ML14045A332: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 02/14/2014
| issue date = 02/14/2014
| title = Applicant'S Petition for Review of Board Decisions Regarding Contentions NYS-8 (Electrical Transformers), CW-EC-3A (Environmental Justice), and NYS-35/36 (SAMA Cost Estimates)
| title = Applicant'S Petition for Review of Board Decisions Regarding Contentions NYS-8 (Electrical Transformers), CW-EC-3A (Environmental Justice), and NYS-35/36 (SAMA Cost Estimates)
| author name = Bessette P M, Dennis W C, Glew W B, Sutton K M
| author name = Bessette P, Dennis W, Glew W, Sutton K
| author affiliation = Entergy Nuclear Operations, Inc, Entergy Services, Inc, Morgan, Lewis & Bockius, LLP
| author affiliation = Entergy Nuclear Operations, Inc, Entergy Services, Inc, Morgan, Lewis & Bockius, LLP
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 77
| page count = 77
}}
}}
=Text=
{{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of                                  )      Docket Nos. 50-247-LR and
                                                  )                    50-286-LR ENTERGY NUCLEAR OPERATIONS, INC.                  )
                                                  )
(Indian Point Nuclear Generating Units 2 and 3)    )
                                                  )      February 14, 2014 APPLICANTS PETITION FOR REVIEW OF BOARD DECISIONS REGARDING CONTENTIONS NYS-8 (ELECTRICAL TRANSFORMERS), CW-EC-3A (ENVIRONMENTAL JUSTICE), AND NYS-35/36 (SAMA COST ESTIMATES)
William B. Glew, Jr., Esq.                  Kathryn M. Sutton, Esq.
William C. Dennis, Esq.                    Paul M. Bessette, Esq.
Entergy Services, Inc.                      MORGAN, LEWIS & BOCKIUS LLP 440 Hamilton Avenue                        1111 Pennsylvania Avenue, N.W.
White Plains, NY 10601                      Washington, D.C. 20004 Phone: (914) 272-3360                      Phone: (202) 739-5738 E-mail: wglew@entergy.com                  E-mail: ksutton@morganlewis.com E-mail: wdennis@entergy.com                E-mail: pbessette@morganlewis.com COUNSEL FOR ENTERGY NUCLEAR OPERATIONS, INC.
TABLE OF CONTENTS Page I. INTRODUCTION ............................................................................................................. 1 II. LEGAL STANDARDS GOVERNING PETITIONS FOR REVIEW .............................. 4 A. Standard of Review ............................................................................................... 4 B. Scope of Review .................................................................................................... 6 III. CONTENTION NYS-8 (ELECTRICAL TRANSFORMERS)......................................... 7 A. Statement of the Case............................................................................................. 7 B. Issues Presented in the Boards Resolution of NYS-8........................................... 9 C. The Commission Should Review and Reverse the Boards Rulings in LBP-08-13 and LBP-13-13 Regarding NYS-8 ...................................................... 9
: 1.      The Board Erred in Admitting NYS-8 ....................................................... 9
: a. NYS-8 did not satisfy contention admissibility requirements ................................................................................... 9
: b. Rejection of NYS-8 as inadmissible is required by Seabrook ...................................................................................... 12
: 2.      The Board Erred in Concluding that Transformers Are Passive Components Subject to AMR .................................................................. 14
: a. The Board erred in concluding that transformers function without a change in configuration, properties, or state ................ 14
: b. The Board erred in creating a new definition of passive that includes components that cannot be readily monitored for incremental degradation and to predict future failure ............ 16
: c. The Board erred by improperly challenging the Indian Point CLB .................................................................................... 18
: d. The Board erred by not adequately comparing transformers to the most relevant active components identified in 10 C.F.R. § 54.21(a)(1)(i) ................................................................. 19
: e. The Board erred by dismissing longstanding regulatory guidance ....................................................................................... 21
: 3.      The Public Interest Supports the Commissions Review and Reversal of the Boards Decisions on NYS-8.......................................... 22 IV. CONTENTION CW-EC-3A (ENVIRONMENTAL JUSTICE) ..................................... 24 A. Statement of the Case........................................................................................... 24
: 1.      The Boards Admission of Clearwaters Original Contention CW-EC-3 ................................................................................................. 24
                                                  -i-
TABLE OF CONTENTS (continued)
Page
: 2.      The Board Decision Admitting Clearwater Amended Contention CW-EC-3A (July 6, 2011 Order) ............................................................. 26
: 3.      The Boards Decision on Entergys First Motion in Limine (March 6, 2012 Order) .......................................................................................... 27
: 4.      The Boards Denial of Entergys Second Motion in Limine (October 15, 2012) ................................................................................... 28
: 5.      The Boards Partial Initial Decision on CW-EC-3A (LBP-13-13) .......... 29 B. Issues Presented in the Boards Resolution of CW-EC-3A ................................. 30 C. The Commission Should Review and Reverse Several Board Rulings and Findings Regarding CW-EC-3 ............................................................................. 31
: 1.      Legal Standards Applicable to Environmental Reviews of License Renewal Applications Under NEPA ........................................................ 31
: 2.      Legal Standards Applicable to Environmental Justice Analyses ............. 32
: 3.      The Board Erred in Admitting CW-EC-3 ................................................ 33
: a. Clearwaters contention is fundamentally a challenge to the adequacy of the Indian Point emergency plans............................ 33
: b. Emergency planning issueswhether labeled as safety or environmental issuesare outside the scope of license renewal ......................................................................................... 34
: c. Even if emergency planning issues brought under NEPA are not precluded, the Board still erred in admitting the contention ..................................................................................... 35
: 4.      The Board Erred in Denying Entergys Motions in Limine Related to CW-EC-3A .......................................................................................... 36
: 5.      The Board Erred in Concluding in LBP-13-13 that the FSEIS Environmental Justice Analysis Was Deficient ....................................... 37
: a. The Board erred in concluding that there could be potential disproportionate and adverse impacts on environmental justice populations in the event of a severe accident ........................................................................................ 37
: b. The Board failed to explain the basis for its conclusion that there would be disproportionate and adverse impacts to environmental justice populations in the event of a severe accident at Indian Point ................................................................ 39
                                          -ii-
TABLE OF CONTENTS (continued)
Page
: c.        The Boards conclusion that there would be potential disproportionate and adverse severe accident impacts to environmental justice populations is not supported by the record ........................................................................................... 40 (i)        The record demonstrates that all populations will be adequately protected under the Indian Point, State, and local emergency plans ............................................... 40 (ii)        The record demonstrates that no particular population segment will be adversely impacted by a severe accident ................................................................. 41
: 6.      The Public Interest Warrants Commission Review of the Boards Decisions on CW-EC-3A ......................................................................... 42 V. CONTENTION NYS-35/36 (SAMA COST ESTIMATES) ........................................... 43 A. Statement of the Case........................................................................................... 43
: 1.      Entergys SAMA Analyses for Indian Point ........................................... 43
: 2.      The Boards Admission of Contention NYS-35/36 ................................. 45
: 3.      Appeals of Contention Admissibility....................................................... 46
: 4.      Issuance of the FSEIS ............................................................................. 47
: 5.      Motions for Summary Disposition........................................................... 47
: 6.      Appeal of Summary Disposition.............................................................. 48
: 7.      Developments Since CLI-11-14 .............................................................. 49 B. Issues Presented by the Boards SAMA Orders .................................................. 50 C. The Commission Should Take Review and Reverse the SAMA Orders Now ..................................................................................................................... 50
: 1.      Review at this Stage Is Appropriate......................................................... 50
: 2.      The Commission Should Review and Reverse the SAMA Orders.......... 51
: a.        Legal Standards Governing SAMA Analyses and Implementation ............................................................................ 51
: b.        The Board Should Not Have Admitted Contention NYS-35/36 ............................................................................................ 52 (i)        The Consolidated Contention Was Untimely .................. 52 (ii)        The Consolidated Contention Is Substantively Inadmissible ..................................................................... 54
                                                    -iii-
TABLE OF CONTENTS (continued)
Page (a)        Entergys SAMA Cost-Benefit Analysis Satisfies Part 51 and Part 54 ................................ 55 (b)        NEPA and Part 51 Provide No Authority to Require SAMA Implementation .......................... 56 (c)        The Backfit Regulations Do Not Establish License Renewal Requirements ........................... 57
: c.          The Board Erred in Granting Summary Disposition ................... 58
: d.          The Public Interest Warrants Review of the SAMA Orders........ 60 VI. CONCLUSION ................................................................................................................ 60
                                                    -iv-
TABLE OF AUTHORITIES Pages U.S. Court of Appeals Decisions Anderson v. Bessemer City, 470 U.S. 564 (1985) ............................................................................5 Communities, Inc. v. Busey, 956 F.2d 619 (6th Cir. 1992) ......................................................32, 56 City of New York v.U.S. Dept of Transp., 715 F.2d 732 (2nd Cir. 1983) ...............................32, 34 Cnty. of Rockland v. FAA, 355 Fed.Appx. 52, 55 (D.C. Cir. 2009) ..............................................51 Ground Zero Center for Non-Violent Action v. United States, 383 F.3d 1086 (9th Cir. 2004).....39 Hells Canyon Alliance v. U.S. Forest Serv., 227 F.3d 1170 (9th Cir. 2000) .................................32 Mass. v. NRC, 708 F.3d 63 (1st Cir. 2013) ....................................................................................51 N.J. Dept of Envtl. Prot. v. NRC, 561 F.3d 132 (3d. Cir. 2009) ...................................................39 N.Y. v. NRC, 681 F.3d 471 (D.C. Cir. 2012)..................................................................................39 Robertson v. Methow Valley Citizens Council, 490 U.S. 332 (1989) ..........................32, 51, 54, 57 Trout Unlimited v. Morton, 509 F.2d 1276 (9th Cir. 1974) .....................................................32, 35 U.S. Dept of Transp. v. Pub. Citizen, 541 U.S. 752 (2004) ..........................................................32 Utahns for Better Transp. v. U.S. Dept of Transp., 305 F.3d 1152 (10th Cir. 2002) .............32, 35 U.S. Nuclear Regulatory Decisions AmerGen Energy Co. (Oyster Creek Nuclear Generating Station), CLI-09-7, 69 NRC 235 (2009) ..................................................................................................................................... passim Ariz. Pub. Serv. Co. (Palo Verde Nuclear Generating Station, Units 1, 2, & 3), CLI-91-12, 34 NRC 149 (1991).............................................................................................................................11 Carolina Power & Light Co. (Shearon Harris Nuclear Power Plant, Unit 1), LBP-07-11, 66 NRC 41 (2007) ........................................................................................................................................58 Consumer Power Co. (Midland Plant, Units 1 & 2), ALAB-282, 2 NRC 9 (1975) ..................6, 31 v
TABLE OF AUTHORITIES (continued)
Pages Dominion Nuclear N. Anna, LLC (Early Site Permit for N. Anna ESP Site), CLI-07-27, 66 NRC 215 (2007) ................................................................................................................................33, 58 Duke Energy Corp. (Catawba Nuclear Station, Units 1 & 2), CLI-04-21, 60 NRC 21 (2004) .......5 Duke Power Co. (William B. McGuire Nuclear Station, Units 1 & 2), ALAB-669, 15 NRC 453 (1982) ...............................................................................................................................................5 Duke Energy Corp. (McGuire Nuclear Station, Units 1 & 2; Catawba Nuclear Station, Units 1 &
2), CLI-02-28, 56 NRC 373 (2002) .............................................................................44, 52, 56, 57 Entergy Nuclear Operations, Inc. (Indian Point, Units 2 & 3), LBP-08-13, 68 NRC 43 (2008) ......
................................................................................................................................................ passim Entergy Nuclear Operations, Inc. (Indian Point, Units 2 & 3), LBP-10-13, 71 NRC 673 (2010) ..................................................................................................................................... passim Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 & 3), CLI-10-30, 72 NRC 564 (2010).......................................................................................................................45, 46 Entergy Nuclear Operations, Inc. (Indian Point, Units 2 & 3), CLI-11-14, 74 NRC 801 (2011) .................................................................................................................................48, 49, 50 Entergy Nuclear Operations, Inc. (Indian Point, Units 2 & 3), LBP-11-17, 74 NRC 11 (2011) ..................................................................................................................................... passim Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 & 3), LBP-13-13, 77 NRC __, slip op. (Nov. 27, 2013) .......................................................................................... passim Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-06-26, 64 NRC 225 (2006) .............................................................................................................................................58 Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-10-11, 71 NRC 287 (2010) ..................................................................................................................................... passim Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-10-22, 72 NRC 202 (2010) .......................................................................................................................................32, 56 Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-12-01, 75 NRC 39 (2012) .................................................................................................................................43, 51, 55 Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-12-06, 75 NRC 352 (2012) .............................................................................................................................................55 vi
TABLE OF AUTHORITIES (continued)
Pages Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-12-10, 75 NRC 479 (2012) .................................................................................................................................10, 51, 55 Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-12-15, 75 NRC 704 (2012) ...........................................................................................................................10, 38, 51, 52 Entergy Nuclear Vt. Yankee, LLC (Vt. Yankee Nuclear Power Station), CLI-10-17, 72 NRC 1 (2010) .......................................................................................................................................23, 60 Fansteel, Inc. (Muskogee, Okla., Site), CLI-03-13, 58 NRC 195 (2003) .....................................11 FirstEnergy Nuclear Operating Co. (Davis-Besse Nuclear Power Station, Unit 1), CLI-12-08, 75 NRC 393 (2012).........................................................................................................................5, 10 Fla. Power & Light Co. (Turkey Point Nuclear Generating Plant, Units 3 & 4), ALAB-952, 33 NRC 521 (1991)...............................................................................................................................6 Fla. Power & Light Co. (Turkey Point Nuclear Generating Plant, Units 3 & 4), CLI-91-13, 34 NRC 185 (1991)...............................................................................................................................5 Fla. Power & Light Co. (Turkey Point Nuclear Generating Plant, Units 3 & 4), LBP-01-6, 53 NRC 138 (2001).............................................................................................................................54 Fla. Power & Light Co. (Turkey Point Nuclear Generating Plant, Units 3 & 4), CLI-01-17, 54 NRC 3 (2001).....................................................................................................................10, 51, 54 Gen. Pub. Utils. Nuclear Corp. (Three Mile Island Nuclear Station, Unit 2), ALAB-926, 31 NRC 1 (1990) ......................................................................................................................................5, 15 GPU Nuclear Inc. (Oyster Creek Nuclear Generating Station), CLI-00-6, 51 NRC 193 (2000)
........................................................................................................................................................11 Hydro Res., Inc. (P.O. Box 777, Crownpoint, N.M. 87313), CLI-06-1, 63 NRC 1 (2006) ............5 Hydro Res., Inc. (P.O. Box 777, Crownpoint, N.M. 87313), LBP-06-1, 63 NRC 41 (2006)........18 Hydro Res., Inc. (P.O. Box 777, Crownpoint, N.M. 87313), CLI-06-7, 63 NRC 165 (2006) ........5 Hydro Res., Inc. (P.O. Box 777, Crownpoint, N.M. 87313), CLI-06-14, 63 NRC 1 (2006) ........18 La. Energy Servs. L.P. (National Enrichment Facility), CLI-98-3, 47 NRC 77 (1998) ................32 La. Energy Servs. L.P. (National Enrichment Facility), CLI-06-22, 64 NRC 37 (2006) ................5 vii
TABLE OF AUTHORITIES (continued)
Pages Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1), ALAB-900, 28 NRC 275 (1988) .......................................................................................................................................14, 22 Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1), CLI-88-11, 28 NRC 603 (1998) .............................................................................................................................................14 N. States Power Co. (Prairie Island Nuclear Generating Plant, Units 1 & 2), ALAB-252, 8 AEC 1175 (1975) ................................................................................................................................7, 31 NextEra Energy Seabrook, LLC (Seabrook Station, Unit 1), LBP-11-2, 73 NRC 28 (2011) .......12 NextEra Energy Seabrook, LLC (Seabrook Station, Unit 1), CLI-12-05, 75 NRC 301 (2012) ........
................................................................................................................................................ passim Nuclear Innovation N. Am. LLC (South Texas Project, Units 3 & 4), CLI-11-6, 74 NRC 203 (2011) .............................................................................................................................................30 Nuclear Mgmt. Co., LLC (Palisades Nuclear Plant), CLI-06-17, 63 NRC 727 (2006) .................52 Paina Haw., LLC (Material License Application), CLI-06-13, 63 NRC 508 (2006) ....................6 Paina Haw., LLC (Material License Application), CLI-08-3, 67 NRC 151 (2008) ....................14 Pac. Gas & Elec. Co. (Diablo Canyon Nuclear Power Plant, Units 1 & 2), LBP-10-15, 72 NRC 257 (2010) ......................................................................................................................................48 Pac. Gas & Elec. Co. (Diablo Canyon Nuclear Power Plant, Units 1 & 2), CLI-11-11, __ NRC
__ (Oct. 12, 2011) ..........................................................................................................................48 Phila. Elec. Co. (Limerick Generating Station, Units 1 & 2), ALAB-857, 25 NRC 7 (1987) ......40 Private Fuel Storage, LLC (Indep. Spent Fuel Storage Installation), LBP-98-7, 47 NRC 142 (1998) .............................................................................................................................................11 Private Fuel Storage, LLC (Indep. Spent Fuel Storage Installation), CLI-00-24, 52 NRC 351 (2000) ...................................................................................................................................6, 50, 51 Private Fuel Storage, LLC (Indep. Spent Fuel Storage Installation), CLI-02-20, 56 NRC 147 (2002) .............................................................................................................................................33 Private Fuel Storage, LLC (Indep. Spent Fuel Storage Installation), CLI-03-8, 58 NRC 11 (2003) ...............................................................................................................................................5 viii
TABLE OF AUTHORITIES (continued)
Pages Private Fuel Storage, LLC (Indep. Spent Fuel Storage Installation), CLI-05-19, 62 NRC 403 (2005) ...............................................................................................................................................5 Progress Energy Carolinas, Inc. (Shearon Harris, Units 2 & 3), CLI-09-08, 69 NRC 317 (2009)
........................................................................................................................................................11 Pub. Serv. Co. of Ind. (Marble Hill Nuclear Generating Station, Units 1 & 2), ALAB-459, 7 NRC 179 (1978).........................................................................................................................7, 31 S.C. Elec. & Gas Co. (Virgil C. Summer Nuclear Station, Unit 1), ALAB-710, 17 NRC 25 (1983) .............................................................................................................................................40 S. Nuclear Operating Co. (Early Site Permit for Vogtle ESP Site), LBP-07-3, 65 NRC 237 (2007) ...........................................................................................................................33, 35, 36, 42 S. Nuclear Operating Co. (Early Site Permit for Vogtle ESP Site), CLI-10-05, 71 NRC 90 (2010) ...............................................................................................................................................5 Statement of Policy on Conduct of Adjudicatory Proceedings, CLI-98-12, 48 NRC 18 (1998) ...11 Tex. Utils. Elec. Co. (Comanche Peak Steam Electric Station, Units 1 & 2), CLI-88-12, 28 NRC 605 (1998) ......................................................................................................................................54 USEC, Inc. (Am. Centrifuge Plant), CLI-06-10, 63 NRC 451 (2006) ..........................................11 Federal Regulations 10 C.F.R. § 2.309 ...........................................................................................................................52 10 C.F.R. § 2.337 ...........................................................................................................................36 10 C.F.R. § 2.341 .........................................................................................................................1, 4 10 C.F.R. § 50.47 .....................................................................................................................32, 41 10 C.F.R. § 51.53 ...........................................................................................................................55 10 C.F.R. § 51.95 ...........................................................................................................................59 10 C.F.R. § 54.21 ................................................................................................................... passim 10 C.F.R. § 54.29 ...........................................................................................................................59 10 C.F.R. § 54.33 ...........................................................................................................................57 ix
TABLE OF AUTHORITIES (continued)
Pages 10 C.F.R. Pt. 51, Subpt. A, App. B ..........................................................................................36, 38 Federal Register Executive Order 12898 of February 11, 1994, Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations, 59 Fed. Reg. 7629 (Feb. 16, 1994) ........32 Final Rule, Environmental Review for Renewal of Nuclear Power Plant Operating Licenses, 61 Fed. Reg. 28,467 (June 5, 1996) ....................................................................................................31 Nuclear Power Plant License Renewal; Revisions, 60 Fed. Reg. 22,461 (May 8, 1995) ...... passim Policy on Conduct of Adjudicatory Proceedings, 63 Fed. Reg. 41,872 (Aug. 5, 1998) ................11 Policy Statement on the Treatment of Environmental Justice Matters in NRC Regulatory and Licensing Actions, 69 Fed. Reg. 52, 040 (Aug. 24, 2004) .....................................................32, 33 Proposed Rule: Nuclear Power Plant License Renewal, 55 Fed. Reg. 29,043, 29,047 (July 17, 1990) ..............................................................................................................................................58 Other Authorities NUREG-1437, Supp. 38, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Regarding Indian Point Nuclear Generating Unit Nos. 2 and 3, Draft Report (Dec. 2008) ....................................................................................................................................44 NUREG-1437, Supp. 38, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Regarding Indian Point Nuclear Generating Unit Nos. 2 and 3, Final Report (Dec. 2010) ..........................................................................................................................3, 26, 47 NUREG-1437, Supp. 38, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Regarding Pilgrim Nuclear Power Station, Final Report (July 2007) ..................55 x
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of                                            )        Docket Nos.      50-247-LR and
                                                            )                        50-286-LR ENTERGY NUCLEAR OPERATIONS, INC.                            )
                                                            )
(Indian Point Nuclear Generating Units 2 and 3)              )
                                                            )        February 14, 2014 APPLICANTS PETITION FOR REVIEW OF BOARD DECISIONS REGARDING CONTENTIONS NYS-8 (ELECTRICAL TRANSFORMERS), CW-EC-3A (ENVIRONMENTAL JUSTICE), AND NYS-35/36 (SAMA COST ESTIMATES)
I.      INTRODUCTION Pursuant to 10 C.F.R. § 2.341(b), Entergy Nuclear Operations, Inc. (Entergy) hereby petitions the Nuclear Regulatory Commission (NRC or Commission) for review of the Atomic Safety and Licensing Boards (Board) First Partial Initial Decision (PID)
Concerning Track 1 Contentions (LBP-13-13), issued on November 27, 2013,1 and other Board decisions that are now ripe for review. As set forth below, the Commission should grant this Petition for Review and reverse certain of the Boards decisions with respect to Contentions NYS-8 (Electrical Transformers), CW-EC-3A (Environmental Justice), and NYS-35/36 (SAMA Cost Estimates) because the Boards decisions are based on conclusions that are contrary to established law and clearly-erroneous findings of material fact.2 Moreover, Commission review is in the public interest because these decisions raise substantial and important questions of policy and law that affect a broad spectrum of Commission licensing decisions.3 Regarding NYS-8, Entergy petitions the Commission for review of the Boards July 31, 1
Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 & 3), LBP-13-13, 77 NRC __, slip op. (Nov. 27, 2013).
2 10 C.F.R. § 2.341(b)(4)(i), (ii).
3 Id. § 2.341(b)(4)(iii), (v).
1
2008 decision (LBP-08-13) originally admitting the contention. As detailed below in Section III, the State of New York (New York or NYS) failed to provide sufficient support for NYS-8, contrary to 10 C.F.R. § 2.309(f)(1)(v). Thus, the Board erred as a matter of law in admitting the contention. This is confirmed by the Commissions decision in Seabrook (CLI-12-05),4 rejecting a materially-indistinguishable contention supported by the same declarant. Entergy also seeks Commission review of the Boards PID finding in favor of NYS on the merits. As to contention NYS-8, the Board erred by concluding that transformers function without a change in configuration, properties, or state; by creating a new definition of passive that includes components that cannot be readily-monitored for incremental degradation and to predict future failure; in challenging the current licensing basis (CLB) for Indian Point Nuclear Generating Units 2 and 3 (IP2 and IP3, collectively Indian Point or IPEC); by failing to adequately compare transformers to the most relevant active electrical components identified in 10 C.F.R.
§ 54.21(a)(1)(i); and by rejecting longstanding persuasive regulatory guidance.
Regarding CW-EC-3A, Entergy petitions the Commission for review of the Boards decisions admitting the original and amended contention (LBP-08-13 and its July 6, 2011 Order).
As set forth below in Section IV, contrary to 10 C.F.R. § 50.47(a)(1)(i), the National Environmental Policy Act (NEPA), and longstanding Commission precedent, the Board erred in admitting Hudson River Sloop Clearwaters (Clearwater) contention that fundamentally challenged the effectiveness of emergency plans for Indian Point. Entergy further petitions the Commission for review of the Boards decisions denying Entergys Motions in Limine and admitting extensive evidence and testimony challenging the effectiveness of the Indian Point emergency plans, contrary to 10 C.F.R. § 2.337(a). Entergy also petitions the Commission for 4
NextEra Energy Seabrook, LLC (Seabrook Station, Unit 1), CLI-12-05, 75 NRC 301 (2012).
2
review of certain aspects of the Boards PID on CW-EC-3A. The Board augmented the NEPA record through its hearing and, in the PID, ultimately resolved Clearwaters environmental justice (EJ) contention CW-EC-3A in the NRC Staffs favor. In doing so, however, the Board de facto reversed the Staffs original finding in the Final Supplemental Environmental Impact Statement (FSEIS)5 that there are no disproportionate adverse impacts on EJ populations associated with the Indian Point license renewal. The decision is based on multiple errors of law and fact that could have a substantial impact upon many licensees and the course of many licensing proceedings. Additionally, the Boards decision raises important questions of policy related to the manner in which the Staff may meet its NEPA-related obligations in future renewal proceedings.
Finally, regarding NYS-35/36, Entergy petitions the Commission for review of the Boards June 30, 2010 decision (LBP-10-13)6 to originally admit the consolidated contention, and its July 14, 2011 summary disposition ruling (LBP-11-17)7 in New Yorks favor (collectively, the SAMA Orders).8 As shown in Section V below, the SAMA Orders are ripe for Commission review given their direct nexus to Entergys severe accident mitigation alternatives (SAMA) analysis and the Staffs review thereof (as documented in the FSEIS);
i.e., it need not await the Boards resolution of pending Track 2 contentions that raise no issues related to the SAMA analysis. Importantly, the Boards decisions raise substantial legal questions concerning the proper interpretation and application of 10 C.F.R. §§ 50.109(a)(3) and 54.33(c), as well as the Staffs legal authority to compel licensee implementation of individual 5
NUREG-1437, Supp. 38, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Regarding Indian Point Nuclear Generating Unit Nos. 2 and 3, Final Report (Dec. 2010) (FSEIS).
6 Entergy Nuclear Operations, Inc. (Indian Point, Units 2 &3), LBP-10-13, 71 NRC 673 (2010).
7 Entergy Nuclear Operations, Inc. (Indian Point, Units 2 &3), LBP-11-17, 74 NRC 11 (2011).
8 Entergy is not appealing the Boards decision in LBP-13-13 on two other SAMA-related contentions, NYS-12 and NYS-16. Entergy believes those contentions were correctly decided.
3
SAMAs unrelated to aging management. The Boards decisions also raise important policy questions insofar as they relate to how the NRC Staff may meet its NEPA-related obligations to review and analyze SAMAs in future license renewal proceedings.
Therefore, Entergy respectfully requests that the Commission reverse the Boards decisions with respect to contentions NYS-8 and NYS-35/36, and uphold the Staffs FSEIS analysis on CW-EC-3A.
