| | issue date = 12/04/2014 | | | issue date = 12/04/2014 |
| | title = William McGuire Nuclear Station - Notification of Licensed Operator Initial Examination 05000369/2015301 and 05000370/2015301 | | | title = William McGuire Nuclear Station - Notification of Licensed Operator Initial Examination 05000369/2015301 and 05000370/2015301 |
| | author name = Guthrie E F | | | author name = Guthrie E |
| | author affiliation = NRC/RGN-II/DRS | | | author affiliation = NRC/RGN-II/DRS |
| | addressee name = Capps S D | | | addressee name = Capps S |
| | addressee affiliation = Duke Energy Corp | | | addressee affiliation = Duke Energy Corp |
| | docket = 05000369, 05000370 | | | docket = 05000369, 05000370 |
Line 14: |
Line 14: |
| | page count = 3 | | | page count = 3 |
| }} | | }} |
| See also: [[followed by::IR 05000369/2015301]] | | See also: [[see also::IR 05000369/2015301]] |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter: | | {{#Wiki_filter:UNITED STATES |
| [[Issue date::December 4, 2014]]
| | NUCLEAR REGULATORY COMMISSION |
| | REGION II |
| | 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 |
| | ATLANTA, GEORGIA 30303-1257 |
| | December 4, 2014 |
| | Mr. Steven D. Capps |
| | Site Vice President |
| | Duke Energy Corporation |
| | McGuire Nuclear Station |
| | MG01VP/12700 Hagers Ferry Road |
| | Huntersville, NC 28078 |
| | SUBJECT: WILLIAM B. MCGUIRE NUCLEAR STATION - NOTIFICATION OF LICENSED |
| | OPERATOR INITIAL EXAMINATION 05000369/2015301 AND 05000370/2015301 |
| | Dear Mr. Capps: |
| | In a telephone conversation on November 25, 2014, between Mr. Steven Mosteller, MNS Exam |
| | Team Lead, and Mr. Daniel Bacon, Senior Operations Engineer, arrangements were made for |
| | the administration of licensing examinations at William B. McGuire Nuclear Station. The |
| | operating test is scheduled to be administered during the weeks of April 27 and May 4, 2015. |
| | The written examination is scheduled to be administered the week of May 11, 2015. The on-site |
| | preparatory week is scheduled for the week of March 30, 2015. |
| | As agreed during the telephone conversation, your staff will prepare both the operating test and |
| | written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021, |
| | "Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory |
| | Commission (NRC) Regional office will discuss any changes with your staff that might be |
| | necessary before the examinations are administered. Your staff has also agreed to make |
| | copies of all examination materials that are necessary for administering the examination. |
| | To meet the above schedule, it will be necessary for your staff to furnish the operating test |
| | outline by February 11, 2015. Mr. Daniel Bacon provided the written examination outline to your |
| | staff in September, 2014. The operating test, written examination, and the supporting reference |
| | materials identified in Attachment 3 to ES-201 will be due by March 13, 2015. Pursuant to Title |
| | 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized |
| | representative of the facility licensee shall approve the outline, examination, and test before |
| | they are submitted to the NRC for review and approval. All materials shall be complete and |
| | ready-to-use. |
| | We request that any personal, proprietary, sensitive unclassified, or safeguards information in |
| | your response be contained in a separate enclosure and appropriately marked. Any delay in |
| | receiving the required examination and reference materials, or the submittal of inadequate or |
| | incomplete materials, may cause the examinations to be rescheduled. |
| | In order to conduct the requested written examinations and operating tests, it will be necessary |
| | for your staff to provide adequate space and accommodations in accordance with ES-402, and |
| | to make the simulation facility available on the dates noted above. In accordance with ES-302, |
|
| |
|
| Mr. Steven Site Vice President Duke Energy Corporation McGuire Nuclear Station MG01VP/12700 Hagers Ferry Road Huntersville, NC 28078 | | S. Capps 2 |
| | your staff should retain the original simulator performance data (e.g., system pressures, |
| | temperatures, and levels) generated during the dynamic operating tests until the examination |
| | results are final. |
| | Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in |
| | effect while the written examinations and operating tests are being administered. |
