| issue date = 05/24/1996
| issue date = 05/24/1996
| title = LER 96-001-00:on 960425,inadvertent ESF Actuations Occurred Due to Tripping of Temporary Power Supply to IN-3.Caused by Personnel Error.Operations Restored to IN-3 Loads & Reset ESF actuations.W/960524 Ltr
| title = LER 96-001-00:on 960425,inadvertent ESF Actuations Occurred Due to Tripping of Temporary Power Supply to IN-3.Caused by Personnel Error.Operations Restored to IN-3 Loads & Reset ESF actuations.W/960524 Ltr
| author name = BEMIS P R, PFITZER B
| author name = Bemis P, Pfitzer B
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORYREGULATORY INFORMATION DISTRIBUTION SYSTEM(RIDS)ACCESSION NBR:9606040015 DOC.DATE:
{{#Wiki_filter:CATEGORY REGULATORY INFORMATION DISTRIBUTION SYSTEM                   (RIDS)
96/05/24NOTARIZED:
ACCESSION NBR:9606040015           DOC.DATE: 96/05/24                NOTARIZED: NO        DOCKET FACIL:50-397   WPPSS   .Nuclear Project, Unit 2, Washington Public                  Powe 05000397 AUTH. NAME            AUTHOR  AFFILIATION PFITZER,B.           Washington Public Power Supply System BEMIS,P.R.           Washington Public Power Supply System RECIP.NAME           RECIPIENT AFFILIATION
NODOCKETFACIL:50-397 WPPSS.NuclearProject,Unit2,Washington PublicPowe05000397AUTH.NAMEAUTHORAFFILIATION PFITZER,B.
Washington PublicPowerSupplySystemBEMIS,P.R.
Washington PublicPowerSupplySystemRECIP.NAME RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
LER96-001-00:on 960425,inadvertent ESFactuations occurredduetotrippingoftemporary powersupplytoIN-3.Caused bypersonnel error.Operations restoredtoIN-3loads&resetESFactuations.W/960524 ltr.DISTRIBUTION CODE:IE22TCOPIESRECEIVED:LTR IENCL)SIZE:TITLE:50.73/50.9 LicenseeEventReport(LER),IncidentRpt,etc.NOTES:ERECIPIENT IDCODE/NAME PD4-2PDINTERNAL:
LER    96-001-00:on 960425,inadvertent ESF actuations occurred due  to tripping of temporary power supply to IN-3.Caused by personnel error. Operations restored to IN-3 loads & reset ESF actuations.W/960524         ltr.
ACRSAEOD/SPD/RRAB NRR/DE/ECGB NRR/DE/EMEB NRR/DRCH/HICB NRR/DRCH/HQMB NRR/DSSA/SPLB RES/DSIR/EIB EXTERNAL:
DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR I ENCL                          ) SIZE:
LSTLOBBYWARDNOACMURPHYIG.A NRCPDRCOPIESLTTRENCL111111111111111111111111RECIPIENT IDCODE/NAME COLBURN,T AEODSPDRABCENTNRR/DRCH/HHFB NRR/DRCH/HOLB NRR/DRPM/PECB NRR/DSSA/SRXB RGN4FILE01LITCOBRYCE,JHNOACPOORE,W.NUDOCSFULLTXTCOPIESLTTRENCL1122111111111111112211110DUN4'0IDS"RECPE~VPLEASEHELPUSTOREDUCEWAS~TE!CONTACTHEOCUMENTCONTROLDESK,ROONOWEN5D-5(EXT.4i5-2083:
TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.
TOELLi>ENATE OURNATEFROi~!DSTREBUTTON LTSTSFORDOCUNENTS YOUDON'TNEED.'ULL TEXTCONVERSION REQUIREDTOTALNUMBEROFCOPIESREQUIRED:
E NOTES:
LTTR26ENCL26
RECIPIENT            COPIES                      RECIPIENT          COPIES ID CODE/NAME          LTTR ENCL                  ID CODE/NAME     LTTR ENCL          0 PD4-2 PD                1      1              COLBURN,T              1    1 INTERNAL: ACRS                        1      1              AEOD SPD RAB          2    2 AEOD/SPD/RRAB             1      1                    CENT            1    1 NRR/DE/ECGB               1      1                                      1    1 NRR/DE/EMEB               1      1              NRR/DRCH/HHFB          1    1 NRR/DRCH/HICB            1      1              NRR/DRCH/HOLB          1    1 NRR/DRCH/HQMB            1      1              NRR/DRPM/PECB         1    1 NRR/DSSA/SPLB            1      1              NRR/DSSA/SRXB         1    1 RES/DSIR/EIB              1      1              RGN4    FILE 01        1    1          D EXTERNAL: L ST LOBBY WARD            1      1              LITCO BRYCE,J H        2    2 NOAC MURPHYIG.A          1      1              NOAC POORE,W.         1    1 NRC PDR                  1      1              NUDOCS FULL TXT        1    1 U
N 4'   0        IDS" REC PE~V PLEASE HELP US TO REDUCE WAS~TE! CONTAC THE OCUMENT CONTROL DESK, ROON OWEN 5D-5 (EXT. 4i5-2083: TO ELLi>ENATE OUR NATE FROi~!
D STREBUTTON LTSTS FOR DOCUNENTS YOU DON'T NEED.'ULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR                      26  ENCL    26


