ML18156A018: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML18156A018
| number = ML18156A018
| issue date = 06/15/2018
| issue date = 06/15/2018
| title = Cover Letter for the Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-18124-NP, Revision 0, Fluence Determination with Raptor M3G and Ferret (CAC No. MF9141)
| title = Cover Letter for the Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-18124-NP, Revision 0, Fluence Determination with Raptor M3G and Ferret
| author name = Morey D C
| author name = Morey D
| author affiliation = NRC/NRR/DLP/PLPB
| author affiliation = NRC/NRR/DLP/PLPB
| addressee name = Gresham J A
| addressee name = Gresham J
| addressee affiliation = Westinghouse Electric Co
| addressee affiliation = Westinghouse Electric Co
| docket = 99902038
| docket = 99902038
Line 15: Line 15:
| page count = 3
| page count = 3
| project = CAC:MF9141
| project = CAC:MF9141
| stage = Other
| stage = Approval
}}
}}


=Text=
=Text=
{{#Wiki_filter:/RA Serita Sanders for
{{#Wiki_filter:June 15, 2018 Mr. James A. Gresham, Manager Regulatory Compliance and Plant Licensing Westinghouse Electric Company 1000 Westinghouse Drive Cranberry Township, PA 16066


for}}
==SUBJECT:==
FINAL SAFETY EVALUATION FOR WESTINGHOUSE ELECTRIC COMPANY TOPICAL REPORT WCAP-18124-NP, REVISION 0, FLUENCE DETERMINATION WITH RAPTOR-M3G AND FERRET (CAC NO. MF9141)
 
==Dear Mr. Gresham:==
 
By letter dated January 25, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17030A377), Westinghouse Electric Company (Westinghouse) submitted for the U. S. Nuclear Regulatory Commission (NRC) staff review Topical Report (TR)
WCAP-18124-NP, Revision 0, "Fluence Determination with RAPTOR-M3G and FERRET." By letter dated November 21, 2017 (ADAMS Accession No. ML17290A147), NRC issued requests for additional information for the review of TR WCAP-18124-NP, Revision 0.
The enclosed final SE addresses the applicability of the WCAP-18124-NP, Revision 0, "Fluence Determination with RAPTOR-M3G and FERRET," TR.
The NRC staff has found that WCAP-18124-NP, Revision 0, "Fluence Determination with RAPTOR-M3G and FERRET," is acceptable for referencing in licensing applications provided that the limitations and conditions stipulated in the Section 4.0 and applicability defined in the enclosed NRC final SE are met along with the proper documentation.
Our acceptance applies only to material provided in the subject TRs. In accordance with the guidance provided on the NRC website, we request that Westinghouse publish accepted proprietary and non-proprietary versions of these TRs within three months of receipt of this letter.
The accepted versions shall incorporate this letter and the enclosed final SE after the title page.
Also, they must contain historical review information, including NRC requests for additional Information (RAIs) and your responses. The accepted versions shall include an "-A"(designating accepted) following the TRs identification symbol.
 
J. Gresham                                      As an alternative to including the RAIs and RAI responses behind the title page, if changes to the TRs were provided to the NRC staff to support the resolution of RAI responses, and the NRC staff reviewed and approved those changes as described in the RAI responses, there are two ways that the accepted version can capture the RAIs:
: 1. The RAIs and RAI responses can be included as an Appendix to the accepted version.
: 2. The RAIs and RAI responses can be captured in the form of a table (inserted after the final SE) which summarizes the changes as shown in the approved version of the TRs.
The table should reference the specific RAIs and RAI responses which resulted in any changes, as shown in the accepted version of the TRs.
If future changes to the NRCs regulatory requirements affect the acceptability of this TR, Westinghouse will be expected to revise the TR appropriately or justify its continued applicability for subsequent referencing. Licensees referencing this TR would be expected to justify its continued applicability or evaluate their plant using the revised TR.
Sincerely,
                                                      /RA Serita Sanders for Dennis C. Morey, Chief Licensing Processes Branch Division of Licensing Projects Office of Nuclear Reactor Regulation
 
