| number = ML12074A183
| number = ML12074A183
| issue date = 03/15/2012
| issue date = 03/15/2012
| title = McGuire Nuclear Station, Units 1 and 2 - Request for Additional Information Regarding Licensing Amendment Related to Changes to Related Specifications Diesel Fuel Oil and Starting Air
| title = Request for Additional Information Regarding Licensing Amendment Related to Changes to Related Specifications Diesel Fuel Oil and Starting Air
| author name = Thompson J H
| author name = Thompson J
| author affiliation = NRC/NRR/DORL/LPLII-1
| author affiliation = NRC/NRR/DORL/LPLII-1
| addressee name = Repko R T
| addressee name = Repko R
| addressee affiliation = Duke Energy Carolinas, LLC
| addressee affiliation = Duke Energy Carolinas, LLC
| docket = 05000369, 05000370
| docket = 05000369, 05000370
| license number = NPF-009, NPF-017
| license number = NPF-009, NPF-017
| contact person = Thompson J H
| contact person = Thompson J
| case reference number = TAC ME7275, TAC ME7276
| case reference number = TAC ME7275, TAC ME7276
| document type = Letter, Request for Additional Information (RAI)
| document type = Letter, Request for Additional Information (RAI)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 March 15, 2012 Mr. Regis T. Repko Vice President McGuire Nuclear Station Duke Energy Carolinas, LLC 12700 Hagers Ferry Road Huntersville, NC 28078 MCGUIRE NUCLEAR STATION, UNITS 1 AND 2, REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT RELATED TO CHANGES TO TECHNICAL SPECIFICATION 3.8.3, "DIESEL FUEL OIL AND STARTING AIR" (TAC NOS. ME7275 AND ME7276) Dear Mr. Repko: By letter dated September 26, 2011, Duke Energy Carolinas, LLC (the licensee), submitted a proposed license amendment to change the McGuire, Units1 and 2 Technical Specifications (TSs). The proposed change revises the TSs to adopt Standard Technical Specification 3.8.3, Condition E, from NUREG-1431, Volume1, Revision 3.0, "Standard Technical Specifications -Westinghouse Plants: Specifications," regarding Diesel Generator starting air receiver pressure limits. The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the licensee's submittal and determined that additional information is needed in order to complete our review. The enclosed document describes this request for additional information. A written response should be provided to the NRC staff within 30 days of the issuance of this letter in order to support our timely review of this application. If you have any questions, please call me at 301-415-1119. Sincerely, Jon Thompson, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-369 and 50-370 Enclosure: RAI cc w/encl: Distribution via Listserv REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION REGARDING LICENSE AMENDMENT REQUEST RELATED TO TO CHANGES TO TECHNICAL SPECIFICATION 3.8.3, "DIESEL FUEL OIL AND STARTING AIR" MCGUIRE NUCLEAR STATION, UNITS 1 AND 2 By letter dated September 26,2011 (Agencywide Documents Access and Management System, Accession No. ML 11277A022), Duke Energy Carolinas, LLC (the licensee), submitted the subject license amendment request (LAR) to change the McGuire, Units 1 and 2 Technical Specifications (TSs). The proposed change revises the TSs to adopt Standard Technical Specification (STS) 3.8.3, Condition E, regarding diesel generator (DG) starting air receiver pressure limits, from NUREG-1431, Volume1, Revision 3.0, "Standard Technical Specifications -Westinghouse Plants: Specifications. " The regulation at Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Appendix A, "General Design Criteria for Nuclear Power Plants," Criterion 17, "Electric Power Systems" (GDC 17), requires that, "An onsite electric power system ... shall be provided to permit functioning of structures, systems and components important to safety .... " It also requires that "The onsite electric power supplies, including the batteries, and the onsite electric distribution system, shall have sufficient independence, redundancy, and testability to perform their safety functions assuming a single failure." The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the licensee's submittal and determined that the following additional information is needed in order to complete our review: In section 3.0 of the LAR, the licensee states: McGuire Updated Final Safety Analysis Report [UFSAR] Figure 9-143 provides a summary flow diagram of the VG [Starting Air] system. Note that this figure will be revised to show the cross-connection line between the VG sub-trains upstream of the VG receiver tanks. Please provide the proposed revised figure referenced in section 3.0 of the LAR so that the proposed cross connection is clearly identified. Enclosure
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 15, 2012 Mr. Regis T. Repko Vice President McGuire Nuclear Station Duke Energy Carolinas, LLC 12700 Hagers Ferry Road Huntersville, NC 28078
-In Section 3.0 of the LAR, the licensee states: Empirical test data from VG system testing was used to determine the mass of air required per start during multiple starts from a single air receiver. Section 9.5.6.1, "Design Bases," of the UFSAR states: Analysis based on results obtained during testing finds the McGuire diesels are capable of starting 5 times consecutively from the initial conditions of one of the two starting air receivers isolated, the other receiver at the lowest pressure allowed by Technical Specifications and diesel room temperature at the highest allowed by Selected License Commitments. At least the first of these 5 consecutive starts will be a fast start. Please provide the empirical test results and analysis, including the assumptions.
 
