|
|
(3 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML14111A367 | | | number = ML14111A367 |
| | issue date = 03/21/2014 | | | issue date = 03/21/2014 |
| | title = River Bend -2014-03-Draft Outline Comments | | | title = 2014-03-Draft Outline Comments |
| | author name = Gaddy V G | | | author name = Gaddy V |
| | author affiliation = NRC/RGN-IV/DRS/OB | | | author affiliation = NRC/RGN-IV/DRS/OB |
| | addressee name = | | | addressee name = |
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:Attachment 6 OBDI 202 | | {{#Wiki_filter:DRAFT OUTLINE COMMENTS Facility: River Bend First Exam Date: 3/21/14 Written Exam Outline Comment Resolution In Tier 1, Group 2 for the RO, System K/A moved. |
| - IOLE Process Rev 1 DRAFT OUTLINE COMMENTS Facility:
| | 295008 is High Reactor Water Level, but 1 the K/A is for High Containment Temperature. Need to move the K/A to system 295011. |
| River Bend First Exam Date: | | 2 3 |
| 3/21/14 Written Exam Outline Comment Resolution 1 In Tier 1, Group 2 for the RO, System 295008 is High Reactor Water Level, but the K/A is for High Containment Temperature. Need to move the K/A to system 295011. | | 4 5 |
| K/A moved.
| | Administrative JPM Outline (Date) |
| 2 3 4 5 Administrative JPM Outline (Date) Comment Resolution 1 JPMs A5, A7, and A8 appear to be RO JPMs. Need to convert at least one to an SRO level JPM. | | Comment Resolution JPMs A5, A7, and A8 appear to be RO JPMs A7 and A8 replaced. |
| JPM's A7 and A8 replaced.
| | 1 JPMs. Need to convert at least one to an SRO level JPM. |
| 2 3 4 5 Control Room / In | | 2 3 |
| -Plant System JPM Outline (Date) Comment Resolution 1 Check with exam author to determine if JPM S5 is a one step JPM. | | 4 5 |
| Determined that the JPM is not one step due to alternate path.
| | Control Room / In-Plant System JPM Outline (Date) |
| 2 3 4 5 Attachment 6 OBDI 202 | | Comment Resolution Check with exam author to determine if Determined that the JPM is not one step due 1 |
| - IOLE Process Rev 1 Simulator Scenario Outline Comments (Date) Comment Resolution 1 Scenario 1 | | JPM S5 is a one step JPM. to alternate path. |
| - Replace Event 2 with an I/C malfunction for the ATC. | | 2 3 |
| | 4 5 OBDI 202 - IOLE Process Rev 1 |
| | |
| | Simulator Scenario Outline Comments (Date) |
| | Comment Resolution Scenario 1 - Replace Event 2 with an Scenario revised to incorporate comments. |
| | I/C malfunction for the ATC. |
| If Event 6 is an action required in response to Event 5, eliminate Event 6. | | If Event 6 is an action required in response to Event 5, eliminate Event 6. |
| What is the cause of the uncontrolled pressure drop and what is the remed y? What alternate leg of the EOPs is exercised in this scenario? | | 1 What is the cause of the uncontrolled pressure drop and what is the remedy? |
| Scenario revised to incorporate comments. | | What alternate leg of the EOPs is exercised in this scenario? |
| 2 Scenario 2 | | Scenario 2 - Make Event 2 Event 1. Scenario revised to incorporate comments. |
| - Make Event 2 Event 1. | |
| Delete Event 1 and 3. | | Delete Event 1 and 3. |
| Add an I/C malfunction for the ATC before the major event. | | Add an I/C malfunction for the ATC before the major event. |
| What alternate leg of the EOPs is exercised in this scenario? | | 2 What alternate leg of the EOPs is exercised in this scenario? |
| If Event 6 directly leads to Event 7 then it is part of the major event. | | If Event 6 directly leads to Event 7 then it is part of the major event. |
| Scenario revised to incorporate comments. | | Scenario 3 - Make Event 2 Event 1. Scenario revised to incorporate comments. |
| 3 Scenario 3 | |
| - Make Event 2 Event 1. | |
| Delete Events 1 and 3. | | Delete Events 1 and 3. |
|
| |
