| title = Palo Verde Nuclear Generating Station Notification of Nrc Design Bases Assurance Inspection (Programs) 05000528/2018011, 05000529/2018011, and 05000530/2018011 Initial Request for Information
| title = Notification of Nrc Design Bases Assurance Inspection (Programs) 05000528/2018011, 05000529/2018011, and 05000530/2018011 Initial Request for Information
| author name = Farnholtz T R
| author name = Farnholtz T
| author affiliation = NRC/RGN-IV/DRS/EB-1
| author affiliation = NRC/RGN-IV/DRS/EB-1
| addressee name = Bement R S
| addressee name = Bement R
| addressee affiliation = Arizona Public Service Co
| addressee affiliation = Arizona Public Service Co
| docket = 05000528, 05000529, 05000530
| docket = 05000528, 05000529, 05000530
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:March 7, 2018
Mr. Robert S. Bement
March 7, 2018
Executive Vice President Nuclear/
  Mr. Robert S. Bement  
   Chief Nuclear Officer
Executive Vice President Nuclear/  
Arizona Public Service Company
   Chief Nuclear Officer  
P.O. Box 52034, MS 7602
Arizona Public Service Company P.O. Box 52034, MS 7602 Phoenix, AZ 85072-2034  
Phoenix, AZ 85072-2034
SUBJECT:       PALO VERDE NUCLEAR GENERATING STATION - NOTIFICATION OF NRC
SUBJECT: PALO VERDE NUCLEAR GENERATING STATION - NOTIFICATION OF NRC DESIGN BASES ASSURANCE INSPECTION (PROGRAMS)  
                DESIGN BASES ASSURANCE INSPECTION (PROGRAMS)
05000528/2018011, 05000529/2018011, AND 05000530/2018011 INITIAL REQUEST FOR INFORMATION
                05000528/2018011, 05000529/2018011, AND 05000530/2018011 INITIAL
Dear Mr. Bement:
                REQUEST FOR INFORMATION
On April 24, 2018, the NRC will begin an inspection at the Palo Verde Nuclear Generating Station. A three-person team will perform this inspection using NRC Inspection Procedure 71111.21N, "Design Bases Inspection (Programs)," Attachment 1, "Environmental Qualification under 10 CFR 50.49 Programs, Processes, and Procedures."
Dear Mr. Bement:
On April 24, 2018, the NRC will begin an inspection at the Palo Verde Nuclear Generating
This inspection will evaluate the implementation of the environmental qualification of electrical equipment program, as required by the Palo Verde Nuclear Generating Station Operating License. Additionally, the team will perform an inspection of the equipment qualification  
Station. A three-person team will perform this inspection using NRC Inspection
documentation files to verify that electrical equipment important to safety meets the requirements of 10 CFR 50.49. The team will select components that will be subjected to harsh  
Procedure 71111.21N, Design Bases Inspection (Programs), Attachment 1, Environmental
environments and required mitigate the consequences of a design basis accident.  
Qualification under 10 CFR 50.49 Programs, Processes, and Procedures.
The inspection will include an information gathering site visit by the team leader and risk analyst, and two weeks of on-site inspection by the team. The inspection will consist of three NRC inspectors. The current inspection schedule is as follows:  
This inspection will evaluate the implementation of the environmental qualification of electrical
On-site Information Gathering Visit: April 24-26, 2018 Preparation Weeks: April 30-May 4 and May 14-18, 2018 On-site Weeks: May 7-11 and May 21-25, 2018
equipment program, as required by the Palo Verde Nuclear Generating Station Operating
The purpose of the information gathering visit is to meet with members of your staff to become familiar with the Palo Verde Nuclear Generating Station environmental qualification program. The lead inspector will request a meeting with your personnel to discuss the site environmental qualification program and procedures. Additionally, the lead inspector will request a discussion with your staff to become familiar with the equipment qualification regulations and standards to  
License. Additionally, the team will perform an inspection of the equipment qualification
which the site is committed. Additional information and documentation needed to support the  
documentation files to verify that electrical equipment important to safety meets the
inspection will be identified during the inspection, including interviews with engineering  
requirements of 10 CFR 50.49. The team will select components that will be subjected to harsh
managers and engineers.
environments and required mitigate the consequences of a design basis accident.
R. Bement 2 Our experience with these inspections has shown that they are resource intensive, both for the NRC inspectors and the licensee staff.  In order to minimize the inspection impact on the site and to ensure a productive inspection, we have enclosed a request for information needed for the inspection.  This information should be made available to the lead inspector on or before the April 24, 2018, visit.  Since the inspection will be concentrated on the environmental qualification
The inspection will include an information gathering site visit by the team leader and risk
of the equipment, the equipment qualification master list should be available to review during
analyst, and two weeks of on-site inspection by the team. The inspection will consist of three
the information gathering visit to assist in our selection of components.
NRC inspectors. The current inspection schedule is as follows:
        On-site Information Gathering Visit: April 24-26, 2018
It is requested that this information be provided to the lead inspector as the information is generated during the inspection.  Additional requests by inspectors will be made during the  on-site week for specific documents needed to complete the review of that component/selection. 
        Preparation Weeks: April 30-May 4 and May 14-18, 2018
It is important that all of these documents are up-to-date and complete in order to minimize the
        On-site Weeks: May 7-11 and May 21-25, 2018
number of additional documents requested during the preparation and/or the on-site portions of
The purpose of the information gathering visit is to meet with members of your staff to become
the inspection.  In order to facilitate the inspection, we request that a contact individual be assigned to each inspector to ensure information requests, questions, and concerns are addressed in a timely manner. 
familiar with the Palo Verde Nuclear Generating Station environmental qualification program.
The lead inspector will request a meeting with your personnel to discuss the site environmental
The lead inspector for this inspection is Wayne Sifre.  We understand that our licensing
qualification program and procedures. Additionally, the lead inspector will request a discussion
engineer contact for this inspection is Sean Dornseif.  If there are any questions about the inspection or the requested materials, please contact the lead inspector by telephone at  817-200-1193 or by e-mail at Wayne.Sifre@nrc.gov. 
with your staff to become familiar with the equipment qualification regulations and standards to
which the site is committed. Additional information and documentation needed to support the
This letter does not contain new or amended information collection requirements subject  to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information
inspection will be identified during the inspection, including interviews with engineering
collection requirements were approved by the Office of Management and Budget, control number 3150-0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the
managers and engineers.
requesting document displays a currently valid Office of Management and Budget control
number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  Sincerely,    /RA/    Thomas R. Farnholtz, Chief  Engineering Branch 1
Division of Reactor Safety
Docket Nos. 50-528, 50-529, and 50-530
License Nos. NPF-41, NPF-51, and NPF-74  Enclosure:  Initial Request for Information
cc:  Electronic Distribution 
R. Bement 3 PALO VERDE NUCLEAR GENERATING STATION - NOTIFICATION OF NRC DESIGN BASES ASSURANCE INSPECTION (PROGRAMS) 05000528/2018011, 05000529/2018011, AND 05000530/2018011 INITIAL REQUEST FOR INFORMATION - March 7, 2018  DISTRIBUTION: KKennedy, RA SMorris, DRA
TPruett, DRP
RLantz, DRP AVegel, DRS JClark, DRS
SKirkwood, RC
GMiller, DRP
JDixon, DRP JChoate, DRP CPeabody, DRP
DYou, DRP
DReinert, DRP
YDubay, DRP JBowen, RIV/OEDO VDricks, ORA
JWeil, OCA
SLingam, NRR
AMoreno, RIV/CAO
BMaier, RSLO EUribe, IPAT MHerrera, DRMA
R4Enforcement 
 