March 15,2012 Mr. Regis T. Repko Vice President McGuire Nuclear Station Duke Energy Carolinas, LLC 12700 Hagers Ferry Road Huntersville, NC 28078 MCGUIRE NUCLEAR STATION, UNITS 1 AND 2, REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT RELATED TO CHANGES TO TECHNICAL SPECIFICATION 3.8.3, "DIESEL FUEL OIL AND STARTING AIR" (TAC NOS. ME7275 AND ME7276) Dear Mr. Repko: By letter dated September 26, 2011, Duke Energy Carolinas, LLC (the licensee), submitted a proposed license amendment to change the McGuire, Units1 and 2 Technical Specifications (TSs). The proposed change revises the TSs to adopt Standard Technical Specification 3.8.3, Condition E, from NUREG-1431, Volume1, Revision 3.0, "Standard Technical Specifications -Westinghouse Plants: Specifications," regarding Diesel Generator starting air receiver pressure limits. The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the licensee's submittal and determined that additional information is needed in order to complete our review. The enclosed document describes this request for additional information. A written response should be provided to the NRC staff with i n 30 days of the issuance of this letter in order to support our timely review of this application. If you have any questions, please call me at 301-415-1119. Sincerely, IRA! Jon Thompson, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-369 and 50-370 Enclosure: RAI cc w/encl: Distribution via Listserv DISTRIBUTION: Public OHopkins, NRR LPL2-1 RlF RidsAcrsAcnw_MailCTR Resource RidsNrrDorlLpl2-1 Resource RidsNrrDssSbpb Resource RidsNrrPMMcGuireResource (hard copy) RidsOgcRp Resource RidsNrrLASFigueroa Resource RidsRgn2MailCenter Resource ADAMS Accession No ML 12074A183 vrrlvl:: NRRlLPL2-1/PM NRRlLPL2-1/LA NRRlLPL2-1/BC NRRlLPL2-1/PM NAME JThompson SFigueroa NSalgado .IThompson DATE 03/15/12 03/15/12 03/15/12 03/15/12 OFFICIAL RECORD COPY 
==SUBJECT:==
}}
MCGUIRE NUCLEAR STATION, UNITS 1 AND 2, REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT RELATED TO CHANGES TO TECHNICAL SPECIFICATION 3.8.3, "DIESEL FUEL OIL AND STARTING AIR" (TAC NOS. ME7275 AND ME7276)
 
==Dear Mr. Repko:==
 
By letter dated September 26, 2011, Duke Energy Carolinas, LLC (the licensee), submitted a proposed license amendment to change the McGuire, Units1 and 2 Technical Specifications (TSs). The proposed change revises the TSs to adopt Standard Technical Specification 3.8.3, Condition E, from NUREG-1431, Volume1, Revision 3.0, "Standard Technical Specifications -
Westinghouse Plants: Specifications," regarding Diesel Generator starting air receiver pressure limits.
The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the licensee's submittal and determined that additional information is needed in order to complete our review. The enclosed document describes this request for additional information. A written response should be provided to the NRC staff within 30 days of the issuance of this letter in order to support our timely review of this application.
If you have any questions, please call me at 301-415-1119.
Sincerely, Jon Thompson, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-369 and 50-370
 
==Enclosure:==
RAI cc w/encl: Distribution via Listserv
 
REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION REGARDING LICENSE AMENDMENT REQUEST RELATED TO TO CHANGES TO TECHNICAL SPECIFICATION 3.8.3, "DIESEL FUEL OIL AND STARTING AIR" MCGUIRE NUCLEAR STATION, UNITS 1 AND 2 By letter dated September 26,2011 (Agencywide Documents Access and Management System, Accession No. ML11277A022), Duke Energy Carolinas, LLC (the licensee), submitted the subject license amendment request (LAR) to change the McGuire, Units 1 and 2 Technical Specifications (TSs). The proposed change revises the TSs to adopt Standard Technical Specification (STS) 3.8.3, Condition E, regarding diesel generator (DG) starting air receiver pressure limits, from NUREG-1431, Volume1, Revision 3.0, "Standard Technical Specifications - Westinghouse Plants:
Specifications. "
The regulation at Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Appendix A, "General Design Criteria for Nuclear Power Plants," Criterion 17, "Electric Power Systems" (GDC 17), requires that, "An onsite electric power system ... shall be provided to permit functioning of structures, systems and components important to safety .... " It also requires that "The onsite electric power supplies, including the batteries, and the onsite electric distribution system, shall have sufficient independence, redundancy, and testability to perform their safety functions assuming a single failure."
The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the licensee's submittal and determined that the following additional information is needed in order to complete our review:
In section 3.0 of the LAR, the licensee states:
McGuire Updated Final Safety Analysis Report [UFSAR] Figure 9-143 provides a summary flow diagram of the VG [Starting Air] system. Note that this figure will be revised to show the cross-connection line between the VG sub-trains upstream of the VG receiver tanks.
Please provide the proposed revised figure referenced in section 3.0 of the LAR so that the proposed cross connection is clearly identified.
Enclosure
 
                                                - 2 In Section 3.0 of the LAR, the licensee states:
Empirical test data from VG system testing was used to determine the mass of air required per start during multiple starts from a single air receiver.
Section 9.5.6.1, "Design Bases," of the UFSAR states:
Analysis based on results obtained during testing finds the McGuire diesels are capable of starting 5 times consecutively from the initial conditions of one of the two starting air receivers isolated, the other receiver at the lowest pressure allowed by Technical Specifications and diesel room temperature at the highest allowed by Selected License Commitments. At least the first of these 5 consecutive starts will be a fast start.
Please provide the empirical test results and analysis, including the assumptions.
 
