(4 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML16251A102 | | | number = ML16251A102 |
| | issue date = 08/31/2016 | | | issue date = 08/31/2016 |
| | title = McGuire Nuclear Station, Units 1 and 2, Independent Spent Fuel Storage Installation (ISFSI) - Register Use of Casks | | | title = Independent Spent Fuel Storage Installation (ISFSI) - Register Use of Casks |
| | author name = Capps S D | | | author name = Capps S |
| | author affiliation = Duke Energy Carolinas, LLC | | | author affiliation = Duke Energy Carolinas, LLC |
| | addressee name = | | | addressee name = |
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:"'i I ef-..DUKE Steven D. Capps Vice President McGuire Nuclear Station Duke Energy M GO I VP I 12700 Hagers Ferry Road Huntersville, NC 28078 o: 980.875.4805 1: 980.875.4809 Steven.Capps@duke-energy.com August 31, 2016 Serial: MNS 16-064 U. S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 ATTENTION: Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards Duke Energy Carolinas, LLC (Duke Energy) McGuire Nuclear Station, Units 1 and 2 Docket Nos. 72-38, 50-369, 50-370 r 2....-I D 5 f Renewed License Nos. NPF-9 and NPF-17 | | {{#Wiki_filter:"'i Steven D. Capps I ef-..DUKE Vice President |
| | ~;ENERGY McGuire Nuclear Station Duke Energy M GO I VP I 12700 Hagers Ferry Road Huntersville, NC 28078 o: 980.875.4805 1: 980.875.4809 Steven.Capps@duke-energy.com 10 CFR 72.4 August 31, 2016 Serial: MNS 16-064 U. S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 ATTENTION: Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards Duke Energy Carolinas, LLC (Duke Energy) |
| | McGuire Nuclear Station, Units 1 and 2 Docket Nos. 72-38, 50-369, 50-370 r 2....- I D 5f Renewed License Nos. NPF-9 and NPF-17 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| Independent Spent Fuel Storage Installation (ISFSI) 10 CFR 72.4 McGuire Nuclear Station has loaded spent nuclear fuel into NAC-MAGNASTOR dry cask storage systems (Model No. MAGNASTOR) as controlled by Certificate of Compliance Number 1031, Amendment Number 2, Revision 1. In accordance with 10 CFR 72.212 (b)(2), Duke Energy hereby registers the use of the following casks which have been loaded and placed on the ISFSI pad as noted below: Cask ID Number Overpack Number Date Placed on ISFSI Pad OFCTKN043 MN-VCC-68 Au ust 9, 2016 If there are any questions or if additional information is needed, please contact Mr. G. M. Murphy at 980-875-5715. Sincerely, U.S. Nuclear Regulatory Commission August 31, 2016 Page 2 xc: C. Haney, Region II Administrator U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Avenue NE, Suite 1200 Atlanta, Georgia 30303-1257 G.E. Miller, Project Manager Ed.Miller@nrc.gov V. Screenivas, Interim Project Manager V.Screenivas@nrc.gov A. Hutto NRC Senior Resident Inspector McGuire Nuclear Station}} | | Independent Spent Fuel Storage Installation (ISFSI) |
| | McGuire Nuclear Station has loaded spent nuclear fuel into NAC-MAGNASTOR dry cask storage systems (Model No. MAGNASTOR) as controlled by Certificate of Compliance Number 1031, Amendment Number 2, Revision 1. In accordance with 10 CFR 72.212 (b)(2), Duke Energy hereby registers the use of the following casks which have been loaded and placed on the ISFSI pad as noted below: |
| | Cask ID Number Overpack Number Date Placed on ISFSI Pad OFCTKN043 MN-VCC-68 Au ust 9, 2016 If there are any questions or if additional information is needed, please contact Mr. G. M. Murphy at 980-875-5715. |
| | Sincerely, |
| | |
| | U.S. Nuclear Regulatory Commission August 31, 2016 Page 2 xc: |
| | C. Haney, Region II Administrator U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Avenue NE, Suite 1200 Atlanta, Georgia 30303-1257 G.E. Miller, Project Manager Ed.Miller@nrc.gov V. Screenivas, Interim Project Manager V.Screenivas@nrc.gov A. Hutto NRC Senior Resident Inspector McGuire Nuclear Station}} |