 
  DOCUMENT NAME:  R:\_REACTORS\_PV\2018\Word Docs\PV2018011-LTR-RFI-WCS.docx ADAMS ACCESSION NUMBER:  ML18066A703  SUNSI Review  ADAMS:    Non-Publicly Available  Non-Sensitive Keyword:  By:  WSifre  Yes    No  Publicly Available  Sensitive  NRC-002 OFFICE RI:EB1 C;PBD C:EB1    NAME WSifre GMiller TFarnholtz    SIGNATURE /RA/ /RA/ /RA/    DATE 3/7/18 3/7/18 3/7/18    OFFICIAL RECORD COPY 
  Enclosure Initial Request for Information Design Bases Inspection (Programs), Environmental Qualification Palo Verde Nuclear Generating Station     
Inspection Report:  05000528/2018011, 05000529/2018011, 050005302018011   
Information Gathering Dates: April 24-26, 2018   
Inspection Dates: May 7-11, 2018, May 21-25, 2018 
  Inspection Procedure: IP 71111, Attachment 21N, "Design Bases Inspection (Programs)"  Lead Inspector:  Wayne C. Sifre, Senior Reactor Inspector 
I. Information Requested for Information Gathering Visit (April 24, 2018)  The following information should be provided to the lead inspector in hard copy or
electronic format (Certrec IMS preferred), to the attention of Wayne Sifre by April 23,
2018, to facilitate the reduction in the items to be selected for a final list of components. 
The inspection team will finalize the selected list during the prep week using the
documents requested in this enclosure.  The specific items selected from the lists shall be available and ready for review on the day indicated in this request.  *Please provide requested documentation electronically in "pdf" files, Excel, or other searchable formats, if possible.  The information should contain descriptive names, and be indexed and hyperlinked to facilitate ease of use.  Information in "lists" should contain enough information to be easily understood by someone who has knowledge of pressurized water reactor technology.  If requested documents are large and only hard copy formats are available, please inform the inspector(s), and provide subject documentation during
the first day of the on-site inspection.  1. List of components that are in the equipment qualification master list.  If plant is approved to categorize structures, systems, and component in accordance with 10 CFR 50.69, please provide the Risk Informed Safety Category of the component.  2. Listing of the equipment qualification master list components sorted by Birnbaum risk importance.
3. List of all post-accident monitoring instrumentation components and locations.  4. Documents which show the environmental service conditions expected for areas in which the equipment qualification components are located.
5. Palo Verde Nuclear Generating Station, word-searchable Updated Final Safety Analysis Report (UFSAR), License Conditions, and Technical Specifications.  Specifically, identify which UFSAR sections address environmental (including seismic) qualification, seismic.
 
