ML11318A191: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML11318A191
| number = ML11318A191
| issue date = 11/01/2011
| issue date = 11/01/2011
| title = 2011/11/01 Watts Bar 2 OL - NRC PM Open Items List 11-02-11.docx
| title = OL - NRC PM Open Items List 11-02-11.docx
| author name =  
| author name =  
| author affiliation = - No Known Affiliation
| author affiliation = - No Known Affiliation
Line 13: Line 13:
| page count = 6
| page count = 6
}}
}}
=Text=
{{#Wiki_filter:WBN2Public Resource From:                  Boyd, Desiree L [dlboyd@tva.gov]
Sent:                  Tuesday, November 01, 2011 9:29 AM To:                    Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc:                    Arent, Gordon; Smith, James D; Bryan, Robert H Jr; Smith, James D; Boyd, Desiree L; Crouch, William D
==Subject:==
NRC PM Open Items List 11-02-11.docx Attachments:          NRC PM Open Items List 11-02-11.docx For next phone call.
Thank You,
~*~*~*~*~*~*~*~*~*~*~*~
Désireé L. Boyd WBN 2 Licensing Support Sun Technical Services dlboyd@tva.gov 423-365-8764 1
Hearing Identifier:      Watts_Bar_2_Operating_LA_Public Email Number:            575 Mail Envelope Properties      (7AB41F650F76BD44B5BCAB7C0CCABFAF24C68FA1)
==Subject:==
NRC PM Open Items List 11-02-11.docx Sent Date:              11/1/2011 9:28:42 AM Received Date:          11/1/2011 9:28:45 AM From:                    Boyd, Desiree L Created By:              dlboyd@tva.gov Recipients:
"Arent, Gordon" <garent@tva.gov>
Tracking Status: None "Smith, James D" <jdsmith@tva.gov>
Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov>
Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com>
Tracking Status: None "Boyd, Desiree L" <dlboyd@tva.gov>
Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov>
Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>
Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>
Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>
Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov>
Tracking Status: None Post Office:            TVANUCXVS2.main.tva.gov Files                            Size                  Date & Time MESSAGE                          234                    11/1/2011 9:28:45 AM NRC PM Open Items List 11-02-11.docx                          33871 Options Priority:                        Standard Return Notification:            No Reply Requested:                No Sensitivity:                    Normal Expiration Date:
Recipients Received:
Page 1 of 4 NRC PM Open Items List 11/2/11 (423) 751-7777 ID 4233658764#
No.              Description              Status                  Additional Comments      Resp Org/Person
: 1. Cyber Security Plan/Controls and NRC Table      NRC Inspection in 2011          Heinrich/Snyder Implementation                  Top/Pilot                                        (Bryan)
Jan. 2012 Inspection 4th Qtr 2012
Page 2 of 4 No.                Description                  Status                    Additional Comments                      Resp Org/Person
: 2. Instrumentation RAI List (Knuettel)    1. 9/29/11A    1. Draft response received and comments sent to GA. Eng/Hilmes
: 1. GA/ESI is preparing a report to      2. Various -  2. 04038903-1SP: 10/11/11 A                        (Smith) document the conformance of their      see status    04038903-2SP: 11/14/11 CGD program to NRC requirements    3. 9/26/11A        04038903-4SP: 11/14/11 based on NRC telecom on 8/30/11. 4. 10/4/11        04038903-QSR: 09/30/11 A Draft scheduled for 9/9 is now TBD. 5. 11/18/11        Non-props and affidavits due 11/18/11
: 2. Updates based on schedule received  6. Various -  3. OP-7.3-240: Complete from GA on 09/07/11 following          see status 4. Create new bridge document 04038800-1SP:
conference call on document        7. 10/24/11A      10/11/11A schedule.                          8. 10/27/11    5. Provide NRC non-prop and affidavit for all
: 3. Revise GA-ESI procedure for CGI      9. 10/27/11A      remaining documents dedication to address NRC          10. 11/14/11  6. WEC to provide the following documents:
comments.                                              WCAP for 0000-ICE-30156 11/9/11
: 4. Draft received for review 9/20/11.                      CN-EQT-10-44: 11/9/11
: 5. Non-props & affidavits                                  DAR-ME-09-10: 10/11/11 A
: 6. WEC to provide demarcated                              EQ-EV-62-WBT: 11/16/11 proprietary, non-proprietary and                      EQLR-171: 11/16/11 affidavits for withholding for each                    EQ-QR-33-WBT: 11/9/11 item.                                                  EQ-QR-64-GEN: 11/16/11
: 7. WEC to revise figure to remove                          WNA-SD-00250-WBT: 11/2/11 connection from OM to printer to                      WNA-SD-00248-WBT: 11/2/11 complete commitment.                                  WNA-TP-02988-WBT: 10/26/11
: 8. WEC to agreed to produce a test                        WNA-VR-00279-WBT: Complete report for the incore IITA.                            WNA-PT-00138-WBT: Complete
