DRAFT OUTLINE COMMENTS Facility: River Bend First Exam Date: 3/21/14 Written Exam Outline Comment Resolution In Tier 1, Group 2 for the RO, System K/A moved.

295008 is High Reactor Water Level, but 1 the K/A is for High Containment Temperature. Need to move the K/A to system 295011.

2 3

4 5

Administrative JPM Outline (Date)

Comment Resolution JPMs A5, A7, and A8 appear to be RO JPMs A7 and A8 replaced.

1 JPMs. Need to convert at least one to an SRO level JPM.

2 3

4 5

Control Room / In-Plant System JPM Outline (Date)

Comment Resolution Check with exam author to determine if Determined that the JPM is not one step due 1

JPM S5 is a one step JPM. to alternate path.

2 3

4 5 OBDI 202 - IOLE Process Rev 1

Simulator Scenario Outline Comments (Date)

Comment Resolution Scenario 1 - Replace Event 2 with an Scenario revised to incorporate comments.

I/C malfunction for the ATC.

If Event 6 is an action required in response to Event 5, eliminate Event 6.

1 What is the cause of the uncontrolled pressure drop and what is the remedy?

What alternate leg of the EOPs is exercised in this scenario?

Scenario 2 - Make Event 2 Event 1. Scenario revised to incorporate comments.

Delete Event 1 and 3.

Add an I/C malfunction for the ATC before the major event.

2 What alternate leg of the EOPs is exercised in this scenario?

If Event 6 directly leads to Event 7 then it is part of the major event.

Scenario 3 - Make Event 2 Event 1. Scenario revised to incorporate comments.

Delete Events 1 and 3.

Add an I/C for the BOP before the major event.

Does Event 5 result in a loss of both CRD pumps? What are the Tech Spec 3

implications?

What alternate leg of the EOPs is exercised in this scenario?

Add a second Tech Spec event.

What are the expected actions for Event 8?

Scenario 4 - Delete Event 2. Scenario revised to incorporate comments.

Component names were added. Note that Add a Tech Spec Event for the BOP Scenario 4 is the spare.

4 before the major event.

What is the significance of the loss of OBDI 202 - IOLE Process Rev 1

RHR A in event 7?

What alternate leg of the EOPs is exercised in this scenario?

What is HDL-P1A?

What is CNM-FV114?

What is the significance of Event 9?

5 OBDI 202 - IOLE Process Rev 1