  2  6. NRC safety evaluation report(s) associated with Palo Verde Nuclear Generating Station environmental qualification program.  7. Identify the various environmental qualification standards (including year, edition, or revision) that Palo Verde Nuclear Generating Station is committed. 
8. Identify whether Palo Verde Nuclear Generating Station has entered its period of extended operation (i.e., operation past the original 40-year license period).
9. Site (and corporate if applicable) procedures associated with the 10 CFR 50.49 environmental qualification program for electrical components.  Additionally, please provide similar procedures used to verify mechanical components meet their
10 CFR Part 50, Appendix A, Criterion 4, "Environmental and Dynamic Effects
Design Bases."  Include procedures for procurement of qualified equipment, maintenance of qualified equipment, and modification to qualified equipment (including equivalency or commercial grade dedication programs).
10. Site high energy line break analyses, including associated plant area drawings.  11. Procedures for material storage and shelf life controls.  12. List of commercial grade dedication evaluations performed, for which the dedicated parts have been issued for installation on equipment qualification applications in the
plant, for the previous five years.  Include description of the component the part was
issued to repair, work order, and date issued or installed.  13. List of condition reports related to the equipment qualification program or environmental qualification of components (both electrical and mechanical) for the
previous 5 years. 
14. Lists of modifications, repairs, or replacement of equipment qualification master list components completed for the previous 5 years.
15. List of modifications, repairs, or replacements of containment penetrations for the previous 5 years.
16. List of components removed from the environmental qualification program since beginning of operation.
17. Any self-assessments and quality assurance assessments of the environmental qualification program performed in the previous 5 years.  18. List of systems, system numbers/designators, and corresponding names. 
  3  II. Discussions Requested  1. Interview with representative to discuss site environmental qualification service condition analyses for plant areas, including plant drawings and assumptions.  This includes analysis for areas that are subject to high energy line breaks (HELB). 
2. Interview with representative to discuss environmental qualification mandated maintenance elements are integrated into plant programs and procedures.  3. Interview with representative to discuss maintaining qualification for plant/equipment that entered its period of extended operation, if applicable.  III. Information Requested for Inspection Preparation (April 30, 2018) 
1. Equipment qualification documentation files, including test reports, for the electrical components selected by the lead inspector listed on the equipment qualification
master list. 
2. References associated with the electrical components equipment qualification document files.  3. Vendor manuals and technical sheets associated with the selected electrical components.
4. Tours of the rooms in which the selected electrical components are installed.  5. Tour of stored selected electrical components in the warehouse. 
Inspector Contact Information:  Wayne C. Sifre
Senior Reactor Inspector
817-200-1193
Wayne.Sifre@nrc.gov  Jim Drake Senior Reactor Inspector
817-200-1558
James.Drake@nrc.gov Wes Cullum Reactor Inspector
817-200-1563
Wes.Cullum@nrc.gov Mailing Address: 
U.S. NRC, Region IV
Attn: Wayne C. Sifre 1600 East Lamar Blvd. Arlington, TX 76011-4511 
 