WASHliVGTOiV PUBLICPOWERSUPPLYSYSTEMPO.Box968~3000George1Visshingtott 1Vn)'Richlnrut, 1Vashington 99352.0968
WASHliVGTOiVPUBLIC POWER SUPPLY SYSTEM PO. Box 968 ~ 3000 George 1Visshingtott 1Vn)' Richlnrut, 1Vashington 99352.0968 ~ (S09) 372-SOOO May 24, 1996 G02-96-110 Docket No. 50-397 Document Control Desk U,S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:
~(S09)372-SOOOMay24,1996G02-96-110 DocketNo.50-397DocumentControlDeskU,S.NuclearRegulatory Commission Washington, D.C.20555Gentlemen:


==Subject:==
==Subject:==
NUCLEARPLANTWNP-2,OPERATING LICENSENPF-21,LICENSEEEVENTREPORTNO.96-001-00 Transmitted herewithisLicenseeEventReportNo.96-001-00 forWNP-2.Thisreportissubmitted inresponsetothereporting requirements of10CFR73anddiscusses theitemsofreportability, corrective actiontaken,andactiontakentoprecluderecurrence.
NUCLEAR PLANT WNP-2, OPERATING LICENSE NPF-21, LICENSEE EVENT REPORT NO. 96-001-00 Transmitted herewith is Licensee Event Report No. 96-001-00 for WNP-2. This report is submitted in response to the reporting requirements of 10CFR73 and discusses the items of reportability, corrective action taken, and action taken to preclude recurrence.
Shouldyouhaveanyquestions ordesireadditional information regarding thismatter,pleasecallmeorMs.LourdesFernandez at(509)377-4147.
Should you have any questions or desire additional information regarding this matter, please call me or Ms. Lourdes Fernandez at (509) 377-4147.
tfully,y.R.emtsatropE20)VicePresident, NuclearOperations Enclosure cc:LJCallan,NRCRIVJWClifford, NRCKEPerkins,Jr.,NRCRIV,WCFONSReynolds, Winston&StrawnNRCSr.ResidentInspector, MD927N(2)INPORecordsCenter-Atlanta,GADLWilliams, BPA,MD39996060tI0015 960524PDRADQCK05000397Pl3fttg-,  
tfully, y
~jhl' LICENSEEEVENTREPORT(LER)FAcs(TYNAMEll(DOCXETN(AIS(R(atACE(%Washington NuclearPlant-Unit2050003971A4m(E(>>INADVERTENT ESFACTUATIONS DUETOTRIPPINGOFTEMPORARY POWERSUPPLYTOIN-3BYOUTAGEELECTRICIANS EV(NTDAVE(SIR(tORTDATE(11FACE(TVNAM(SN/AOTN(RFACLITI(S t(VOLVTDle(OOCXETIMIS(R(SI000042596960010005249600opERATSIQ MODE(SITHSR(PORTISSVOM(TTED PVRSVANI'O TIIEREOVTI(M(NTS OF10(TILl(11POW(RLLV(L00100020.402(bl 20.405(e)(l)b)
  . R. emts      at  rop E20)
J20.405(e)(l)(ii)
Vice President, Nuclear Operations Enclosure cc:     LJ Callan, NRC RIV                                    NRC Sr. Resident Inspector, MD927N (2)
I20.405(e)()
JW Clifford, NRC                                      INPO Records Center - Atlanta, GA KE Perkins, Jr., NRC RIV, WCFO                        DL Williams, BPA, MD399 NS Reynolds, Winston & Strawn 96060tI0015 960524 ADQCK 05000397 tg-,
)(N')(20.405(e)(l
PDR                      P l3ft
)(ivl20.405(sl(l
 