: 9. WEC has the necessary                              7. WNA-AR-00189-WBT:10/24/11A documentation. WEC to produce a                    8. IITA In-core EQ report non-proprietary summary report and                9. MI cable 600V test report Produce non-prop place the test reports in the WEC                      summary document A Rockville office for NRC audit.                    10. Next I&C submittal update
: 10. Submit I&C update letter
: 3. Exemption to 10CFR50.49 for some          11/14/11        Determine if exemption required. NRC may need  Hilmes Category II cables?                                        to establish a license condition.              (Stockton)
Page 3 of 4 No.              Description              Status                    Additional Comments                      Resp Org/Person
: 4. Complete Implementation (Hemmer)    Pump          Substantial building to complete and equipment in  Hemmer Relocation    May.                                                (Smith) 5/30/12        Provide document of mitigating equipment and location for unit 2.
Bldg Plan 10/31/11 Inspection -
June 2012 Table update -
TBD
: 5. Fire Protection Report Questions    1. 10/25-27/11 1. Audit                                            ENG/Hilmes regarding OMA                      2.9/30/11A    2. Group 7 RAI response                            (Arent) 3.9/30/11A    3. Receive Group 8 RAIs - if needed
: 4. 10/31/11A  4. Response to Group 8 plus 2Qs on 9/30/11 letter
: 5. 11/30/11    5. Submit As-designed U1/U2 FPR
: 6. 9/30/11A    6. Fire Protection Program Audit Frequency - add to
: 7. TBD        group 7 response
: 7. Follow-up meeting
: 6. Tech Spec Revisions from latest T/S 1. 11/18/11    1. CSST A & B - discretionary                      Licensing/Elton markup and NRC Review comments      2. 11/18/11    2. I-131 DEI                                        (Bryan)
: 3. 11/18/11    3. Diesel Generator Frequency                      5. Shea
: 4. 11/18/11    4. Unit 1 AST FHA
: 5. 10/31/11A  5. List of Unit 1 Changes
: 7. ACRS                                12/15/11      Chapter 15 (T&A and dose), Chapters 11 & 12,        Arent/Bryan Attachment HH?
: 8. SSER 22/23/24 Open Items Response  As needed      The expanded HH list and status is covered          Licensing periodically.
: 9. Transient Analysis issues          10/31/11      Question on RG revision and modes 3, 4, & 5. TVA to ENG/Koontz provide write-up explaining NRC acceptance (CLB) of WEC/Morgan Boron dilution RAI response                        unit 1 for modes 3, 4, & 5. See SSER OI 132.
: 10. FSAR A107                          11/18/11      Current target date for A107 is 11/18/11.          Lic/Stockton
Page 4 of 4 No.                Description                  Status                  Additional Comments                        Resp Org/Person
: 11. Develop list of planned License          1. 11/18/11  1. Review Unit 1 SER for exemptions. Sand        NRR/TVA Conditions, Exemptions and Relief        2. TBD      baskets, cyber security, physical security, PAD 4.0  (Bryan)
Requests (Arent)                        3. TBD      2. NRR to review current exemptions
: 3. Verify required notifications made
: 12. Verify Tech Spec Setpoints match calcs  1. TBD      1. SSDs are complete. Six changes to the TSs will be Eng/Hilmes submitted to NRC                                    (Bryan)
TS certification                        2. Feb 2012  2. TS certification
: 13. Issue two Unit Offsite Dose Calculation 3/1/12      Determine actual need date                          Chemistry/
Manual (Beach) Review TS Chapter 5                                                                        Woods programs also                                                                                            (Bryan)
: 14. Issue Unit 2 Completion Letter (Arent)  8/1/12                                                            Licensing
: 15. Submit final as-constructed FSAR        7/1/12                                                            Licensing/
figures                                                                                                  Stockton
: 16. TMI action items                        7/1/12      TVA to provide letter when TMI actions are field    Licensing complete.                                            (Gordon)
: 17. ASME N-801 & N-802 code cases          11/30/11    NRC response to relief request submitted 9/1/11. NRR
: 18. ASME Section III N-3 report            8/1/12
: 0. Discretionary Actions
: 1. Letter to terminate Part 30/40 License  4/1/12                                                            Licensing after receipt of Part 50 License                                                                          (Arent)
: 2. Combined U1/U2 FSAR (Stockton)          3/1/13                                                            Licensing
: 3. Status of GSI 199 Eastern Seismicity    Fall 2011    No action pending upcoming Generic Letter            TVA/NRR (Arent)
: 4. Letter to notify NRC when Vital Area    Jan. 2012    Security Plan Update - Boundary to be restored.      Lic/Arent Boundary returned to original location
: 5. IEB 88-02 SG Tube Cracking              TBD          Tubes are assumed locked in the WEC analysis.        Corp SG/
Waiting for NRC concurrence. When will the WEC      Webber analysis be submitted? NRC willing to review as a    ISI/Tinley contingency.}}