R. Bement                                        2
Our experience with these inspections has shown that they are resource intensive, both for the
NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site
and to ensure a productive inspection, we have enclosed a request for information needed for
the inspection. This information should be made available to the lead inspector on or before the
April 24, 2018, visit. Since the inspection will be concentrated on the environmental qualification
of the equipment, the equipment qualification master list should be available to review during
the information gathering visit to assist in our selection of components.
It is requested that this information be provided to the lead inspector as the information is
generated during the inspection. Additional requests by inspectors will be made during the
on-site week for specific documents needed to complete the review of that component/selection.
It is important that all of these documents are up-to-date and complete in order to minimize the
number of additional documents requested during the preparation and/or the on-site portions of
the inspection. In order to facilitate the inspection, we request that a contact individual be
assigned to each inspector to ensure information requests, questions, and concerns are
addressed in a timely manner.
The lead inspector for this inspection is Wayne Sifre. We understand that our licensing
engineer contact for this inspection is Sean Dornseif. If there are any questions about the
inspection or the requested materials, please contact the lead inspector by telephone at
817-200-1193 or by e-mail at Wayne.Sifre@nrc.gov.
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, control
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of
this letter will be made available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
                                                  Sincerely,
                                                  /RA/
                                                  Thomas R. Farnholtz, Chief
                                                  Engineering Branch 1
                                                  Division of Reactor Safety
Docket Nos. 50-528, 50-529, and 50-530
License Nos. NPF-41, NPF-51, and NPF-74
Enclosure: Initial Request for Information
cc: Electronic Distribution
ML18066A703
SUNSI Review        ADAMS:          Non-Publicly Available  Non-Sensitive Keyword:
  By: WSifre          Yes  No      Publicly Available      Sensitive    NRC-002
OFFICE        RI:EB1      C;PBD        C:EB1
NAME          WSifre      GMiller      TFarnholtz
SIGNATURE    /RA/        /RA/          /RA/
DATE          3/7/18      3/7/18        3/7/18
                                   