II.      LEGAL STANDARDS GOVERNING PETTIONS FOR REVIEW A.      Standard of Review Section 2.341(b)(1) provides for discretionary review of a full initial decision or PID. It provides that the Commission will consider a petition for review if it raises a substantial question with respect to the following considerations: (1) a finding of material fact is clearly erroneous or in conflict with a finding as to the same fact in a different proceeding; (2) a necessary legal conclusion is without governing precedent or is a departure from or contrary to established law; (3) a substantial and important question of law, policy or discretion has been raised; (4) the conduct of the proceeding involved a prejudicial procedural error; or (5) any other consideration which the Commission may deem to be in the public interest.9 The Commission reviews legal or policy questions de novo.10 The Commission has cited several reasons for granting review of legal and policy questions including: (1) when a case presents a legal issue that is essential to a broad spectrum of Commission licensing decisions; (2) when a question of proper interpretation of the Commissions regulations exists; and (3) when the Presiding Officers ruling is without governing precedent, i.e., the Commission has 9
See 10 C.F.R. § 2.341(b)(4).
10 AmerGen Energy Co. (Oyster Creek Nuclear Generating Station), CLI-09-7, 69 NRC 235, 259 (2009).
4
not had the opportunity to rule on the precise issue presented.11 The Commission will reverse a licensing boards legal rulings if they are a departure from, or contrary to, established law.12 Licensing boards have a duty to carefully review the evidence, including testimony and exhibits, and to resolve any factual disputes.13 The Commission has the authority to review factual findings de novo, but typically defers to a licensing boards findings of fact as long as the Licensing Board has issued a plausible decision that rests on carefully rendered findings of fact.14 The Commission, however, may intercede to correct clearly erroneous findingsthat is, findings not even plausible in light of the record viewed in its entirety15where there is strong reason to believe that . . . a board has overlooked or misunderstood important evidence.16 In such instances, the Commission will reject or modify a licensing boards findings if the Commission is convinced that the record compels a different result.17 The Commission has recognized that licensing boards have considerable discretion in making decisions on whether to admit evidence.18 The Commission reviews such decisions under an abuse of discretion standard.19 Under that standard, the petitioner must persuade the 11 See Hydro Res., Inc. (P.O Box 777, Crownpoint, N.M. 87313), CLI-06-7, 63 NRC 165, 166 (2006).
12 See Oyster Creek, CLI-09-7, 69 NRC at 259 (citation omitted).
13 See id. (citing Private Fuel Storage, LLC (Indep. Spent Fuel Storage Installation), CLI-05-19, 62 NRC 403, 411 (2005).
14 S. Nuclear Operating Co. (Early Site Permit for Vogtle ESP Site), CLI-10-05, 71 NRC 90, 98-99 (2010)
(citation omitted).
15 La. Energy Servs. L.P. (National Enrichment Facility), CLI-06-22, 64 NRC 37, 40 (2006) (some internal quotation marks omitted) (citing Hydro Res., Inc., (P.O. Box 777, Crownpoint, N.M. 87313), CLI-06-01, 63 NRC 1, 2 (2006); Anderson v. Bessemer City, 470 U.S. 564, 573-76 (1985); Private Fuel Storage, L.L.C.
(Indep. Spent Fuel Storage Installation), CLI-03-8, 58 NRC 11, 25-26 (2003)).
16 Oyster Creek, CLI-09-7, 69 NRC at 259 (citing Private Fuel Storage, CLI-05-19, 62 NRC at 411).
17 Gen. Pub. Utils. Nuclear Corp. (Three Mile Island Nuclear Station, Unit 2), ALAB-926, 31 NRC 1, 13 (1990).
18 See Duke Energy Corp. (Catawba Nuclear Station, Units 1 & 2), CLI-04-21, 60 NRC 21, 27 (2004); see also Duke Power Co. (William B. McGuire Nuclear Station, Units 1 & 2), ALAB-669, 15 NRC 453, 475 (1982).
19 Catawba, CLI-04-21, 60 NRC at 27.
5
Commission that a reasonable mind could reach no other result in order to prevail.20 With regard to admitting contentions, the Commission generally defers to Board decisions, but it will reverse if there is clear error of law or abuse of discretion.21 B.        Scope of Review Following the issuance of a PID, a party should assert any claims of error that relate to the subject matter of the partial initial decision.22 This includes issues that were admitted for hearing or not, [] without regard to whether the issue was originally designated a separate contention or a basis for a contention.23 In this matter, among those claims that relate to the subject matter of the PID is NYS-35/36, which is substantially related to the other SAMA contentions that were disposed of in LBP-13-13 and was originally part of the Track 1 contentions before the Board granted summary disposition to NYS.
Under 10 C.F.R. § 2.311(d)(1), an applicant may appeal an order granting a petition to intervene, only if the request for hearing or petition to intervene should have been wholly denied. If an applicant only seeks to challenge the admission of some of the contentions, then it must wait until later in [the] proceeding, once the Board has issued its Initial Decision.24 Accordingly, a party may appropriately challenge the admission of a contention following the issuance of a PID related to that contention.
As a general rule, petitions for review are considered unnecessary when a party seeks to 20 Fla. Power & Light Co. (Turkey Point Nuclear Generating Plant, Units 3 and 4), ALAB-952, 33 NRC 521, 532 (1991), affd, CLI-91-13, 34 NRC 185 (1991).
21 See e.g., FirstEnergy Nuclear Operating Co. (Davis-Besse Nuclear Power Station, Unit 1), CLI-12-08, 75 NRC 393, 398 (2012); Seabrook, CLI-12-05, 75 NRC at 307.
22 Private Fuel Storage, L.L.C. (Indep. Spent Fuel Storage Installation), CLI-00-24, 52 NRC 351, 353 (2000)
(PFS).
23 Id.
24 Paina Haw., LLC (Material License Application), CLI-06-13, 63 NRC 508, 509 (2006).
6
appeal a decision that was ultimately decided in the petitioners favor.25 There are, however, several exceptions. Where a licensing boards decision could have an impact upon the course of many licensing hearings, it is appropriate for a party to seek review even if a contention was ultimately decided in its favor.26 Prevailing parties may also challenge a legal issue of clear recurring importance, even though (wholly fortuitously) the disposition of this case did not hinge upon it.27 III. CONTENTION NYS-8 (ELECTRICAL TRANSFORMERS)
A.      Statement of the Case This proceeding concerns the joint license renewal application (LRA) for Indian Point, as submitted by Entergy on April 23, 2007 and subsequently amended. The procedural history of this proceeding is provided in detail in LBP-13-13. The following, therefore, focuses only on the most pertinent submissions and rulings.
NYS filed an intervention petition in this proceeding on November 30, 2007, including submission of NYS-8, alleging that the LRA violates 10 C.F.R. §§ 54.21(a) and 54.29 because it does not include an aging management program (AMP) for each electrical transformer whose function is important for plant safety.28 Although not referenced in NYS-8, NYS submitted with its intervention petition a declaration of Paul Blanch that included four paragraphs related to 25 See Pub. Serv. Co. of Ind. (Marble Hill Nuclear Generating Station, Units 1 & 2), ALAB-459, 7 NRC 179, 202 (1978); Consumer Power Co. (Midland Plant, Units 1 & 2), ALAB-282, 2 NRC 9, 10 n.1 (1975).
26 N. States Power Co. (Prairie Island Nuclear Generating Plant, Units 1 & 2), ALAB-252, 8 AEC 1175, 1177 (1975).
27 Id. at 1178.
28 See New York State Notice of Intention to Participate and Petition to Intervene at 103 (Nov. 30, 2007) (NYS Petition), available at ADAMS Accession No. ML073400187.
7
transformers.29 NYS and Mr. Blanch asserted, without more, that [t]ransformers function without moving parts or without a change in configuration or properties.30 Entergy and the NRC Staff opposed admission of NYS-8 based on lack of adequate support.31 In particular, NYS did not address or challenge longstanding NRC-approved guidance that transformers are active components not subject to aging management review (AMR) per 10 C.F.R. § 54.21(a)(1)(i).32 The Board issued LBP-08-13 on July 31, 2008, with a brief ruling that admitted NYS-8 as follows: Entergy has not proposed an AMP for each electrical transformer in IP2 and IP3 required for compliance with 10 C.F.R. §§ 50.48 and 50.63. This does not include transformer support structures.33 The parties thereafter made their pre-hearing filings,34 and the Board held the evidentiary hearing on NYS-8 on December 13, 2012. On November 27, 2013, the Board issued the PID.
The Board concluded:
In regard to NYS-8, because we find transformers to be passive components, transformers fall with[in] the scope of 10 C.F.R. Part 54 and must undergo AMR pursuant to 10 C.F.R. § 54.21(a)(1). Therefore, Entergy has not demonstrated that it will 29 See Declaration of Paul Blanch (Nov. 28, 2007) (Blanch Declaration), available at ADAMS Accession No. ML073400205. The four paragraphs in the Blanch Declaration that address transformers are reproduced in their entirety in Attachment 1 to this petition for review.
30 NYS Petition at 103; Blanch Declaration ¶ 21.
31 Answer of Entergy Nuclear Operations, Inc. Opposing New York State Notice of Intention to Participate and Petition to Intervene at 69-73 (Jan. 22, 2008) (Entergy Answer), available at ADAMS Accession No. ML080300149; NRC Staffs Response to Petitions for Leave to Intervene Filed by (1) Connecticut Attorney General Richard Blumenthal, (2) Connecticut Residents Opposed to Relicensing of Indian Point, and Nancy Burton, (3) Hudson River Sloop Clearwater, Inc., (4) the State of New York, (5) Riverkeeper, Inc., (6) the Town of Cortlandt, and (7) Westchester County, at 44-46 (Jan. 22, 2008) (NRC Staff Answer), available at ADAMS Accession No. ML080230543.
32 Entergy Answer at 70.
33 Entergy Nuclear Operations, Inc. (Indian Point, Units 2 & 3), LBP-08-13, 68 NRC 43, 218 (2008).
34 See Indian Point, LBP-13-13, slip op. at 20-22, 198-99. In its pre-hearing filings and at the evidentiary hearing, NYS did not rely upon any testimony from Mr. Blanch. Instead, NYS relied on testimony from Dr. Robert Degeneff. Id. at 198.
8
adequately manage the effects of aging on the relevant components as required by 10 C.F.R. §§ 54.21(a)(3). Accordingly, NYS-8 is resolved in favor of New York.35 B.      Issues Presented in the Boards Resolution of NYS-8
: 1. Whether the Board incorrectly concluded in LBP-08-13 that NYS-8 satisfied the Commissions contention admissibility requirements in 10 C.F.R. § 2.309(f)(1),
particularly given the Commissions subsequent rejection of a materially-indistinguishable contention in Seabrook (CLI-12-05)?
: 2. Whether the Boards conclusion in LBP-13-13 that transformers are passive components subject to AMR is plausible and adequately supported when reviewed against the evidentiary record in its entirety?
C.      The Commission Should Review and Reverse the Boards Rulings in LBP-08-13 and LBP-13-13 Regarding NYS-8
: 1.      The Board Erred In Admitting NYS-8 Commission review of LBP-08-13 is warranted under 10 C.F.R. § 2.341(b)(4)(ii) because the Boards admission of NYS-8 rested on legal conclusions that depart from established law.36
: a.      NYS-8 did not satisfy contention admissibility requirements.
NYS argued that the Indian Point LRA violates 10 C.F.R. §§ 54.21(a) and 54.29 because it does not include an AMP for electrical transformers whose function is important for plant safety.37 NYS submitted the declaration of Mr. Blanch to support its contention.38 As purported evidence, both Mr. Blanch and NYS provided a few identical, cursory statements about the importance of transformers to plant safety, but they failed to provide any support for why transformers are subject to AMR under 10 C.F.R. Part 54. Instead, they offered only the conclusory statement that [t]ransformers function without moving parts or without a change in configuration or properties.39 35 Id. at 389.
36 See Oyster Creek, CLI-09-7, 69 NRC at 259.
37 NYS Petition at 103-05.
38 See Blanch Declaration at 5-6.
39 NYS Petition at 103; Blanch Declaration at 5.
9
Entergy and the NRC Staff opposed admission of NYS-8 for failing to satisfy the contention admissibility requirements in 10 C.F.R. § 2.309(f)(1).40 Specifically, Entergy established that NEI 95-10 (Industry Guideline for Implementing the Requirements of 10 C.F.R.
Part 54 - The License Renewal Rule), which the NRC endorsed in 2001 in Regulatory Guide 1.188, concludes that transformers are active components that are not subject to AMR.41 Transformers instead are managed by the ongoing maintenance rule program in accordance with 10 C.F.R. § 50.65, which is outside the scope of license renewal.42 NYS never cited or discussed this guidance in the contention or four paragraphs of the supporting declaration, much less proffered any bases to support a challenge to this longstanding NRC guidance classifying transformers as active components.43 For these reasons, NYS failed to meet the contention admissibility requirements of 10 C.F.R. §§ 2.309(f)(1)(ii), (v), and (vi).
Notwithstanding this deficiency, the Board admitted NYS-8. It adopted the conclusory statement of NYS and Mr. Blanch, ruling that [t]ransformers (necessary for compliance with 10 C.F.R. §§ 50.48 and 50.63) nominally perform their safety-related function without moving parts and without a change in configuration or properties.44 In doing so, the Board failed to hold NYS to its burden under 10 C.F.R. § 2.309(f)(1)(v) to provide adequate support for its proposed contention.45 The Commission has repeatedly held 40 Entergy Answer at 69-73; NRC Staff Answer at 44-46.
41 Entergy Answer at 70.
42 Id.; see also Fla. Power & Light Co. (Turkey Point Nuclear Generating Plant, Units 3 & 4), CLI-01-17, 54 NRC 3, 7-8 (2001) (stating that current licensing basis issues, which already are the focus of ongoing regulatory processesdo not come within the NRCs safety review at the license renewal stage).
43 Although NYSs reply mentions the Standard Review Plan in response to the Staffs answer, NYS does not challenge its contents. New York State Reply in Support of Petition to Intervene at 58-61 (Feb. 22, 2008).
44 Indian Point, LBP-08-13, 68 NRC at 88.
45 See Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-12-15, 75 NRC 704, 714 (2012)
(At the threshold contention admission stage, the burden for providing support for a contention is on the petitioner.); Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-12-10, 75 NRC 479, 488 (2012) (stating that a petitioners failure to provide adequate basis and support by itself is sufficient to require 10
that an expert opinion that merely states a conclusion . . . without providing a reasoned basis or explanation for that conclusion is inadequate because it deprives the Board of the ability to make the necessary, reflective assessment of the opinion.46 In short, a contention will be ruled inadmissible if the petitioner . . . [provides] only bare assertions and speculation.47 NYSs and Mr. Blanchs statements failed to satisfy these mandatory requirements.
The Board also rejected Entergys and the Staffs arguments derived from the on-point transformer guidance, concluding that Entergy and the Staff did not provide any legally binding justification for excluding transformers from AMR and did not explain how a transformer changes its configuration or properties in performing its functions.48 In doing so, the Board inappropriately shifted the burden onto Entergy and the NRC Staff to provide support for rejecting the contention. Longstanding Commission precedent establishes, however, that the initial burden of showing whether the contention meets our admissibility standards lies with the petitioner (not the applicant).49 The petitioner did not shoulder its burden and, consequently, the Boards admissibility determination should be overturned as an error of law.
rejection of the contention); Davis-Besse, CLI-12-08, 75 NRC at 414 (At the contention admissibility stage, it is Petitioners burden to come forward with factual or expert support for their argument . . .).
46 USEC, Inc. (Am. Centrifuge Plant), CLI-06-10, 63 NRC 451, 472 (2006) (emphasis added) (quoting Private Fuel Storage, (Indep. Spent Fuel Storage Installation), LBP-98-7, 47 NRC 142, 181 (1998)).
47 Fansteel, Inc. (Muskogee, Okla., Site), CLI-03-13, 58 NRC 195, 203 (2003) (quoting GPU Nuclear Inc. (Oyster Creek Nuclear Generating Station), CLI-00-6, 51 NRC 193, 208 (2000)).
48 Indian Point, LBP-08-13, 68 NRC. at 89.
49 Progress Energy Carolinas, Inc. (Shearon Harris, Units 2 & 3), CLI-09-08, 69 NRC 317, 325 (2009) (citing Ariz. Pub. Serv. Co. (Palo Verde Nuclear Generating Station, Units 1, 2, & 3), CLI-91-12, 34 NRC 149, 155 (1991)); see also Policy on Conduct of Adjudicatory Proceedings, 63 Fed. Reg. 41,872, 41,874 (Aug. 5, 1998)
([T]he burden of coming forward with admissible contentions is on their proponent). A contentions proponent, not the licensing board, is responsible for formulating the contention and providing the necessary information to satisfy the basis requirement for the admission of contentions in 10 CFR [2.309(f)(1)].
Statement of Policy on Conduct of Adjudicatory Proceedings, CLI-98-12, 48 NRC 18, 22 (1998).
11
: b.      Rejection of NYS-8 as inadmissible is required by Seabrook.
The original Indian Point and Seabrook transformer contentions are materially indistinguishable.50 The wording of the contentions is identical (except for the facility names),
the contentions bases and supporting evidence are materially the same, and the contentions relied upon statements from Mr. Blanch that are materially the same. To assist the Commission,  to this Petition for Review tracks the minimal differences between the submissions made to support the identical contentions and illustrates that the two contentions differ in no substantive, material way. Significantly, in admitting the contention, the Seabrook board, like the Indian Point Board, cited the non-binding nature of Staff guidance51 and relied on Mr.
Blanchs declaration in admitting the transformer contention.52 On appeal, the Commission reversed the Seabrook boards admissibility ruling.53 It concluded that the petitioners transformer contention was too thinly supported to warrant admission,54 and that the petitioners did not challenge longstanding NRC guidance classifying transformers as active components under 10 C.F.R. Part 54.55 The Commission cited a 1997 letter from Christopher Grimes, former Director of the NRCs License Renewal Project Directorate, to NEI, which explains the basis of the Staffs conclusion that transformers are not 50 Compare NYS Petition at 103-05 with NextEra Inc. (Seabrook Station, Unit 1), Friends of the Coast and New England Coalition Petition for Leave to Intervene, Request for Hearing, and Admission of Contentions at 20-22 (Oct. 20, 2010), available at ADAMS Accession No. ML102940558; Compare NextEra Inc. (Seabrook Station, Unit 1), Blanch Declaration ¶¶ 21-24 with Declaration of Paul Blanch ¶¶ 28-31 (Oct. 18, 2010), available at ADAMS Accession No. ML102940557.
51 NextEra Energy Seabrook, LLC (Seabrook Station, Unit 1), LBP-11-2, 73 NRC 28, 58 (2011), revd in part, affd in part, CLI-12-05, 75 NRC at 319.
52 See id. at 57-58. Notably, in concluding that the classification of transformers as active or passive components remains an unresolved issue, the Seabrook board expressly cited the Indian Point Boards prior decision to admit NYS-8. Id. at 58.
53 Seabrook, CLI-12-05, 75 NRC at 322.
54 Id. at 319.
55 Id.
12
passive components.56 It also noted that the Grimes Letter is included as Reference 2 in Appendix C to NEI 95-10.57 The Commission further noted that the NRCs Standard Review Plan for license renewal also reflects the Staffs conclusion that transformers are not passive components.58 Moreover, while the Commission in Seabrook recognized that guidance documents may be challenged in individual proceedings, it found Mr. Blanchs assertions that transformers are passive components too conclusory to support admission.59 Absent a supported challenge to the guidance, there was no genuine dispute for litigation.60 The Commissions Seabrook ruling and the Indian Point Boards decision admitting NYS-8 cannot be reconciled.61 The Indian Point Board relied on the same opinion by Mr.
Blanch that the Commission subsequently rejected in CLI-12-05 as conclusory and not adequate to support admission of an essentially identical contention.62 The Commission should therefore conclude, as it did in Seabrook, that proposed NYS-8 lacked the support required by 10 C.F.R. § 2.309(f)(1)(v), and overturn the Boards decision in LBP-08-13 to admit NYS-8 as a clear error of law and an abuse of discretion.
56 Id. (citing Letter from C.I. Grimes, NRR, to D.J. Walters, NEI, Determination of Aging Management Review for Electrical Components, Attach. at 2 (Sept. 19, 1997) (Grimes Letter) (ENT000097)).
57 Id. at 317 n.98.
58 Id. at 320 n.116 (citing NUREG-1800, Rev. 1, Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants, at 2.1-24, Table 2.1-5, item 104 (Sept. 2005) (excluding transformers from the list of structures and components subject to AMR)).
59 Id. at 320.
60 Id.
61 See Indian Point, LBP-08-13, 68 NRC at 86-89.
62 Seabrook, CLI-12-05, 75 NRC at 320. The Boards discussion of Seabrook in LBP-13-13 is inapplicable to original admissibility.
13
: 2.      The Board Erred in Concluding that Transformers Are Passive Components Subject to AMR Commission review of LBP-13-13 is warranted under either or both of two provisions:
10 C.F.R. § 2.341(b)(4)(ii), because the Boards decision (similar to LBP-08-13 discussed above) rests on legal conclusions that depart from well-established law and precedent, and 10 C.F.R. § 2.341(b)(4)(i) because the Boards decision makes a finding of material fact that is clearly erroneous. As demonstrated below, the Commission should reverse LBP-13-13 to remedy these errors.
: a. The Board erred in concluding that transformers function without a change in configuration, properties, or state.
Almost 20 years ago, the Commission established a two-part test defining passive components as those (1) that perform their intended functions without moving parts or without a change in configuration or properties, and (2) for which the aging degradation effects are not readily monitorable.63 The Commission specifically noted that it reviewed several industry concepts of passive structures and components and has determined that they do not accurately describe the structures and components that should be subject to an [AMR] for license renewal.64 The Commission emphasized that its description of passive structures and components has been incorporated into § 54.21(a) and should be used only in connection with
. . . the license renewal process.65 Rather than follow this Commission direction, the Board instead relied upon industry conceptsthe engineering communitys viewon passive and active components. The Board stated that Entergys and the Staffs position that transformers are active devices due to their 63 Nuclear Power Plant License Renewal; Revisions, 60 Fed. Reg. 22,461, 22,477 (May 8, 1995) (1995 License Renewal SOC) (NYS000016).
64 Id. (emphasis added).
65 Id. (emphasis added).
14
change in state during operations runs counter to the prevailing view of the electrical engineering community.66 This is contrary to the Commissions directions in the SOC for the license renewal rule, which are entitled to special weight.67 The Board also erred by concluding that voltage, current, and magnetic flux are properties of the electricity flowing through a transformer, and not properties of the transformer itself.68 Notwithstanding the convincing arguments and substantial evidence Entergy presented, the Board merely asserted that it found NYSs position more reasonable,69 with little further explanation. However, as Entergys experts explained, transformers perform the intended function of transforming and supplying voltage and current to electrical busses.70 Specifically, when a transformer is energized, it changes from an idle state to an active state, and the transformers electrical and magnetic properties change.71 These changes in properties are integral to transformer operation and can be directly measured or observed.72 Because transformers perform their intended function through changes in their configuration, properties, or state, and because transformer performance, including degradation, is readily monitored, 66 Indian Point, LBP-13-13, slip op. at 215. The Board also points to a statement by Entergys witness that NYS relied on the academic community for support, and the academic communitys opinions do not apply in the case of nuclear power. Indian Point, LBP-13-13, slip op. at 213. The Board responded that we find nothing academic about the experience of NYSs witness. Id. at 215. From the context of the testimony quoted by the Board, it is clear that the witness was not addressing the credentials of NYSs witnesses, but rather the Statement of Considerations (SOC) position discussed above - for purposes of license renewal, the NRC does not define passive the same way the term is defined by industry, including by electrical engineering academics. See Testimony of Applicant Witnesses Roger Rucker, Steven Dobbs, John Craig, and Thomas McCaffrey Regarding Contention NYS-8 (Electrical Transformers) at 12, 52 (Mar. 28, 2012) (Entergy Transformers Testimony) (ENTR00091).
67 Language in the SOC addressing a regulation is entitled to special weight. See, e.g., Paina Haw., LLC (Materials License Application), CLI-08-3, 67 NRC 151, 154 (2008) (As NRC guidance endorsed by the Commission and reached in a rulemaking, following notice and comment, [] rulemaking conclusions are entitled to special weight.); see also Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1),
ALAB-900, 28 NRC 275, 290-91 (1988), review declined, CLI-88-11, 28 NRC 603 (1988).
68 Indian Point, LBP-13-13, slip op. at 216-17.
69 Id. at 216.
70 Entergy Transformers Testimony at A24 (ENTR00091).
71 Id.
72 Id.
15
transformers are active components not subject to AMR. Therefore, the Board should be reversed because the Boards conclusion is implausible as the record compels a different result.73
: b.      The Board erred in creating a new definition of passive that includes components that cannot be readily monitored for incremental degradation and to predict future failure.
The Board stated that [t]he Commission has determined that it is possible to generically exclude active components from AMR, because, in part, these components have performance and condition characteristics that are readily monitorable.74 The Board then stated that performance monitoring tracks whether an SSC [system, structure, or component] is performing its intended function (i.e., assuring gross failure has not occurred), while condition monitoring is concerned with changes in performance with time (i.e., trends) in order to predict the failure.75 Based on these premises, the Board found that the ability to detect incremental functional degradation (as opposed to gross failure) is the important criteria for an SSC to be considered readily monitorable.76 Thus, the Board concluded that SSCs that cannot be measured for trending data to predict impending failure could not realistically be considered readily monitorable.77 In essence, the Board has created a new, additional requirement under which a component can only be considered active for purposes of license renewal if it already is being monitored in a manner to detect incremental degradation and successfully predict future failure.
For example, the Board considers whether there has been a clear success rate in tracking progressive degradation of transformers.78 While certainly monitoring should do more than 73 See Oyster Creek, CLI-09-7, 69 NRC at 259; Three Mile Island, ALAB-926, 31 NRC at 13.
74 Indian Point, LBP-13-13, slip op. at 217-18 (citing 1995 License Renewal SOC, 60 Fed. Reg. at 22,476).
75 Id. at 218.
76 Id. at 219-20 (emphasis added).
77 Id. at 220 (emphasis added).
78 Id. at 253.
16
simply detect complete failure, the Board goes much further. This new requirement runs counter to Commission direction, and the Board should be reversed for departing from established law.79 First, the 1995 License Renewal SOC does not rely on trending, does not require prediction of future failure, and does not discuss incremental functional degradation when discussing the standard for whether a component is active.80 Instead, the Commission stated that active functions include those functions where the parameter of concern (required function),
including any design margins, can be directly measured or observed.81 As Entergy explained, for transformers, the parameter of concern (required function) can be directly monitored through output voltage and current at the terminals, making transformers active components.82 Furthermore, the list of components excluded from AMR in 10 C.F.R. § 54.21(a)(1)(i) contains numerous electrical components, including transistors, power inverters, circuit boards, battery chargers, and power supplies. As in the case of transformers, all of these components:
(1) have terminal voltages and currents; (2) these terminal voltages and currents are component properties that change as the components perform their required functions; and (3) the changes in terminal voltages and currents can be directly measured or observed.83 In summary, the applicable test for an active component is whether its functionality can be directly monitored, not whether incremental functional degradation can be detected to prevent future failure. The Board 79 See Oyster Creek, CLI-09-7, 69 NRC at 259.
80 See 1995 License Renewal SOC, 60 Fed. Reg. at 22,471-472, 22,477-478 (NYS000016).
81 Id. at 22,471.
82 The primary voltage and current are readily monitored at the primary terminals. The presence of the magnetic field is readily monitored at the secondary terminals. If a load is connected to the secondary winding, then current will flow, which is readily monitored by instrumentation or the reaction at the load (e.g., a motor starts).
If the load is varied, then the terminal voltages and currents will vary, as will the internal magnetic field. Thus, all of these transformer properties are readily monitored at the transformers terminals. See Entergy Transformers Testimony at 37 (A55) (ENTR00091).
83 Entergy Transformers Testimony at 42-44 (A60-61) (ENTR00091); NRC Staffs Testimony of Roy Mathew and Sheila Ray Concerning Contention NYS-8 at 12-13 (A20), 23-24 (A32) (Mar. 22, 2012) (NRC Staff Testimony) (NRC000031).
17
erred by creating its new requirement.84
: c.      The Board erred by improperly challenging the Indian Point CLB.
As recognized by the Board itself, the NRCs license renewal process specifically exempts challenges to a plants operational activities covered by its CLB.85 The Boards conclusions regarding the insufficiency of ongoing transformer preventive maintenance, conducted pursuant to the CLB, run afoul of these requirements and represent an impermissible challenge to current operations.86 With respect to Entergys current programs and procedures to track transformer performance, and past transformer failures at Indian Point (which were not found to be age-related),87 the Board states: And while these programs are based on the current knowledge of industry practice, we find that Entergys and the NRC Staffs testimony does not demonstrate the effectiveness of these tests and assessments in detecting impending transformer failures.88 The improper challenge to the CLB is further highlighted by the following testimony from NYSs witness, which the Board cited in LBP-13-13: the problem is not that failures arent preventable, but that such preventive measures are not requirements under the Part 50 84 Furthermore, even assuming that the Board is correct in concluding that transformers are only active if a licensee monitors for incremental degradation, the Board reached the wrong conclusion here and erred as a matter of fact. The Board acknowledges testimony by Entergy and the NRC Staff that there is substantial existing monitoring of transformers beyond monitoring of output voltage and current, conducted under ongoing, 10 C.F.R. Part 50 preventive maintenance programs, but still erroneously concluded that an AMP is warranted.
See, e.g., Indian Point, LBP-13-13, slip op. at 222-25; id. at 231 (Beyond measuring voltage and current at the output terminals, numerous other tests and assessments are available to monitor the performance and condition of a transformer, and have been incorporated into the current preventive maintenance programs developed by Entergy.); id. at 232 (To be sure, detailed corporate programs and plant-specific procedures have been developed for [Indian Point] by Entergy and incorporated into its CLB to track transformer performance.); id.
at 234 ([W]e find that Entergy has incorporated the current industry practices to monitor transformer health into its preventive maintenance programs and is using that information to identify degrading trends.).
85 Indian Point, LBP-13-13, slip op. at 26.
86 See, e.g., id. at 230-35. The Board is bound by NRC regulations and cannot impose additional requirements upon licensees. Hydro Res., Inc., LBP-06-1, 63 NRC 41, 59 (2006), affd, CLI-06-14, 63 NRC 510 (2006)
(finding that a board lacks authority to adopt a policy that invalidates a Commission regulation).
87 Entergy Transformers Testimony at 105-06 (A115) (ENTR00091).
88 Indian Point, LBP-13-13, slip op. at 232 (emphasis added).
18
regulations. Mandating an AMP for transformers would force licensees to take such additional steps.89 Forcing such additional steps is particularly troubling given the lack of evidence of age-related failures of Indian Points transformers that perform license renewal intended functions.90 In summary, the Board has imposed a new, additional requirement to determine whether a component is passive; a requirement that challenges the CLB and runs contrary to 10 C.F.R.
Part 54. Thus, the Board erred as a matter of law and abused its discretion by departing from established law.
: d.      The Board erred by not adequately comparing transformers to the most relevant active components identified in 10 C.F.R. § 54.21(a)(1)(i).
In LBP-08-13, the Board acknowledged that transformers are similar to other items that are excluded from AMR in 10 C.F.R. § 54.21(a)(1).91 Nonetheless, the Board required testimony from the parties regarding whether transformers are more similar to the included or excluded component examples.92 This exercise resulted in the facially deficient Board conclusion that transformers are more closely aligned with mechanical components that require AMR, such as piping, reactor vessels, and steam generators, than with electrical components that do not require AMR, such as transistors, power supplies, and power inverters.93 As Entergys witnesses thoroughly explained, a transformer is more similar to other electrical components in the AMR-excluded list because its 89 Id. at 226-27 (quoting Rebuttal Testimony of Dr. Robert C. Degeneff, D. Eng. Regarding Contention NYS-8 at 34-35 (Aug. 6, 2012) (NYSR00414)).
90 Entergy Transformers Testimony at 105-06 (A115) (ENTR00091).
91 Indian Point, LBP-08-13, 68 NRC at 88.
92 Id. at 89.
93 Indian Point, LBP-13-13, slip op. at 253-56. Furthermore, the Board erred in its consideration of substantial Entergy and Staff evidence about how transformers are more like AMR-excluded electrical components by simply concluding that Entergys and the Staffs arguments ultimately collapse under our finding that transformers do not change properties or state during operation. Id. at 253.
19