|
---|
Category:Letter
MONTHYEARIR 05000369/20230042024-01-31031 January 2024 Integrated Inspection Report 05000369/2023004 and 05000370/2023004 ML24019A1392024-01-25025 January 2024 TSTF 505 and 50.69 Audit Summary ML24019A2002024-01-24024 January 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000369/20234022023-12-14014 December 2023 Material Control and Accounting Program Inspection Report 05000369/2023402 and 05000370/2023402 ML23317A2272023-11-17017 November 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Transmittal of Dam Inspection Report - Non-Proprietary ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000369/20230032023-10-24024 October 2023 Integrated Inspection Report 05000369/2023003 and 05000370/2023003; and Inspection Report 07200038/2023001 IR 05000369/20230102023-10-13013 October 2023 Age Related Degradation Inspection Report 05000369/2023010 and 05000370/2023010 IR 05000369/20240102023-10-13013 October 2023 Notification of McGuire Nuclear Station Comprehensive Engineering Team Inspection U.S. Nuclear Regulatory Commission Inspection Report 05000369, 370/2024010 IR 07200031/20234012023-10-0404 October 2023 Yankee Atomic Electric Company - Independent Spent Fuel Storage Security Inspection Report 07200031/2023401 ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds IR 05000369/20233012023-09-20020 September 2023 William B. McGuire Nuclear Station - NRC Examination Report 05000369/2023301 and 05000370/2023301 ML23230A0652023-08-31031 August 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Relief Request Use of Later Edition of ASME Code ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000369/20230052023-08-25025 August 2023 Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 (Report 05000369/2023005 and 05000370/2023005) IR 05000369/20230022023-07-28028 July 2023 Integrated Inspection Report 05000369/2023002 and 05000370/2023002 IR 05000369/20234202023-07-24024 July 2023 Security Baseline Inspection Report 050003692023420 and 050003702023420 ML23206A0092023-07-24024 July 2023 William B. McGuire Nuclear Station Operator Licensing Written Examination Approval 05000369/2023301 and 05000370/2023301 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23159A2712023-06-20020 June 2023 William B. McGuire Nuclear Station, Unit 1 - Relief Request Impractical Reactor System Welds ML23237A2672023-06-13013 June 2023 June 13, 2002 - Meeting Announcement - McGuire and Catawba Nuclear Stations 50-369, 50-370 and 50-413, 50-414 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined ML23157A1012023-05-0404 May 2023 Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(2) for the Yankee Nuclear Power Station Independent Spent Fuel Storage Installation ML23115A2122023-05-0101 May 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000369/20230012023-05-0101 May 2023 Integrated Inspection Report 05000369/2023001 and 05000370/2023001 ML23130A1562023-04-24024 April 2023 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2022 ML23094A1832023-04-18018 April 2023 Audit Plan TSTF-505, Rev. 2, RITSTF Initiative 4B & 10 CFR 50.69, Risk-Informed Categorization & Treatment of Structures, Systems & Components for Nuclear Power Reactors (EPIDs L-2023-LLA-0021 & L-2023-LLA-0022) ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility ML23080A1112023-03-0606 March 2023 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation, Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML23080A1072023-03-0606 March 2023 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report IR 05000369/20220062023-03-0101 March 2023 Annual Assessment Letter for McGuire Nuclear Station Units 1 and 2 (NRC Inspection Report 05000369/2022006 and 05000370 2022006) ML22340A4752023-02-24024 February 2023 Closeout Letter to Yankee Atomic Electric Company Regarding 2018 and 2021 Updated DFPs for Yankee Nuclear Power Station ISFSI IR 