ML12074A183 vrrlvl::     NRRlLPL2-1/PM           NRRlLPL2-1/LA             NRRlLPL2-1/BC             NRRlLPL2-1/PM NAME         JThompson               SFigueroa                 NSalgado                 .IThompson DATE         03/15/12               03/15/12                 03/15/12                 03/15/12}}

Latest revision as of 07:46, 12 November 2019

Request for Additional Information Regarding Licensing Amendment Related to Changes to Related Specifications Diesel Fuel Oil and Starting Air
ML12074A183
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 03/15/2012
From: Jacqueline Thompson
Plant Licensing Branch II
To: Repko R
Duke Energy Carolinas
Thompson J
References
TAC ME7275, TAC ME7276
Download: ML12074A183 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 15, 2012 Mr. Regis T. Repko Vice President McGuire Nuclear Station Duke Energy Carolinas, LLC 12700 Hagers Ferry Road Huntersville, NC 28078

SUBJECT:

MCGUIRE NUCLEAR STATION, UNITS 1 AND 2, REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT RELATED TO CHANGES TO TECHNICAL SPECIFICATION 3.8.3, "DIESEL FUEL OIL AND STARTING AIR" (TAC NOS. ME7275 AND ME7276)

Dear Mr. Repko:

By letter dated September 26, 2011, Duke Energy Carolinas, LLC (the licensee), submitted a proposed license amendment to change the McGuire, Units1 and 2 Technical Specifications (TSs). The proposed change revises the TSs to adopt Standard Technical Specification 3.8.3, Condition E, from NUREG-1431, Volume1, Revision 3.0, "Standard Technical Specifications -

Westinghouse Plants: Specifications," regarding Diesel Generator starting air receiver pressure limits.

The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the licensee's submittal and determined that additional information is needed in order to complete our review. The enclosed document describes this request for additional information. A written response should be provided to the NRC staff within 30 days of the issuance of this letter in order to support our timely review of this application.

If you have any questions, please call me at 301-415-1119.

Sincerely, Jon Thompson, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-369 and 50-370

Enclosure:

RAI cc w/encl: Distribution via Listserv

REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION REGARDING LICENSE AMENDMENT REQUEST RELATED TO TO CHANGES TO TECHNICAL SPECIFICATION 3.8.3, "DIESEL FUEL OIL AND STARTING AIR" MCGUIRE NUCLEAR STATION, UNITS 1 AND 2 By letter dated September 26,2011 (Agencywide Documents Access and Management System, Accession No. ML11277A022), Duke Energy Carolinas, LLC (the licensee), submitted the subject license amendment request (LAR) to change the McGuire, Units 1 and 2 Technical Specifications (TSs). The proposed change revises the TSs to adopt Standard Technical Specification (STS) 3.8.3, Condition E, regarding diesel generator (DG) starting air receiver pressure limits, from NUREG-1431, Volume1, Revision 3.0, "Standard Technical Specifications - Westinghouse Plants:

Specifications. "

The regulation at Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Appendix A, "General Design Criteria for Nuclear Power Plants," Criterion 17, "Electric Power Systems" (GDC 17), requires that, "An onsite electric power system ... shall be provided to permit functioning of structures, systems and components important to safety .... " It also requires that "The onsite electric power supplies, including the batteries, and the onsite electric distribution system, shall have sufficient independence, redundancy, and testability to perform their safety functions assuming a single failure."

The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the licensee's submittal and determined that the following additional information is needed in order to complete our review:

In section 3.0 of the LAR, the licensee states:

McGuire Updated Final Safety Analysis Report [UFSAR] Figure 9-143 provides a summary flow diagram of the VG [Starting Air] system. Note that this figure will be revised to show the cross-connection line between the VG sub-trains upstream of the VG receiver tanks.

Please provide the proposed revised figure referenced in section 3.0 of the LAR so that the proposed cross connection is clearly identified.

Enclosure

- 2 In Section 3.0 of the LAR, the licensee states:

Empirical test data from VG system testing was used to determine the mass of air required per start during multiple starts from a single air receiver.

Section 9.5.6.1, "Design Bases," of the UFSAR states:

Analysis based on results obtained during testing finds the McGuire diesels are capable of starting 5 times consecutively from the initial conditions of one of the two starting air receivers isolated, the other receiver at the lowest pressure allowed by Technical Specifications and diesel room temperature at the highest allowed by Selected License Commitments. At least the first of these 5 consecutive starts will be a fast start.

Please provide the empirical test results and analysis, including the assumptions.