terminal voltages and currentslike those of a power supply, battery charger, or power inverterchange as the transformer performs its intended function and can be directly measured and monitored.94 The Boards findings, however, only focused on a few specific examples of AMR-excluded components, including piping, transistors, and batteries.95 The Board did not make specific findings on the myriad of additional relevant examples, such as relays, power inverters, circuit boards, battery chargers, and power supplies. Instead, the Board stated that the difference between transformers and other active components like power supplies, inverters, battery chargers, and circuit boards is debatable.96 Additionally, the Board erred in its comparison of transformers and transistors (perhaps the item in the AMR-excluded list that is most similar to transformers). For example, the change in resistivity in a transistor is directly analogous to the change in the magnetic field inside a transformer, the physical characteristics of both components are independent of the applied power, and the changing parameters in both cases are the internal electromagnetic fields.97 Transistor operation also can be readily observed at the external terminals.98 Furthermore, there is no monitoring of transistors for slow degradation. This fact, which is directly contrary to the Boards new requirement for whether a component is active, is omitted from the Boards 94 Entergy Transformers Testimony at 11 (A24) (ENTR00091).
95 Indian Point, LBP-13-13, slip op. at 251-56.
96 Id. at 252. Indeed, the Board even concluded that comparing transformers to the components in 10 C.F.R. § 54.21(a)(1)(i) is not conclusive. Id. at 251.
97 Entergy Transformers Testimony at 74-75 (A82), 78 (A86) (ENTR000091); see also Official Transcript of Proceedings, Indian Point Nuclear Generating Units 2 & 3 at 4337:4-12 (Dec. 13, 2012) (Dec. 13, 2012 Tr.)
(Dobbs).
98 Entergy Transformers Testimony at 74-75 (A82), 81 (A91) (ENTR00091); Dec. 13, 2012 Tr. at 4337:8-12 (Dobbs), 4431:4-10 (Degeneff).
20
discussion of transistors.99 The Board did not fully consider and address Entergys testimony in its decision and reached an implausible conclusion.
For all of these reasons, the Board erred in its consideration of AMR-included or AMR-excluded components in 10 C.F.R. § 54.21(a)(1)(i), and LBP-13-13 should be reversed.
: e.      The Board erred by dismissing longstanding regulatory guidance.
In LBP-13-13, the Board rejected over 15 years of NRC guidance and precedent concluding that electrical transformers are active components not subject to AMR.100 This is contrary to Commission precedent, which refers to regulatory guidance documents as having special weight.101 The Commission recently considered this guidance and its purpose and development in Seabrook.102 Notably, the Commission specifically acknowledged that [l]ongstanding Staff guidance directly addresses the classification of electrical transformers for the purposes of license renewal, and has found them to be active components.103 That longstanding guidance includes the 1997 Grimes Letter, Table 2.1-5 of NUREG-1800 (License Renewal Standard Review Plan), and NEI 95-10.104 In dismissing the Seabrook intervenors transformers contention, the Commission noted that the intervenors had disregard[ed] this Staff guidance 99 See Indian Point, LBP-13-13, slip op. at 255-56.
100 Id. at 205, 214 (rejecting the validity of the Grimes Letter as an opinion that, at best, has scant documentation justifying its technical conclusions).
101 See Seabrook, CLI-12-5, 75 NRC at 314 n.78; Yankee Atomic Elec. Co. (Yankee Nuclear Power Station), CLI-05-15, 61 NRC 365, 375 n.26 (2005) (We recognize, of course, that guidance documents do not have the force and effect of law. Nonetheless, guidance is at least implicitly endorsed by the Commission and therefore is entitled to correspondingly special weight) (citations and internal quotation marks omitted); Private Fuel Storage, L.L.C. (Indep. Spent Fuel Storage Installation), CLI-01-22, 54 NRC 255, 264 (2001) (Where the NRC develops a guidance document to assist in compliance with applicable regulations, it is entitled to special weight), petition for review held in abeyance, Devia v. NRC, 492 F.3d 421 (D.C. Cir. 2007).
102 Seabrook, CLI-12-05, 75 NRC at 316-18.
103 Id. at 319.
104 See NEI 95-10, Rev. 6, Industry Guideline for Implementing the Requirements of 10 CFR Part 54 - The License Renewal Rule at B-14 (June 2005) (ENT000098).
21
and relied only on conclusory statements.105 Thus, the Commission in Seabrook implicitly endorsed the Staffs 1997 guidance concerning transformers.106 In LBP-13-13, the Board declined to consider the Commissions decision on transformers in Seabrook, stating that it was not a merits determination.107 Although the procedural posture here differs from Seabrook, the underlying legal and regulatory principles discussed by the Commission are the same, and the extensive testimony proffered in this matter confirmed that the longstanding guidance stands on sound technical bases.108 The Boards conclusion that the Commission has not endorsed the Grimes Letter109 also is contrary to the Commissions statements in Seabrook, discussed above, and to the Commissions treatment of transformers in every license renewal to date as active components not subject to AMR, but rather addressed by the maintenance rule. Therefore, the Commission should reverse LBP-13-13 with respect to NYS-8 because it departs from established law.
: 3.      The Public Interest Supports the Commissions Review and Reversal of the Boards Decisions on NYS-8 Commission review of LBP-08-13 and LBP-13-13 also is warranted under 10 C.F.R.
§§ 2.341(b)(4)(iii) and (v) because the Boards decisions raise substantial policy questions that are in the public interest to be reviewed.
NRC and industry guidance documents have long classified transformers as active components that are excluded from AMR.110 The NRC has never reached a different conclusion 105 Seabrook, CLI-12-05, 75 NRC at 320.
106 See, e.g., Shoreham, ALAB-900, 28 NRC at 290 (holding that guidance documents are at least implicitly endorsed by the Commission [and] entitled to correspondingly special weight).
107 Indian Point, LBP-13-13, slip op. at 204-05.
108 While rejecting the Commissions statements in Seabrook on electrical transformers because of the different procedural posture, the Board cited Seabrook repeatedly in other parts of LBP-13-13 on other topics. See Indian Point, LBP-13-13, slip op. at 29-30, 33-34, 265, 292, 310.
109 See id. at 205.
110 See supra Section III.C.2.e.
22
in approving license renewal applications for 73 reactor units to date.111 In fact, the NRC has never concluded that a Part 54 AMP is necessary to replace or supplement CLB programs and practices as they relate to transformers. Instead, transformer performance is addressed and inspected pursuant to 10 C.F.R. Part 50, including reliance on the maintenance rule.112 The Boards decisions have potentially wide-reaching consequences because they involve a fundamentally generic issue, not one that is specific to Indian Point license renewal or Indian Point transformers.113 The Boards decisions call into question the treatment of electrical transformers for all reactor license renewals, generating considerable confusion for past, present, and future renewals. The decisions also blur the dichotomy between 10 C.F.R. Parts 50 and 54, and would require review of the effectiveness of longstanding Part 50 programs (e.g.,
maintenance rule program) to determine if AMPs are needed for certain SSCs. This is precisely what the Commission sought to avoid in adopting 10 C.F.R. Part 54, in which it determined that to ensure safe operation during the period of extended operation (PEO) it should rely upon existing licensee programs and the regulatory process with only a few exceptions.114 In summary, the Boards decisions regarding electrical transformers raise important and substantial policy questions that are in the public interest to be reviewed. The Commission should review these decisions and reverse them for the reasons discussed above.
111 See Entergy Transformers Testimony at 10-14 (A24), 86-87 (A96) (ENTR00091).
112 Entergy Transformers Testimony at 86-87 (A96) (ENTR00091).
113 See, e.g., Entergy Nuclear Vt. Yankee, LLC (Vt. Yankee Nuclear Power Station), CLI-10-17, 72 NRC 1, 13 (2010) (taking review because a petition raised issues that could affect other license renewal proceedings).
114 1995 License Renewal SOC, 60 Fed. Reg. at 22,464 (NYS000016) (The first principle of license renewal was that, with the exception of age-related degradation unique to license renewal and possibly a few other issues related to safety only during the period of extended operation of nuclear power plants, the regulatory process is adequate to ensure that the licensing bases of all currently operating plants provides and maintains an acceptable level of safety so that operation will not be inimical to public health and safety or common defense and security.).
23
IV.      CONTENTION CW-EC-3A (ENVIRONMENTAL JUSTICE)
A.      Statement of the Case
: 1.      The Boards Admission of Clearwaters Original Contention CW-EC-3 Entergys LRA includes an environmental report (ER) that identifies EJ populations within 50 miles of Indian Point, as well as any new and significant information regarding environmental impacts addressed in the Generic Environmental Impact Statement (GEIS).
Entergy determined that there would be no disproportionally high and adverse impacts on members of minority and low-income populations from the proposed action.115 As originally proposed, CW-EC-3 raised two overarching concerns.116 First, Clearwater claimed that Entergy incorrectly used census Block Group data, rather than census Block data, to identify minority and low income populations.117 Second, Clearwater made multiple assertions,118 including, as relevant to this appeal, the claim that Entergy failed to account for purported disproportionate impacts because minority and low-income populations will be more severely and negatively impacted by an evacuation resulting from a radiological event at Indian Point.119 Clearwater attributed those disproportionate impacts to purported deficiencies in state and local emergency plans for Indian Point. In particular, Clearwater cited alleged significant 115 Indian Point Energy Center License Renewal Application, App, E, Applicants Environmental Report, Operating License Renewal Stage, Indian Point Energy Center §§ 2.6.2, 4.22 (ER) (ENT00015B).
116 Hudson River Sloop Clearwater, Incs Petition to Intervene and Request for Hearing (Dec. 10, 2007)
(Clearwater Petition), available at ADAMS Accession No. ML073520042.
117 See id. at 36-37.
118 Id. at 41-55. Clearwater also argued that Entergy failed to account for purported disproportionate impacts including: 1) cancer rates for minority communities surrounding Indian Point exceed the national average; 2) minority and low-income populations that engage in subsistence fishing in the region ingest radionuclides and other toxic substances from Indian Point at a greater rate, and thus suffer greater harm, than the population at large; and 3) the production, use, and storage of Indian Point nuclear fuel would disproportionately impact Native American populations. See id.
119 Id. at 47-48.
24
difficulties in evacuating low-income and minority populations that rely on public transportation,120 the alleged lack of evacuation plans for Sing Sing Correctional Facility prisoners,121 and extremely problematic evacuations of disabled individuals due to the lack of sufficient emergency planning.122 As further support, Clearwater referenced various reports on emergency preparedness,123 hurricane Katrina,124 and also New York State proposed Contention 29 which alleged that Entergys ER failed to address emergency preparedness and evacuation planning for Indian Point.125 Entergy opposed the admission of CW-EC-3, arguingas relevant herethat emergency planning and the environmental impacts of severe accidents are outside the scope of this license renewal proceeding.126 Entergy also argued that Clearwater failed to provide evidence of any significant and disproportionate adverse impact, noting that allegations of radioactivity releases below regulatory limits are insufficient to demonstrate a significant adverse impact that would support admission of an EJ contention.127 The Staff opposed the contentions admission for similar reasons.128 The Board admitted CW-EC-3 only with respect to Clearwaters claim that 120 See id. at 47-48.
121 See id. at 48-53 122 See id. at 51-52 123 James Lee Witt Associates, LLC, Review of Emergency Preparedness of Area Adjacent to Indian Point and Millstone at 4.5.2.1 at 71 (2003) (ENT000263).
124 American Civil Liberties Union's National Prison Project, Abandoned & Abused Orleans Parish Prisoners in the Wake of Hurricane Katrina (Aug. 9, 2006), available at http://www.aclui.org/prison/conditions/2641.4pub20060809.html.
125 See id. at 47-48 . The Board ultimately rejected NYS-29 for being outside the scope the proceeding. See Indian Point, LBP-08-13, 68 NRC at 149 (finding that Commission regulations and precedent place consideration of emergency plans outside the scope of this proceeding).
126 Answer of Entergy Nuclear Operations, Inc. Opposing Hudson River Sloop Clearwater Incs Petition to Intervene and Request for Hearing at 61 (Jan. 22, 2008), available at ADAMS Accession No. ML080300053.
127 Id. at 66-67 (Clearwater merely assumed a significant adverse impact absent any foundation in law or fact, thus failing to establish a genuine dispute on a material issue). Further, Entergy argued that Clearwater had inappropriately included, in its expansive definition of EJ populations, various segments of the general population, such as children, students, hospital patients, the disabled, and the elderly. Id. at 64.
128 NRC Staff Answer at 98-99.
25
Entergys EJ evaluation failed to address potential disparate severe accident impacts on minority and low-income populations.129
: 2.      The Board Decision Admitting Clearwater Amended Contention CW-EC-3A (July 6, 2011 Order)
Similar to the ER, the Staffs FSEIS identifies minority and low-income populations within a 50-mile radius of Indian Point, and concludes that license renewal would not disproportionately and adversely impact such populations.130 Thereafter, Clearwater submitted amended Contention CW-EC-3A, requesting that CW-EC-3 also apply to the FSEIS analysis of EJ populations.131 Entergy and the NRC Staff opposed Clearwaters proposed amendments to CW-EC-3, again on the grounds that they raised issues beyond the limited scope of license renewal and otherwise failed to meet the Commissions admissibility requirements.132 The Board admitted CW-EC-3A, in part, expanding it to challenge whether the FSEIS adequately assessed whether EJ populations would suffer disproportionate impacts in the event of a severe accident.133 130 NUREG-1437, Supp. 38, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Regarding Indian Point Nuclear Generating Units Nos. 2 and 3, Final Report at 4-53 (Dec. 2010) (FSEIS)
(NYS00133B).
131 Motion for Leave to Amend and Extend Contention EC-3 Regarding Environmental Justice and Petition to Do So (Feb. 3, 2011), available at ADAMS Accession No. ML110410369. Clearwater also sought to expand the contentions scope to challenge the adequacy of the FSEIS assessments of the no-action alternative and the impact of adding closed cycle cooling on local EJ populations. Id. at 16.
132 Applicants Answer to Hudson River Sloop Clearwater, Inc.s Amended Environmental Justice Contention at 2-3, 10 (Mar. 7, 2011), available at ADAMS Accession No. ML110770579; NRC Staffs Answer to Amended and New Contention (EC-3) Filed by Hudson River Sloop Clearwater, Inc. Concerning the Final Supplemental Environmental Impact Statement at 2, 8-18 (Mar. 7, 2011), available at ADAMS Accession No. ML110670293.
133 Licensing Board Memorandum and Order (Ruling on Pending Motions for Leave to File New and Amended Contentions) at 56, 59-60 (July 6, 2011) (finding that other than those portions of the contention updated to refer to the FSEIS rather than the ER, the rest was inadmissible).
26
: 3.      The Boards Decision on Entergys First Motion in Limine (March 6, 2012 Order)
On December 22, 2011, Clearwater submitted its Statement of Position, written direct testimony, and supporting exhibits.134 Contrary to the Boards unambiguous ruling that consideration of emergency plans [is] outside the scope of this proceeding,135 Clearwaters testimony was fundamentally and inappropriately founded on purported emergency planning deficiencies.136 In particular, Clearwaters witnesses offered testimony: (1) challenging evacuation plans for Sing Sing prisoners (and for prisons generally);137 (2) challenging sheltering-in-place as an appropriate protective action recommendation;138 (3) summarizing interviews Clearwater conducted at various facilities regarding emergency preparedness;139 (4) asserting local hospitals are unprepared for an accident at Indian Point;140 (5) asserting difficulties evacuating EJ populations that do not have access to automobiles;141 (6) asserting difficulties evacuating assisted living facilities;142 and (7) alleging that Spanish translations of 134 Initial Statement of Position for Clearwaters Contention EC-3A Regarding Environmental Justice (Dec. 22, 2011) (Clearwater Position Statement) (CLE000002). See Clearwater Exhs. CLE000003 through CLE000010.
135 Indian Point, LBP-08-13, 68 NRC at 149.
136 See, e.g., Clearwater Position Statement at 21 (CLE000002) (arguing that the NRC Staff has repeatedly made the erroneous legal argument that emergency planning issues for environmental justice populations are outside the scope of this proceeding and NEPA.).
137 Testimony of Dr. Michael Edelstein in Support of Hudson River Sloop Clearwater, Inc.s Contention Regarding Environmental Justice at 3-4 (Dec. 22, 2011) (Edelstein Direct Testimony) (CLE000003); Initial Prefiled Testimony of Anthony Papa in Support of Hudson River Sloop Clearwater, Inc.s Contention Regarding Environmental Justice (EC-3A) at 3 (Dec. 22, 2011) (Papa Direct Testimony) (CLE000004).
138 Edelstein Direct Testimony at 3-4 (CLE000003) (stating that radiation-related impacts would be significantly greater in prisons); Papa Direct Testimony at 4 (CLE000004).
139 Initial Prefiled Written Testimony of Manna Jo Greene Regarding Clearwaters Environmental Justice Contention EC-3A at 3 (Dec. 22, 2011) (CLE000010).
140 Initial Prefiled Written Testimony of Erik A. Larsen, MD, FACEP Regarding Clearwaters Environmental Justice Contention EC-3A at 2-3 (Dec. 22, 2011) (CLE000005).
141 Initial Prefiled Written Testimony of Aaron Mair Regarding Clearwaters Environmental Justice Contention at 7-11 (Dec. 22, 2011) (CLE000007); Initial Prefiled Written Testimony of Stephen Filler Regarding Clearwaters Environmental Justice Contention EC-3A at 2-3 (Dec. 22, 2011) (CLE000009).
142 Testimony of John Simms in Support of Hudson River Sloop Clearwater, Inc.s Contention Regarding Environmental Justice at 2 (Dec. 22, 2011) (CLE000006).
27
emergency planning information are not properly distributed.143 Clearwater further requested consideration of feasible mitigation measures to address these purported deficiencies, including numerous emergency planning improvements, as well as IP2 and IP3 plant hardware changes to lessen the impact of severe accidents.144 Entergy filed a Motion in Limine to exclude direct testimony and exhibits that constituted direct challenges to the effectiveness of existing emergency plans.145 The NRC Staff supported Entergys motion.146 The Board denied Entergys First Motion in Limine, noting that at hearing it would be capable of distinguishing between disparaging comments against Indian Points emergency plans and Clearwaters witnesses descriptions of how certain EJ populations will be adversely harmed by a severe accident compared to the general population.147
: 4.      The Boards Denial of Entergys Second Motion in Limine (October 15, 2012)
In June 2012, Clearwater filed rebuttal testimony, which also raised broad emergency planning challenges.148 Entergy and the NRC Staff each filed Motions in Limine seeking again to exclude the portions of Clearwaters testimony and exhibits challenging emergency 143 Initial Prefiled Written Testimony of Dolores Guardado Regarding Clearwaters Environmental Justice Contention EC-3A at 4-5 (Dec. 22, 2011) (CLE000008).
144 See Clearwater Position Statement at 31-32 (CLE000002).
145 See Entergys Motion in Limine to Exclude Portions of Pre-filed Testimony and Exhibits for Contention CW-EC-3A (Environmental Justice) at 7-24 (Jan. 30, 2012), available at ADAMS Accession No. ML12030A200.
Entergy also sought to exclude testimony on impacts to non-EJ populations and testimony by Clearwater witnesses who lacked necessary expertise or personal knowledge.
146 NRC Staffs Response in Support of Entergys Motion in Limine to Exclude Portions of Pre-Filed Testimony and Exhibits for Contention CW-EC-3A (Environmental Justice) (Feb. 9, 2012), available at ADAMS Accession No. ML12040A313; Clearwaters Reply in Opposition to Entergys Motion in Limine (Feb. 17, 2012), available at ADAMS Accession No. ML12048B478.
147 Licensing Board Order (Granting in Part and Denying in Part Applicants Motions in Limine) at 35 (Mar. 6, 2012) (unpublished). Recognizing the Boards Order, but without waiving its arguments that testimony addressing the adequacy of emergency planning is outside the scope of this proceeding, Entergy offered testimony describing the Indian Point emergency plans.
148 See, e.g., Rebuttal Testimony of Michael Edelstein Regarding Clearwaters Environmental Justice Contention EC-3A at 2 (A5) (June 28, 2012) (CLE000047); Rebuttal Testimony of Dr. Andrew S. Kanter , M.D. M.P.H. in Support of Hudson River Sloop Clearwater, Inc.s Contention EC-3A Regarding Clearwaters Environmental Justice at 2-9 (A4-11) (June 28, 2012) (CLE000048); see also Clearwater Exhs. CLE000045 though CLE000059.
28
planning.149 On the first day of evidentiary hearings, the Board denied Entergys second Motion in Limine on CW-EC-3A.150 It provided no basis for its denial.151
: 5.      The Boards Partial Initial Decision on CW-EC-3A (LBP-13-13)
In LBP-13-13, the Board found that the FSEIS analysis of EJ was flawed, because the Staff did not take the requisite hard look at the environmental impacts of license renewal on the EJ population.152 Specifically, the Board found that the Staff failed to: (1) determine whether the EJ population would suffer disproportionate and adverse effects during the PEO in comparison to the general population; and (2) determine whether members of the low-income population who cannot afford to, or do not have the freedom to, self-evacuate or effectively shelter-in-place due to substandard housing would be disparately and adversely impacted in comparison to those who have the freedom, financial means, and readily-available modes of transportation to self-evacuate or access adequate shelter.153 The Board also found no legal basis for the Staffs conclusion that there would be no disproportionate and significant adverse impact on minority and low-income populations due to a severe accident, despite the Staffs reliance on the GEIS conclusion that the probability-weighted 149 Entergys Motion In Limine to Exclude Portions of Clearwaters Rebuttal Filings On Contention CW-EC-3A (Environmental Justice) (July 30, 2012), available at ADAMS Accession No. ML12212A345; NRC Staffs Motion in Limine to Exclude Portions of Pre-Filed Rebuttal Testimony and Rebuttal Exhibits Regarding Contention CW-EC-3A (Environmental Justice) (July 30, 2012), available at ADAMS Accession No. ML12212A419. Entergy also sought to exclude testimony concerning numerous non-EJ populations and irrelevant new claims concerning environmental impacts from terrorist attacks.
150 Official Transcript of Proceedings, Indian Point Nuclear Generating Units 2 & 3 at 1265:13-22 (Oct. 15, 2012)
(Judge McDade).
151 Id. at 1265:14-17 (Judge McDade) (We have had seven motions in limine that we have not yet ruled on, and let me say up front with regard to those seven, the first seven, we are denying the motions in limine.).
152 LBP-13-13 at 384, 385.
153 Id. at 383-84. The Board, however, found that the NRC Staff used a reasonable method for identifying minority and low-income populations within the 50-mile radius around Indian Point. Id. at 382.
29
consequences of a severe accident are SMALL for all plants.154 Accordingly, the Board found that the FSEIS fails to meet the NEPA reasonableness standard.155 The Board further found that Clearwaters witnesses had presented testimony that sufficiently illustrated the potentially disproportionate and adverse impacts on the EJ population surrounding Indian Point in the event of a severe accident.156 Significantly, while the Board acknowledged that the risk to both the EJ and non-EJ populations [from a severe accident] is small, it nonetheless concluded, based on testimony from Clearwater witnesses, that there is a higher risk of adverse consequences to the EJ population that warranted discussion in the FSEIS, should an accident occur.157 In the end, the Board concluded that because the record of the proceeding included this evidence and would therefore adequately ensure informed decision-making, the Commission, without additional Staff action to revise or supplement the FSEIS, could make an informed decision on whether to grant the requested renewed license.158 The Board therefore ruled that, despite the foregoing perceived deficiencies in the FSEIS, the agency had met its obligations under NEPA, and resolved the contention in the Staffs favor.159 B.      Issues Presented in the Boards Resolution of CW-EC-3A
: 1.      Whether it was legal error for the Board to admit CW-EC-3 and CW-EC-3A, as amended, given that (a) Clearwater failed to point to any adverse environmental impacts that would result from license renewal (let alone significant adverse impacts that would disproportionately affect EJ populations); and (b) both the 154 Id. at 386. According to the Board, to accept this position would run counter to the NRC requirement that licenseesdevote resources to protecting the public from the consequences of a severe accident. Id.
155 See id.
156 Id. at 387.
157 Id.
158 Id. at 388.
159 Id. at 387. Entergy does not dispute the Boards authority to augment the NEPA record to include the adjudicatory record. See, e.g., Nuclear Innovation N. Am. LLC (South Texas Project, Units 3 & 4), CLI-11-6, 74 NRC 203, 208-09 (2011). Instead, Entergy challenges the sources and subject matters the Board used to augment the record.
30
original and amended contention are directly founded on purported deficiencies in Indian Point emergency plans and emergency planning guidance generally?
: 2.        Whether it was legal and prejudicial error for the Board to permit Clearwater to present extensive evidence regarding purported deficiencies in the Indian Point emergency plans and emergency planning guidance generally, which are outside the scope of license renewal and the required NEPA analysis?
: 3.        Whether the Board committed legal and factual error in concluding that the Staffs EJ analysis in the FSEIS was inadequate, based on the Boards finding that there could be disproportionate and adverse impacts on EJ populations in the event of a severe accident, given (a) the Staffs reasonable use of the agencys generic finding of SMALL probability-weighted consequences of a severe accident; and (b) the lack of record evidence to support the Boards finding?
C.        The Commission Should Review and Reverse Several Board Rulings and Findings Regarding CW-EC-3 Petitions for review are generally considered unnecessary when a party seeks to appeal a decision that was ultimately resolved in the petitioners favor.160 But the Commission will nevertheless take review where a licensing boards holding could have an impact on the course of many licensing hearings and involves a legal issue of recurring importance.161 As discussed below, such circumstances are present here.
: 1.      Legal Standards Applicable to Environmental Reviews of License Renewal Applications Under NEPA Under NEPA and 10 C.F.R. Part 51, the major federal action here is license renewal for IP2 and IP3, and the scope of all license renewal proceedings is defined and purposefully limited, pursuant to 10 C.F.R. Part 54.162 The scope of the Staffs NEPA review is similarly limited and defined by the major federal actioni.e., the renewal of the IP2 and IP3 operating 160 See Marble Hill, ALAB-459, 7 NRC 179, 202 (1978); Midland, ALAB-282, 2 NRC 9, 10 n.1.
161 Prairie Island, ALAB-252, 8 AEC at 1177-78.
162 See Final Rule, Environmental Review for Renewal of Nuclear Power Plant Operating Licenses, 61 Fed. Reg.
28,467, 28,485 (June 5, 1996) (NYS000127).
31
licenses.163 The major federal action is defined by Part 54 and does not include review of the CLB, including emergency plans.164 Two NEPA principles must guide the Commission in its consideration of this petition.
First, NEPA requires agencies to take a hard look at the environmental impacts of a proposed action and reasonable alternatives to that action.165 Second, this hard look is tempered by a practical rule of reason.166 Consequently, [w]ith respect to environmental consequences that are only remote possibilities, an agency must be given some latitude to decide what sorts of risks it will assess.167 Thus, [a]n EIS [environmental impact statement] need not discuss remote and highly speculative consequences.168 The rule of reason also applies to the level of detail required in an EISs analysis of those impacts it does analyze.169
: 2.      Legal Standards Applicable to Environmental Justice Analyses Environmental justice refers to the federal policy established in 1994 by Executive Order 12898.170 In accordance with Executive Order 12898, the NRC has obligated itself to address only the disproportionate distribution of high and adverse effects in its NEPA 163 See La. Energy Servs.L.P. (Claiborne Enrichment Center), CLI-98-3, 47 NRC 77, 87-88 (1998); 42 U.S.C. § 4332(2)(C) (2006).
164 10 C.F.R. §§ 50.47(a)(1(i), 54.30(a).
165 See Claiborne, CLI-98-3, 47 NRC at 87-88; see also v. Methow Valley Citizens Council, 490 U.S. 332, 349 (1989) (holding that NEPA requires agencies to take a hard look at environmental consequences prior to taking major actions).
166 Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-10-22, 72 NRC 202, 208 (2010) (citing Cmtys., Inc. v. Busey, 956 F.2d 619, 626 (6th Cir. 1992); see also Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-10-11, 71 NRC 287, 316 (2010); Hells Canyon Alliance v. U.S. Forest Serv., 227 F.3d 1170, 1184-85 (9th Cir. 2000)); U.S. Dept of Transp. v. Pub. Citizen, 541 U.S. 752, 767-69 (2004) (stating that the rule of reason is inherent in NEPA and its implementing regulations).
167 City of New York v. U.S. Dept of Transp., 715 F.2d 732, 750 (2nd Cir. 1983).
168 Trout Unlimited v. Morton, 509 F.2d 1276, 1283 (9th Cir. 1974) (emphasis added).
169 Utahns for Better Transp. v. U.S. Dept of Transp., 305 F.3d 1152, 1176 (10th Cir. 2002). A [d]etailed analysis is required only where impacts are likely. Id.
170 Executive Order 12898 of February 11, 1994, Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations, 59 Fed. Reg. 7629, 7632 (Feb. 16, 1994) (ENT000259). In 2004, the NRC issued its own Policy Statement on the Treatment of Environmental Justice Matters in NRC Regulatory and Licensing Actions. 69 Fed. Reg. 52,040, 52,041, 52,046 (Aug. 24, 2004) (NRC Environmental Justice Policy Statement) (ENT000260).
32
analysis.171 To that end, [t]he focus of any EJ review should be on identifying and weighing disproportionately significant and adverse environmental impacts on minority and low-income populations that may be different from the impacts on the general population.172 Thus, if no significant and adverse impacts are identified that differ from those on the greater population, then an analysis of disparate impacts is not required.173 Thus, there are two prerequisites to support an admissible contention alleging deficiencies in an EJ analysis. First, support must be presented for the alleged existence of significant and disproportionate adverse impacts or harm on the physical or human environment.174 The mere identification of the presence of an EJ population is insufficient, as are unsupported claims of disparate and adverse impacts.175 Second, support must be proffered for the claim that the purported adverse impacts could disproportionately affect poor or minority communities in the vicinity of the facility at issue.176 Accordingly, small impacts that occur equally across all populations cannot form the basis for an admissible contention.177
: 3.      The Board Erred in Admitting CW-EC-3
: a.        Clearwaters contention is fundamentally a challenge to the adequacy of the Indian Point emergency plans.
The Board did not admit CW-EC-3 as a challenge to the adequacy of Entergys 171 S. Nuclear Operating Co. (Early Site Permit for Vogtle ESP Site), LBP-07-3, 65 NRC 237, 266 (2007) (citing Private Fuel Storage, L.L.C. (Indep. Spent Fuel Storage Installation), CLI-02-20, 56 NRC 147, 154 (2002))
(emphasis added).
172 NRC Environmental Justice Policy Statement, 69 Fed. Reg. at 52,047 (emphasis added) (internal quotations omitted) (ENT000260).
173 Id.
174 Vogtle ESP, LBP-07-3, 65 NRC at 262 (citing 69 Fed. Reg. at 52,047).
175 See Dominion Nuclear N. Anna, LLC (Early Site Permit for N. Anna ESP Site), CLI-07-27, 66 NRC 215, 247 (2007) (describing EJ issues as those that could lead to a disproportionately high and adverse impact).
176 Vogtle ESP, LBP-07-3, 65 NRC at 262.
177 See N. Anna ESP, CLI-07-27, 66 NRC at 247 (resting its decision in part on the fact that the Staff found a majority of the general environmental impacts set forth in this FEIS to be small or, in a very few cases, moderate.).
33
emergency plan, but rather, as a challenge to Entergys ER for failing to properly consider, and publicly disclose, environmental factors that may cause harm to minority and low-income populations that would be disproportionate to that suffered by the general population.178 But as described above, the only environmental factors alleged in CW-EC-3 were unsupported, alleged deficiencies in the evacuation plans for certain populations. Accordingly, it was clear error for the Board to interpret CW-EC-3 as anything other than a challenge to the effectiveness of the Indian Point offsite emergency plans.
: b.      Emergency planning issueswhether labeled as safety or environmental issuesare outside the scope of license renewal.
The Board also relied on the rationale that CW-EC-3 was an environmental contention brought under NEPA and not a safety contention brought under Part 54.179 But there simply is no regulatory or legal basis to assert that emergency planning issues can be raised in a license renewal proceeding via NEPA. Since the license renewal rule was first promulgated, the Commission has consistently stated that emergency planning issues are outside the scope of consideration.180 As the Board itself recognized in rejecting other contentions challenging the effectiveness of emergency plans, 10 C.F.R. § 50.47(a)(1)(i) places consideration of emergency plans outside the scope of this proceeding and is supported by NRC case law.181 Furthermore, exclusion of emergency planning issues from license renewal is entirely consistent with NEPA. When considering environmental consequences that are only remote possibilities, the NRC Staff has latitude in determining which risks to assess.182 Statute and regulation require Indian Points emergency plans to provide adequate protection for all 178 Indian Point, LBP-08-13, 68 NRC at 201 (citation omitted).