| | To permit timely NRC review and evaluation, your staff should submit preliminary reactor |
| | operator and senior reactor operator license applications, medical certifications, and waiver |
| | requests (if any) at least 30 days before the first examination date. If the applications are not |
| | received at least 30 days before the examination date, a postponement may be necessary. |
| | Signed applications certifying that all training has been completed should be submitted at least |
| | 14 days before the first examination date. |
| | This letter contains information collections that are subject to the Paperwork Reduction Act |
| | of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office |
| | of Management and Budget (OMB) under approval number 3150-0018, which expires on |
| | April 30, 2016. The public reporting burden for this collection of information is estimated to |
| | average 500 hours per response, including the time for reviewing instructions, gathering and |
| | maintaining the data needed, writing the examinations, and completing and reviewing the |
| | collection of information. Send comments on any aspect of this collection of information, |
| | including suggestions for reducing the burden, to the Information and Records Management |
| | Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by |
| | Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of |
| | Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and |
| | Budget, Washington, DC 20503. |
| | The NRC may neither conduct nor sponsor, and a person is not required to respond to, an |
| | information collection, unless it displays a currently valid OMB control number. |
| | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will |
| | be available electronically for public inspection in the NRC Public Document Room, or from |
| | the Publicly Available Records (PARS) component of the NRCs Agencywide Documents |
| | Access and Management System (ADAMS), accessible from the NRC Web site |
| | at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
| | Thank you for your cooperation in this matter. Mr. Steven Mosteller has been advised of the |
| | policies and guidelines referenced in this letter. If you have any questions regarding the NRCs |
| | examination procedures and guidelines, please contact Mr. Daniel Bacon at 404-997-4518, |
| | (Internet E-mail: daniel.bacon@nrc.gov), or me at 404-997-4662, (Internet E-mail: |
| | eugene.guthrie@nrc.gov). |
| | Sincerely, |
| | /RA/ |
| | Eugene F. Guthrie, Chief |
| | Operations Branch 2 |
| | Division of Reactor Safety |
| | Docket Nos. 50-369 and 50-370 |
| | License Nos. NPF-9 and NPF-17 |
| | cc: Distribution via Listserv |
|
| |
|
| SUBJECT: WILLIAM B. MCGUIRE NUCLEAR STATION - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000369/2015301 AND 05000370/2015301
| |
|
| |
|
| ==Dear Mr. Capps:==
| | ML14342A873 SUNSI REVIEW COMPLETE FORM 665 ATTACHED |
| In a telephone conversation on November 25, 2014, between Mr. Steven Mosteller, MNS Exam Team Lead, and Mr. Daniel Bacon, Senior Operations Engineer, arrangements were made for the administration of licensing examinations at William B. McGuire Nuclear Station. The operating test is scheduled to be administered during the weeks of April 27 and May 4, 2015. The written examination is scheduled to be administered the week of May 11, 2015. The on-site preparatory week is scheduled for the week of March 30, 2015.
| | OFFICE RII:DRS/OB2 RII:DRS/OB2 |
| | | SIGNATURE DXB2 EFG |
| As agreed during the telephone conversation, your staff will prepare both the operating test and written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,
| | NAME DBacon EGuthrie |
| "Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory Commission (NRC) Regional office will discuss any changes with your staff that might be necessary before the examinations are administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.
| | DATE 12/ 4/2014 12/4/2014 |
| | | E-MAIL COPY YES NO YES NO YES NO |
| To meet the above schedule, it will be necessary for your staff to furnish the operating test outline by February 11, 2015. Mr. Daniel Bacon provided the written examination outline to your staff in September, 2014. The operating test, written examination, and the supporting reference materials identified in Attachment 3 to ES-201 will be due by March 13, 2015. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outline, examination, and test before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use.