==Enclosure:==
 
As stated
 
ML18155A186 Package; ML18156A018 Letter; ML18156A066 Safety Evaluation; ML18155A215 Attachment
                          *concurrence via email        NRR-106 OFFICE NRR/DLP/PLPB    NRR/DLP/PLPB* NRR/DSS/SNPB*      NRR/DLP/PLPB NAME  ELenning        DHarrison        SKrepel        DMorey SSanders for DATE  6/5/2018        6/7/2018        6/12/2018      6/15/2018}}

Latest revision as of 23:53, 20 October 2019

Cover Letter for the Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-18124-NP, Revision 0, Fluence Determination with Raptor M3G and Ferret
ML18156A018
Person / Time
Site: Westinghouse
Issue date: 06/15/2018
From: Dennis Morey
NRC/NRR/DLP/PLPB
To: Gresham J
Westinghouse
Lenning E, NRR/DLP, 415-3151
Shared Package
ML18155A186 -Pkg. List:
References
CAC MF9141
Download: ML18156A018 (3)


Text

June 15, 2018 Mr. James A. Gresham, Manager Regulatory Compliance and Plant Licensing Westinghouse Electric Company 1000 Westinghouse Drive Cranberry Township, PA 16066

SUBJECT:

FINAL SAFETY EVALUATION FOR WESTINGHOUSE ELECTRIC COMPANY TOPICAL REPORT WCAP-18124-NP, REVISION 0, FLUENCE DETERMINATION WITH RAPTOR-M3G AND FERRET (CAC NO. MF9141)

Dear Mr. Gresham:

By letter dated January 25, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17030A377), Westinghouse Electric Company (Westinghouse) submitted for the U. S. Nuclear Regulatory Commission (NRC) staff review Topical Report (TR)

WCAP-18124-NP, Revision 0, "Fluence Determination with RAPTOR-M3G and FERRET." By letter dated November 21, 2017 (ADAMS Accession No. ML17290A147), NRC issued requests for additional information for the review of TR WCAP-18124-NP, Revision 0.

The enclosed final SE addresses the applicability of the WCAP-18124-NP, Revision 0, "Fluence Determination with RAPTOR-M3G and FERRET," TR.

The NRC staff has found that WCAP-18124-NP, Revision 0, "Fluence Determination with RAPTOR-M3G and FERRET," is acceptable for referencing in licensing applications provided that the limitations and conditions stipulated in the Section 4.0 and applicability defined in the enclosed NRC final SE are met along with the proper documentation.

Our acceptance applies only to material provided in the subject TRs. In accordance with the guidance provided on the NRC website, we request that Westinghouse publish accepted proprietary and non-proprietary versions of these TRs within three months of receipt of this letter.

The accepted versions shall incorporate this letter and the enclosed final SE after the title page.

Also, they must contain historical review information, including NRC requests for additional Information (RAIs) and your responses. The accepted versions shall include an "-A"(designating accepted) following the TRs identification symbol.

J. Gresham As an alternative to including the RAIs and RAI responses behind the title page, if changes to the TRs were provided to the NRC staff to support the resolution of RAI responses, and the NRC staff reviewed and approved those changes as described in the RAI responses, there are two ways that the accepted version can capture the RAIs:

1. The RAIs and RAI responses can be included as an Appendix to the accepted version.
2. The RAIs and RAI responses can be captured in the form of a table (inserted after the final SE) which summarizes the changes as shown in the approved version of the TRs.

The table should reference the specific RAIs and RAI responses which resulted in any changes, as shown in the accepted version of the TRs.

If future changes to the NRCs regulatory requirements affect the acceptability of this TR, Westinghouse will be expected to revise the TR appropriately or justify its continued applicability for subsequent referencing. Licensees referencing this TR would be expected to justify its continued applicability or evaluate their plant using the revised TR.

Sincerely,

/RA Serita Sanders for Dennis C. Morey, Chief Licensing Processes Branch Division of Licensing Projects Office of Nuclear Reactor Regulation

Enclosure:

As stated

ML18155A186 Package; ML18156A018 Letter; ML18156A066 Safety Evaluation; ML18155A215 Attachment

  • concurrence via email NRR-106 OFFICE NRR/DLP/PLPB NRR/DLP/PLPB* NRR/DSS/SNPB* NRR/DLP/PLPB NAME ELenning DHarrison SKrepel DMorey SSanders for DATE 6/5/2018 6/7/2018 6/12/2018 6/15/2018