179 Id.
180 See Final Rule, Nuclear Power Plant License Renewal, 56 Fed. Reg. 64,943 64,966 (Dec. 31, 1991) (There is no need for a licensing review of emergency planning issues in the context of license renewal).
181 Id. at 149 (emphasis added).
182 New York, 715 F.2d at 750.
34
members of the public equally, and the effectiveness of those plans has been demonstrated through continuous regulatory oversight and drills.183 Based on these facts, the NRC has determined that the risks associated with emergency planning need not be considered during license renewal. Under NEPAs rule of reason, the NRC Staff need not analyze these risks simply because of unsupported assertions that certain populations would somehow be disproportionately and significantly adversely impacted by ineffective sheltering and poorly-executed evacuation plans, as they amount to little more than remote and highly-improbable or highly-speculative consequences.
Accordingly, Clearwaters challenges to the effectiveness of the Indian Point emergency planswhether they are characterized as safety or environmental challengesare beyond the scope of this license renewal proceeding and NEPA.
: c.      Even if emergency planning issues brought under NEPA are not precluded, the Board still erred in admitting the contention.
Even if challenges to emergency plans brought under NEPA are somehow deemed to be within the scope of a license renewal proceedingor more fundamentally, even if CW-EC-3 is not viewed as raising emergency planning issues at allthe Board nonetheless erred in admitting the contention. Clearwater failed to show at the contention admissibility stage that any likely or probable adverse environmental impacts would be visited upon EJ populations as a result of license renewalmuch less significant or high impacts that would disproportionately affect EJ populations.184 In particular, Clearwater provided no evidence showing that license renewal would result 183 See further discussion at Section IV.D.4.c below.
184 Utahns for Better Transp., 305 F.3d at 1176; Trout, 509 F.2d at 1283. See also Vogtle ESP, LBP-07-3, 65 NRC at 263-64 (denying the admission of a similar EJ contention, on the basis that the contention lacks an adequate showing of adverse impacts, without which disparate impacts have no significance, making the potential issue immaterial to the environmental findings associated with the . . . application and thus an inadmissible contention).
35
in any radiological doses above regulatory thresholds.185 Moreover, as discussed below, the Commission has determined generically that the probability-weighted environmental impacts of a severe accident are small (i.e., not detectable or so minor186) for all plants.187
: 4.      The Board Erred in Denying Entergys Motions in Limine Related to CW-EC-3A.
Commission regulations provide that, [o]nly relevant, material, and reliable evidence which is not unduly repetitious will be admitted.188 Accordingly, the Board should have excluded or accorded no weight to testimony and exhibits that are outside the scope of, or not relevant to, this license renewal proceeding.189 In denying Entergys First Motion in Limine, the Board stated that it was capable of distinguishing irrelevant testimony critical of Entergys emergency plan from potentially relevant testimony.190 In doing so, it essentially acknowledged that attacks on Indian Points emergency planning were outside the proceedings scope. But as discussed in Section IV.D.5.b below, despite its assurances and statements, the Board did consider evidence critiquing the adequacy of the emergency plans. In fact, at the hearing, the Board actively elicited such testimony.191 185 Vogtle ESP, LBP-07-3, 65 NRC at 266. Consistent with the Council on Environmental Quality (CEQ) guidance, any dose within EPA guidelines would not be significant (as employed by NEPA), or above generally accepted norms and therefore, could not result in disproportionately high and adverse human health effects. CEQ Environmental Justice Guidance at 25 (Dec. 10, 1997) (ENT000266).
186 10 C.F.R. Pt. 51, Subpt. A, App. B, Tbl. B-1 § 3 (emphasis added); see also Testimony of Entergy Witnesses Donald P. Cleary, Jerry L. Riggs, and Michael J. Slobodien Regarding Contention CW-EC-3A (Environmental Justice) at 44 (A52) (Mar. 29, 2012) (Entergy EJ Testimony) (ENT000258).
187 See further discussion at Section IV.D.4.a below.
188 10 C.F.R. §§ 2.337(a), 2.319(d)-(e).
189 See, e.g., Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), Licensing Board Order (Ruling on Pending Matters and Addressing Preparation of Exhibits for Hearing) at 2 (Mar. 24, 2008) (unpublished)
(granting in part motions to exclude testimony on topics outside the scope of a license renewal proceeding).
190 Licensing Board Order (Granting in Part and Denying in Part Applicants Motions in Limine) at 35 (Mar. 6, 2012) (unpublished). As noted above, the Board provided no explanation for its oral ruling denying Entergys Second Motion in Limine on CW-EC-3A.
191 See, e.g., Official Transcript of Proceedings, Indian Point Nuclear Generating Units 2 & 3 at 2832:10-32 (Oct.
23, 2012) (Oct. 23, 2012, Tr.) (Judge McDade) (Is there anything about the patterns of automobile ownership or public transportation in Peekskill that would affect the [EJ] population), Id. at 2845:4-7 (Judge 36
Moreover, Entergy and Staff witnesseswith decades of emergency planning expertiseprovided substantial testimony directly contrary to the Clearwater testimony cited by the Board.192 The Board did not, however, discuss this directly contrary Entergy and Staff witness testimony in the basis for its decisionfurther indicating that the Board both considered and credited the testimony of Clearwater witnesses (none of whom demonstrated any emergency planning expertise). It was this very error that Entergys Motions in Limine sought to prevent.
Thus, the Board committed clear legal and prejudicial procedural error as well as abused its discretion in denying Entergys Motions in Limine on CW-EC-3A.
: 5.      The Board Erred in Concluding in LBP-13-13 that the FSEIS Environmental Justice Analysis Was Deficient.
: a.      The Board erred in concluding that there could be potential disproportionate and adverse impacts on environmental justice populations in the event of a severe accident.
As a legal matter, the Board incorrectly determined that the Staff could not rely on the Commissions finding in the GEIS that the probability-weighted consequences of a severe accident are SMALL for all plants.193 The GEIS finding is codified in 10 C.F.R. Part 51, Table B-1 and carries with it the force of law. The Staff had an absolute duty, as well as a rational basis, to rely on the Commissions finding.
NRC regulations define SMALL impacts as environmental impacts that are not detectable or are so minor that they will neither destabilize nor noticeably alter any important attribute of the resource.194 Thus, by definition, SMALL impacts cannot be either high or McDade) ([P]rior to your involvement with this proceeding, were you aware that there were Spanish language sources of information with regard to emergency planning?), Id. at 2847:15-18 (Judge McDade) ([I]n your direct testimony you talked about some of the circumstances that would be applicable to people in assisted living and in nursing homes in the event of a disaster in the area. Correct?).
192 Energy and NRC Staff EJ testimony are described further in Section IV.D.5.c below.
193 See LBP-13-13 at 386.
194 10 C.F.R. Pt. 51, Subpt. A, App. B, Tbl. B-1 § 3 (emphasis added); see also Entergy EJ Testimony at 44 (A52)
(ENT000258).
37
significantly adverse, an important stepping stone in any NEPA-related EJ analysis.
The Commission reaffirmed this GEIS finding in the Pilgrim license renewal proceeding stating that the environmental impacts of severe accidents during the license renewal term already have been addressed generically in bounding fashion.195 In a separate Pilgrim decision, the Commission further stated that no site-specific severe accident impacts analysis need be done in license renewal proceedings.196 Accordingly, the Staff acted well within the bounds of NEPA in declining to pursue any further specific analysis on whether EJ populations would suffer disproportionately significant and adverse impacts in the event of a postulated severe accident at Indian Point.
In rejecting this argument, the Board found that the NRCs emergency planning requirements are a clear indication that the NRC, while cautiously optimistic that a potentially severe accident will not occur at a licensed nuclear reactor, believes it necessary to prepare for just such a possibility.197 But under NEPA, an agency may draw reasonable bounds as to which contingencies and effects it chooses to analyze. Contrary to what the Board appeared to assume as matter of logic, the law is clear that simply because an agency may require certain emergency preparedness or planning in anticipation of potential low-probability events does not dictate that those same low probability events must be fully analyzed under NEPA. Thus, the Ninth Circuit has rejected the claim that simply because the Navy acknowledged a risk that a missile might explode, and designed a base to minimize the potential impacts from such an event, that risk must be 195 Pilgrim, CLI-10-11, 71 NRC at 316; see also Entergy EJ Testimony at 44 (A52) (ENT000258); Entergys Proposed Findings of Fact and Conclusions of Law for Contention CW-EC-3A (Environmental Justice) at 35-36 (¶ 74) (Mar. 22, 2013) (Entergy Proposed Findings), available at ADAMS Accession No. ML13081A746.
196 Pilgrim, CLI-12-15, 75 NRC at 709; see also Entergy Proposed Findings at 36 (¶ 74).
197 LBP-13-13 at 386.
38
evaluated under NEPA.198 Similarly, the Third Circuit has held that the fact that NRC has made certain planning efforts with respect to a potential terrorist attack does not then require detailed NEPA analysis of such attacks in connection with relicensing.199 Finally, while citing and selectively quoting from the D.C. Circuits decision in New York v. NRC,200 the Board misses that this case too is consistent with what the Staff did here.
As the court in New York noted, the finding that the probability of a given harm is nonzero does not, by itself, mandate an EIS: after the agency examines the consequences of the harm in proportion to the likelihood of its occurrence, the overall expected harm could still be insignificant and thus could support a FONSI.201 So too here - the NRC Staff has concluded that the overall expected harm for all populations is SMALL by considering both the expected harm and the likelihood of occurrence. In turn, it need not undertake further analysis of this small effect within its EIS under NEPAs rule of reason. In sum, the fact that for purposes other than satisfying NEPA the Agency may require facilities to plan for emergencies does not then require the Agency to further analyze such eventualities as part of its NEPA EJ analysis. The Board erred as a matter of law in concluding otherwise.
: b.        The Board failed to explain the basis for its conclusion that there would be disproportionate and adverse impacts to environmental justice populations in the event of a severe accident at Indian Point.
Licensing boards are obliged to explain their rulings202 and articulate in reasonable 198 Ground Zero Center for Non-Violent Action v. U.S., 383 F.3d 1086, 1090-91 (9th Cir. 2004).
199 N.J. Dept. of Envtl. Prot. v. NRC, 561 F.3d 132, 143 (3d Cir. 2009).
200 See LBP-13-13 at 385 (citing N.Y. v. NRC, 681 F.3d 471, 482 (D.C. Cir. 2012)).
201 N.Y. v. NRC. 681 F.3d at 482 (emphasis added).
202 S. Carolina Elec. & Gas Co. (Virgil C. Summer Nuclear Station, Unit 1), ALAB-710, 17 NRC 25, 28 (1983)
(Reviewing courts require agencies to explain their rulings, and, accordingly, we must expect no less from the hearing boards.).
39
detail the basis for the course of action chosen.203 Without further elaboration, however, the Board announced that the testimony provided by Clearwaters witnesses sufficiently illustrated the potentially disproportionate and adverse impacts on the EJ population surrounding Indian Point in the event of a severe accident.204 As discussed below, Clearwaters testimony on these issues was convincingly rebutted by Entergy and Staff witnesses, but the Board did not confront that testimony.205 Given this directly competing evidence, the Boards failure to identify specifically which Clearwater testimony or other evidence supported its conclusion is grounds for Commission review and reversal of the Boards conclusions regarding the adequacy of the FSEIS.
: c.      The Boards conclusion that there would be potential disproportionate and adverse severe accident impacts to environmental justice populations is not supported by the record.
(i)      The record demonstrates that all populations will be adequately protected under the Indian Point, State, and local emergency plans.
Referring only very generally to Clearwater witness testimony on different sectors of the EJ population, the Board concluded that the higher risk to the EJ population should be discussed in an adequate EJ analysis.206 The Board did not, however, identify the testimony that supported its finding. Nor would it have any legal or factual basis to find such a higher risk.
NRC regulations require that licensees include a range of protective actionsincluding sheltering and evacuationwhen developing emergency plans for all members of the public 203 Phila. Elec. Co. (Limerick Generating Station, Units 1 & 2), ALAB-857, 25 NRC 7, 14 (1987) (Licensing boards must confront the facts and articulate in reasonable detail the basis for the course of action chosen.).
(internal quotations omitted).
204 LBP-13-13 at 387.
205 Limerick, ALAB-857, 25 NRC at 14.
206 LBP-13-13 at 387 (emphasis added).
40
within the 10-mile emergency planning zone (EPZ).207 The record also shows that the Federal Emergency Management Agency (FEMA) has reviewed and approved the Indian Point emergency plans.208 Clearwater presented no contrary evidence or testimony on these points.
Given this, it is difficult to imagine how the Staff could, within an FSEIS, discuss a higher risk to EJ populations and thus have satisfied the Boards apparent concern. Such a discussion would have required the Staff to assume and accept the very opposite of FEMAs expert conclusion - i.e., Staff would have had to identify specific EJ populations it anticipated would not be adequately protected and thus would suffer significant adverse impacts disproportionate to the surrounding population. Such a requirement cannot be squared with this Commissions repeated guidance that emergency planning review is outside the scope of license renewal or with a proper respect for the work of companion expert federal agencies. Thus, the Board clearly erred in finding the FSEIS deficient.
(ii)      The record demonstrates that no particular population segment will be adversely impacted by a severe accident.
The Staff concluded that the potential impacts of license renewal to EJ populations would mostly consist of radiological effects.209 Given the extensive planning requirements and FEMA findings, it is unsurprising then that Staff witnesses provided further uncontroverted testimony that any radiation doses received by any population as a result of a severe accident at 207 10 C.F.R. § 50.47(b)(10). See also NRC Staff Testimony of Jeffrey J. Rikhoff and Patricia A. Milligan Regarding Contention CW-EC-3A (Environmental Justice) at 23 (A29) (Mar. 30, 2012) (NRC Staff EJ Testimony) (NRC000063).
208 Letter from L. Canton, FEMA, to D. Tailleart, NRC (Dec. 5, 2011) (ENT000273) (transmitting the Final Exercise Report for the Indian Point Energy Center Radiological Emergency Preparedness Plume Pathway Exercise Conducted on September 14, 2010 (Nov. 30, 2011)). Entergy and the Staff also presented uncontroverted evidence regarding State and local emergency plan compliance with New York Executive Law Article 2-B, which requires that State and local emergency management plans include programs to assist victims of disasters, with particular attention to the needs of the poor, the elderly, individuals with disabilities and other groups which may be especially affected. See, e.g., Entergy EJ Testimony at 67 (A88)
(ENT000258); Entergy Proposed Findings at 78 (¶157).
209 Oct. 23, 2012 Tr. at 2774:18-20 (Rikhoff ); see also NRC Staff EJ Testimony at 12 (A11) (NRC000063).
41
Indian Point would be within acceptable federal guidelines set by the U.S. Environmental Protection Agency (EPA).210 Clearwater presented no testimony or evidence to the contrary.
To support its finding that there would be disproportionate impacts on EJ populations, the Board focused on Ms. Milligans testimony that, in the event of a severe accident, certain populations, such as those incarcerated at Sing Sing, could receive radiation doses higher than other populations that are immediately able to self-evacuate.211 However, the Board failed to adequately address Ms. Milligans testimony that, any doses received would be within the EPA dose guidelines.212 Thus, even if certain individuals might hypothetically receive a different or higher dose than others, such impacts would not be adverse, much less significant and adverse.213 Accordingly, Commission review and reversal of the Boards clearly erroneous finding regarding potential disproportionate and adverse impacts to EJ populations is warranted.
: 6.      The Public Interest Warrants Commission Review of the Boards Decisions on CW-EC-3A.
Permitting these Board rulings to stand would have potential wide-ranging impacts, in that the door would be opened for petitioners to raise emergency planning issues through NEPA in license renewal proceedings. Furthermore, Clearwaters arguments regarding the potential for problematic evacuations and ineffective sheltering, to the extent they are even considered, are 210 NRC Staff EJ Testimony at 12 (A11) (NRC000063); Oct. 23, 2012 Tr. at 2774:20-23 (Rikhoff), 2762:6-25 (Milligan) (All of these doses are well within the established federal guidelines.), 2780:17-25 (Milligan)
(agreeing that nobody would receive an inappropriate dose beyond the regulatory limits).
211 LBP-13-13 at 384 (quoting Oct. 23, 2012 Tr. at 2760:22-2761:2 (Milligan).
212 Oct. 23, 2012 Tr. at 2760:22-2761:2 (Milligan) (emphasis added).
213 Oct. 23, 2012 Tr. at 2762:24-2763:12, 2779:2-5 (Milligan). As discussed above, [a] dosage increase that remains well under regulatory limits is not a high and adverse effect. Vogtle ESP, LBP-07-3, 65 NRC at 266.
Consistent with CEQ guidance, any dose within EPA guidelines would not be significant (as employed by NEPA), or above generally accepted norms. CEQ Environmental Justice Guidance at 25 (Dec. 10, 1997)
(ENT000266). The dose limits identified in the EPA guidelines were selected to safeguard public health.
EPA Guidance 400-R-92-001, Manual of Protective Action Guides and Protective Actions for Nuclear Incidents at iii (1991) (ENT00284A).
42
fundamentally generic. Thus, the Boards finding that there is a higher risk of adverse consequences for those without cars or those who shelter in place necessarily is a criticism of the overall effectiveness of all emergency plans.
For these reasons and the reasons discussed above, the Commission should: (1) review and reverse the Boards decisions to admit the original and amended contention; or (2) in the alternative, review and reverse (a) the Boards rulings denying Entergys January 30, 2012 and July 30, 2012 Motions in Limine, and (b) the Boards finding in LBP-13-13 that the FSEIS EJ analysis was deficient.
V.      CONTENTION NYS-35/36 (SAMA COST ESTIMATES)
A.        Statement of the Case
: 1.      Entergys SAMA Analyses for Indian Point In its original LRA, Entergy submitted a detailed site-specific evaluation of potentially cost-beneficial SAMAs.214 Entergy prepared this analysis using state-of the-art practices and in full accordance with NEPA and the NRC-endorsed guidance in NEI 05-01.215 The ER identified twelve potentially cost-beneficial SAMAs, but because they do not relate to adequately managing the effects of aging, those SAMAs were submitted for further engineering project cost-benefit analysis216 as part of ongoing plant operation. This fully satisfied the requirement in 10 C.F.R. § 51.53(c)(3)(ii)(L) to provide a SAMA analysis for IP2 and IP3 license renewal.
The Staff issued its Draft Supplemental Environmental Impact Statement (DSEIS) in December 2008. In it, the Staff documented its independent and detailed technical review of 214 See ER § 4.21, & App. E (ENT00015B).
215 See id.; see also Pilgrim, CLI-10-11, 71 NRC at 291 n.11 (citing NEI 05-01, Rev. A, Severe Accident Mitigation Alternatives (SAMA) Analysis, Guidance Document (Nov. 2005) (NEI 05-01); Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-12-01, 75 NRC 39, 55 (2012) (noting NRC endorsement of NEI 05-01).
216 ER at 4-73 (ENT00015B); see also id. at 4-73 to -77 (ENT00015B) (listing and describing potentially cost-beneficial SAMAs).
43
Entergys SAMA analyses, and concluded that they were reasonable and sufficient for the license renewal submittal.217 The Staff also stated that because the SAMAs identified as potentially cost-beneficial do not relate to adequately managing the effects of aging during the PEO, they need not be implemented as part of license renewal pursuant to Part 54.218 As demonstrated in Section V.C.2.b.ii, below, this analysis is fully consistent with unbroken precedent establishing that conditions of a renewed license must be related to managing aging effects.219 Approximately one year later, the Staff sought clarification regarding certain wind direction data used as inputs into the Indian Points SAMA analysis, and Entergy addressed the Staffs specific questions by revising the SAMA analysis.220 The only changes to the SAMA analysis related to wind direction inputs, but as a result, the number of cost-beneficial SAMAs changed. Three months later, NYS filed contentions NYS-35 and NYS-36, challenging Entergys revised analysis.
217 See NUREG-1437, Supp. 38, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Regarding Indian Point Nuclear Generating Unit Nos. 2 and 3, Draft Report for Comment at 5-10 (Dec. 2008)
(DSEIS) (NYS00132G).
218 See id. at G-36 (NYS00132G).
219 See Pilgrim, CLI-10-11, 71 NRC at 293 n.26 (because none of the SAMAs identified as potentially cost-effective bear on adequately managing the effects of aging, none need be implemented as part of the license renewal safety review, pursuant to 10 C.F.R. Part 54); Duke Energy Corp. (McGuire Nuclear Station, Units 1
    & 2; Catawba Nuclear Station, Units 1 & 2), CLI-02-28, 56 NRC 373, 388 n.77 (2002) (upholding a DSEISs conclusion that a SAMA did not relate to adequately managing the effects of aging during the PEO and
[t]herefore, it need not be implemented as part of license renewal pursuant to 10 CFR Part 54).
220 See NL-09-165, Letter from Fred Dacimo, Entergy, to NRC, License Renewal Application: Revised SAMA Analysis Using Alternate Meteorological Data (Dec. 11, 2009) (Revised SAMA Analysis), available at ADAMS Accession No. ML093580089. The revisions identified three more potentially cost-beneficial SAMAs for IP2, and three more for IP3, raising the total number of potentially cost beneficial SAMAs for Indian Point from 16 to 22. See id. at 31-32.
44
: 2.      The Boards Admission of Contention NYS-35/36 More than two years into this proceeding, NYS-35 alleged for the first time that Entergy had not sufficiently completed the SAMA cost-benefit analysis.221 Focusing on Entergys stated intention to conduct further engineering project cost-benefit analysis to evaluate potential implementation, NYS argued that the failure to complete this evaluation violated NEPA.222 NYS further alleged that SAMAs ultimately found sufficiently cost-effective must be added as license conditions for the renewed licenses.223 NYS-36 alleged that for nine specific SAMAs, refined estimates are unlikely to change the outcome.224 NYS further asserted that the SAMA analysis would be meaningless without implementation of such clearly cost-effective SAMAs, and that the Staff had failed to provide a rational basis for not requiring implementation.225 Entergy objected to these contentions as untimely, because the revised SAMA analysis did not provide any materially-different information about the nature or content of the SAMA cost estimates, so any question about their completeness under NEPA should have been raised at the outset of the proceeding.226 Entergy also argued that the SAMA analysis was complete as a matter of fact and law, and that NYS improperly conflated the Part 54 license renewal regulations with the Part 50 backfit process.227 The Staff raised similar objections.228 221 See Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 & 3), CLI-10-30, 72 NRC 564-66 (2010) (citing State of New Yorks New and Amended Contentions Concerning the December 2009 Renalysis of Severe Accident Mitigation Alternatives at 13, 15-17, 22-35 (Mar. 11, 2010) (New Yorks New and Amended Contentions), available at ADAMS Accession No. ML00780366).
222 See id. (citing New Yorks New and Amended Contentions at 15-17, 22-35).
223 See id. (citing New Yorks New and Amended Contentions at 13).
224 See id. at 567 (citing New Yorks New and Amended Contentions at 36, 37, 39).
225 See New Yorks New and Amended Contentions at 40-41; Indian Point, CLI-10-30, 72 NRC at 567.
226 See Applicants Answer to New York States New and Amended Contentions Concerning Entergys December 2009 Revised SAMA Analysis at 21-24 (Apr. 5, 2010) (Entergy Answer to SAMA Contentions), available at ADAMS Accession No. ML101450328.
227 See id. at 24-31.
45
In LBP-10-13, the Board admitted NYS-35 insofar as the contention alleged the DSEIS did not provide a rational basis for granting license renewal without mandating a CLB backfit to mandate implementation of cost-effective SAMAs.229 The Board also admitted the portion of NYS-35 calling for completion of the SAMA analyses through further engineering cost analyses, and the portion of NYS-36 that alleged the Staff had violated NEPA by failing to explain why license renewal could be granted without requiring implementation of cost-beneficial SAMAs.230
: 3.      Appeals of Contention Admissibility Entergy and the Staff sought interlocutory review arguing, among other things, that LBP-10-13 ignored controlling NEPA precedent, improperly conflated Part 54 license renewal regulations with the Part 50 backfit process, and failed to distinguish between conceptual environmental alternative cost estimates prepared for purposes of NEPA and detailed engineering project cost estimates performed to assess the viability of a particular plant modification for current plant operations.231 The Commission denied interlocutory review, but referring to the Boards importation of Part 50 backfit matters into a NEPA analysis and a Part 54 proceeding, it observed that
[p]ortions of the Boards decision appear problematic, and that arguments against admissibility were not without force.232 Thus, review might be warranted later in the proceeding.233 228 See NRC Staffs Answer to State of New Yorks New and Amended Contentions Concerning the December 2009 Severe Accident Mitigation Alternative Reanalysis at 16-35 (Apr. 5, 2010), available at ADAMS Accession No. ML100960165.
229 Indian Point, CLI-10-30, 72 NRC at 567 (quoting Indian Point, LBP-10-13, 71 NRC at 698).
230 See id. at 567-68 (quoting Indian Point, LBP-10-13, 71 NRC at 702).
231 See generally Applicants Petition for Interlocutory Review of LBP-10-13 (July 15, 2010), available at ADAMS Accession No. ML102030050; see also NRC Staffs Petition for Interlocutory Review of the Atomic Safety and Licensing Boards Decision Admitting New York State Contentions 35 and 36 on Severe Accident Mitigation Alternatives (LBP-10-13) (July 15, 2010), available at ADAMS Accession No. ML101970197.
232 Indian Point, CLI-10-30, 72 NRC at 568.
46
: 4.      Issuance of the FSEIS In December 2010, the Staff issued its FSEIS, which, like the ER and DSEIS, concluded that none of the potentially cost-beneficial SAMAs were related to aging management and that they, therefore, would be addressed under the agencys oversight of the current operating licenses.234 To specifically address the Boards ruling in LBP-10-13, the Staff substantially expanded its explanation of the SAMA implementation process.235 It concluded, again, that there is no regulatory basis to suggest that potentially cost-beneficial SAMAs unrelated to Part 54 requirements must be imposed as a backfit to the CLB, as a condition for license renewal.236
: 5.      Motions for Summary Disposition Following issuance of the FSEIS, NYS sought summary disposition of NYS-35/36, requesting that the FSEIS be revised to either direct all cost-effective SAMAs to be implemented as a condition of license renewal, or else provide a rational basis as to why implementation is not required.237 Alternatively, NYS asked that the application be denied.238 Entergy and the Staff each filed cross-motions for summary disposition, arguing that the SAMA analysis was complete as a matter of fact and law, and that neither Part 54 nor Part 51 compels changes to the CLB as part of the license renewal process or implementation of mitigation measures unrelated to aging management.239 233 See id.
234 See FSEIS at 5-11 (NYS00133C).
235 See id.
236 Id.
237 State of New Yorks Motion for Summary Disposition of Consolidated Contention NYS-35/36 at 2 (Jan. 14, 2011), available at ADAMS Accession No. ML110270252.
238 See id. at 3.
239 See Applicants Consolidated Memorandum in Opposition to New York States Motion for Summary Disposition of Contention NYS-35/36 and in Support of its Cross-Motion for Summary Disposition (Feb. 3, 2011) ), available at ADAMS Accession No. ML110460187; see also NRC Staffs (1) Cross-Motion for Summary Disposition, and (2) Response to New York States Motion for Summary Disposition, of Contention NYS-35/36 (Severe Accident Mitigation Alternatives) (Feb. 7, 2011), available at ADAMS Accession No. ML110400012.
47
In LBP-11-17, the Board granted NYSs motion and denied the cross-motions.240 It held that Entergys licenses cannot be renewed unless and until the NRC Staff reviews Entergys completed SAMA analyses and either incorporates the result of these reviews into the FSEIS or, in the alternative, modifies its FSEIS to provide a valid reason for recommending the renewal of the licenses before the analysis of potentially cost-effective SAMAs is complete and for not requiring the implementation of cost-beneficial SAMAs.241 The Board reasoned that the NEPA review in license renewal proceedings, which is conducted pursuant to Part 51, is not limited to aging management-related issues.242 Thus, the Staff has the authority to require implementation of non-aging management SAMAs through its CLB backfit review under Part 50 or through setting conditions of the license renewal, and must exercise that authority, or explain why it did not.243
: 6.        Appeal of Summary Disposition Entergy sought Commission review and reversal of LBP-11-17, arguing that the Board erred in holding that: (a) Part 50 backfit rules established requirements that applied to the review of LRAs; (b) Part 54 and 51 regulations authorized the Staff to condition renewed licenses to require implementation of SAMAs unrelated to aging management; and (c) the license renewal SAMA analysis was incomplete.244 The Staff filed an answer arguing that interlocutory review was warranted.245 The Commission concluded that LBP-11-17 did not dispose of a major 240 See Indian Point, LBP-11-17, 74 NRC at 15.
241 See id. at 27.
242 Id. at 21 (citing Pac. Gas & Elec. Co. (Diablo Canyon Nuclear Power Plant, Units 1 & 2), LBP-10-15, 72 NRC 257, 288 (2010), revd in part on other grounds, CLI-11-11, __ NRC __ (Oct. 12, 2011)).
243 Id. at 22; see also id. (citing 10 C.F.R. § 51.103(a)(4)).
244 See generally Applicants Petition for Review of LBP-11-17 Granting Summary Disposition of Consolidated Contention NYS-35/36 (July 29, 2011), available at ADAMS Accession No. ML11217A066.
245 See Entergy Nuclear Operations, Inc. (Indian Point, Units 2 & 3), CLI-11-14, 74 NRC 801, 805-06 (2011).
48
segment of the case, and denied review without reaching the merits, and without prejudice to Entergys ability to seek review after the Boards final decision in this case.246
: 7.      Developments Since CLI-11-14 Given the Boards unambiguous ruling that license renewal cannot be granted without further FSEIS supplementation, Entergy prepared and submitted refined project-level cost estimates to the NRC Staff for potentially cost beneficial SAMAs.247 In making this submittal, Entergy did not waive any rights to appeal the SAMA Orders or concede that its original SAMA cost estimates were in any way insufficient or incomplete.248 The Staffs review of this submittal is ongoing.249 As explained above, the PID, disposed of all Track 1 contentions including all admitted SAMA contentions. The Board also discussed the SAMA Orders and the Staffs review of Entergys refined project-level cost estimates,250 reiterating that:
The FSEIS does not articulate a rational basis for not requiring Entergy to complete its SAMA review and for not requiring the implementation of cost-beneficial SAMAs prior to the relicensing of IP2 and IP3 and, therefore, violates NRC regulations, NEPA, and the APA [Administrative Procedures Act].
Renewed licenses cannot be issued unless and until this deficiency is corrected.251 246 Id. at 811, 813-14. The Commission also noted that two other SAMA contentions were among fourteen contentions pending before the Board. Id. at 811. Those contentions were subsequently resolved in LBP-13-13.
247 NL-13-075, Letter from F. Dacimo, Entergy, to NRC Document Control Desk, License Renewal Application -
Completed Engineering Project Cost Estimates for SAMAs Previously Identified as Potentially Cost-Beneficial (May 6, 2013) (NL-13-075), available at ADAMS Accession No. ML13127A459. The refined estimates were consistent with estimates Entergy prepares for project approvals, including details on construction, equipment, supplies, labor, etc. that are well-beyond the level of detail required for NEPA alternatives. NL    075 also discussed recent and directly-relevant Commission precedent governing SAMAs.
248 See id., encl. at 2.
249 See NRC Staffs 24th Status Report In Response to the Atomic Safety and Licensing Boards Order of February 16, 2012, at 5-6 (Feb. 3, 2014), available at ADAMS Accession No. ML14034A369. Entergys preparation and submission of the additional cost information demanded by the Board does not resolve the Boards decision in LBP-11-17, as the Staff has not yet decided whether Entergys cost estimates will lead to another FSEIS supplement. Prompt Commission review and reversal of the SAMA Orders would obviate the need for review, which is not related to aging management and not required by NEPA or the Commissions regulations.