05000369/20220042023-01-30030 January 2023 Mcguire Nuclear Station - Integrated Inspection Report 05000369/2022004 and 05000370/2022004 IR 05000369/20224202023-01-11011 January 2023 Security Baseline Inspection Report 05000369/2022420 and 05000370/2022420 ML23041A1122023-01-0505 January 2023 Independent Spent Fuel Storage Installation, 10 CFR 50.59 Changes, Tests, and Experiments Report ML23041A1132023-01-0505 January 2023 Yankee Atomic Electric Company - Report of 10 CFR 72.48 Changes, Tests, and Experiments ML22347A2802022-12-21021 December 2022 Yankee Atomic Electric Company - Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML22356A0512022-12-14014 December 2022 Curtiss-Wright Nuclear Division, Letter Regarding Potential Efect in a Configuration of the 11/2 Inch Quick Disconnect Connector Cable Assemblies Supplied to Duke Energy (See Attached Spreadsheet) for a Total of 460 of Connectors Only Suppl ML22347A1512022-12-13013 December 2022 William B. Mcguire Nuclear Station Notification of Licensed Operator Initial Examination 05000369/2023301 and 05000370/2023301 ML22340A6662022-12-0808 December 2022 Summary of November 30, 2022, Public Meeting with Duke Energy Carolinas, LLC for McGuire Nuclear Station, Units 1 & 2 Proposed LAR to Adopt TSTF-505, Rev. 2 and 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems ML22290A1012022-11-29029 November 2022 Issuance of Amendment Nos. 326 and 305, Regarding Changes to Technical Specification 3.4.3, Reactor Coolant System Pressure Temperature Limits ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000369/20220032022-10-27027 October 2022 Integrated Inspection Report 05000369/2022003 and 05000370/2022003 IR 05000369/20220112022-09-29029 September 2022 Biennial Problem Identification and Resolution Inspection Report 05000369/2022011 and 05000370/2022011 ML22266A0782022-09-26026 September 2022 William B. Mcguire Nuclear Station, Unit 2 Pressurizer Power Operated Relief Valve Relief Request ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports IR 07200038/20220012022-09-12012 September 2022 Operation of an Independent Spent Fuel Storage Installation Report 07200038/2022001 ML22242A0022022-09-12012 September 2022 Issuance of Amendments to Adopt TSTF 569, Revision 2, Revise Response Time Testing Definition 2024-01-31
[Table view] |
Text
"'i Steven D. Capps I ef-..DUKE Vice President
~;ENERGY McGuire Nuclear Station Duke Energy M GO I VP I 12700 Hagers Ferry Road Huntersville, NC 28078 o: 980.875.4805 1: 980.875.4809 Steven.Capps@duke-energy.com 10 CFR 72.4 August 31, 2016 Serial: MNS16-064 U. S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 ATTENTION: Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards Duke Energy Carolinas, LLC (Duke Energy)
McGuire Nuclear Station, Units 1 and 2 Docket Nos. 72-38, 50-369, 50-370 r 2....- I D 5f Renewed License Nos. NPF-9 and NPF-17
SUBJECT:
Independent Spent Fuel Storage Installation (ISFSI)
McGuire Nuclear Station has loaded spent nuclear fuel into NAC-MAGNASTOR dry cask storage systems (Model No. MAGNASTOR) as controlled by Certificate of Compliance Number 1031, Amendment Number 2, Revision 1. In accordance with 10 CFR 72.212 (b)(2), Duke Energy hereby registers the use of the following casks which have been loaded and placed on the ISFSI pad as noted below:
Cask ID Number Overpack Number Date Placed on ISFSI Pad OFCTKN043 MN-VCC-68 Au ust 9, 2016 If there are any questions or if additional information is needed, please contact Mr. G. M. Murphy at 980-875-5715.
Sincerely,
U.S. Nuclear Regulatory Commission August 31, 2016 Page 2 xc:
C. Haney, Region II Administrator U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Avenue NE, Suite 1200 Atlanta, Georgia 30303-1257 G.E. Miller, Project Manager Ed.Miller@nrc.gov V. Screenivas, Interim Project Manager V.Screenivas@nrc.gov A. Hutto NRC Senior Resident Inspector McGuire Nuclear Station