Latest revision as of 00:32, 6 December 2019

OL - NRC PM Open Items List 11-02-11.docx
ML11318A191
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 11/01/2011
From:
- No Known Affiliation
To:
Division of Operating Reactor Licensing
References
Download: ML11318A191 (6)


Text

WBN2Public Resource From: Boyd, Desiree L [dlboyd@tva.gov]

Sent: Tuesday, November 01, 2011 9:29 AM To: Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc: Arent, Gordon; Smith, James D; Bryan, Robert H Jr; Smith, James D; Boyd, Desiree L; Crouch, William D

Subject:

NRC PM Open Items List 11-02-11.docx Attachments: NRC PM Open Items List 11-02-11.docx For next phone call.

Thank You,

~*~*~*~*~*~*~*~*~*~*~*~

Désireé L. Boyd WBN 2 Licensing Support Sun Technical Services dlboyd@tva.gov 423-365-8764 1

Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 575 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF24C68FA1)

Subject:

NRC PM Open Items List 11-02-11.docx Sent Date: 11/1/2011 9:28:42 AM Received Date: 11/1/2011 9:28:45 AM From: Boyd, Desiree L Created By: dlboyd@tva.gov Recipients:

"Arent, Gordon" <garent@tva.gov>

Tracking Status: None "Smith, James D" <jdsmith@tva.gov>

Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov>

Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com>

Tracking Status: None "Boyd, Desiree L" <dlboyd@tva.gov>

Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov>

Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>

Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>

Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>

Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov>

Tracking Status: None Post Office: TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 234 11/1/2011 9:28:45 AM NRC PM Open Items List 11-02-11.docx 33871 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

Page 1 of 4 NRC PM Open Items List 11/2/11 (423) 751-7777 ID 4233658764#

No. Description Status Additional Comments Resp Org/Person

1. Cyber Security Plan/Controls and NRC Table NRC Inspection in 2011 Heinrich/Snyder Implementation Top/Pilot (Bryan)

Jan. 2012 Inspection 4th Qtr 2012

Page 2 of 4 No. Description Status Additional Comments Resp Org/Person

2. Instrumentation RAI List (Knuettel) 1. 9/29/11A 1. Draft response received and comments sent to GA. Eng/Hilmes
1. GA/ESI is preparing a report to 2. Various - 2. 04038903-1SP: 10/11/11 A (Smith) document the conformance of their see status 04038903-2SP: 11/14/11 CGD program to NRC requirements 3. 9/26/11A 04038903-4SP: 11/14/11 based on NRC telecom on 8/30/11. 4. 10/4/11 04038903-QSR: 09/30/11 A Draft scheduled for 9/9 is now TBD. 5. 11/18/11 Non-props and affidavits due 11/18/11
2. Updates based on schedule received 6. Various - 3. OP-7.3-240: Complete from GA on 09/07/11 following see status 4. Create new bridge document 04038800-1SP:

conference call on document 7. 10/24/11A 10/11/11A schedule. 8. 10/27/11 5. Provide NRC non-prop and affidavit for all

3. Revise GA-ESI procedure for CGI 9. 10/27/11A remaining documents dedication to address NRC 10. 11/14/11 6. WEC to provide the following documents:

comments. WCAP for 0000-ICE-30156 11/9/11

4. Draft received for review 9/20/11. CN-EQT-10-44: 11/9/11
5. Non-props & affidavits DAR-ME-09-10: 10/11/11 A
6. WEC to provide demarcated EQ-EV-62-WBT: 11/16/11 proprietary, non-proprietary and EQLR-171: 11/16/11 affidavits for withholding for each EQ-QR-33-WBT: 11/9/11 item. EQ-QR-64-GEN: 11/16/11
7. WEC to revise figure to remove WNA-SD-00250-WBT: 11/2/11 connection from OM to printer to WNA-SD-00248-WBT: 11/2/11 complete commitment. WNA-TP-02988-WBT: 10/26/11
8. WEC to agreed to produce a test WNA-VR-00279-WBT: Complete report for the incore IITA. WNA-PT-00138-WBT: Complete
9. WEC has the necessary 7. WNA-AR-00189-WBT:10/24/11A documentation. WEC to produce a 8. IITA In-core EQ report non-proprietary summary report and 9. MI cable 600V test report Produce non-prop place the test reports in the WEC summary document A Rockville office for NRC audit. 10. Next I&C submittal update
10. Submit I&C update letter
3. Exemption to 10CFR50.49 for some 11/14/11 Determine if exemption required. NRC may need Hilmes Category II cables? to establish a license condition. (Stockton)