250 See Indian Point, LBP-13-13, slip op. at 7-8, 10, A-3.
251 Id. at A-3.
49
B.      Issues Presented by the Boards SAMA Orders
: 1. Whether the Board erred in admitting NYS-35/36 when: (a) Entergys Revised SAMA Analysis did not include any materially different information regarding the SAMA cost-benefit analysis or SAMA implementation that could trigger a timely late-filed contention; and (b) the contention sought to require, as a condition of license renewal, either SAMA implementation or further justification for not implementing individual SAMAs, absent a legal or regulatory basis to do so?
: 2. Whether the Board erred in granting summary judgment to NYS on NYS-35/36, when the Staff has no legal or regulatory authority to require additional cost-benefit analyses as a precondition of license renewal?
C.      The Commission Should Take Review and Reverse the SAMA Orders Now
: 1.      Review at this Stage Is Appropriate Following a PID, the parties should assert any claims of error that relate to the subject matter of the partial initial decision, whether the specific issue was admitted for hearing or not, and without regard to whether the issue was originally designated a separate contention or a basis for a contention.252 The Commission should take review of the Boards SAMA Orders now because these decisions relate to the subjects addressed in LBP-13-13, and not to any other pending matters in this proceeding. NYS-35/36 originally was part of the set of Track 1 contentions which were heard in 2012. It was removed from Track 1, however, because the Board granted summary disposition in favor of NYS. Further, LBP-13-13 is a final order on all other pending SAMA issues in this proceeding, and therefore disposes of a major segment of the case.253 252 PFS, CLI-00-24, 52 NRC at 353.
253 See Indian Point, LBP-13-13, slip op. at 293, 313 (resolving NYS-12B and 16B in favor of the NRC Staff); see also Indian Point, CLI-11-14, 74 NRC at 810-11 (In Pilgrim, we explained that the basis for our allowing immediate appellate review of partial initial decisions rests on prior Appeal Board decisions permitting review of a licensing board ruling that disposes of . . . a major segment of the case or terminates a partys right to participate.). NYS has also taken the position that NYS-35/36 is related to its other Track 1 SAMA contentions. See State of New York Motion Seeking Leave to File an Additional Exhibit and Supplemental Proposed Findings of Fact and Conclusions of Law on Contention NYS-16B (May 17, 2013) (asserting that Entergys revised cost estimates in NL-13-075 were related to a different SAMA contention, NYS-16B).
50
Thus, as specified in CLI-00-24, Entergy must seek review now, and the Commission should take review of the SAMA Orders at this juncture.254
: 2.      The Commission Should Review and Reverse the SAMA Orders
: a.      Legal Standards Governing SAMA Analyses and Implementation The SAMA analysis is a NEPA-driven mitigation alternatives analysis.255 NEPA requires a discussion of possible mitigation measures, but imposes no substantive requirement that mitigation measures actually be taken.256 As the Commission recently confirmed in response to a claim that NRC must require implementation of all possible mitigation alternatives, such a demand is inconsistent with NEPA, which neither requires nor authorizes the NRC to order implementation of mitigation measures analyzed in an environmental analysis.257 Likewise, a NEPA mitigation analysis demands no fully developed plan, or detailed examination of specific measures which will be employed to mitigate adverse environmental effects.258 The scope of license renewal under Part 54 is limited to aging-related matters and does not require applicants to revisit CLB issues that fall outside that limited scope.259 For this reason, and as the Indian Point Board has acknowledged, SAMAs unrelated to aging management need not be implemented pursuant to the NRCs license renewal safety view under Part 54.260 The ultimate decision on whether to require a facility to modify its CLB to 254 See PFS, CLI-00-24, 52 NRC at 353.
255 See Pilgrim, CLI-12-15, 75 NRC at 706 (2012); Pilgrim, CLI-12-01, 75 NRC at 41.
256 Robertson, 490 U.S. at 352, 353 n.16; see also Cnty. of Rockland v. FAA, 335 Fed.Appx. 52, 55 (D.C. Cir.
2009) (quoting Robertson, 490 U.S. at 352).
257 Pilgrim, CLI-12-10, 75 NRC at 488 (emphasis added); see also Mass. v. NRC, 708 F.3d 63, 81 n.27 (1st Cir.
2013) (To the extent Massachusetts seeks to impose a substantive requirement that the NRC must require certain mitigation measures under NEPA, that is foreclosed by the fact that NEPA is not outcome driven.).
258 Pilgrim, CLI-10-11, 71 NRC at 316 (emphasis added).
259 Turkey Point, CLI-01-17, 54 NRC at 7-9 & 21.
260 Indian Point, LBP-11-17, 74 NRC at 25 (citing Pilgrim, CLI-10-11, 71 NRC at 293 n.26).
51
implement any particular SAMA is outside of the scope of the LRA review.261 Consistent with this precedent, the Commission recently reiterated that the NRC will consider any new information on severe accident mitigation under its ongoing reactor oversight.262
: b. The Board Should Not Have Admitted Contention NYS-35/36 (i)      The Consolidated Contention Was Untimely The Commission should reverse the Boards admission of NYS-35/36 because the proposed contentions were untimely. The purportedly new information that triggered NYS-35/36 was not materially different from what was previously available over two years earlier.263 As a threshold matter, NYS has acknowledged that NYS-35/36 raises purely legal issues.264 Those issues are: (a) whether the Staff must either require implementation of potentially cost-beneficial SAMAs or better explain why particular non-aging related SAMAs were not required as a condition of license renewal; and (b) whether Entergys current SAMA analysis, particularly the SAMA cost estimates, is complete under Part 51 and NEPA as a matter of law. As Entergy argued at the admissibility stage, nothing about the specific inputs or 261 See McGuire/Catawba, CLI-02-28, 56 NRC at 388 n.77 ([T]he ultimate agency decision on whether to require facilities . . . to implement any particular SAMA will fall under a Part 50 current licensing basis review.).
262 Pilgrim, CLI-12-15, 75 NRC at 707-08.
263 See 10 C.F.R. 2.309(f)(2)(ii) (2010). Since LBP-10-13, the Commission has clarified its timeliness rules for late-filed contentions. See Final Rule, Amendments to Adjudicatory Process Rules and Related Requirements, 77 Fed. Reg. 46,562, 46,582-83 (Aug. 3, 2012). The requirements relevant to the appeal of LBP-10-13, however, have not changed, as the current 10 C.F.R. § 2.309(c)(1)(i)-(iii) retain the same standards previously codified at Section 2.309(f)(2)(i)-(iii). Entergy cites to the timeliness regulations in effect in 2010.
264 See State of New Yorks Motion for Leave to File New and Amended Contentions Concerning the December 2009 Renalysis of Severe Accident Mitigation Alternatives at 14 (Mar. 11, 2010), available at ADAMS Accession No. ML100780366 (Contentions 35 and 36 are essentially based on legal deficiencies in the December 2009 Revised SAMA Analysis.). New York later sought to overcome Entergy and the Staffs timeliness objections by disavowing this point. See State of New York Combined Reply to Entergy and the NRC Staff Answers to the States New and Amended Contentions Concerning the December 2009 Severe Accident Mitigation Alternatives Reanalysis at 26 n.7 (Apr. 12, 2010), available at ADAMS Accession No. ML101160415. But it is axiomatic that a contention cannot be amended through a reply. See Nuclear Mgmt.
Co., LLC (Palisades Nuclear Plant), CLI-06-17, 63 NRC 727, 732 (2006).
52
methods used in its 2009 SAMA revisions was materially different from what was previously available with respect to the legal issues raised in NYS-35/36.265 As to the first legal issue, NYS filed NYS-35/36 following Entergys SAMA analysis revisions that specifically addressed a narrow Staff question concerning meteorological data inputs. This was not a completely new SAMA analysis. While the new data inputs led to changes in the results of the cost-benefit analyses, Entergy used precisely the same NRC-approved methodology used in the original SAMA analysis.266 Thus, the changes in meteorological data inputs are simply irrelevant to the question of whether the Staff must require implementation of identified potentially cost-beneficial SAMAs, or further justify why it is not.
As to the second legal issue, the 2009 revisions provided no materially different information regarding the completeness of the SAMA cost-benefit analysis under NEPA and Part 51.267 The original LRA states that since the SAMA analysis is conservative and is not a complete engineering project cost-benefit analysis, it does not estimate all of the benefits or costs of a SAMA.268 This is fully consistent with NEPA and Commission precedent interpreting NEPA, which do not require a fully developed engineering project cost analysis.269 Nothing in the December 2009 submittal changed these facts about the SAMA analysis. Thus, sufficient information was available to file NYS-35/36 more than two years before NYS did, rendering it untimely under 10 C.F.R. § 2.309(f)(2)(ii) (2010).270 265 See Entergy Answer to SAMA Contentions at 21-24.
266 See id. at 2, 10-11; see also Revised SAMA Analysis at 5, 31-32.
267 Contrary to the Boards statement that Entergy has stated . . . that it will conclude its SAMA review after license renewal is complete, Indian Point, LBP-11-17, 74 NRC at 26, Entergy has never acknowledged nor does it believe that its SAMA analysis is not complete for purposes of compliance with NEPA requirements for license renewal.
268 ER at 4-73 (ENT00015B).
269 Pilgrim, CLI-10-11, 71 NRC at 316.
270 See, e.g., Oyster Creek, CLI-09-07, 69 NRC at 272-75 (upholding the rejection of untimely contentions, despite the existence of some new information, when the specific information challenged by the petitioners in each 53
In response to Entergys and the NRCs timeliness arguments, the Board simply pointed to the allegedly new cost-benefit picture created by the new meteorological inputs.271 But, as explained in Section V.C.2.b.i, above, the changes in meteorological input data and number of cost-beneficial SAMAs are immaterial to the strictly legal issues raised in NYS-35/36.
In sum, NYSs arguments could and should have been raised at the time of its initial petition. The Boards decision that NYS-35/36 was timely is erroneous and should be reversed.
(ii)    The Consolidated Contention Is Substantively Inadmissible NYS-35/36 are also inadmissible under 10 C.F.R. § 2.309(f)(1), because NYSs claims are contrary to NEPA and the Commissions regulations.272 The admission of NYS-35/36 rests on the faulty premise that NEPA, when read in conjunction with Parts 50 and 54, authorizes NRC to compel implementation of cost beneficial SAMAs regardless of their nexus to aging management.273 This premise runs counter to one of the most fundamental and settled precepts of NEPA law, as established by the U.S. Supreme Court: NEPA itself does not mandate particular results, but simply prescribes the necessary process.274 contention was long available). At a minimum, NYS should have filed its contentions following the December 2008 DSEIS, which, as shown in Section V.C.2.b.i, above, clearly sets forth the Staffs position on NYSs issues.
271 Indian Point, LBP-10-13, 71 NRC at 696. The Board also cited its own order establishing a fixed deadline for new contentions . . . which arise out of Entergys revised SAMA submissions . . . . Id. at 677; see also id. at 696 n.126. But an administrative deadline for new contentions does not and cannot dispense with the petitioners burden to show that the new information is in fact materially different from what was previously availablewith respect to its actual proposed contention. Tex. Utils. Elec. Co. (Comanche Peak Steam Electric Station, Units 1 & 2), CLI-88-12, 28 NRC 605, 609 (1988) (holding that the petitioner bears the burden of demonstrating the timeliness of its contentions).
272 See Fla. Power & Light Co. (Turkey Point Nuclear Generating Plant, Units 3 & 4), LBP-01-6, 53 NRC 138, 159-60, affd, CLI-01-17, 54 NRC 3 (2001) (rejecting a contention that a license renewal applicant was required to prepare a probabilistic risk assessment that was not required under the regulations).
273 See Indian Point, LBP-10-13, 71 NRC at 696-98. NYS-35/36 raised similar legal issues at both the contention admissibility and summary disposition stages. Therefore, where appropriate, this section addresses the analysis in LBP-11-17, in areas where that decision provides a fuller discussion of the legal issues raised in the contention.
274 Robertson, 490 U.S. at 350 (citing Stryckers Bay Neighborhood Council, Inc. v. Karlen, 444 U.S. 223, 227-228 (1980) (per curiam); Vt. Yankee Nuclear Power Corp. v. Natural Res. Def. Council, Inc., 435 U.S. 519, 558 (1978)).
54
Notably, the Commission has approved dozens of renewed operating licenses which identified potentially cost-beneficial SAMAs. But the NRC has never mandated implementation of SAMAs unrelated to aging management as a condition of license renewal, or required a more detailed explanation for not doing so, beyond the well-established reason that none of the identified SAMAs related to aging management. Indeed, the Boards rationale for the SAMA Orders has been repeatedly rejected, most notably in a series of rulings in the Pilgrim license renewal proceeding that the Commission issued after the Indian Point SAMA Orders.275 The NRC renewed the Pilgrim license in 2012, but the renewed license did not require the implementation of non-aging-related SAMAs.276 Indian Point is no different, and the Boards reasons for departing from longstanding precedent and practice lack legal justification.
(a)      Entergys SAMA Cost-Benefit Analysis Satisfies Part 51 and Part 54 The Boards determination rests, in part, on the unfounded supposition that Entergy improperly deferred completion of the necessary SAMA analysis until after license renewal.277 Part 51 requires license renewal applicants to perform site-specific SAMA analyses,278 but this requirement is tempered by a practical rule of reason.279 In this regard, NEPA 275 See Pilgrim, CLI-12-01, 75 NRC at 39 (explaining that the SAMA analysis is intended to indentify additional mitigation measures that might further reduce the already-SMALL severe accident risk, and that the SAMA analysis is supplemental to the NRCs safety regulations); Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-12-06, 75 NRC 352, 374 (2012) (emphasizing that the current regulatory and oversight process provides reasonable assurance of compliance with the CLB, which can be adjusted by the Commission outside of the license renewal process); Pilgrim, CLI-12-10, 75 NRC at 488 (holding that NEPA, neither requires nor authorizes the NRC to order implementation of mitigation measures analyzed in an environmental analysis).
276 See Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station) Docket No. 50-293, Renewed Facility Operating License at 7 (May 9, 2012). This was because [t]he potentially cost-beneficial SAMAs do not relate to adequately managing the effects of aging during the period of extended operation; therefore, they need not be implemented as part of license renewal pursuant to 10 CFR Part 54. NUREG-1437, Supp. 29, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Regarding Pilgrim Nuclear Power Station, Final Report at 5-5 (July 2007), available at ADAMS Accession No. ML071990020.
277 See Indian Point, LBP-10-13, 71 NRC at 698; see also Indian Point, LBP-11-17, 74 NRC at 26.
278 10 C.F.R. § 51.53(c)(3)(ii)(L).
279 Pilgrim, CLI-10-22, 72 NRC at 208 (quoting Cmtys., Inc. v. Busey, 956 F.2d 619, 626 (6th Cir. 1992)).
55
requires [applicants and] the NRC to provide a reasonable mitigation alternatives analysis, containing reasonable estimates.280 Entergys original SAMA analysis and the 2009 revisions did precisely that by following NRC-approved guidance and state-of-the-art practices in providing sufficient information for the Staff to take a hard look at SAMAs for purposes of license renewal.
Entergy has therefore supplied sufficient facts to allow the Staff to explain its conclusions and to fully satisfy its hard look obligations under NEPA,281 so the SAMA analysis is complete for purposes of NEPA and Part 51. NEPA does not require a fully developed engineering project cost estimate.282 Entergys statement, in its ER, that it plans to prepare more refined engineering project cost evaluations of the potentially cost-beneficial SAMAs for possible implementation as part of current plant operation does not negate Entergys and the Staffs demonstrated current compliance with NEPA for purposes of license renewal.
In short, the Board erred as a matter of law by failing to address the key distinction between the conservatively low, conceptual cost estimates prepared under NEPA and subsequent internal engineering project analyses that an applicant may perform to assess the viability of implementing a particular plant modification under its current operating procedures.
(b)      NEPA and Part 51 Provide No Authority to Require SAMA Implementation As previously shown, SAMAs unrelated to managing the effects of aging need not be implemented under Part 54, even if they are potentially cost effective.283 The Board found the Commissions precedent from the Pilgrim and McGuire/Catawba proceeding inapposite 280 Id.
281 Indian Point, LBP-10-13, 71 NRC at 698.
282 See Pilgrim, CLI-10-11, 71 NRC at 316.
283 See Pilgrim, CLI-10-11, 71 NRC at 293-94 n.26; McGuire/Catawba, CLI-02-28, 56 NRC at 388 n.77.
56
because the IPEC SAMAs were analyzed under [the NRCs] Part 51 environmental review, not Part 54.284 That explanation does not withstand scrutiny.
First and foremost, as a matter of law, NEPA and Part 51 contain no action-forcing mechanisms.285 Moreover, the situations in the Pilgrim and McGuire/Catawba proceedings are indistinguishable from this proceeding. The IPEC SAMAs were analyzed under [the NRCs]
Part 51 environmental review, exactly as in Pilgrim, McGuire/Catawba, and all other license renewal proceedings.286 Thus, the Board erred as a matter of law when it determined that NEPA and Part 51 provide the Staff with authority for conditioning renewed licenses to require implementation of SAMAs unrelated to aging management.
(c)    The Backfit Regulations Do Not Establish License Renewal Requirements In admitting NYS-35/36, the Board erroneously posits that the Staff may institute a backfit prior to license renewal under Part 50 as a result of its SAMA review.287 Again, the Boards ruling is contrary to established law, in that the Board has improperly conflated the disparate regulatory processes set forth in Parts 54, 51, and 50.
284 Indian Point, LBP-11-17, 74 NRC at 25 (citing McGuire/Catawba, CLI-02-28, 56 NRC at 388 n.77; Pilgrim, CLI-10-11, 71 NRC at 293-94 n.26).
285 Robertson, 490 U.S. at 352, 353 n.16 (NEPA imposes no substantive requirement that mitigation measures actually be undertaken.).
286 The Board also erroneously accepted NYSs claim that the Staff could have relied upon 10 C.F.R. § 54.33(c) as a basis for compelling Entergy to implement environmental mitigation measures identified through the Part 51 NEPA process. See Indian Point, LBP-11-17, 74 NRC at 26. SAMA implementation is a matter considered under Part 50, not as a license renewal matter. See, e.g., McGuire/Catawba, CLI-02-28, 56 NRC at 388 n.77.
Further, the only conditions for the license renewal, Indian Point, LBP-11-17, 74 NRC at 26, relevant to Section 54.33(c) are possible amendment or supplementation of current operating license conditions related to a licensees ongoing environmental monitoring, reporting, and recordkeeping obligations under Section 50.36b, not mitigation measures such as plant modifications. Thus, license conditions that were not previously imposed under Section 50.36(b) as part of the current operating license are irrelevant to Section 54.33.
287 Indian Point, LBP-10-13, 71 NRC at 697 (emphasis added); see also Indian Point, LBP-11-17, 72 NRC at 26 (reaching the same conclusion).
57
First, controlling precedent holds that backfit requests under Part 50 are not permissible in a license renewal proceeding.288 Second, the Boards novel view of Section 50.109 is inconsistent with the regulatory history of Part 54, which clarifies the relationship between Part 54 and the backfit rule:
If the staff or the licensee seeks to make changes in a plants licensing basis for reasons other than age-related degradation, they should be pursued either in the existing operating license or the renewed license, once issued. Staff-initiated changes would be evaluated in accordance with the backfit rule, 10 CFR 50.109.289 In its May 1995 revisions to Part 54, the Commission reaffirmed that it does not intend to impose requirements on a licensee that go beyond what is necessary to adequately manage aging effects.290 The Boards reliance on the backfit rule in the SAMA Orders cannot be reconciled with these settled and Commission-endorsed principles.291
: c. The Board Erred in Granting Summary Disposition Relying upon the same erroneous conclusions discussed in the previous Sections, the Board granted summary disposition in favor of NYS in LBP-11-17. As shown in Section V.C.2.b.ii, above, this decision was contrary to established law and should be reversed under 10 288 See Entergy Nuclear Operations, Inc. (Pilgrim Nuclear Power Station), CLI-06-26, 64 NRC 225, 226-27 (2006); see also Carolina Power & Light Co. (Shearon Harris Nuclear Power Plant, Unit 1), LBP-07-11, 66 NRC 41, 96-97 (2007) (denying petitioners request for fire barrier system backfits and noting that a petition for backfits is essentially a request for enforcement action and is not cognizable in a license renewal adjudication); N. Anna, CLI-07-27, 66 NRC at 233 (noting the limited applicability of the backfit rule).
289 Proposed Rule: Nuclear Power Plant License Renewal, 55 Fed. Reg. 29,043, 29,047 (July 17, 1990) (emphasis added).
290 1995 License Renewal SOC, 60 Fed. Reg. at 22,490.
291 These same principles are reflected in NRC guidance documents. See, e.g., NRR Office Instruction LIC-202, Rev. 2, Procedures for Managing Plant-Specific Backfits and 50.54(f) Information Requests at 1 (May 17, 2010), available at ADAMS Accession No. ML092010045 ([I]f the NRC proposes to address safety issues outside the [aging management] scope of Part 54  then any actions necessary to address such out-of-scope safety issues are subject to the Backfit Rule.); NUREG-1850, Frequently Asked Questions on License Renewal of Nuclear Power Reactors at 4-34 (Mar. 2006), available at http://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1850/sr1850_faq_lr.pdf (stating that plant enhancements that appear to be cost-beneficial but are unrelated to aging management during the PEO are considered as current operating issues and are further evaluated as changes that might appropriately be made under the current operating license rather than as a license renewal issue).
58
C.F.R. § 2.341(b)(4)(ii). For purposes of brevity, Entergy adopts and incorporates the legal arguments in that Section here, as the legal arguments against admissibility of NYS-35/36 also support reversal of the Boards grant of summary disposition. As demonstrated above, NYS did not carry its burden of showing that it is entitled to a decision as a matter of law.292 Moreover, LBP-11-17 is based upon additional legal and factual errors that warrant reversal under 10 C.F.R. § 2.341(b)(4)(i) and (ii). In LBP-11-17 the Board found that the FSEIS fails to articulate a rational basis for not requiring Entergy to complete its SAMA review and for not requiring the implementation of cost-beneficial SAMAs prior to the license renewal . . . .293 On the contrary, the Staff took the requisite hard look at potential SAMAs under NEPA, as shown in the detailed technical evaluation in Appendix G of the FSEIS, and articulated a rational legal basis for not requiring implementation of potentially cost-beneficial SAMAs as a condition of license renewal.
In Section 5.2.6 of the FSEIS, the Staff fully explained why it was not ordering Entergy to implement the non-aging related SAMAs, logically concluding that it lacked a regulatory basis to require implementation as a condition of license renewal.294 This conclusion is rational and complies with governing law and longstanding precedent.295 Thus, even if the Commission does not reverse the admission of NYS-35/36, the Boards grant of summary disposition to NYS should be reversed, and summary disposition should be granted to Entergy and the Staff.
292 See Pilgrim, CLI-10-11, 71 NRC at 297; AmerGen Energy Co., LLC (Oyster Creek Nuclear Generating Station), CLI-08-28, 68 NRC 658, 673 (2008) (stating that the summary disposition standard places the burden of proof on the moving party).
293 Indian Point, LBP-11-17, 74 NRC at 26.
294 See supra § V.C.2.b.ii.
295 See 10 C.F.R. §§ 54.29(a), 51.95(c).
59
: d. The Public Interest Warrants Review of the SAMA Orders This appeal brings to the Commission an important legal question that directly affects the manner in which the Staff must discharge its obligations under NEPA, the AEA, and NRC regulations governing LRAs. As shown above, the evaluation of SAMAs in the FSEIS is entirely consistent with NEPA, the Commissions regulations, and all prior license renewal reviews. Allowing the SAMA Orders to stand would represent a fundamental reversal of policy regarding the scope of license renewal proceedings, and effect a departure from precedent set in more than 70 renewed licenses that the NRC has previously issued. This appeal therefore raises a substantial question of law, policy, and discretion, and review of the SAMA Orders would be in the public interest, consistent with 10 C.F.R. § 2.341(b)(4)(iii) and (v).296 VI. CONCLUSION For the foregoing reasons, the Commission should accept review of LBP-13-13 and its preceding decisions and reverse the Boards rulings related to contentions NYS-8 and NYS-35/36, and uphold the Staffs FSEIS analysis on CW-EC-3A.
Respectfully submitted, Executed in accord with 10 C.F.R. § 2.304(d)
William B. Glew, Jr., Esq.                      Kathryn M. Sutton, Esq.
William C. Dennis, Esq.                        Paul M. Bessette, Esq.
Entergy Services, Inc.                          MORGAN, LEWIS & BOCKIUS LLP 440 Hamilton Avenue                            1111 Pennsylvania Avenue, N.W.
White Plains, NY 10601                          Washington, D.C. 20004 Phone: (914) 272-3360                          Phone: (202) 739-5738 E-mail: wglew@entergy.com                      E-mail: ksutton@morganlewis.com E-mail: wdennis@entergy.com                    E-mail: pbessette@morganlewis.com Counsel for Entergy Nuclear Operations, Inc.
Dated at Washington, DC this 14th day of February 2014 296 See Vt. Yankee, CLI-10-17, 72 NRC at 13.
60
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of                                    )        Docket Nos. 50-247-LR and
                                                    )                        50-286-LR ENTERGY NUCLEAR OPERATIONS, INC.                    )
                                                    )
(Indian Point Nuclear Generating Units 2 and 3)      )
                                                    )        February 14, 2014 CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305 (as revised), I certify that, on this date, copies of Applicants Petition for Review of Board Decisions Regarding Contentions NYS-8 (Electrical Transformers), CW-EC-3A (Environmental Justice), and NYS-35/36 (SAMA Cost Estimates) were served upon the Electronic Information Exchange (the NRCs E-Filing System) in the above-captioned proceeding.
Signed (electronically) by Lance A. Escher Lance A. Escher, Esq.
MORGAN, LEWIS & BOCKIUS LLP 1111 Pennsylvania Ave. N.W.
Washington, DC 20004 Phone: (202) 739-5080 Fax: (202) 739-3001 E-mail: lescher@morganlewis.com Counsel for Entergy Nuclear Operations, Inc.
1
ATTACHMENT 1 Comparison of the Electrical Transformers Contentions in the Indian Point and the Seabrook License Renewal Proceedings Note: This attachment identifies changes from the wording of the electrical transformers contention (Friends/NEC Contention 2) and the Declaration of Mr. Paul Blanch that were submitted in the Seabrook license renewal proceeding to the similar contention (Contention NYS-8) and Declaration of Mr. Paul Blanch that were submitted in the Indian Point license renewal proceeding. Portions that were added from the Seabrook version to the Indian Point version are indentified with an underline, and portions that were deleted are indicated by strikethrough. Simple formatting changes are not tracked.
Contention Language THE LRA FOR SEABROOK IP2 AND IP3 VIOLATES 10 C.F.R. §§ 54.21(a) AND 54.29 BECAUSE IT FAILS TO INCLUDE AN AGING MANAGEMENT PLAN FOR EACH ELECTRICAL TRANSFORMER WHOSE PROPER FUNCTION IS IMPORTANT FOR PLANT SAFETY.
BASIS
: 1. There are numerous electrical transformers that perform a function described in
§§ 54.4(a)(1)/(2) and (3). Transformers function without moving parts or without a change in configuration or properties as defined in that regulation.
: 2. Failure to properly manage aging of Electrical Transformers may compromise:
: a. The integrity of the reactor coolant pressure boundary;
: b. The capability to shut down the reactor and maintain it in a safe shutdown condition; or
: c. The capability to prevent or mitigate the consequences of accidents, which could result in potential offsite exposures comparable to those referred to in §§ 50.34(a)(1),
50.67(b)(2), or § 100.11 of this chapter, as applicable. 10 C.F.R. §§ 54.4(a)(1)(2) and (3).
: 3. The consequence of failures of Electrical Transformers may result in accidents beyond the Design Basis Accidents resulting in exposures to the public exceeding 10 C.F.R. § 100 limits.
1
: 4. Failure to properly manage aging of electrical transformers could result in loss of emergency power to safety equipment and vital bussesthe 480 volt safety equipment and 6.9kV busses, including all station blackout loads. Appendix A, Page A-35 of the UFSAR supplement describes a Structures Monitoring Program that includes a program for monitoring transformer/switchyard support structures yet there is no APM described for transformers within the scope of 10 C.F.R. § 54.21(a)(1)(I).
: 5. Attachment 2 of Tthe LRA (p.2.4-22) also discusses the need for an AMP for transformer support structures based on the criterion of 10 CFR § 54.4(a)(3).
SUPPORTING EVIDENCE
: 6. The role of mostsome of the transformers in providing power for safety functions is normally described in Chapter 8 of the UFSAR for each Unit on pp. 1167-68, 1333-43 of the UFSAR for IP3 and pp. 1039-50 of the UFSAR for IP2. The Seabrook LRA provides an FSAR supplement as required by 10 CFR 54.21.
: 7. The UFSAR for IP2 is a one line diagram of the electrical plan for IP2, which identifies some of the transformers and their central role in the electrical system of the plant. IP2 UFSAR, figure 8.2.1, 8.2.2. A similar drawing for IP3 has not been provided with the LRA.
While other License renewal applications contained a copy of relevant sections of the UFSAR, Seabrook did not provide a copy and only reference applicable sections of the UFSAR.
: 8. Without a copy of the UFSAR it is not possible to identify all of the transformers within the scope of 10 CFR 54.4, however it is well known that many transformers perform functions described in 10 CFR 54 and are passive devices in that they contain no moving parts and do not undergo a change of properties or state.
2
: 9. Transformers are active devices within the scope of 10 CFR 54.4 yet the licensee has not provided any AMP to assure
: 10. In D-RAI 2.5-1 the Staff identifies some of the transformers for which AMP should be provided but which are not included in the LRA.
For purposes of the license renewal rule, the staff has determined that the plant system portion of the offsite power system that is used to connect the plant to the offsite power source should be included within the scope of the rule. This path typically includes switchyard circuit breakers that connect to the offsite system power transformers (startup transformers), the transformers themselves, the intervening overhead or underground circuits between circuit breaker and transformer and transformer and onsite electrical system, and the associated control circuits and structures. Ensuring that the appropriate offsite power system long-lived passive structures and components that are part of this circuit path are subject to an AMR will assure that the bases underlying the SBO requirements are maintained over the period of extended license.
September 21, 2007 Draft Requests for Additional Information Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application at p. 10.
3
Declaration of Paul Blanch 2821. There are numerous electrical transformers that perform a function described in §§ 54.4(a)(1)/(2) and (3). Transformers function without moving parts or without a change in configuration or properties as defined in that regulation.
2922. Failure to properly manage aging of Electrical Transformers may compromise:
: a. The integrity of the reactor coolant pressure boundary;
: b. The capability to shut down the reactor and maintain it in a safe shutdown condition; or
: c. The capability to prevent or mitigate the consequences of accidents, which could result in potential offsite exposures comparable to those referred to in §§ 50.34(a)(1), 50.67(b)(2), or § 100.11 of this chapter, as applicable. 10 C.F.R. §§ 54.4(a)(1)(2) and (3).
3023. The consequence of failures of Electrical Transformers may result in accidents beyond the Design Basis Accidents resulting in exposures to the public exceeding 10 C.F.R.
§ 100 limits.
3124. Failure to properly manage aging of electrical transformers could result in loss of emergency power to safety equipment and vital bussesthe 480 volt safety equipment and 6.9kV busses, including all station blackout loads. Appendix A, Page A-35 of the UFSAR supplement describes a Structures Monitoring Program that includes a program for monitoring transformer/switchyard support structures yet there is no APM described for transformers within the scope of 10 C.F.R. § 54.21(a)(1)(I).
: 32. The LRA also discusses the need for an AMP for transformer support structures based on the criterion of 10 CFR § 54.4(a)(3).
4
: 33. The role of most of the transformers in providing power for safety functions is normally described in Chapter 8 of the UFSAR. The Seabrook LRA provides an FSAR supplement as required by 10 CFR 54.21.
: 34. While other License renewal applications contained a copy of relevant sections of the UFSAR, Seabrook did not provide such copy and only referenced applicable sections of the UFSAR.
: 35. Without a copy of the UFSAR it is not possible to identify all of the transformers within the scope of 10 CFR 54.4, however it is well known that many transformers perform functions described in 10 CFR 54 and are passive devices in that they contain no moving parts and do not undergo a change of properties or state.
: 36. Transformers are active devices within the scope of 10 CFR 54.4 yet the licensee has not provided any AMP to assure ???????
DB1/ 76945373 5}}