| Add an I/C for the BOP before the major event. | | Add an I/C for the BOP before the major event. |
| Does Event 5 result in a loss of both CRD pumps? What are the Tech Spec implications? | | Does Event 5 result in a loss of both CRD pumps? What are the Tech Spec 3 |
| | implications? |
| What alternate leg of the EOPs is exercised in this scenario? | | What alternate leg of the EOPs is exercised in this scenario? |
| Add a second Tech Spec event. | | Add a second Tech Spec event. |
| What are the expected actions for Event 8? Scenario revised to incorporate comments. | | What are the expected actions for Event 8? |
| 4 Scenario 4
| | Scenario 4 - Delete Event 2. Scenario revised to incorporate comments. |
| - Delete Event 2. | | Component names were added. Note that Add a Tech Spec Event for the BOP Scenario 4 is the spare. |
| Add a Tech Spec Event for the BOP before the major event. | | 4 before the major event. |
| What is the significance of the loss of Scenario revised to incorporate comments. Component names were added. | | What is the significance of the loss of OBDI 202 - IOLE Process Rev 1 |
| Note that Scenario 4 is the spare.
| |
|
| |
|
| Attachment 6 OBDI 202
| | RHR A in event 7? |
| - IOLE Process Rev 1 RHR A in event 7?
| |
| What alternate leg of the EOPs is exercised in this scenario? | | What alternate leg of the EOPs is exercised in this scenario? |
| What is HDL | | What is HDL-P1A? |
| -P1A? | | What is CNM-FV114? |
| What is CNM-FV114? What is the significance of Event 9? | | What is the significance of Event 9? |
| 5}} | | 5 OBDI 202 - IOLE Process Rev 1}} |
|
---|
Category:License-Operator
MONTHYEARIR 05000458/20243012024-04-0202 April 2024 Notification of NRC Initial Operator Licensing Examination 05000458/2024301 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23031A0132023-02-14014 February 2023 Examination Confirmation Letter No. 50-186/OL-23-01, University of Missouri-Columbia ML22354A2582022-12-15015 December 2022 10_RBS-2022-12 Post-Exam Comments ML23004A1922022-12-14014 December 2022 11_RBS-2022-12 Public Forms ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21320A3692021-11-30030 November 2021 Notification of NRC Initial Operator Licensing Examination 05000458/2022301 2CAN042102, 10 AN2-2021-03 Post-Exam Comments2021-04-16016 April 2021 10_AN2-2021-03 Post-Exam Comments ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21096A0212021-02-19019 February 2021 RB-2021-02 Draft Operating Test Comments ML21111A1472021-02-19019 February 2021 RB-2021-02 Public Forms ML21096A0282021-02-19019 February 2021 RB-2021-02 Final Written Exam ML21096A0272021-02-19019 February 2021 RB-2021-02 Final Outlines ML21095A0532021-02-19019 February 2021 RB-2021-02 Final Op Test ML21096A0262021-02-19019 February 2021 RB-2021-02 Draft Written Exam ML21096A0322021-02-19019 February 2021 RB-2021-02 Post Exam Comments ML21096A0252021-02-19019 February 2021 RB-2021-02 Draft Written Exam Comments ML21096A0232021-02-19019 February 2021 RB-2021-02 Draft Outline Comments ML21096A0242021-02-19019 February 2021 RB-2021-02 Draft Outlines ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20015A4712019-11-26026 November 2019 2019-11-Public Forms ML20006C6592019-11-26026 November 2019 2019-11-Post Exam Comments ML19312B5852019-11-0808 November 2019 NRC Initial Operator Licensing Examination Approval 05000458/2019301 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML18340A0892018-12-0606 December 2018 Notification of NRC Initial Operator Licensing Examination 05000458/2019301 ML18198A2172018-07-16016 July 2018 NRC Initial Operator Licensing Examination Approval 05000458/2018301 ML18135A0672018-05-14014 May 2018 Response to Regulatory Issue Summary 2018-02 ML18086B0842018-02-16016 February 2018 Facility Cover Letter - Riv - March 2018 - GFE ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17361A0422017-12-26026 December 2017 Notification of NRC Initial Operator Licensing Examination 05000458/2018301 ML17048A3562017-02-17017 February 2017 Generic Fundamentals Examination Results ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 ML16280A4602016-09-30030 September 2016 2016-09 Draft Outlines ML16285A0172016-09-30030 September 2016 2016-09 Public Forms ML16280A4652016-09-30030 September 2016 2016-09 Final Outlines ML16280A4642016-09-30030 September 2016 2016-09 Draft Written Exam ML16280A4492016-09-30030 September 2016 2016-09-Written Handouts Package ML16280A4352016-09-30030 September 2016 2016-09 Final Written Exam ML16280A4622016-09-30030 September 2016 2016-09 Draft Written Comments ML16280A4592016-09-30030 September 2016 2016-09 Draft Outline Comments ML16280A4562016-09-30030 September 2016 2016-09 Draft Op Test ML16280A4532016-09-30030 September 2016 2016-09 Draft Op Test Comments ML16280A4372016-09-12012 September 2016 2016-09 Final Op Test ML16246A0012016-09-0101 September 2016 NRC Initial Operator Licensing Examination Approval 05000458/2016301 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML15180A0512015-06-29029 June 2015 Generic Fundamentals Examination Results June 2015 ML16043A0022015-06-19019 June 2015 May 2015 Draft Written Initial License Retake Exam, Reactor Operator ML16043A0012015-06-19019 June 2015 2015-05-DRAFT Outline ML16043A0002015-06-19019 June 2015 2015-05 - Draft Outline Comments 2024-04-02
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000458/20243012024-04-0202 April 2024 Notification of NRC Initial Operator Licensing Examination 05000458/2024301 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23031A0132023-02-14014 February 2023 Examination Confirmation Letter No. 50-186/OL-23-01, University of Missouri-Columbia ML22354A2582022-12-15015 December 2022 10_RBS-2022-12 Post-Exam Comments ML23004A1922022-12-14014 December 2022 11_RBS-2022-12 Public Forms ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21320A3692021-11-30030 November 2021 Notification of NRC Initial Operator Licensing Examination 05000458/2022301 ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations 2CAN042102, 10 AN2-2021-03 Post-Exam Comments2021-04-16016 April 2021 10_AN2-2021-03 Post-Exam Comments ML21095A0532021-02-19019 February 2021 RB-2021-02 Final Op Test ML21096A0232021-02-19019 February 2021 RB-2021-02 Draft Outline Comments ML21096A0282021-02-19019 February 2021 RB-2021-02 Final Written Exam ML21096A0272021-02-19019 February 2021 RB-2021-02 Final Outlines ML21111A1472021-02-19019 February 2021 RB-2021-02 Public Forms ML21096A0322021-02-19019 February 2021 RB-2021-02 Post Exam Comments ML21096A0252021-02-19019 February 2021 RB-2021-02 Draft Written Exam Comments ML21096A0262021-02-19019 February 2021 RB-2021-02 Draft Written Exam ML21096A0242021-02-19019 February 2021 RB-2021-02 Draft Outlines ML21096A0212021-02-19019 February 2021 RB-2021-02 Draft Operating Test Comments ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20015A4712019-11-26026 November 2019 2019-11-Public Forms ML20006C6592019-11-26026 November 2019 2019-11-Post Exam Comments ML19312B5852019-11-0808 November 2019 NRC Initial Operator Licensing Examination Approval 05000458/2019301 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML18340A0892018-12-0606 December 2018 Notification of NRC Initial Operator Licensing Examination 05000458/2019301 ML18198A2172018-07-16016 July 2018 NRC Initial Operator Licensing Examination Approval 05000458/2018301 ML18135A0672018-05-14014 May 2018 Response to Regulatory Issue Summary 2018-02 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17361A0422017-12-26026 December 2017 Notification of NRC Initial Operator Licensing