                                  Initial Request for Information
              Design Bases Inspection (Programs), Environmental Qualification
                            Palo Verde Nuclear Generating Station
Inspection Report:                      05000528/2018011, 05000529/2018011,
                                        050005302018011
Information Gathering Dates:            April 24-26, 2018
Inspection Dates:                        May 7-11, 2018, May 21-25, 2018
Inspection Procedure:                    IP 71111, Attachment 21N, Design Bases Inspection
                                        (Programs)
Lead Inspector:                          Wayne C. Sifre, Senior Reactor Inspector
I.    Information Requested for Information Gathering Visit (April 24, 2018)
      The following information should be provided to the lead inspector in hard copy or
      electronic format (Certrec IMS preferred), to the attention of Wayne Sifre by April 23,
      2018, to facilitate the reduction in the items to be selected for a final list of components.
      The inspection team will finalize the selected list during the prep week using the
      documents requested in this enclosure. The specific items selected from the lists shall
      be available and ready for review on the day indicated in this request. *Please provide
      requested documentation electronically in pdf files, Excel, or other searchable formats,
      if possible. The information should contain descriptive names, and be indexed and
      hyperlinked to facilitate ease of use. Information in "lists" should contain enough
      information to be easily understood by someone who has knowledge of pressurized
      water reactor technology. If requested documents are large and only hard copy formats
      are available, please inform the inspector(s), and provide subject documentation during
      the first day of the on-site inspection.
      1. List of components that are in the equipment qualification master list. If plant is
            approved to categorize structures, systems, and component in accordance with
            10 CFR 50.69, please provide the Risk Informed Safety Category of the component.
      2. Listing of the equipment qualification master list components sorted by Birnbaum risk
            importance.
      3. List of all post-accident monitoring instrumentation components and locations.
      4. Documents which show the environmental service conditions expected for areas in
            which the equipment qualification components are located.
      5. Palo Verde Nuclear Generating Station, word-searchable Updated Final Safety
            Analysis Report (UFSAR), License Conditions, and Technical Specifications.
            Specifically, identify which UFSAR sections address environmental (including
            seismic) qualification, seismic.
                                                                                      Enclosure
6. NRC safety evaluation report(s) associated with Palo Verde Nuclear Generating
    Station environmental qualification program.
7. Identify the various environmental qualification standards (including year, edition, or
    revision) that Palo Verde Nuclear Generating Station is committed.
8. Identify whether Palo Verde Nuclear Generating Station has entered its period of
    extended operation (i.e., operation past the original 40-year license period).
9. Site (and corporate if applicable) procedures associated with the 10 CFR 50.49
    environmental qualification program for electrical components. Additionally, please
    provide similar procedures used to verify mechanical components meet their
    10 CFR Part 50, Appendix A, Criterion 4, Environmental and Dynamic Effects
    Design Bases. Include procedures for procurement of qualified equipment,
    maintenance of qualified equipment, and modification to qualified equipment
    (including equivalency or commercial grade dedication programs).
10. Site high energy line break analyses, including associated plant area drawings.
11. Procedures for material storage and shelf life controls.
12. List of commercial grade dedication evaluations performed, for which the dedicated
    parts have been issued for installation on equipment qualification applications in the
    plant, for the previous five years. Include description of the component the part was
    issued to repair, work order, and date issued or installed.
13. List of condition reports related to the equipment qualification program or
    environmental qualification of components (both electrical and mechanical) for the
    previous 5 years.
14. Lists of modifications, repairs, or replacement of equipment qualification master list
    components completed for the previous 5 years.
15. List of modifications, repairs, or replacements of containment penetrations for the
    previous 5 years.
16. List of components removed from the environmental qualification program since
    beginning of operation.
17. Any self-assessments and quality assurance assessments of the environmental
    qualification program performed in the previous 5 years.
18. List of systems, system numbers/designators, and corresponding names.
                                            2
II.    Discussions Requested
        1. Interview with representative to discuss site environmental qualification service
            condition analyses for plant areas, including plant drawings and assumptions. This
            includes analysis for areas that are subject to high energy line breaks (HELB).
        2. Interview with representative to discuss environmental qualification mandated
            maintenance elements are integrated into plant programs and procedures.
        3. Interview with representative to discuss maintaining qualification for plant/equipment
            that entered its period of extended operation, if applicable.
III.    Information Requested for Inspection Preparation (April 30, 2018)
        1. Equipment qualification documentation files, including test reports, for the electrical
            components selected by the lead inspector listed on the equipment qualification
            master list.
        2. References associated with the electrical components equipment qualification
            document files.
        3. Vendor manuals and technical sheets associated with the selected electrical
            components.
        4. Tours of the rooms in which the selected electrical components are installed.
        5. Tour of stored selected electrical components in the warehouse.
Inspector Contact Information:
Wayne C. Sifre                      Jim Drake                          Wes Cullum
Senior Reactor Inspector            Senior Reactor Inspector            Reactor Inspector
817-200-1193                        817-200-1558                        817-200-1563
Wayne.Sifre@nrc.gov                  James.Drake@nrc.gov                Wes.Cullum@nrc.gov
Mailing Address:
U.S. NRC, Region IV
Attn: Wayne C. Sifre
1600 East Lamar Blvd.
Arlington, TX 76011-4511
                                                  3
}}
}}

Latest revision as of 17:42, 21 October 2019

Notification of Nrc Design Bases Assurance Inspection (Programs) 05000528/2018011, 05000529/2018011, and 05000530/2018011 Initial Request for Information
ML18066A703
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/07/2018
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Bement R
Arizona Public Service Co
References
IR 2018011
Download: ML18066A703 (6)


See also: IR 05000528/2018011

Text

March 7, 2018

Mr. Robert S. Bement

Executive Vice President Nuclear/

Chief Nuclear Officer

Arizona Public Service Company

P.O. Box 52034, MS 7602

Phoenix, AZ 85072-2034

SUBJECT: PALO VERDE NUCLEAR GENERATING STATION - NOTIFICATION OF NRC

DESIGN BASES ASSURANCE INSPECTION (PROGRAMS)

05000528/2018011, 05000529/2018011, AND 05000530/2018011 INITIAL

REQUEST FOR INFORMATION

Dear Mr. Bement:

On April 24, 2018, the NRC will begin an inspection at the Palo Verde Nuclear Generating

Station. A three-person team will perform this inspection using NRC Inspection

Procedure 71111.21N, Design Bases Inspection (Programs), Attachment 1, Environmental

Qualification under 10 CFR 50.49 Programs, Processes, and Procedures.