Latest revision as of 22:09, 5 February 2020

Applicant'S Petition for Review of Board Decisions Regarding Contentions NYS-8 (Electrical Transformers), CW-EC-3A (Environmental Justice), and NYS-35/36 (SAMA Cost Estimates)
ML14045A332
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 02/14/2014
From: Bessette P, Dennis W, Glew W, Sutton K
Entergy Nuclear Operations, Entergy Services, Morgan, Morgan, Lewis & Bockius, LLP
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01, RAS 25590
Download: ML14045A332 (77)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of ) Docket Nos. 50-247-LR and

) 50-286-LR ENTERGY NUCLEAR OPERATIONS, INC. )

)

(Indian Point Nuclear Generating Units 2 and 3) )

) February 14, 2014 APPLICANTS PETITION FOR REVIEW OF BOARD DECISIONS REGARDING CONTENTIONS NYS-8 (ELECTRICAL TRANSFORMERS), CW-EC-3A (ENVIRONMENTAL JUSTICE), AND NYS-35/36 (SAMA COST ESTIMATES)

William B. Glew, Jr., Esq. Kathryn M. Sutton, Esq.

William C. Dennis, Esq. Paul M. Bessette, Esq.

Entergy Services, Inc. MORGAN, LEWIS & BOCKIUS LLP 440 Hamilton Avenue 1111 Pennsylvania Avenue, N.W.

White Plains, NY 10601 Washington, D.C. 20004 Phone: (914) 272-3360 Phone: (202) 739-5738 E-mail: wglew@entergy.com E-mail: ksutton@morganlewis.com E-mail: wdennis@entergy.com E-mail: pbessette@morganlewis.com COUNSEL FOR ENTERGY NUCLEAR OPERATIONS, INC.