Page 3 of 4 No. Description Status Additional Comments Resp Org/Person

4. Complete Implementation (Hemmer) Pump Substantial building to complete and equipment in Hemmer Relocation May. (Smith) 5/30/12 Provide document of mitigating equipment and location for unit 2.

Bldg Plan 10/31/11 Inspection -

June 2012 Table update -

TBD

5. Fire Protection Report Questions 1. 10/25-27/11 1. Audit ENG/Hilmes regarding OMA 2.9/30/11A 2. Group 7 RAI response (Arent) 3.9/30/11A 3. Receive Group 8 RAIs - if needed
4. 10/31/11A 4. Response to Group 8 plus 2Qs on 9/30/11 letter
5. 11/30/11 5. Submit As-designed U1/U2 FPR
6. 9/30/11A 6. Fire Protection Program Audit Frequency - add to
7. TBD group 7 response
7. Follow-up meeting
6. Tech Spec Revisions from latest T/S 1. 11/18/11 1. CSST A & B - discretionary Licensing/Elton markup and NRC Review comments 2. 11/18/11 2. I-131 DEI (Bryan)
3. 11/18/11 3. Diesel Generator Frequency 5. Shea
4. 11/18/11 4. Unit 1 AST FHA
5. 10/31/11A 5. List of Unit 1 Changes
7. ACRS 12/15/11 Chapter 15 (T&A and dose), Chapters 11 & 12, Arent/Bryan Attachment HH?
8. SSER 22/23/24 Open Items Response As needed The expanded HH list and status is covered Licensing periodically.
9. Transient Analysis issues 10/31/11 Question on RG revision and modes 3, 4, & 5. TVA to ENG/Koontz provide write-up explaining NRC acceptance (CLB) of WEC/Morgan Boron dilution RAI response unit 1 for modes 3, 4, & 5. See SSER OI 132.
10. FSAR A107 11/18/11 Current target date for A107 is 11/18/11. Lic/Stockton

Page 4 of 4 No. Description Status Additional Comments Resp Org/Person

11. Develop list of planned License 1. 11/18/11 1. Review Unit 1 SER for exemptions. Sand NRR/TVA Conditions, Exemptions and Relief 2. TBD baskets, cyber security, physical security, PAD 4.0 (Bryan)

Requests (Arent) 3. TBD 2. NRR to review current exemptions

3. Verify required notifications made
12. Verify Tech Spec Setpoints match calcs 1. TBD 1. SSDs are complete. Six changes to the TSs will be Eng/Hilmes submitted to NRC (Bryan)

TS certification 2. Feb 2012 2. TS certification

13. Issue two Unit Offsite Dose Calculation 3/1/12 Determine actual need date Chemistry/

Manual (Beach) Review TS Chapter 5 Woods programs also (Bryan)

14. Issue Unit 2 Completion Letter (Arent) 8/1/12 Licensing
15. Submit final as-constructed FSAR 7/1/12 Licensing/

figures Stockton

16. TMI action items 7/1/12 TVA to provide letter when TMI actions are field Licensing complete. (Gordon)
17. ASME N-801 & N-802 code cases 11/30/11 NRC response to relief request submitted 9/1/11. NRR
18. ASME Section III N-3 report 8/1/12
0. Discretionary Actions
1. Letter to terminate Part 30/40 License 4/1/12 Licensing after receipt of Part 50 License (Arent)
2. Combined U1/U2 FSAR (Stockton) 3/1/13 Licensing
3. Status of GSI 199 Eastern Seismicity Fall 2011 No action pending upcoming Generic Letter TVA/NRR (Arent)
4. Letter to notify NRC when Vital Area Jan. 2012 Security Plan Update - Boundary to be restored. Lic/Arent Boundary returned to original location
5. IEB 88-02 SG Tube Cracking TBD Tubes are assumed locked in the WEC analysis. Corp SG/

Waiting for NRC concurrence. When will the WEC Webber analysis be submitted? NRC willing to review as a ISI/Tinley contingency.