This inspection will evaluate the implementation of the environmental qualification of electrical

equipment program, as required by the Palo Verde Nuclear Generating Station Operating

License. Additionally, the team will perform an inspection of the equipment qualification

documentation files to verify that electrical equipment important to safety meets the

requirements of 10 CFR 50.49. The team will select components that will be subjected to harsh

environments and required mitigate the consequences of a design basis accident.

The inspection will include an information gathering site visit by the team leader and risk

analyst, and two weeks of on-site inspection by the team. The inspection will consist of three

NRC inspectors. The current inspection schedule is as follows:

On-site Information Gathering Visit: April 24-26, 2018

Preparation Weeks: April 30-May 4 and May 14-18, 2018

On-site Weeks: May 7-11 and May 21-25, 2018

The purpose of the information gathering visit is to meet with members of your staff to become

familiar with the Palo Verde Nuclear Generating Station environmental qualification program.

The lead inspector will request a meeting with your personnel to discuss the site environmental

qualification program and procedures. Additionally, the lead inspector will request a discussion

with your staff to become familiar with the equipment qualification regulations and standards to

which the site is committed. Additional information and documentation needed to support the

inspection will be identified during the inspection, including interviews with engineering

managers and engineers.

R. Bement 2

Our experience with these inspections has shown that they are resource intensive, both for the

NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site

and to ensure a productive inspection, we have enclosed a request for information needed for

the inspection. This information should be made available to the lead inspector on or before the

April 24, 2018, visit. Since the inspection will be concentrated on the environmental qualification

of the equipment, the equipment qualification master list should be available to review during

the information gathering visit to assist in our selection of components.

It is requested that this information be provided to the lead inspector as the information is

generated during the inspection. Additional requests by inspectors will be made during the

on-site week for specific documents needed to complete the review of that component/selection.

It is important that all of these documents are up-to-date and complete in order to minimize the

number of additional documents requested during the preparation and/or the on-site portions of

the inspection. In order to facilitate the inspection, we request that a contact individual be

assigned to each inspector to ensure information requests, questions, and concerns are

addressed in a timely manner.

The lead inspector for this inspection is Wayne Sifre. We understand that our licensing

engineer contact for this inspection is Sean Dornseif. If there are any questions about the

inspection or the requested materials, please contact the lead inspector by telephone at

817-200-1193 or by e-mail at Wayne.Sifre@nrc.gov.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, control

number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of

this letter will be made available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Docket Nos. 50-528, 50-529, and 50-530

License Nos. NPF-41, NPF-51, and NPF-74

Enclosure: Initial Request for Information

cc: Electronic Distribution

ML18066A703

SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: WSifre Yes No Publicly Available Sensitive NRC-002

OFFICE RI:EB1 C;PBD C:EB1

NAME WSifre GMiller TFarnholtz

SIGNATURE /RA/ /RA/ /RA/

DATE 3/7/18 3/7/18 3/7/18

Initial Request for Information

Design Bases Inspection (Programs), Environmental Qualification

Palo Verde Nuclear Generating Station

Inspection Report: 05000528/2018011, 05000529/2018011,

050005302018011

Information Gathering Dates: April 24-26, 2018

Inspection Dates: May 7-11, 2018, May 21-25, 2018

Inspection Procedure: IP 71111, Attachment 21N, Design Bases Inspection

(Programs)

Lead Inspector: Wayne C. Sifre, Senior Reactor Inspector

I. Information Requested for Information Gathering Visit (April 24, 2018)

The following information should be provided to the lead inspector in hard copy or

electronic format (Certrec IMS preferred), to the attention of Wayne Sifre by April 23,

2018, to facilitate the reduction in the items to be selected for a final list of components.