Examination 05000458/2018301 ML17048A3562017-02-17017 February 2017 Generic Fundamentals Examination Results ML16280A4532016-09-30030 September 2016 2016-09 Draft Op Test Comments ML16280A4652016-09-30030 September 2016 2016-09 Final Outlines ML16285A0172016-09-30030 September 2016 2016-09 Public Forms ML16280A4492016-09-30030 September 2016 2016-09-Written Handouts Package ML16280A4352016-09-30030 September 2016 2016-09 Final Written Exam ML16280A4562016-09-30030 September 2016 2016-09 Draft Op Test ML16280A4592016-09-30030 September 2016 2016-09 Draft Outline Comments ML16280A4602016-09-30030 September 2016 2016-09 Draft Outlines ML16280A4642016-09-30030 September 2016 2016-09 Draft Written Exam ML16280A4622016-09-30030 September 2016 2016-09 Draft Written Comments ML16280A4372016-09-12012 September 2016 2016-09 Final Op Test ML16246A0012016-09-0101 September 2016 NRC Initial Operator Licensing Examination Approval 05000458/2016301 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML15180A0512015-06-29029 June 2015 Generic Fundamentals Examination Results June 2015 ML15220A1382015-06-19019 June 2015 2015-05-POST-EXAM Comments Analysis ML15220A1392015-06-19019 June 2015 June 2015 Initial License Retake Exam, Reactor Operator, with Answer Key ML16043A0002015-06-19019 June 2015 2015-05 - Draft Outline Comments ML16043A0012015-06-19019 June 2015 2015-05-DRAFT Outline ML16043A0022015-06-19019 June 2015 May 2015 Draft Written Initial License Retake Exam, Reactor Operator ML16043A0032015-06-19019 June 2015 2015-05 - Final Outline 2024-04-02
[Table view] |
Text
DRAFT OUTLINE COMMENTS Facility: River Bend First Exam Date: 3/21/14 Written Exam Outline Comment Resolution In Tier 1, Group 2 for the RO, System K/A moved.
295008 is High Reactor Water Level, but 1 the K/A is for High Containment Temperature. Need to move the K/A to system 295011.
2 3
4 5
Administrative JPM Outline (Date)
Comment Resolution JPMs A5, A7, and A8 appear to be RO JPMs A7 and A8 replaced.
1 JPMs. Need to convert at least one to an SRO level JPM.
2 3
4 5
Control Room / In-Plant System JPM Outline (Date)
Comment Resolution Check with exam author to determine if Determined that the JPM is not one step due 1
JPM S5 is a one step JPM. to alternate path.
2 3
4 5 OBDI 202 - IOLE Process Rev 1
Simulator Scenario Outline Comments (Date)
Comment Resolution Scenario 1 - Replace Event 2 with an Scenario revised to incorporate comments.
I/C malfunction for the ATC.
If Event 6 is an action required in response to Event 5, eliminate Event 6.
1 What is the cause of the uncontrolled pressure drop and what is the remedy?
What alternate leg of the EOPs is exercised in this scenario?
Scenario 2 - Make Event 2 Event 1. Scenario revised to incorporate comments.
Delete Event 1 and 3.
Add an I/C malfunction for the ATC before the major event.
2 What alternate leg of the EOPs is exercised in this scenario?
If Event 6 directly leads to Event 7 then it is part of the major event.
Scenario 3 - Make Event 2 Event 1. Scenario revised to incorporate comments.
Delete Events 1 and 3.
Add an I/C for the BOP before the major event.
Does Event 5 result in a loss of both CRD pumps? What are the Tech Spec 3
implications?
What alternate leg of the EOPs is exercised in this scenario?
Add a second Tech Spec event.
What are the expected actions for Event 8?
Scenario 4 - Delete Event 2. Scenario revised to incorporate comments.
Component names were added. Note that Add a Tech Spec Event for the BOP Scenario 4 is the spare.
4 before the major event.
What is the significance of the loss of OBDI 202 - IOLE Process Rev 1
RHR A in event 7?
What alternate leg of the EOPs is exercised in this scenario?
What is HDL-P1A?
What is CNM-FV114?
What is the significance of Event 9?
5 OBDI 202 - IOLE Process Rev 1