)(v)(J20.405c(50.38(c)(1(
~ jhl' LICENSEE EVENT REPORT (LER)
J50.38(cl(2)
FAcs(TY NAME ll(                                                                                                                         DOCXET N(AIS(R (a                            tACE(%
[50,73(s)(2)(i)
Washington Nuclear Plant                                      Unit 2                                                        0 5 0 0 0 3 9 7 1 A 4 m(E(>>       INADVERTENT ESF ACTUATIONS DUE TO TRIPPING OF TEMPORARY POWER SUPPLY TO IN-3 BY OUTAGE ELECTRICIANS EV(NT DAVE (SI                                                                          R(tORT DATE (11                                  OTN(R FACLITI(S t(VOLVTD le(
)50.73(s)(2)(i)
FACE(TV NAM(S OOCXET  IMIS(R(S I N/A                                      0 0 0 04            25        96    96              0      0    1          0        0        05      24        96 0 0 opERATSIQ                  THS R(PORT IS SVOM(TTED PVRSVANI'O TIIE REOVTI(M(NTS OF 10 (TIL l(11 MODE (SI 20.402(bl                       (    J 20.405c                        ( X ] 50.73(e)(2)(ivl                        73.71(b) 20.405(e)(l)b)                      (   50.38(c)(1(                     )   ( 50.73(e)(2)(vl                      ( 73.71(c)
(S0.73(s)(2)(<<)
POW(R LLV(L                            20.405(e)(l)(ii)                    J    50.38(cl(2)                       J 50.73(s)(2)(vi)                      ) OTHER (Specify in Abstract below end J
(X]50.73(e)(2)(ivl
001                                                                                                                                                        in Text. NRC Form 388A) 20.405(e)()  )(N')                        50,73(s)(2)(i)                       50.73(e)(2)(vM)A 0    0  0      I                                          [
)(50.73(e)(2)(vl J50.73(s)(2)(vi) 50.73(e)(2)(vM)A J50.73(s)(2)(vsr)B (50.73(s)(2)(xl 73.71(b)(73.71(c))OTHER(SpecifyinAbstractbelowendinText.NRCForm388A)Uc(NS(ECONTACTFORTHSL(R(INBillPfitzer,Licensing EngineerCOMPLETEOICLs(ETO(IEACNCOMPO(CRT FASIMED(SCRN(Ot(THSR(PORT(ISIAR(ACODE509377-2419SVST(MMAIAFACTVRERR(PORTA(XE TOM%05R(PORTA(LE TOI@ROESVPtLEM(NTAL R(to(ITExt(CTEDIHIYES(ifyes,completeEXPECTEDSUBMISSION DATE)ABSTRACr()6)IXINOEXPECTEDSUBMISSION DATE(15)MON(I(V(A(IOnThursday, April25,1996,at0835,withtheplantdefueled, twotemporary plantelectricians inadvertently openedthefuseddisconnect supplying theUninterruptible PowerSupply(UPS)inverterIN-3loads,causingalossofpowertotheloads.Deenergization ofIN-3loadsresultedinEngineered SafetyFeature(ESF)actuations andcontainment isolations whichwereresetwithoutfurtherincidentbycontrolroompersonnel.
( 20.405(e)(l )(ivl                   )   50.73(s)(2)(i)                    J 50.73(s)(2)(vsr)B 20.405(sl(l ) (v)                   (   S0.73(s)(2)(<<)                     ( 50.73(s)(2)(xl Uc(NS(E CONTACT FOR THS L(R (IN Bill Pfitzer,                     Licensing Engineer                                                                                    AR(A CODE 509                        377-2419 COMPLETE OIC Ls(E TO(I EACN COMPO(CRT FASIME D(SCRN(O      t( THS R(PORT (ISI SVST(M                            MAIAFAC          R(PORTA(XE                                                                                           R(PORTA(LE TVRER            TO M%05                                                                                                TO I@ROE EXPECTED                  MON(I(                        V(A(I SVPtLEM(NTAL R(to(IT Ext(CTED  IHI SUBMISSION YES (if yes, complete EXPECTED SUBMISSION DATE)                                         I XI    NO                    DATE (15)
Atthetime,theIN-3loadswerebeingtemporarily suppliedthroughadisconnect switchlocatedonPowerPanelPP-7Athatwaslabeledasasparedisconnect.
ABSTRACr () 6)
Thedisconnect handlehadacautiontagwhichidentified thedisconnect asONandsupplying temporary powertotheIN-3loads.Alsowrittenonthecautiontagwereinstructions tocontactthecontrolroompriortooperating thedisconnect.
On Thursday, April 25, 1996, at 0835, with the plant defueled, two temporary plant electricians inadvertently opened the fused disconnect supplying the Uninterruptible Power Supply (UPS) inverter IN-3 loads, causing a loss of power to the loads. Deenergization of IN-3 loads resulted in Engineered Safety Feature (ESF) actuations and containment isolations which were reset without further incident by control room personnel.
Thetwoelectricians statedtheydidnotreadandunderstand thecautiontag.Theyhavebeenrestricted fromworkinthepowerblockfortheremainder oftheoutage,andtheimportance oftheadministrative barriersreiterated tomaintenance personnel.
At the time, the IN-3 loads were being temporarily supplied through a disconnect switch located on Power Panel PP-7A that was labeled as a spare disconnect. The disconnect handle had a caution tag which identified the disconnect as ON and supplying temporary power to the IN-3 loads. Also written on the caution tag were instructions to contact the control room prior to operating the disconnect. The two electricians stated they did not read and understand the caution tag. They have been restricted from work in the power block for the remainder of the outage, and the importance of the administrative barriers reiterated to maintenance personnel.
EventNotification wasmadetotheNRCpursuanttotherequirements of10CFR50.72(b)(2).  
Event Notification was made to the NRC pursuant to the requirements of 10 CFR 50.72(b)(2).
~H LICENSVENTREPORT(LER)TEXTCOUATIONTEXT(l7)Washington NuclearPlant-Unit20500039796SEOVCNTIAL NUM80l-001002o"4EvenDescritionOnThursday, April25,1996,at0835,withtheplantdefueled, twotemporary plantelectricians inadvertently openedthefuseddisconnect supplying theUninterruptible PowerSupplyinverter[UJX,INVT]
 