The inspection team will finalize the selected list during the prep week using the

documents requested in this enclosure. The specific items selected from the lists shall

be available and ready for review on the day indicated in this request. *Please provide

requested documentation electronically in pdf files, Excel, or other searchable formats,

if possible. The information should contain descriptive names, and be indexed and

hyperlinked to facilitate ease of use. Information in "lists" should contain enough

information to be easily understood by someone who has knowledge of pressurized

water reactor technology. If requested documents are large and only hard copy formats

are available, please inform the inspector(s), and provide subject documentation during

the first day of the on-site inspection.

1. List of components that are in the equipment qualification master list. If plant is

approved to categorize structures, systems, and component in accordance with

10 CFR 50.69, please provide the Risk Informed Safety Category of the component.

2. Listing of the equipment qualification master list components sorted by Birnbaum risk

importance.

3. List of all post-accident monitoring instrumentation components and locations.

4. Documents which show the environmental service conditions expected for areas in

which the equipment qualification components are located.

5. Palo Verde Nuclear Generating Station, word-searchable Updated Final Safety

Analysis Report (UFSAR), License Conditions, and Technical Specifications.

Specifically, identify which UFSAR sections address environmental (including

seismic) qualification, seismic.

Enclosure

6. NRC safety evaluation report(s) associated with Palo Verde Nuclear Generating

Station environmental qualification program.

7. Identify the various environmental qualification standards (including year, edition, or

revision) that Palo Verde Nuclear Generating Station is committed.

8. Identify whether Palo Verde Nuclear Generating Station has entered its period of

extended operation (i.e., operation past the original 40-year license period).

9. Site (and corporate if applicable) procedures associated with the 10 CFR 50.49

environmental qualification program for electrical components. Additionally, please

provide similar procedures used to verify mechanical components meet their

10 CFR Part 50, Appendix A, Criterion 4, Environmental and Dynamic Effects

Design Bases. Include procedures for procurement of qualified equipment,

maintenance of qualified equipment, and modification to qualified equipment

(including equivalency or commercial grade dedication programs).

10. Site high energy line break analyses, including associated plant area drawings.

11. Procedures for material storage and shelf life controls.

12. List of commercial grade dedication evaluations performed, for which the dedicated

parts have been issued for installation on equipment qualification applications in the

plant, for the previous five years. Include description of the component the part was

issued to repair, work order, and date issued or installed.

13. List of condition reports related to the equipment qualification program or

environmental qualification of components (both electrical and mechanical) for the

previous 5 years.

14. Lists of modifications, repairs, or replacement of equipment qualification master list

components completed for the previous 5 years.

15. List of modifications, repairs, or replacements of containment penetrations for the

previous 5 years.

16. List of components removed from the environmental qualification program since

beginning of operation.

17. Any self-assessments and quality assurance assessments of the environmental

qualification program performed in the previous 5 years.

18. List of systems, system numbers/designators, and corresponding names.

2

II. Discussions Requested

1. Interview with representative to discuss site environmental qualification service

condition analyses for plant areas, including plant drawings and assumptions. This

includes analysis for areas that are subject to high energy line breaks (HELB).

2. Interview with representative to discuss environmental qualification mandated

maintenance elements are integrated into plant programs and procedures.

3. Interview with representative to discuss maintaining qualification for plant/equipment

that entered its period of extended operation, if applicable.

III. Information Requested for Inspection Preparation (April 30, 2018)

1. Equipment qualification documentation files, including test reports, for the electrical

components selected by the lead inspector listed on the equipment qualification

master list.

2. References associated with the electrical components equipment qualification

document files.

3. Vendor manuals and technical sheets associated with the selected electrical

components.

4. Tours of the rooms in which the selected electrical components are installed.

5. Tour of stored selected electrical components in the warehouse.

Inspector Contact Information:

Wayne C. Sifre Jim Drake Wes Cullum

Senior Reactor Inspector Senior Reactor Inspector Reactor Inspector

817-200-1193 817-200-1558 817-200-1563

Wayne.Sifre@nrc.gov James.Drake@nrc.gov Wes.Cullum@nrc.gov

Mailing Address:

U.S. NRC, Region IV

Attn: Wayne C. Sifre

1600 East Lamar Blvd.

Arlington, TX 76011-4511

3