| |
| | |
| We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
| |
| | |
| In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
| |
| | |
| To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications, medical certifications, and waiver requests (if any) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
| |
| | |
| This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB) under approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for this collection of information is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
| |
| | |
| The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
| |
| | |
| In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Thank you for your cooperation in this matter. Mr. Steven Mosteller has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Daniel Bacon at 404-997-4518, (Internet E-mail: daniel.bacon@nrc.gov), or me at 404-997-4662, (Internet E-mail: eugene.guthrie@nrc.gov).
| |
| | |
| Sincerely,/RA/ Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety
| |
| | |
| Docket Nos. 50-369 and 50-370 License Nos. NPF-9 and NPF-17 cc: Distribution via Listserv your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
| |
| | |
| Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
| |
| | |
| To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications, medical certifications, and waiver requests (if any) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
| |
| | |
| This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB) under approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for this collection of information is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
| |
| | |
| The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Thank you for your cooperation in this matter. Mr. Steven Mosteller has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Daniel Bacon at 404-997-4518, (Internet E-mail: daniel.bacon@nrc.gov), or me at 404-997-4662, (Internet E-mail: eugene.guthrie@nrc.gov).
| |
| | |
| Sincerely,/RA/ Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket Nos. 50-369 and 50-370 License Nos. NPF-9 and NPF-17 cc: Distribution via Listserv PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE NON-SENSITIVE ADAMS: Yes ACCESSION NUMBER: ML14342A873 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/OB2 RII:DRS/OB2 SIGNATURE DXB2 EFG NAME DBacon EGuthrie DATE 12/ 4/2014 12/4/2014 E-MAIL COPY YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\OLEXAMS\MCGUIRE EXAMINATIONS\INITIAL EXAM 2015-301\CORRESPONDENCE\MCGUIRE 2015-301 CORPORATE NOTIFICATION LETTER.DOCX
| |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARIR 05000369/20240052024-08-26026 August 2024 Updated Inspection Plan for McGuire Nuclear Station, Units 1 and 2, (Report 05000369-2024005 and 05000370-2024005) IR 05000369/20244042024-08-0101 August 2024 Cover Letter Security Baseline Inspection Report 05000369/2024404 and 05000370/2024404 IR 05000369/20253012024-07-29029 July 2024 Notification of Licensed Operator Initial Examination 05000369/2025301 and 05000370/2025301 IR 05000369/20244032024-07-25025 July 2024 – Cyber Security Inspection Report 05000369/2024403 and 05000370/2024403 Rev IR 05000369/20240022024-07-24024 July 2024 Integrated Inspection Report 05000369/2024002 and 05000370/2024002 ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000369/20244012024-07-0303 July 2024 – Security Baseline Inspection Report 05000369/2024401 and 05000370/2024401 ML24176A2802024-06-26026 June 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000369-2024404 and 05000370-2024404) IR 05000369/20240112024-06-0404 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000369/2024011 and 05000370/2024011 ML24149A1772024-05-28028 May 2024 NRC Response to Duke Energy 2025 FOF Schedule Change Request (Catawba and McGuire) IR 05000369/20240012024-05-0808 May 2024 Integrated Inspection Report 05000369-2024001 and 05000370-2024001 and 07200038-2024001 ML24110A0382024-04-30030 April 2024 – Correction to Issuance of Amendment Nos. 330 and 309, Regarding Implementation of Technical Specifications Task Force (TSTF) Traveler TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf ML24100A8742024-04-10010 April 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000369/2024403; and 05000370/2024403 ML24052A3062024-04-0808 April 2024 Issuance of Amendment Nos. 331 & 310, Regarding Adoption of Title 10 of Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Plants ML24031A5402024-03-26026 