IN-3loads,causingalossofpowertotheloads.Atthetime,theIN-3loadswerebeingtemporarily suppliedthroughadisconnect switchlocatedonPowerPanel[PL]PP-7A,andlabeledasasparedisconnect.
~ H LICENS      VENT REPORT (LER) TEXT CO              UATION SEOVCNTIAL NUM80l Washington Nuclear Plant          Unit 2 05    0 0 0  3  9  7  96  -00          1 0 0  2 o" 4 TEXT (l7)
Deenergization ofIN-3loadsresultedinthefollowing ESFactuations:
Even Descri tion On Thursday, April 25, 1996, at 0835, with the plant defueled, two temporary plant electricians inadvertently opened the fused disconnect supplying the Uninterruptible Power Supply inverter
StartofControlRoomEmergency Filtration systemStartofStandbyGasTreatment system[BH]Isolation ofReactorBuildingVentilation system[VA]Isolation ofthefollowing containment valves:~CSP-V-1[VB,V]andCEP-V-1A[VB,V](containment purgeandexhaust)~RCC-V-5andRCC-V-21[CC,V](containment coolingsupplyandreturn)~EDR-V-395
[UJX,INVT]IN-3 loads, causing a loss of power to the loads. At the time, the IN-3 loads were being temporarily supplied through a disconnect switch located on Power Panel [PL] PP-7A, and labeled as a spare disconnect. Deenergization of IN-3 loads resulted in the following ESF actuations:
[V]andFDR-V-220
Start of Control Room Emergency Filtration system Start of Standby Gas Treatment system [BH]
[V](reactorbuildingsumpdischarges toradwaste)
Isolation of Reactor Building Ventilation system [VA]
Atthetimeoftheincident, thepersonnel involvedwerewalkingdownWorkOrderTaskDS34-01inpreparation forreplacing thedisconnect switch.Theirintentwastotakephotographs ofthedisconnect fuseclips,andwhileattempting toopenthecabinetdoortotakethephotostheyinadvertently openedthedisconnect.
Isolation of the following containment valves:
Immediate orrective ActionOperations restoredpowertoIN-3loadsandresettheESFactuations withoutfurtherincident.
                  ~       CSP-V-1 [VB,V] and CEP-V-1A [VB,V] (containment purge and exhaust)
'EventNotification wasmadetotheNRCpursuanttotherequirements of10CFR50.72(b)(2).
                  ~       RCC-V-5 and RCC-V-21 [CC,V] (containment cooling supply and return)
Thetemporary electricians involvedwererestricted fromperforming workinthepowerblock.'IManagement expectations concerning equipment cle'arance requirements andtheappropriate approvals neededpriortoenteringpanels,components orsystems,werereiterated duringbriefings withplantandcontractor maintenance personnel regarding thisevent.
                  ~       EDR-V-395 [V] and FDR-V-220 [V] (reactor building sump discharges to radwaste)
LICENSVENTREPORT(LER)TEXTCOUATlONTEXT(17)Washington NuclearPlant-Unit20500039796SKIIIIIHTIAI HVMIOI001003o"4FrtherEvaluinThetwoelectricians statedtheyassumedthedisconnect wasopenbecausetheworkinstructions identified thedisconnect asaspare,andtheinstructions madenomentionofthedisconnect beingthetemporary powersupplytoIN-3.Furthermore, theyfoundthebreakerhandleinthemid-positionbetweenOPENandCLOSED.Theelectricians didnotquestionthiscondition becausetheworkinstructions described theproblemas,"cubiclewillnotcloseproperlyandhasmissingparts.Themainbarrierinplacetopreventthisoccurrence wasacautionorderonthedisconnect handlewhichstatedthestatusasON.Thebacksideofthecardread,"Cautiontagthetemporary powersupplybreakertoPP-7A-Aper10.25.1step6.1.14.DonotoperatewithoutCRS/Shift Managerpermission."
At the time of the incident, the personnel involved were walking down Work Order Task DS34-01 in preparation for replacing the disconnect switch. Their intent was to take photographs of the disconnect fuse clips, and while attempting to open the cabinet door to take the photos they inadvertently opened the disconnect.
Theelectricians statedtheyfailedtonoticethestatusONindication onthefrontofthecard,anddidnotreadtheinformation onthebackofthecard.Anadditional barrierwasprovidedbydirection giveninprocedure PPM1.3.7Gwhichspecifically disallows openingofpanelsbycraftsmen performing walkdownofworkinstructions.
Immediate     orrective Action Operations restored power to IN-3 loads and reset the ESF actuations without further incident.
RootauseTheprimaryrootcauseofthiseventwaspersonnel error.Theelectricians involveddidnotreadandfollowtheinstructions onthecautiontag.Additionally, theelectricians didnotfollowtherequirements ofPPM1.3.7Gwhichspecifically disallows openingofpanelsbycraftsmen performing walkdownofworkinstructions.
Event Notification was made to the NRC pursuant to the requirements of 10 CFR 50.72(b)(2).
Contributing causeswerelackofaquestioning attitudeandinexperience usingSupplySystemprocedures.
The temporary electricians involved were restricted from performing work in the power block.
Furtherorrective AcinRevisePPM10.25.1toincludetherequirement toprovidefieldidentification ofsparedisconnects whichareproviding temporary power.Reviseapplicable maintenance lessonplansregarding clearance orders(PPM1.3.8)andopeningofpanelsbymaintenance personnel (PPM1.3.7G)toincludelessonslearnedfromthisevent.AsementofSafensuenceThesafetyconsequences ofthiseventareminimalbecausetheplantwasdefueledinMode5.Allexpectedactuations andisolations
                                                      'I Management expectations concerning equipment cle'arance requirements and the appropriate approvals needed prior to entering panels, components or systems, were reiterated during briefings with plant and contractor maintenance personnel regarding this event.
: occurred, andtheaffectedsystemswererestoredbycontrol'oompersonnel withoutfurtherincident.
 