TABLE OF CONTENTS Page I. INTRODUCTION ............................................................................................................. 1 II. LEGAL STANDARDS GOVERNING PETITIONS FOR REVIEW .............................. 4 A. Standard of Review ............................................................................................... 4 B. Scope of Review .................................................................................................... 6 III. CONTENTION NYS-8 (ELECTRICAL TRANSFORMERS)......................................... 7 A. Statement of the Case............................................................................................. 7 B. Issues Presented in the Boards Resolution of NYS-8........................................... 9 C. The Commission Should Review and Reverse the Boards Rulings in LBP-08-13 and LBP-13-13 Regarding NYS-8 ...................................................... 9

1. The Board Erred in Admitting NYS-8 ....................................................... 9
a. NYS-8 did not satisfy contention admissibility requirements ................................................................................... 9
b. Rejection of NYS-8 as inadmissible is required by Seabrook ...................................................................................... 12
2. The Board Erred in Concluding that Transformers Are Passive Components Subject to AMR .................................................................. 14
a. The Board erred in concluding that transformers function without a change in configuration, properties, or state ................ 14
b. The Board erred in creating a new definition of passive that includes components that cannot be readily monitored for incremental degradation and to predict future failure ............ 16
c. The Board erred by improperly challenging the Indian Point CLB .................................................................................... 18
d. The Board erred by not adequately comparing transformers to the most relevant active components identified in 10 C.F.R. § 54.21(a)(1)(i) ................................................................. 19
e. The Board erred by dismissing longstanding regulatory guidance ....................................................................................... 21
3. The Public Interest Supports the Commissions Review and Reversal of the Boards Decisions on NYS-8.......................................... 22 IV. CONTENTION CW-EC-3A (ENVIRONMENTAL JUSTICE) ..................................... 24 A. Statement of the Case........................................................................................... 24
1. The Boards Admission of Clearwaters Original Contention CW-EC-3 ................................................................................................. 24

-i-

TABLE OF CONTENTS (continued)

Page

2. The Board Decision Admitting Clearwater Amended Contention CW-EC-3A (July 6, 2011 Order) ............................................................. 26
3. The Boards Decision on Entergys First Motion in Limine (March 6, 2012 Order) .......................................................................................... 27
4. The Boards Denial of Entergys Second Motion in Limine (October 15, 2012) ................................................................................... 28
5. The Boards Partial Initial Decision on CW-EC-3A (LBP-13-13) .......... 29 B. Issues Presented in the Boards Resolution of CW-EC-3A ................................. 30 C. The Commission Should Review and Reverse Several Board Rulings and Findings Regarding CW-EC-3 ............................................................................. 31
1. Legal Standards Applicable to Environmental Reviews of License Renewal Applications Under NEPA ........................................................ 31
2. Legal Standards Applicable to Environmental Justice Analyses ............. 32
3. The Board Erred in Admitting CW-EC-3 ................................................ 33
a. Clearwaters contention is fundamentally a challenge to the adequacy of the Indian Point emergency plans............................ 33
b. Emergency planning issueswhether labeled as safety or environmental issuesare outside the scope of license renewal ......................................................................................... 34
c. Even if emergency planning issues brought under NEPA are not precluded, the Board still erred in admitting the contention ..................................................................................... 35
4. The Board Erred in Denying Entergys Motions in Limine Related to CW-EC-3A .......................................................................................... 36
5. The Board Erred in Concluding in LBP-13-13 that the FSEIS Environmental Justice Analysis Was Deficient ....................................... 37
a. The Board erred in concluding that there could be potential disproportionate and adverse impacts on environmental justice populations in the event of a severe accident ........................................................................................ 37
b. The Board failed to explain the basis for its conclusion that there would be disproportionate and adverse impacts to environmental justice populations in the event of a severe accident at Indian Point ................................................................ 39

-ii-

TABLE OF CONTENTS (continued)

Page

c. The Boards conclusion that there would be potential disproportionate and adverse severe accident impacts to environmental justice populations is not supported by the record ........................................................................................... 40 (i) The record demonstrates that all populations will be adequately protected under the Indian Point, State, and local emergency plans ............................................... 40 (ii) The record demonstrates that no particular population segment will be adversely impacted by a severe accident ................................................................. 41
6. The Public Interest Warrants Commission Review of the Boards Decisions on CW-EC-3A ......................................................................... 42 V. CONTENTION NYS-35/36 (SAMA COST ESTIMATES) ........................................... 43 A. Statement of the Case........................................................................................... 43
1. Entergys SAMA Analyses for Indian Point ........................................... 43
2. The Boards Admission of Contention NYS-35/36 ................................. 45
3. Appeals of Contention Admissibility....................................................... 46
4. Issuance of the FSEIS ............................................................................. 47
5. Motions for Summary Disposition........................................................... 47
6. Appeal of Summary Disposition.............................................................. 48
7. Developments Since CLI-11-14 .............................................................. 49 B. Issues Presented by the Boards SAMA Orders .................................................. 50 C. The Commission Should Take Review and Reverse the SAMA Orders Now ..................................................................................................................... 50
1. Review at this Stage Is Appropriate......................................................... 50
2. The Commission Should Review and Reverse the SAMA Orders.......... 51
a. Legal Standards Governing SAMA Analyses and Implementation ............................................................................ 51
b. The Board Should Not Have Admitted Contention NYS-35/36 ............................................................................................ 52 (i) The Consolidated Contention Was Untimely .................. 52 (ii) The Consolidated Contention Is Substantively Inadmissible ..................................................................... 54

-iii-

TABLE OF CONTENTS (continued)

Page (a) Entergys SAMA Cost-Benefit Analysis Satisfies Part 51 and Part 54 ................................ 55 (b) NEPA and Part 51 Provide No Authority to Require SAMA Implementation .......................... 56 (c) The Backfit Regulations Do Not Establish License Renewal Requirements ........................... 57

c. The Board Erred in Granting Summary Disposition ................... 58
d. The Public Interest Warrants Review of the SAMA Orders........ 60 VI. CONCLUSION ................................................................................................................ 60

-iv-

TABLE OF AUTHORITIES Pages U.S. Court of Appeals Decisions Anderson v. Bessemer City, 470 U.S. 564 (1985) ............................................................................5 Communities, Inc. v. Busey, 956 F.2d 619 (6th Cir. 1992) ......................................................32, 56 City of New York v.U.S. Dept of Transp., 715 F.2d 732 (2nd Cir. 1983) ...............................32, 34 Cnty. of Rockland v. FAA, 355 Fed.Appx. 52, 55 (D.C. Cir. 2009) ..............................................51 Ground Zero Center for Non-Violent Action v. United States, 383 F.3d 1086 (9th Cir. 2004).....39 Hells Canyon Alliance v. U.S. Forest Serv., 227 F.3d 1170 (9th Cir. 2000) .................................32 Mass. v. NRC, 708 F.3d 63 (1st Cir. 2013) ....................................................................................51 N.J. Dept of Envtl. Prot. v. NRC, 561 F.3d 132 (3d. Cir. 2009) ...................................................39 N.Y. v. NRC, 681 F.3d 471 (D.C. Cir. 2012)..................................................................................39 Robertson v. Methow Valley Citizens Council, 490 U.S. 332 (1989) ..........................32, 51, 54, 57 Trout Unlimited v. Morton, 509 F.2d 1276 (9th Cir. 1974) .....................................................32, 35 U.S. Dept of Transp. v. Pub. Citizen, 541 U.S. 752 (2004) ..........................................................32 Utahns for Better Transp. v. U.S. Dept of Transp., 305 F.3d 1152 (10th Cir. 2002) .............32, 35 U.S. Nuclear Regulatory Decisions AmerGen Energy Co. (Oyster Creek Nuclear Generating Station), CLI-09-7, 69 NRC 235 (2009) ..................................................................................................................................... passim Ariz. Pub. Serv. Co. (Palo Verde Nuclear Generating Station, Units 1, 2, & 3), CLI-91-12, 34 NRC 149 (1991).............................................................................................................................11 Carolina Power & Light Co. (Shearon Harris Nuclear Power Plant, Unit 1), LBP-07-11, 66 NRC 41 (2007) ........................................................................................................................................58 Consumer Power Co. (Midland Plant, Units 1 & 2), ALAB-282, 2 NRC 9 (1975) ..................6, 31 v

TABLE OF AUTHORITIES (continued)

Pages Dominion Nuclear N. Anna, LLC (Early Site Permit for N. Anna ESP Site), CLI-07-27, 66 NRC 215 (2007) ................................................................................................................................33, 58 Duke Energy Corp. (Catawba Nuclear Station, Units 1 & 2), CLI-04-21, 60 NRC 21 (2004) .......5 Duke Power Co. (William B. McGuire Nuclear Station, Units 1 & 2), ALAB-669, 15 NRC 453 (1982) ...............................................................................................................................................5 Duke Energy Corp. (McGuire Nuclear Station, Units 1 & 2; Catawba Nuclear Station, Units 1 &

2), CLI-02-28, 56 NRC 373 (2002) .............................................................................44, 52, 56, 57 Entergy Nuclear Operations, Inc. (Indian Point, Units 2 & 3), LBP-08-13, 68 NRC 43 (2008) ......

................................................................................................................................................ passim Entergy Nuclear Operations, Inc. (Indian Point, Units 2 & 3), LBP-10-13, 71 NRC 673 (2010) ..................................................................................................................................... passim Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 & 3), CLI-10-30, 72 NRC 564 (2010).......................................................................................................................45, 46 Entergy Nuclear Operations, Inc. (Indian Point, Units 2 & 3), CLI-11-14, 74 NRC 801 (2011) .................................................................................................................................48, 49, 50 Entergy Nuclear Operations, Inc. (Indian Point, Units 2 & 3), LBP-11-17, 74 NRC 11 (2011) ..................................................................................................................................... passim Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 & 3), LBP-13-13, 77 NRC __, slip op. (Nov. 27, 2013) .......................................................................................... passim Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-06-26, 64 NRC 225 (2006) .............................................................................................................................................58 Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-10-11, 71 NRC 287 (2010) ..................................................................................................................................... passim Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-10-22, 72 NRC 202 (2010) .......................................................................................................................................32, 56 Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-12-01, 75 NRC 39 (2012) .................................................................................................................................43, 51, 55 Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-12-06, 75 NRC 352 (2012) .............................................................................................................................................55 vi

TABLE OF AUTHORITIES (continued)

Pages Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-12-10, 75 NRC 479 (2012) .................................................................................................................................10, 51, 55 Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-12-15, 75 NRC 704 (2012) ...........................................................................................................................10, 38, 51, 52 Entergy Nuclear Vt. Yankee, LLC (Vt. Yankee Nuclear Power Station), CLI-10-17, 72 NRC 1 (2010) .......................................................................................................................................23, 60 Fansteel, Inc. (Muskogee, Okla., Site), CLI-03-13, 58 NRC 195 (2003) .....................................11 FirstEnergy Nuclear Operating Co. (Davis-Besse Nuclear Power Station, Unit 1), CLI-12-08, 75 NRC 393 (2012).........................................................................................................................5, 10 Fla. Power & Light Co. (Turkey Point Nuclear Generating Plant, Units 3 & 4), ALAB-952, 33 NRC 521 (1991)...............................................................................................................................6 Fla. Power & Light Co. (Turkey Point Nuclear Generating Plant, Units 3 & 4), CLI-91-13, 34 NRC 185 (1991)...............................................................................................................................5 Fla. Power & Light Co. (Turkey Point Nuclear Generating Plant, Units 3 & 4), LBP-01-6, 53 NRC 138 (2001).............................................................................................................................54 Fla. Power & Light Co. (Turkey Point Nuclear Generating Plant, Units 3 & 4), CLI-01-17, 54 NRC 3 (2001).....................................................................................................................10, 51, 54 Gen. Pub. Utils. Nuclear Corp. (Three Mile Island Nuclear Station, Unit 2), ALAB-926, 31 NRC 1 (1990) ......................................................................................................................................5, 15 GPU Nuclear Inc. (Oyster Creek Nuclear Generating Station), CLI-00-6, 51 NRC 193 (2000)

........................................................................................................................................................11 Hydro Res., Inc. (P.O. Box 777, Crownpoint, N.M. 87313), CLI-06-1, 63 NRC 1 (2006) ............5 Hydro Res., Inc. (P.O. Box 777, Crownpoint, N.M. 87313), LBP-06-1, 63 NRC 41 (2006)........18 Hydro Res., Inc. (P.O. Box 777, Crownpoint, N.M. 87313), CLI-06-7, 63 NRC 165 (2006) ........5 Hydro Res., Inc. (P.O. Box 777, Crownpoint, N.M. 87313), CLI-06-14, 63 NRC 1 (2006) ........18 La. Energy Servs. L.P. (National Enrichment Facility), CLI-98-3, 47 NRC 77 (1998) ................32 La. Energy Servs. L.P. (National Enrichment Facility), CLI-06-22, 64 NRC 37 (2006) ................5 vii

TABLE OF AUTHORITIES (continued)

Pages Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1), ALAB-900, 28 NRC 275 (1988) .......................................................................................................................................14, 22 Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1), CLI-88-11, 28 NRC 603 (1998) .............................................................................................................................................14 N. States Power Co. (Prairie Island Nuclear Generating Plant, Units 1 & 2), ALAB-252, 8 AEC 1175 (1975) ................................................................................................................................7, 31 NextEra Energy Seabrook, LLC (Seabrook Station, Unit 1), LBP-11-2, 73 NRC 28 (2011) .......12 NextEra Energy Seabrook, LLC (Seabrook Station, Unit 1), CLI-12-05, 75 NRC 301 (2012) ........

................................................................................................................................................ passim Nuclear Innovation N. Am. LLC (South Texas Project, Units 3 & 4), CLI-11-6, 74 NRC 203 (2011) .............................................................................................................................................30 Nuclear Mgmt. Co., LLC (Palisades Nuclear Plant), CLI-06-17, 63 NRC 727 (2006) .................52 Paina Haw., LLC (Material License Application), CLI-06-13, 63 NRC 508 (2006) ....................6 Paina Haw., LLC (Material License Application), CLI-08-3, 67 NRC 151 (2008) ....................14 Pac. Gas & Elec. Co. (Diablo Canyon Nuclear Power Plant, Units 1 & 2), LBP-10-15, 72 NRC 257 (2010) ......................................................................................................................................48 Pac. Gas & Elec. Co. (Diablo Canyon Nuclear Power Plant, Units 1 & 2), CLI-11-11, __ NRC

__ (Oct. 12, 2011) ..........................................................................................................................48 Phila. Elec. Co. (Limerick Generating Station, Units 1 & 2), ALAB-857, 25 NRC 7 (1987) ......40 Private Fuel Storage, LLC (Indep. Spent Fuel Storage Installation), LBP-98-7, 47 NRC 142 (1998) .............................................................................................................................................11 Private Fuel Storage, LLC (Indep. Spent Fuel Storage Installation), CLI-00-24, 52 NRC 351 (2000) ...................................................................................................................................6, 50, 51 Private Fuel Storage, LLC (Indep. Spent Fuel Storage Installation), CLI-02-20, 56 NRC 147 (2002) .............................................................................................................................................33 Private Fuel Storage, LLC (Indep. Spent Fuel Storage Installation), CLI-03-8, 58 NRC 11 (2003) ...............................................................................................................................................5 viii

TABLE OF AUTHORITIES (continued)

Pages Private Fuel Storage, LLC (Indep. Spent Fuel Storage Installation), CLI-05-19, 62 NRC 403 (2005) ...............................................................................................................................................5 Progress Energy Carolinas, Inc. (Shearon Harris, Units 2 & 3), CLI-09-08, 69 NRC 317 (2009)

........................................................................................................................................................11 Pub. Serv. Co. of Ind. (Marble Hill Nuclear Generating Station, Units 1 & 2), ALAB-459, 7 NRC 179 (1978).........................................................................................................................7, 31 S.C. Elec. & Gas Co. (Virgil C. Summer Nuclear Station, Unit 1), ALAB-710, 17 NRC 25 (1983) .............................................................................................................................................40 S. Nuclear Operating Co. (Early Site Permit for Vogtle ESP Site), LBP-07-3, 65 NRC 237 (2007) ...........................................................................................................................33, 35, 36, 42 S. Nuclear Operating Co. (Early Site Permit for Vogtle ESP Site), CLI-10-05, 71 NRC 90 (2010) ...............................................................................................................................................5 Statement of Policy on Conduct of Adjudicatory Proceedings, CLI-98-12, 48 NRC 18 (1998) ...11 Tex. Utils. Elec. Co. (Comanche Peak Steam Electric Station, Units 1 & 2), CLI-88-12, 28 NRC 605 (1998) ......................................................................................................................................54 USEC, Inc. (Am. Centrifuge Plant), CLI-06-10, 63 NRC 451 (2006) ..........................................11 Federal Regulations 10 C.F.R. § 2.309 ...........................................................................................................................52 10 C.F.R. § 2.337 ...........................................................................................................................36 10 C.F.R. § 2.341 .........................................................................................................................1, 4 10 C.F.R. § 50.47 .....................................................................................................................32, 41 10 C.F.R. § 51.53 ...........................................................................................................................55 10 C.F.R. § 51.95 ...........................................................................................................................59 10 C.F.R. § 54.21 ................................................................................................................... passim 10 C.F.R. § 54.29 ...........................................................................................................................59 10 C.F.R. § 54.33 ...........................................................................................................................57 ix

TABLE OF AUTHORITIES (continued)

Pages 10 C.F.R. Pt. 51, Subpt. A, App. B ..........................................................................................36, 38 Federal Register Executive Order 12898 of February 11, 1994, Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations, 59 Fed. Reg. 7629 (Feb. 16, 1994) ........32 Final Rule, Environmental Review for Renewal of Nuclear Power Plant Operating Licenses, 61 Fed. Reg. 28,467 (June 5, 1996) ....................................................................................................31 Nuclear Power Plant License Renewal; Revisions, 60 Fed. Reg. 22,461 (May 8, 1995) ...... passim Policy on Conduct of Adjudicatory Proceedings, 63 Fed. Reg. 41,872 (Aug. 5, 1998) ................11 Policy Statement on the Treatment of Environmental Justice Matters in NRC Regulatory and Licensing Actions, 69 Fed. Reg. 52, 040 (Aug. 24, 2004) .....................................................32, 33 Proposed Rule: Nuclear Power Plant License Renewal, 55 Fed. Reg. 29,043, 29,047 (July 17, 1990) ..............................................................................................................................................58 Other Authorities NUREG-1437, Supp. 38, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Regarding Indian Point Nuclear Generating Unit Nos. 2 and 3, Draft Report (Dec. 2008) ....................................................................................................................................44 NUREG-1437, Supp. 38, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Regarding Indian Point Nuclear Generating Unit Nos. 2 and 3, Final Report (Dec. 2010) ..........................................................................................................................3, 26, 47 NUREG-1437, Supp. 38, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Regarding Pilgrim Nuclear Power Station, Final Report (July 2007) ..................55 x

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of ) Docket Nos. 50-247-LR and

) 50-286-LR ENTERGY NUCLEAR OPERATIONS, INC. )

)

(Indian Point Nuclear Generating Units 2 and 3) )

) February 14, 2014 APPLICANTS PETITION FOR REVIEW OF BOARD DECISIONS REGARDING CONTENTIONS NYS-8 (ELECTRICAL TRANSFORMERS), CW-EC-3A (ENVIRONMENTAL JUSTICE), AND NYS-35/36 (SAMA COST ESTIMATES)

I. INTRODUCTION Pursuant to 10 C.F.R. § 2.341(b), Entergy Nuclear Operations, Inc. (Entergy) hereby petitions the Nuclear Regulatory Commission (NRC or Commission) for review of the Atomic Safety and Licensing Boards (Board) First Partial Initial Decision (PID)

Concerning Track 1 Contentions (LBP-13-13), issued on November 27, 2013,1 and other Board decisions that are now ripe for review. As set forth below, the Commission should grant this Petition for Review and reverse certain of the Boards decisions with respect to Contentions NYS-8 (Electrical Transformers), CW-EC-3A (Environmental Justice), and NYS-35/36 (SAMA Cost Estimates) because the Boards decisions are based on conclusions that are contrary to established law and clearly-erroneous findings of material fact.2 Moreover, Commission review is in the public interest because these decisions raise substantial and important questions of policy and law that affect a broad spectrum of Commission licensing decisions.3 Regarding NYS-8, Entergy petitions the Commission for review of the Boards July 31, 1

Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 & 3), LBP-13-13, 77 NRC __, slip op. (Nov. 27, 2013).

2 10 C.F.R. § 2.341(b)(4)(i), (ii).

3 Id. § 2.341(b)(4)(iii), (v).

1

2008 decision (LBP-08-13) originally admitting the contention. As detailed below in Section III, the State of New York (New York or NYS) failed to provide sufficient support for NYS-8, contrary to 10 C.F.R. § 2.309(f)(1)(v). Thus, the Board erred as a matter of law in admitting the contention. This is confirmed by the Commissions decision in Seabrook (CLI-12-05),4 rejecting a materially-indistinguishable contention supported by the same declarant. Entergy also seeks Commission review of the Boards PID finding in favor of NYS on the merits. As to contention NYS-8, the Board erred by concluding that transformers function without a change in configuration, properties, or state; by creating a new definition of passive that includes components that cannot be readily-monitored for incremental degradation and to predict future failure; in challenging the current licensing basis (CLB) for Indian Point Nuclear Generating Units 2 and 3 (IP2 and IP3, collectively Indian Point or IPEC); by failing to adequately compare transformers to the most relevant active electrical components identified in 10 C.F.R.

§ 54.21(a)(1)(i); and by rejecting longstanding persuasive regulatory guidance.

Regarding CW-EC-3A, Entergy petitions the Commission for review of the Boards decisions admitting the original and amended contention (LBP-08-13 and its July 6, 2011 Order).

As set forth below in Section IV, contrary to 10 C.F.R. § 50.47(a)(1)(i), the National Environmental Policy Act (NEPA), and longstanding Commission precedent, the Board erred in admitting Hudson River Sloop Clearwaters (Clearwater) contention that fundamentally challenged the effectiveness of emergency plans for Indian Point. Entergy further petitions the Commission for review of the Boards decisions denying Entergys Motions in Limine and admitting extensive evidence and testimony challenging the effectiveness of the Indian Point emergency plans, contrary to 10 C.F.R. § 2.337(a). Entergy also petitions the Commission for 4

NextEra Energy Seabrook, LLC (Seabrook Station, Unit 1), CLI-12-05, 75 NRC 301 (2012).

2

review of certain aspects of the Boards PID on CW-EC-3A. The Board augmented the NEPA record through its hearing and, in the PID, ultimately resolved Clearwaters environmental justice (EJ) contention CW-EC-3A in the NRC Staffs favor. In doing so, however, the Board de facto reversed the Staffs original finding in the Final Supplemental Environmental Impact Statement (FSEIS)5 that there are no disproportionate adverse impacts on EJ populations associated with the Indian Point license renewal. The decision is based on multiple errors of law and fact that could have a substantial impact upon many licensees and the course of many licensing proceedings. Additionally, the Boards decision raises important questions of policy related to the manner in which the Staff may meet its NEPA-related obligations in future renewal proceedings.

Finally, regarding NYS-35/36, Entergy petitions the Commission for review of the Boards June 30, 2010 decision (LBP-10-13)6 to originally admit the consolidated contention, and its July 14, 2011 summary disposition ruling (LBP-11-17)7 in New Yorks favor (collectively, the SAMA Orders).8 As shown in Section V below, the SAMA Orders are ripe for Commission review given their direct nexus to Entergys severe accident mitigation alternatives (SAMA) analysis and the Staffs review thereof (as documented in the FSEIS);

i.e., it need not await the Boards resolution of pending Track 2 contentions that raise no issues related to the SAMA analysis. Importantly, the Boards decisions raise substantial legal questions concerning the proper interpretation and application of 10 C.F.R. §§ 50.109(a)(3) and 54.33(c), as well as the Staffs legal authority to compel licensee implementation of individual 5

NUREG-1437, Supp. 38, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Regarding Indian Point Nuclear Generating Unit Nos. 2 and 3, Final Report (Dec. 2010) (FSEIS).

6 Entergy Nuclear Operations, Inc. (Indian Point, Units 2 &3), LBP-10-13, 71 NRC 673 (2010).

7 Entergy Nuclear Operations, Inc. (Indian Point, Units 2 &3), LBP-11-17, 74 NRC 11 (2011).

8 Entergy is not appealing the Boards decision in LBP-13-13 on two other SAMA-related contentions, NYS-12 and NYS-16. Entergy believes those contentions were correctly decided.

3

SAMAs unrelated to aging management. The Boards decisions also raise important policy questions insofar as they relate to how the NRC Staff may meet its NEPA-related obligations to review and analyze SAMAs in future license renewal proceedings.

Therefore, Entergy respectfully requests that the Commission reverse the Boards decisions with respect to contentions NYS-8 and NYS-35/36, and uphold the Staffs FSEIS analysis on CW-EC-3A.

II. LEGAL STANDARDS GOVERNING PETTIONS FOR REVIEW A. Standard of Review Section 2.341(b)(1) provides for discretionary review of a full initial decision or PID. It provides that the Commission will consider a petition for review if it raises a substantial question with respect to the following considerations: (1) a finding of material fact is clearly erroneous or in conflict with a finding as to the same fact in a different proceeding; (2) a necessary legal conclusion is without governing precedent or is a departure from or contrary to established law; (3) a substantial and important question of law, policy or discretion has been raised; (4) the conduct of the proceeding involved a prejudicial procedural error; or (5) any other consideration which the Commission may deem to be in the public interest.9 The Commission reviews legal or policy questions de novo.10 The Commission has cited several reasons for granting review of legal and policy questions including: (1) when a case presents a legal issue that is essential to a broad spectrum of Commission licensing decisions; (2) when a question of proper interpretation of the Commissions regulations exists; and (3) when the Presiding Officers ruling is without governing precedent, i.e., the Commission has 9

See 10 C.F.R. § 2.341(b)(4).

10 AmerGen Energy Co. (Oyster Creek Nuclear Generating Station), CLI-09-7, 69 NRC 235, 259 (2009).

4

not had the opportunity to rule on the precise issue presented.11 The Commission will reverse a licensing boards legal rulings if they are a departure from, or contrary to, established law.12 Licensing boards have a duty to carefully review the evidence, including testimony and exhibits, and to resolve any factual disputes.13 The Commission has the authority to review factual findings de novo, but typically defers to a licensing boards findings of fact as long as the Licensing Board has issued a plausible decision that rests on carefully rendered findings of fact.14 The Commission, however, may intercede to correct clearly erroneous findingsthat is, findings not even plausible in light of the record viewed in its entirety15where there is strong reason to believe that . . . a board has overlooked or misunderstood important evidence.16 In such instances, the Commission will reject or modify a licensing boards findings if the Commission is convinced that the record compels a different result.17 The Commission has recognized that licensing boards have considerable discretion in making decisions on whether to admit evidence.18 The Commission reviews such decisions under an abuse of discretion standard.19 Under that standard, the petitioner must persuade the 11 See Hydro Res., Inc. (P.O Box 777, Crownpoint, N.M. 87313), CLI-06-7, 63 NRC 165, 166 (2006).