March 2024 Issuance of Amendment Nos. 330 and 309 Regarding Implementation of TSTF 505,Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML24085A2402024-03-21021 March 2024 Requalification Program Inspection - McGuire Nuclear Station IR 05000369/20240102024-03-13013 March 2024 Comprehensive Engineering Team Inspection Report 05000369/2024010 and 05000370/2024010 IR 05000369/20230062024-02-28028 February 2024 Annual Assessment Letter for McGuire Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000369/2023006 and 05000370/2023006 ML24024A2182024-02-0505 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000369/20230042024-01-31031 January 2024 Integrated Inspection Report 05000369/2023004 and 05000370/2023004 ML24019A1392024-01-25025 January 2024 TSTF 505 and 50.69 Audit Summary ML24019A2002024-01-24024 January 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000369/20234022023-12-14014 December 2023 – Material Control and Accounting Program Inspection Report 05000369/2023402 and 05000370/2023402 ML23317A2272023-11-17017 November 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Transmittal of Dam Inspection Report - Non-Proprietary ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000369/20230032023-10-24024 October 2023 Integrated Inspection Report 05000369/2023003 and 05000370/2023003; and Inspection Report 07200038/2023001 IR 05000369/20230102023-10-13013 October 2023 Age Related Degradation Inspection Report 05000369/2023010 and 05000370/2023010 ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds IR 05000369/20233012023-09-20020 September 2023 William B. McGuire Nuclear Station - NRC Examination Report 05000369/2023301 and 05000370/2023301 ML23230A0652023-08-31031 August 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Relief Request Use of Later Edition of ASME Code ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000369/20230052023-08-25025 August 2023 Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 (Report 05000369/2023005 and 05000370/2023005) IR 05000369/20230022023-07-28028 July 2023 Integrated Inspection Report 05000369/2023002 and 05000370/2023002 IR 05000369/20234202023-07-24024 July 2023 Security Baseline Inspection Report 050003692023420 and 050003702023420 ML23206A0092023-07-24024 July 2023 William B. McGuire Nuclear Station Operator Licensing Written Examination Approval 05000369/2023301 and 05000370/2023301 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23159A2712023-06-20020 June 2023 William B. McGuire Nuclear Station, Unit 1 - Relief Request Impractical Reactor System Welds ML23237A2672023-06-13013 June 2023 June 13, 2002 - Meeting Announcement - McGuire and Catawba Nuclear Stations 50-369, 50-370 and 50-413, 50-414 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined ML23115A2122023-05-0101 May 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000369/20230012023-05-0101 May 2023 Integrated Inspection Report 05000369/2023001 and 05000370/2023001 ML23094A1832023-04-18018 April 2023 Audit Plan TSTF-505, Rev. 2, RITSTF Initiative 4B & 10 CFR 50.69, Risk-Informed Categorization & Treatment of Structures, Systems & Components for Nuclear Power Reactors (EPIDs L-2023-LLA-0021 & L-2023-LLA-0022) ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000369/20220062023-03-0101 March 2023 Annual Assessment Letter for McGuire Nuclear Station Units 1 and 2 (NRC Inspection Report 05000369/2022006 and 05000370 2022006) IR 05000369/20220042023-01-30030 January 2023 Mcguire Nuclear Station - Integrated Inspection Report 05000369/2022004 and 05000370/2022004 IR 05000369/20224202023-01-11011 January 2023 Security Baseline Inspection Report 05000369/2022420 and 05000370/2022420 ML22356A0512022-12-14014 December 2022 Curtiss-Wright Nuclear Division, Letter Regarding Potential Efect in a Configuration of the 11/2 Inch Quick Disconnect Connector Cable Assemblies Supplied to Duke Energy (See Attached Spreadsheet) for a Total of 460 of Connectors Only Suppl ML22347A1512022-12-13013 December 2022 William B. Mcguire Nuclear Station Notification of Licensed Operator Initial Examination 05000369/2023301 and 05000370/2023301 ML22340A6662022-12-0808 December 2022 Summary of November 30, 2022, Public Meeting with Duke Energy Carolinas, LLC for McGuire Nuclear Station, Units 1 & 2 Proposed LAR to Adopt TSTF-505, Rev. 2 and 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems 2024-08-26
[Table view] |
See also: IR 05000369/2015301
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200