LICENSVENTREPORT(LER)TEXTCO,UATIONTEXTu7)Washington NuclearPlant-Unit20500039796001004o"4PreviousimilarEventsPreviousLERsdocumenting personnel errorresulting inESForRPSactuation areasfollows:~LER95-002involvedOperations personnel operating thewrongleverduringamainturbinetestresulting inturbinetripandreactorscram.~LER93-024involvedpersonnel errorandfailuretoselfcheckduringrestoration oftheContainment Instrument Air(CIA)system.Improperrestoration resultedinactuation oftheCIAbackupnitrogenbottleprogrammer.
LICENS      VENT REPORT (LER) TEXT CO                UATlON SKIIIIIHTIAI HVMIOI Unit 2 Washington Nuclear Plant                        05    0 0 0  3  9  7  96    0 0 1        0 0  3  o" 4 TEXT (17)
~LER93-002-01 involvedpaintersinadvertently actuating ReactorFeedwater PumpRoom"A"fireprotection delugesystemwhichultimately ledtothetripofReactorFeedwater Pump"A"tripandreactorscram.}}
F rther Evalu i    n The two electricians stated they assumed the disconnect was open because the work instructions identified the disconnect as a spare, and the instructions made no mention of the disconnect being the temporary power supply to IN-3. Furthermore, they found the breaker handle in the mid-position between OPEN and CLOSED. The electricians did not question this condition because the work instructions described the problem as, "cubicle will not close properly and has missing parts.
The main barrier in place to prevent this occurrence was a caution order on the disconnect handle which stated the status as ON. The back side of the card read, "Caution tag the temporary power supply breaker to PP-7A-A per 10.25.1 step 6.1.14. Do not operate without CRS/Shift Manager permission." The electricians stated they failed to notice the status ON indication on the front of the card, and did not read the information on the back of the card. An additional barrier was provided by direction given in procedure PPM 1.3.7G which specifically disallows opening of panels by craftsmen performing walkdown of work instructions.
Root    ause The primary root cause of this event was personnel error. The electricians involved did not read and follow the instructions on the caution tag. Additionally, the electricians did not follow the requirements of PPM 1.3.7G which specifically disallows opening of panels by craftsmen performing walkdown of work instructions. Contributing causes were lack of a questioning attitude and inexperience using Supply System procedures.
Further    orrective Ac i n Revise PPM 10.25.1 to include the requirement to provide field identification  of spare disconnects which are providing temporary power.
Revise applicable maintenance lesson plans regarding clearance orders (PPM 1.3.8) and opening of panels by maintenance personnel (PPM 1.3.7G) to include lessons learned from this event.
As e ment    of Safe    ns  uence The safety consequences    of this event are minimal because the plant was defueled in Mode 5. All expected actuations and isolations occurred, and the affected systems were restored by control
      'oom personnel without further incident.
 
