeterson DATE 09/18/13 09/18/13 OFFICIAL RECORD COPY