ATLANTA, GEORGIA 30303-1257
December 4, 2014
Mr. Steven D. Capps
Site Vice President
Duke Energy Corporation
McGuire Nuclear Station
MG01VP/12700 Hagers Ferry Road
Huntersville, NC 28078
SUBJECT: WILLIAM B. MCGUIRE NUCLEAR STATION - NOTIFICATION OF LICENSED
OPERATOR INITIAL EXAMINATION 05000369/2015301 AND 05000370/2015301
Dear Mr. Capps:
In a telephone conversation on November 25, 2014, between Mr. Steven Mosteller, MNS Exam
Team Lead, and Mr. Daniel Bacon, Senior Operations Engineer, arrangements were made for
the administration of licensing examinations at William B. McGuire Nuclear Station. The
operating test is scheduled to be administered during the weeks of April 27 and May 4, 2015.
The written examination is scheduled to be administered the week of May 11, 2015. The on-site
preparatory week is scheduled for the week of March 30, 2015.
As agreed during the telephone conversation, your staff will prepare both the operating test and
written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,
"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory
Commission (NRC) Regional office will discuss any changes with your staff that might be
necessary before the examinations are administered. Your staff has also agreed to make
copies of all examination materials that are necessary for administering the examination.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outline by February 11, 2015. Mr. Daniel Bacon provided the written examination outline to your
staff in September, 2014. The operating test, written examination, and the supporting reference
materials identified in Attachment 3 to ES-201 will be due by March 13, 2015. Pursuant to Title
10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized
representative of the facility licensee shall approve the outline, examination, and test before
they are submitted to the NRC for review and approval. All materials shall be complete and
ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in
your response be contained in a separate enclosure and appropriately marked. Any delay in
receiving the required examination and reference materials, or the submittal of inadequate or
incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
S. Capps 2
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications, medical certifications, and waiver
requests (if any) at least 30 days before the first examination date. If the applications are not
received at least 30 days before the examination date, a postponement may be necessary.
Signed applications certifying that all training has been completed should be submitted at least
14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act
of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office
of Management and Budget (OMB) under approval number 3150-0018, which expires on
April 30, 2016. The public reporting burden for this collection of information is estimated to
average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and
maintaining the data needed, writing the examinations, and completing and reviewing the
collection of information. Send comments on any aspect of this collection of information,
including suggestions for reducing the burden, to the Information and Records Management
Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by
Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of
Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and
Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will
be available electronically for public inspection in the NRC Public Document Room, or from
the Publicly Available Records (PARS) component of the NRCs Agencywide Documents
Access and Management System (ADAMS), accessible from the NRC Web site
at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. Mr. Steven Mosteller has been advised of the
policies and guidelines referenced in this letter. If you have any questions regarding the NRCs
examination procedures and guidelines, please contact Mr. Daniel Bacon at 404-997-4518,
(Internet E-mail: daniel.bacon@nrc.gov), or me at 404-997-4662, (Internet E-mail:
eugene.guthrie@nrc.gov).
Sincerely,
/RA/
Eugene F. Guthrie, Chief
Operations Branch 2
Division of Reactor Safety
Docket Nos. 50-369 and 50-370
License Nos. NPF-9 and NPF-17
cc: Distribution via Listserv
ML14342A873 SUNSI REVIEW COMPLETE FORM 665 ATTACHED
OFFICE RII:DRS/OB2 RII:DRS/OB2
SIGNATURE DXB2 EFG
NAME DBacon EGuthrie
DATE 12/ 4/2014 12/4/2014
E-MAIL COPY YES NO YES NO YES NO