LICENS        VENT REPORT (LER) TEXT        CO,     UATION Washington Nuclear Plant          Unit  2      05  0  0 0  3  9  7  96    0 0 1    0 0  4 o" 4 TEXT u7)
Previous  imilar Events Previous LERs documenting personnel error resulting in ESF or RPS actuation are as follows:
        ~ LER 95-002 involved Operations personnel operating the wrong lever during a main turbine test resulting in turbine trip and reactor scram.
        ~ LER 93-024 involved personnel error and failure to self check during restoration of the Containment Instrument Air (CIA) system. Improper restoration resulted in actuation of the CIA backup nitrogen bottle programmer.
        ~ LER 93-002-01 involved painters inadvertently actuating Reactor Feedwater Pump Room "A" fire protection deluge system which ultimately led to the trip of Reactor Feedwater Pump "A" trip and reactor scram.}}

Latest revision as of 07:04, 4 February 2020

LER 96-001-00:on 960425,inadvertent ESF Actuations Occurred Due to Tripping of Temporary Power Supply to IN-3.Caused by Personnel Error.Operations Restored to IN-3 Loads & Reset ESF actuations.W/960524 Ltr
ML17292A286
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/24/1996
From: Bemis P, Pfitzer B
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-96-110, LER-96-001, LER-96-1, NUDOCS 9606040015
Download: ML17292A286 (9)


Text

CATEGORY REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9606040015 DOC.DATE: 96/05/24 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS .Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION PFITZER,B. Washington Public Power Supply System BEMIS,P.R. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

LER 96-001-00:on 960425,inadvertent ESF actuations occurred due to tripping of temporary power supply to IN-3.Caused by personnel error. Operations restored to IN-3 loads & reset ESF actuations.W/960524 ltr.

DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR I ENCL ) SIZE:

TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.

E NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 0 PD4-2 PD 1 1 COLBURN,T 1 1 INTERNAL: ACRS 1 1 AEOD SPD RAB 2 2 AEOD/SPD/RRAB 1 1 CENT 1 1 NRR/DE/ECGB 1 1 1 1 NRR/DE/EMEB 1 1 NRR/DRCH/HHFB 1 1 NRR/DRCH/HICB 1 1 NRR/DRCH/HOLB 1 1 NRR/DRCH/HQMB 1 1 NRR/DRPM/PECB 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 RES/DSIR/EIB 1 1 RGN4 FILE 01 1 1 D EXTERNAL: L ST LOBBY WARD 1 1 LITCO BRYCE,J H 2 2 NOAC MURPHYIG.A 1 1 NOAC POORE,W. 1 1 NRC PDR 1 1 NUDOCS FULL TXT 1 1 U

N 4' 0 IDS" REC PE~V PLEASE HELP US TO REDUCE WAS~TE! CONTAC THE OCUMENT CONTROL DESK, ROON OWEN 5D-5 (EXT. 4i5-2083: TO ELLi>ENATE OUR NATE FROi~!

