ML13302B869: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML13302B869
| number = ML13302B869
| issue date = 10/29/2013
| issue date = 10/29/2013
| title = Fermi Power Plant, Unit 2 - Requalification Program Inspection
| title = Requalification Program Inspection
| author name = Peterson H
| author name = Peterson H
| author affiliation = NRC/RGN-III/DRS/OB
| author affiliation = NRC/RGN-III/DRS/OB
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 October 29, 2013 Mr. Joseph Plona Senior Vice President and Chief Nuclear Officer Detroit Edison Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, MI 48166
-4352 October 29, 2013 Mr. Joseph Plona Senior Vice President and Chief Nuclear Officer Detroit Edison Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, MI 48166


==SUBJECT:==
==SUBJECT:==
Line 22: Line 21:


==Dear Mr. Plona:==
==Dear Mr. Plona:==
In a telephone conversation on October 17
 
, 2013, Mr. R. Duke, Operator Requalification Training Supervisor, and Mr. B
In a telephone conversation on October 17, 2013, Mr. R. Duke, Operator Requalification Training Supervisor, and Mr. B. Palagi, NRC Inspector, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect the Licensed Operator Requalification Program at the Fermi Power Plant, Unit 2. The inspection is planned for the week of November 4, 2013, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved Requalification Program.
. Palagi, NRC Inspector
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the written examinations, and operating tests scheduled for the week of the inspection to the NRC by October 28, 2013. Mr. R. Duke has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
, made arrangements for the U.S. Nuclear Regulatory Commission (
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, Control Number 3150-0018. The public reporting burden for this collection of information is estimated to average four hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to infocollects@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
NRC) to inspect the Licensed Operator Requalification Program at the Fermi Power Plant, Unit 2
. The inspection is planned for the week of November 4, 2013, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC
-approved Requalification Program. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit the ir biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the written examinations
, and operating tests scheduled for the week of the inspection to the NRC by October 28, 2013. Mr. R. Duke has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, Control Number 3150
-0018. The public reporting burden for this collection of information is estimated to average four hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T
-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555
-0001, or by Internet electronic mail to infocollects@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150
-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to a collection of information unless it displays a currently valid OMB control number.
The NRC may not conduct or sponsor, and a person is not required to respond to a collection of information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading
-rm/adams.html.
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. B. Palagi at 630-829-9611, or I can be reached at 630
-829-9707. Sincerely,
/RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50
-341 License No. NPF-43 cc:  Distribution via ListServ
Ž In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading
-rm/adams.html.
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. B. Palagi at 630-829-9611, or I can be reached at 630
-829-9707. Sincerely,


/RA/
J. Plona                                      In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the Electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. B. Palagi at 630-829-9611, or I can be reached at 630-829-9707.
-341 License No. NPF-43 cc: Distribution via ListServ
Sincerely,
Ž DISTRIBUTION
                                                /RA/
: Daniel Rich RidsNrrDorlLpl3
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 cc: Distribution via ListServ'
-1 Resource RidsNrrPMFermi2 Resource RidsNrrDirsIrib Resource Cynthia Pederson


Anne Boland Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak John McHale DOCUMENT NAME: Ltr 102913 Fermi Requal Inspection (BBP).docx x Publicly Available
J. Plona                                                                In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the Electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
-Publicly Available x Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII   RIII   RIII   RIII   NAME MBielby for BPalagi:bl HPeterson DATE 10/25/13 10/29/13     OFFICIAL RECORD COPY}}
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. B. Palagi at 630-829-9611, or I can be reached at 630-829-9707.
Sincerely,
                                                                          /RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 cc: Distribution via ListServ' DISTRIBUTION:
Daniel Rich RidsNrrDorlLpl3-1 Resource RidsNrrPMFermi2 Resource RidsNrrDirsIrib Resource Cynthia Pederson Anne Boland Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak John McHale DOCUMENT NAME: Ltr 102913 Fermi Requal Inspection (BBP).docx x Publicly Available                         Non-Publicly Available                   Sensitive            x Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE             RIII                                       RIII                     RIII                               RIII NAME               MBielby for BPalagi:bl                     HPeterson DATE               10/25/13                                   10/29/13 OFFICIAL RECORD COPY}}

Latest revision as of 13:01, 4 November 2019

Requalification Program Inspection
ML13302B869
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/29/2013
From: Hironori Peterson
Operations Branch III
To: Plona J
Detroit Edison, Co
Bruce Palagi
References
Download: ML13302B869 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 October 29, 2013 Mr. Joseph Plona Senior Vice President and Chief Nuclear Officer Detroit Edison Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, MI 48166

SUBJECT:

FERMI POWER PLANT, UNIT 2 - REQUALIFICATION PROGRAM INSPECTION

Dear Mr. Plona:

In a telephone conversation on October 17, 2013, Mr. R. Duke, Operator Requalification Training Supervisor, and Mr. B. Palagi, NRC Inspector, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect the Licensed Operator Requalification Program at the Fermi Power Plant, Unit 2. The inspection is planned for the week of November 4, 2013, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved Requalification Program.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the written examinations, and operating tests scheduled for the week of the inspection to the NRC by October 28, 2013. Mr. R. Duke has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, Control Number 3150-0018. The public reporting burden for this collection of information is estimated to average four hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to infocollects@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to a collection of information unless it displays a currently valid OMB control number.

J. Plona In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the Electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. B. Palagi at 630-829-9611, or I can be reached at 630-829-9707.

Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 cc: Distribution via ListServ'

J. Plona In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the Electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. B. Palagi at 630-829-9611, or I can be reached at 630-829-9707.

Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 cc: Distribution via ListServ' DISTRIBUTION:

Daniel Rich RidsNrrDorlLpl3-1 Resource RidsNrrPMFermi2 Resource RidsNrrDirsIrib Resource Cynthia Pederson Anne Boland Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak John McHale DOCUMENT NAME: Ltr 102913 Fermi Requal Inspection (BBP).docx x Publicly Available Non-Publicly Available Sensitive x Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME MBielby for BPalagi:bl HPeterson DATE 10/25/13 10/29/13 OFFICIAL RECORD COPY