D STREBUTTON LTSTS FOR DOCUNENTS YOU DON'T NEED.'ULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL 26

WASHliVGTOiVPUBLIC POWER SUPPLY SYSTEM PO. Box 968 ~ 3000 George 1Visshingtott 1Vn)' Richlnrut, 1Vashington 99352.0968 ~ (S09) 372-SOOO May 24, 1996 G02-96-110 Docket No. 50-397 Document Control Desk U,S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:

Subject:

NUCLEAR PLANT WNP-2, OPERATING LICENSE NPF-21, LICENSEE EVENT REPORT NO. 96-001-00 Transmitted herewith is Licensee Event Report No. 96-001-00 for WNP-2. This report is submitted in response to the reporting requirements of 10CFR73 and discusses the items of reportability, corrective action taken, and action taken to preclude recurrence.

Should you have any questions or desire additional information regarding this matter, please call me or Ms. Lourdes Fernandez at (509) 377-4147.

tfully, y

. R. emts at rop E20)

Vice President, Nuclear Operations Enclosure cc: LJ Callan, NRC RIV NRC Sr. Resident Inspector, MD927N (2)

JW Clifford, NRC INPO Records Center - Atlanta, GA KE Perkins, Jr., NRC RIV, WCFO DL Williams, BPA, MD399 NS Reynolds, Winston & Strawn 96060tI0015 960524 ADQCK 05000397 tg-,

PDR P l3ft

~ jhl' LICENSEE EVENT REPORT (LER)

FAcs(TY NAME ll( DOCXET N(AIS(R (a tACE(%

Washington Nuclear Plant Unit 2 0 5 0 0 0 3 9 7 1 A 4 m(E(>> INADVERTENT ESF ACTUATIONS DUE TO TRIPPING OF TEMPORARY POWER SUPPLY TO IN-3 BY OUTAGE ELECTRICIANS EV(NT DAVE (SI R(tORT DATE (11 OTN(R FACLITI(S t(VOLVTD le(

FACE(TV NAM(S OOCXET IMIS(R(S I N/A 0 0 0 04 25 96 96 0 0 1 0 0 05 24 96 0 0 opERATSIQ THS R(PORT IS SVOM(TTED PVRSVANI'O TIIE REOVTI(M(NTS OF 10 (TIL l(11 MODE (SI 20.402(bl ( J 20.405c ( X ] 50.73(e)(2)(ivl 73.71(b) 20.405(e)(l)b) ( 50.38(c)(1( ) ( 50.73(e)(2)(vl ( 73.71(c)

POW(R LLV(L 20.405(e)(l)(ii) J 50.38(cl(2) J 50.73(s)(2)(vi) ) OTHER (Specify in Abstract below end J

001 in Text. NRC Form 388A) 20.405(e)() )(N') 50,73(s)(2)(i) 50.73(e)(2)(vM)A 0 0 0 I [

( 20.405(e)(l )(ivl ) 50.73(s)(2)(i) J 50.73(s)(2)(vsr)B 20.405(sl(l ) (v) ( S0.73(s)(2)(<<) ( 50.73(s)(2)(xl Uc(NS(E CONTACT FOR THS L(R (IN Bill Pfitzer, Licensing Engineer AR(A CODE 509 377-2419 COMPLETE OIC Ls(E TO(I EACN COMPO(CRT FASIME D(SCRN(O t( THS R(PORT (ISI SVST(M MAIAFAC R(PORTA(XE R(PORTA(LE TVRER TO M%05 TO I@ROE EXPECTED MON(I( V(A(I SVPtLEM(NTAL R(to(IT Ext(CTED IHI SUBMISSION YES (if yes, complete EXPECTED SUBMISSION DATE) I XI NO DATE (15)

ABSTRACr () 6)

On Thursday, April 25, 1996, at 0835, with the plant defueled, two temporary plant electricians inadvertently opened the fused disconnect supplying the Uninterruptible Power Supply (UPS) inverter IN-3 loads, causing a loss of power to the loads. Deenergization of IN-3 loads resulted in Engineered Safety Feature (ESF) actuations and containment isolations which were reset without further incident by control room personnel.

At the time, the IN-3 loads were being temporarily supplied through a disconnect switch located on Power Panel PP-7A that was labeled as a spare disconnect. The disconnect handle had a caution tag which identified the disconnect as ON and supplying temporary power to the IN-3 loads. Also written on the caution tag were instructions to contact the control room prior to operating the disconnect. The two electricians stated they did not read and understand the caution tag. They have been restricted from work in the power block for the remainder of the outage, and the importance of the administrative barriers reiterated to maintenance personnel.

Event Notification was made to the NRC pursuant to the requirements of 10 CFR 50.72(b)(2).

~ H LICENS VENT REPORT (LER) TEXT CO UATION SEOVCNTIAL NUM80l Washington Nuclear Plant Unit 2 05 0 0 0 3 9 7 96 -00 1 0 0 2 o" 4 TEXT (l7)

Even Descri tion On Thursday, April 25, 1996, at 0835, with the plant defueled, two temporary plant electricians inadvertently opened the fused disconnect supplying the Uninterruptible Power Supply inverter

[UJX,INVT]IN-3 loads, causing a loss of power to the loads. At the time, the IN-3 loads were being temporarily supplied through a disconnect switch located on Power Panel [PL] PP-7A, and labeled as a spare disconnect. Deenergization of IN-3 loads resulted in the following ESF actuations:

Start of Control Room Emergency Filtration system Start of Standby Gas Treatment system [BH]

Isolation of Reactor Building Ventilation system [VA]

Isolation of the following containment valves:

~ CSP-V-1 [VB,V] and CEP-V-1A [VB,V] (containment purge and exhaust)

~ RCC-V-5 and RCC-V-21 [CC,V] (containment cooling supply and return)

~ EDR-V-395 [V] and FDR-V-220 [V] (reactor building sump discharges to radwaste)

At the time of the incident, the personnel involved were walking down Work Order Task DS34-01 in preparation for replacing the disconnect switch. Their intent was to take photographs of the disconnect fuse clips, and while attempting to open the cabinet door to take the photos they inadvertently opened the disconnect.

Immediate orrective Action Operations restored power to IN-3 loads and reset the ESF actuations without further incident.

Event Notification was made to the NRC pursuant to the requirements of 10 CFR 50.72(b)(2).

The temporary electricians involved were restricted from performing work in the power block.

'I Management expectations concerning equipment cle'arance requirements and the appropriate approvals needed prior to entering panels, components or systems, were reiterated during briefings with plant and contractor maintenance personnel regarding this event.

LICENS VENT REPORT (LER) TEXT CO UATlON SKIIIIIHTIAI HVMIOI Unit 2 Washington Nuclear Plant 05 0 0 0 3 9 7 96 0 0 1 0 0 3 o" 4 TEXT (17)

F rther Evalu i n The two electricians stated they assumed the disconnect was open because the work instructions identified the disconnect as a spare, and the instructions made no mention of the disconnect being the temporary power supply to IN-3. Furthermore, they found the breaker handle in the mid-position between OPEN and CLOSED. The electricians did not question this condition because the work instructions described the problem as, "cubicle will not close properly and has missing parts.

The main barrier in place to prevent this occurrence was a caution order on the disconnect handle which stated the status as ON. The back side of the card read, "Caution tag the temporary power supply breaker to PP-7A-A per 10.25.1 step 6.1.14. Do not operate without CRS/Shift Manager permission." The electricians stated they failed to notice the status ON indication on the front of the card, and did not read the information on the back of the card. An additional barrier was provided by direction given in procedure PPM 1.3.7G which specifically disallows opening of panels by craftsmen performing walkdown of work instructions.

Root ause The primary root cause of this event was personnel error. The electricians involved did not read and follow the instructions on the caution tag. Additionally, the electricians did not follow the requirements of PPM 1.3.7G which specifically disallows opening of panels by craftsmen performing walkdown of work instructions. Contributing causes were lack of a questioning attitude and inexperience using Supply System procedures.

Further orrective Ac i n Revise PPM 10.25.1 to include the requirement to provide field identification of spare disconnects which are providing temporary power.

Revise applicable maintenance lesson plans regarding clearance orders (PPM 1.3.8) and opening of panels by maintenance personnel (PPM 1.3.7G) to include lessons learned from this event.

As e ment of Safe ns uence The safety consequences of this event are minimal because the plant was defueled in Mode 5. All expected actuations and isolations occurred, and the affected systems were restored by control

'oom personnel without further incident.

LICENS VENT REPORT (LER) TEXT CO, UATION Washington Nuclear Plant Unit 2 05 0 0 0 3 9 7 96 0 0 1 0 0 4 o" 4 TEXT u7)

Previous imilar Events Previous LERs documenting personnel error resulting in ESF or RPS actuation are as follows:

~ LER 95-002 involved Operations personnel operating the wrong lever during a main turbine test resulting in turbine trip and reactor scram.

~ LER 93-024 involved personnel error and failure to self check during restoration of the Containment Instrument Air (CIA) system. Improper restoration resulted in actuation of the CIA backup nitrogen bottle programmer.

~ LER 93-002-01 involved painters inadvertently actuating Reactor Feedwater Pump Room "A" fire protection deluge system which ultimately led to the trip of Reactor Feedwater Pump "A" trip and reactor scram.