12 See Oyster Creek, CLI-09-7, 69 NRC at 259 (citation omitted).

13 See id. (citing Private Fuel Storage, LLC (Indep. Spent Fuel Storage Installation), CLI-05-19, 62 NRC 403, 411 (2005).

14 S. Nuclear Operating Co. (Early Site Permit for Vogtle ESP Site), CLI-10-05, 71 NRC 90, 98-99 (2010)

(citation omitted).

15 La. Energy Servs. L.P. (National Enrichment Facility), CLI-06-22, 64 NRC 37, 40 (2006) (some internal quotation marks omitted) (citing Hydro Res., Inc., (P.O. Box 777, Crownpoint, N.M. 87313), CLI-06-01, 63 NRC 1, 2 (2006); Anderson v. Bessemer City, 470 U.S. 564, 573-76 (1985); Private Fuel Storage, L.L.C.

(Indep. Spent Fuel Storage Installation), CLI-03-8, 58 NRC 11, 25-26 (2003)).

16 Oyster Creek, CLI-09-7, 69 NRC at 259 (citing Private Fuel Storage, CLI-05-19, 62 NRC at 411).

17 Gen. Pub. Utils. Nuclear Corp. (Three Mile Island Nuclear Station, Unit 2), ALAB-926, 31 NRC 1, 13 (1990).

18 See Duke Energy Corp. (Catawba Nuclear Station, Units 1 & 2), CLI-04-21, 60 NRC 21, 27 (2004); see also Duke Power Co. (William B. McGuire Nuclear Station, Units 1 & 2), ALAB-669, 15 NRC 453, 475 (1982).

19 Catawba, CLI-04-21, 60 NRC at 27.

5

Commission that a reasonable mind could reach no other result in order to prevail.20 With regard to admitting contentions, the Commission generally defers to Board decisions, but it will reverse if there is clear error of law or abuse of discretion.21 B. Scope of Review Following the issuance of a PID, a party should assert any claims of error that relate to the subject matter of the partial initial decision.22 This includes issues that were admitted for hearing or not, [] without regard to whether the issue was originally designated a separate contention or a basis for a contention.23 In this matter, among those claims that relate to the subject matter of the PID is NYS-35/36, which is substantially related to the other SAMA contentions that were disposed of in LBP-13-13 and was originally part of the Track 1 contentions before the Board granted summary disposition to NYS.

Under 10 C.F.R. § 2.311(d)(1), an applicant may appeal an order granting a petition to intervene, only if the request for hearing or petition to intervene should have been wholly denied. If an applicant only seeks to challenge the admission of some of the contentions, then it must wait until later in [the] proceeding, once the Board has issued its Initial Decision.24 Accordingly, a party may appropriately challenge the admission of a contention following the issuance of a PID related to that contention.

As a general rule, petitions for review are considered unnecessary when a party seeks to 20 Fla. Power & Light Co. (Turkey Point Nuclear Generating Plant, Units 3 and 4), ALAB-952, 33 NRC 521, 532 (1991), affd, CLI-91-13, 34 NRC 185 (1991).

21 See e.g., FirstEnergy Nuclear Operating Co. (Davis-Besse Nuclear Power Station, Unit 1), CLI-12-08, 75 NRC 393, 398 (2012); Seabrook, CLI-12-05, 75 NRC at 307.

22 Private Fuel Storage, L.L.C. (Indep. Spent Fuel Storage Installation), CLI-00-24, 52 NRC 351, 353 (2000)

(PFS).

23 Id.

24 Paina Haw., LLC (Material License Application), CLI-06-13, 63 NRC 508, 509 (2006).

6

appeal a decision that was ultimately decided in the petitioners favor.25 There are, however, several exceptions. Where a licensing boards decision could have an impact upon the course of many licensing hearings, it is appropriate for a party to seek review even if a contention was ultimately decided in its favor.26 Prevailing parties may also challenge a legal issue of clear recurring importance, even though (wholly fortuitously) the disposition of this case did not hinge upon it.27 III. CONTENTION NYS-8 (ELECTRICAL TRANSFORMERS)

A. Statement of the Case This proceeding concerns the joint license renewal application (LRA) for Indian Point, as submitted by Entergy on April 23, 2007 and subsequently amended. The procedural history of this proceeding is provided in detail in LBP-13-13. The following, therefore, focuses only on the most pertinent submissions and rulings.

NYS filed an intervention petition in this proceeding on November 30, 2007, including submission of NYS-8, alleging that the LRA violates 10 C.F.R. §§ 54.21(a) and 54.29 because it does not include an aging management program (AMP) for each electrical transformer whose function is important for plant safety.28 Although not referenced in NYS-8, NYS submitted with its intervention petition a declaration of Paul Blanch that included four paragraphs related to 25 See Pub. Serv. Co. of Ind. (Marble Hill Nuclear Generating Station, Units 1 & 2), ALAB-459, 7 NRC 179, 202 (1978); Consumer Power Co. (Midland Plant, Units 1 & 2), ALAB-282, 2 NRC 9, 10 n.1 (1975).

26 N. States Power Co. (Prairie Island Nuclear Generating Plant, Units 1 & 2), ALAB-252, 8 AEC 1175, 1177 (1975).

27 Id. at 1178.

28 See New York State Notice of Intention to Participate and Petition to Intervene at 103 (Nov. 30, 2007) (NYS Petition), available at ADAMS Accession No. ML073400187.

7

transformers.29 NYS and Mr. Blanch asserted, without more, that [t]ransformers function without moving parts or without a change in configuration or properties.30 Entergy and the NRC Staff opposed admission of NYS-8 based on lack of adequate support.31 In particular, NYS did not address or challenge longstanding NRC-approved guidance that transformers are active components not subject to aging management review (AMR) per 10 C.F.R. § 54.21(a)(1)(i).32 The Board issued LBP-08-13 on July 31, 2008, with a brief ruling that admitted NYS-8 as follows: Entergy has not proposed an AMP for each electrical transformer in IP2 and IP3 required for compliance with 10 C.F.R. §§ 50.48 and 50.63. This does not include transformer support structures.33 The parties thereafter made their pre-hearing filings,34 and the Board held the evidentiary hearing on NYS-8 on December 13, 2012. On November 27, 2013, the Board issued the PID.

The Board concluded:

In regard to NYS-8, because we find transformers to be passive components, transformers fall with[in] the scope of 10 C.F.R. Part 54 and must undergo AMR pursuant to 10 C.F.R. § 54.21(a)(1). Therefore, Entergy has not demonstrated that it will 29 See Declaration of Paul Blanch (Nov. 28, 2007) (Blanch Declaration), available at ADAMS Accession No. ML073400205. The four paragraphs in the Blanch Declaration that address transformers are reproduced in their entirety in Attachment 1 to this petition for review.

30 NYS Petition at 103; Blanch Declaration ¶ 21.

31 Answer of Entergy Nuclear Operations, Inc. Opposing New York State Notice of Intention to Participate and Petition to Intervene at 69-73 (Jan. 22, 2008) (Entergy Answer), available at ADAMS Accession No. ML080300149; NRC Staffs Response to Petitions for Leave to Intervene Filed by (1) Connecticut Attorney General Richard Blumenthal, (2) Connecticut Residents Opposed to Relicensing of Indian Point, and Nancy Burton, (3) Hudson River Sloop Clearwater, Inc., (4) the State of New York, (5) Riverkeeper, Inc., (6) the Town of Cortlandt, and (7) Westchester County, at 44-46 (Jan. 22, 2008) (NRC Staff Answer), available at ADAMS Accession No. ML080230543.

32 Entergy Answer at 70.

33 Entergy Nuclear Operations, Inc. (Indian Point, Units 2 & 3), LBP-08-13, 68 NRC 43, 218 (2008).

34 See Indian Point, LBP-13-13, slip op. at 20-22, 198-99. In its pre-hearing filings and at the evidentiary hearing, NYS did not rely upon any testimony from Mr. Blanch. Instead, NYS relied on testimony from Dr. Robert Degeneff. Id. at 198.

8

adequately manage the effects of aging on the relevant components as required by 10 C.F.R. §§ 54.21(a)(3). Accordingly, NYS-8 is resolved in favor of New York.35 B. Issues Presented in the Boards Resolution of NYS-8

1. Whether the Board incorrectly concluded in LBP-08-13 that NYS-8 satisfied the Commissions contention admissibility requirements in 10 C.F.R. § 2.309(f)(1),

particularly given the Commissions subsequent rejection of a materially-indistinguishable contention in Seabrook (CLI-12-05)?

2. Whether the Boards conclusion in LBP-13-13 that transformers are passive components subject to AMR is plausible and adequately supported when reviewed against the evidentiary record in its entirety?

C. The Commission Should Review and Reverse the Boards Rulings in LBP-08-13 and LBP-13-13 Regarding NYS-8

1. The Board Erred In Admitting NYS-8 Commission review of LBP-08-13 is warranted under 10 C.F.R. § 2.341(b)(4)(ii) because the Boards admission of NYS-8 rested on legal conclusions that depart from established law.36
a. NYS-8 did not satisfy contention admissibility requirements.

NYS argued that the Indian Point LRA violates 10 C.F.R. §§ 54.21(a) and 54.29 because it does not include an AMP for electrical transformers whose function is important for plant safety.37 NYS submitted the declaration of Mr. Blanch to support its contention.38 As purported evidence, both Mr. Blanch and NYS provided a few identical, cursory statements about the importance of transformers to plant safety, but they failed to provide any support for why transformers are subject to AMR under 10 C.F.R. Part 54. Instead, they offered only the conclusory statement that [t]ransformers function without moving parts or without a change in configuration or properties.39 35 Id. at 389.

36 See Oyster Creek, CLI-09-7, 69 NRC at 259.

37 NYS Petition at 103-05.

38 See Blanch Declaration at 5-6.

39 NYS Petition at 103; Blanch Declaration at 5.

9

Entergy and the NRC Staff opposed admission of NYS-8 for failing to satisfy the contention admissibility requirements in 10 C.F.R. § 2.309(f)(1).40 Specifically, Entergy established that NEI 95-10 (Industry Guideline for Implementing the Requirements of 10 C.F.R.

Part 54 - The License Renewal Rule), which the NRC endorsed in 2001 in Regulatory Guide 1.188, concludes that transformers are active components that are not subject to AMR.41 Transformers instead are managed by the ongoing maintenance rule program in accordance with 10 C.F.R. § 50.65, which is outside the scope of license renewal.42 NYS never cited or discussed this guidance in the contention or four paragraphs of the supporting declaration, much less proffered any bases to support a challenge to this longstanding NRC guidance classifying transformers as active components.43 For these reasons, NYS failed to meet the contention admissibility requirements of 10 C.F.R. §§ 2.309(f)(1)(ii), (v), and (vi).

Notwithstanding this deficiency, the Board admitted NYS-8. It adopted the conclusory statement of NYS and Mr. Blanch, ruling that [t]ransformers (necessary for compliance with 10 C.F.R. §§ 50.48 and 50.63) nominally perform their safety-related function without moving parts and without a change in configuration or properties.44 In doing so, the Board failed to hold NYS to its burden under 10 C.F.R. § 2.309(f)(1)(v) to provide adequate support for its proposed contention.45 The Commission has repeatedly held 40 Entergy Answer at 69-73; NRC Staff Answer at 44-46.

41 Entergy Answer at 70.

42 Id.; see also Fla. Power & Light Co. (Turkey Point Nuclear Generating Plant, Units 3 & 4), CLI-01-17, 54 NRC 3, 7-8 (2001) (stating that current licensing basis issues, which already are the focus of ongoing regulatory processesdo not come within the NRCs safety review at the license renewal stage).

43 Although NYSs reply mentions the Standard Review Plan in response to the Staffs answer, NYS does not challenge its contents. New York State Reply in Support of Petition to Intervene at 58-61 (Feb. 22, 2008).

44 Indian Point, LBP-08-13, 68 NRC at 88.

45 See Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-12-15, 75 NRC 704, 714 (2012)

(At the threshold contention admission stage, the burden for providing support for a contention is on the petitioner.); Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-12-10, 75 NRC 479, 488 (2012) (stating that a petitioners failure to provide adequate basis and support by itself is sufficient to require 10

that an expert opinion that merely states a conclusion . . . without providing a reasoned basis or explanation for that conclusion is inadequate because it deprives the Board of the ability to make the necessary, reflective assessment of the opinion.46 In short, a contention will be ruled inadmissible if the petitioner . . . [provides] only bare assertions and speculation.47 NYSs and Mr. Blanchs statements failed to satisfy these mandatory requirements.

The Board also rejected Entergys and the Staffs arguments derived from the on-point transformer guidance, concluding that Entergy and the Staff did not provide any legally binding justification for excluding transformers from AMR and did not explain how a transformer changes its configuration or properties in performing its functions.48 In doing so, the Board inappropriately shifted the burden onto Entergy and the NRC Staff to provide support for rejecting the contention. Longstanding Commission precedent establishes, however, that the initial burden of showing whether the contention meets our admissibility standards lies with the petitioner (not the applicant).49 The petitioner did not shoulder its burden and, consequently, the Boards admissibility determination should be overturned as an error of law.

rejection of the contention); Davis-Besse, CLI-12-08, 75 NRC at 414 (At the contention admissibility stage, it is Petitioners burden to come forward with factual or expert support for their argument . . .).

46 USEC, Inc. (Am. Centrifuge Plant), CLI-06-10, 63 NRC 451, 472 (2006) (emphasis added) (quoting Private Fuel Storage, (Indep. Spent Fuel Storage Installation), LBP-98-7, 47 NRC 142, 181 (1998)).

47 Fansteel, Inc. (Muskogee, Okla., Site), CLI-03-13, 58 NRC 195, 203 (2003) (quoting GPU Nuclear Inc. (Oyster Creek Nuclear Generating Station), CLI-00-6, 51 NRC 193, 208 (2000)).

48 Indian Point, LBP-08-13, 68 NRC. at 89.

49 Progress Energy Carolinas, Inc. (Shearon Harris, Units 2 & 3), CLI-09-08, 69 NRC 317, 325 (2009) (citing Ariz. Pub. Serv. Co. (Palo Verde Nuclear Generating Station, Units 1, 2, & 3), CLI-91-12, 34 NRC 149, 155 (1991)); see also Policy on Conduct of Adjudicatory Proceedings, 63 Fed. Reg. 41,872, 41,874 (Aug. 5, 1998)

([T]he burden of coming forward with admissible contentions is on their proponent). A contentions proponent, not the licensing board, is responsible for formulating the contention and providing the necessary information to satisfy the basis requirement for the admission of contentions in 10 CFR [2.309(f)(1)].

Statement of Policy on Conduct of Adjudicatory Proceedings, CLI-98-12, 48 NRC 18, 22 (1998).

11

b. Rejection of NYS-8 as inadmissible is required by Seabrook.

The original Indian Point and Seabrook transformer contentions are materially indistinguishable.50 The wording of the contentions is identical (except for the facility names),

the contentions bases and supporting evidence are materially the same, and the contentions relied upon statements from Mr. Blanch that are materially the same. To assist the Commission, to this Petition for Review tracks the minimal differences between the submissions made to support the identical contentions and illustrates that the two contentions differ in no substantive, material way. Significantly, in admitting the contention, the Seabrook board, like the Indian Point Board, cited the non-binding nature of Staff guidance51 and relied on Mr.

Blanchs declaration in admitting the transformer contention.52 On appeal, the Commission reversed the Seabrook boards admissibility ruling.53 It concluded that the petitioners transformer contention was too thinly supported to warrant admission,54 and that the petitioners did not challenge longstanding NRC guidance classifying transformers as active components under 10 C.F.R. Part 54.55 The Commission cited a 1997 letter from Christopher Grimes, former Director of the NRCs License Renewal Project Directorate, to NEI, which explains the basis of the Staffs conclusion that transformers are not 50 Compare NYS Petition at 103-05 with NextEra Inc. (Seabrook Station, Unit 1), Friends of the Coast and New England Coalition Petition for Leave to Intervene, Request for Hearing, and Admission of Contentions at 20-22 (Oct. 20, 2010), available at ADAMS Accession No. ML102940558; Compare NextEra Inc. (Seabrook Station, Unit 1), Blanch Declaration ¶¶ 21-24 with Declaration of Paul Blanch ¶¶ 28-31 (Oct. 18, 2010), available at ADAMS Accession No. ML102940557.

51 NextEra Energy Seabrook, LLC (Seabrook Station, Unit 1), LBP-11-2, 73 NRC 28, 58 (2011), revd in part, affd in part, CLI-12-05, 75 NRC at 319.

52 See id. at 57-58. Notably, in concluding that the classification of transformers as active or passive components remains an unresolved issue, the Seabrook board expressly cited the Indian Point Boards prior decision to admit NYS-8. Id. at 58.

53 Seabrook, CLI-12-05, 75 NRC at 322.

54 Id. at 319.

55 Id.

12

passive components.56 It also noted that the Grimes Letter is included as Reference 2 in Appendix C to NEI 95-10.57 The Commission further noted that the NRCs Standard Review Plan for license renewal also reflects the Staffs conclusion that transformers are not passive components.58 Moreover, while the Commission in Seabrook recognized that guidance documents may be challenged in individual proceedings, it found Mr. Blanchs assertions that transformers are passive components too conclusory to support admission.59 Absent a supported challenge to the guidance, there was no genuine dispute for litigation.60 The Commissions Seabrook ruling and the Indian Point Boards decision admitting NYS-8 cannot be reconciled.61 The Indian Point Board relied on the same opinion by Mr.

Blanch that the Commission subsequently rejected in CLI-12-05 as conclusory and not adequate to support admission of an essentially identical contention.62 The Commission should therefore conclude, as it did in Seabrook, that proposed NYS-8 lacked the support required by 10 C.F.R. § 2.309(f)(1)(v), and overturn the Boards decision in LBP-08-13 to admit NYS-8 as a clear error of law and an abuse of discretion.

56 Id. (citing Letter from C.I. Grimes, NRR, to D.J. Walters, NEI, Determination of Aging Management Review for Electrical Components, Attach. at 2 (Sept. 19, 1997) (Grimes Letter) (ENT000097)).

57 Id. at 317 n.98.

58 Id. at 320 n.116 (citing NUREG-1800, Rev. 1, Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants, at 2.1-24, Table 2.1-5, item 104 (Sept. 2005) (excluding transformers from the list of structures and components subject to AMR)).

59 Id. at 320.

60 Id.

61 See Indian Point, LBP-08-13, 68 NRC at 86-89.

62 Seabrook, CLI-12-05, 75 NRC at 320. The Boards discussion of Seabrook in LBP-13-13 is inapplicable to original admissibility.

13

2. The Board Erred in Concluding that Transformers Are Passive Components Subject to AMR Commission review of LBP-13-13 is warranted under either or both of two provisions:

10 C.F.R. § 2.341(b)(4)(ii), because the Boards decision (similar to LBP-08-13 discussed above) rests on legal conclusions that depart from well-established law and precedent, and 10 C.F.R. § 2.341(b)(4)(i) because the Boards decision makes a finding of material fact that is clearly erroneous. As demonstrated below, the Commission should reverse LBP-13-13 to remedy these errors.

a. The Board erred in concluding that transformers function without a change in configuration, properties, or state.

Almost 20 years ago, the Commission established a two-part test defining passive components as those (1) that perform their intended functions without moving parts or without a change in configuration or properties, and (2) for which the aging degradation effects are not readily monitorable.63 The Commission specifically noted that it reviewed several industry concepts of passive structures and components and has determined that they do not accurately describe the structures and components that should be subject to an [AMR] for license renewal.64 The Commission emphasized that its description of passive structures and components has been incorporated into § 54.21(a) and should be used only in connection with

. . . the license renewal process.65 Rather than follow this Commission direction, the Board instead relied upon industry conceptsthe engineering communitys viewon passive and active components. The Board stated that Entergys and the Staffs position that transformers are active devices due to their 63 Nuclear Power Plant License Renewal; Revisions, 60 Fed. Reg. 22,461, 22,477 (May 8, 1995) (1995 License Renewal SOC) (NYS000016).

64 Id. (emphasis added).

65 Id. (emphasis added).

14

change in state during operations runs counter to the prevailing view of the electrical engineering community.66 This is contrary to the Commissions directions in the SOC for the license renewal rule, which are entitled to special weight.67 The Board also erred by concluding that voltage, current, and magnetic flux are properties of the electricity flowing through a transformer, and not properties of the transformer itself.68 Notwithstanding the convincing arguments and substantial evidence Entergy presented, the Board merely asserted that it found NYSs position more reasonable,69 with little further explanation. However, as Entergys experts explained, transformers perform the intended function of transforming and supplying voltage and current to electrical busses.70 Specifically, when a transformer is energized, it changes from an idle state to an active state, and the transformers electrical and magnetic properties change.71 These changes in properties are integral to transformer operation and can be directly measured or observed.72 Because transformers perform their intended function through changes in their configuration, properties, or state, and because transformer performance, including degradation, is readily monitored, 66 Indian Point, LBP-13-13, slip op. at 215. The Board also points to a statement by Entergys witness that NYS relied on the academic community for support, and the academic communitys opinions do not apply in the case of nuclear power. Indian Point, LBP-13-13, slip op. at 213. The Board responded that we find nothing academic about the experience of NYSs witness. Id. at 215. From the context of the testimony quoted by the Board, it is clear that the witness was not addressing the credentials of NYSs witnesses, but rather the Statement of Considerations (SOC) position discussed above - for purposes of license renewal, the NRC does not define passive the same way the term is defined by industry, including by electrical engineering academics. See Testimony of Applicant Witnesses Roger Rucker, Steven Dobbs, John Craig, and Thomas McCaffrey Regarding Contention NYS-8 (Electrical Transformers) at 12, 52 (Mar. 28, 2012) (Entergy Transformers Testimony) (ENTR00091).

67 Language in the SOC addressing a regulation is entitled to special weight. See, e.g., Paina Haw., LLC (Materials License Application), CLI-08-3, 67 NRC 151, 154 (2008) (As NRC guidance endorsed by the Commission and reached in a rulemaking, following notice and comment, [] rulemaking conclusions are entitled to special weight.); see also Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1),

ALAB-900, 28 NRC 275, 290-91 (1988), review declined, CLI-88-11, 28 NRC 603 (1988).

68 Indian Point, LBP-13-13, slip op. at 216-17.

69 Id. at 216.

70 Entergy Transformers Testimony at A24 (ENTR00091).

71 Id.

72 Id.

15

transformers are active components not subject to AMR. Therefore, the Board should be reversed because the Boards conclusion is implausible as the record compels a different result.73

b. The Board erred in creating a new definition of passive that includes components that cannot be readily monitored for incremental degradation and to predict future failure.

The Board stated that [t]he Commission has determined that it is possible to generically exclude active components from AMR, because, in part, these components have performance and condition characteristics that are readily monitorable.74 The Board then stated that performance monitoring tracks whether an SSC [system, structure, or component] is performing its intended function (i.e., assuring gross failure has not occurred), while condition monitoring is concerned with changes in performance with time (i.e., trends) in order to predict the failure.75 Based on these premises, the Board found that the ability to detect incremental functional degradation (as opposed to gross failure) is the important criteria for an SSC to be considered readily monitorable.76 Thus, the Board concluded that SSCs that cannot be measured for trending data to predict impending failure could not realistically be considered readily monitorable.77 In essence, the Board has created a new, additional requirement under which a component can only be considered active for purposes of license renewal if it already is being monitored in a manner to detect incremental degradation and successfully predict future failure.

For example, the Board considers whether there has been a clear success rate in tracking progressive degradation of transformers.78 While certainly monitoring should do more than 73 See Oyster Creek, CLI-09-7, 69 NRC at 259; Three Mile Island, ALAB-926, 31 NRC at 13.

74 Indian Point, LBP-13-13, slip op. at 217-18 (citing 1995 License Renewal SOC, 60 Fed. Reg. at 22,476).

75 Id. at 218.

76 Id. at 219-20 (emphasis added).

77 Id. at 220 (emphasis added).

78 Id. at 253.

16

simply detect complete failure, the Board goes much further. This new requirement runs counter to Commission direction, and the Board should be reversed for departing from established law.79 First, the 1995 License Renewal SOC does not rely on trending, does not require prediction of future failure, and does not discuss incremental functional degradation when discussing the standard for whether a component is active.80 Instead, the Commission stated that active functions include those functions where the parameter of concern (required function),

including any design margins, can be directly measured or observed.81 As Entergy explained, for transformers, the parameter of concern (required function) can be directly monitored through output voltage and current at the terminals, making transformers active components.82 Furthermore, the list of components excluded from AMR in 10 C.F.R. § 54.21(a)(1)(i) contains numerous electrical components, including transistors, power inverters, circuit boards, battery chargers, and power supplies. As in the case of transformers, all of these components:

(1) have terminal voltages and currents; (2) these terminal voltages and currents are component properties that change as the components perform their required functions; and (3) the changes in terminal voltages and currents can be directly measured or observed.83 In summary, the applicable test for an active component is whether its functionality can be directly monitored, not whether incremental functional degradation can be detected to prevent future failure. The Board 79 See Oyster Creek, CLI-09-7, 69 NRC at 259.

80 See 1995 License Renewal SOC, 60 Fed. Reg. at 22,471-472, 22,477-478 (NYS000016).

81 Id. at 22,471.

82 The primary voltage and current are readily monitored at the primary terminals. The presence of the magnetic field is readily monitored at the secondary terminals. If a load is connected to the secondary winding, then current will flow, which is readily monitored by instrumentation or the reaction at the load (e.g., a motor starts).

If the load is varied, then the terminal voltages and currents will vary, as will the internal magnetic field. Thus, all of these transformer properties are readily monitored at the transformers terminals. See Entergy Transformers Testimony at 37 (A55) (ENTR00091).

83 Entergy Transformers Testimony at 42-44 (A60-61) (ENTR00091); NRC Staffs Testimony of Roy Mathew and Sheila Ray Concerning Contention NYS-8 at 12-13 (A20), 23-24 (A32) (Mar. 22, 2012) (NRC Staff Testimony) (NRC000031).

17

erred by creating its new requirement.84

c. The Board erred by improperly challenging the Indian Point CLB.

As recognized by the Board itself, the NRCs license renewal process specifically exempts challenges to a plants operational activities covered by its CLB.85 The Boards conclusions regarding the insufficiency of ongoing transformer preventive maintenance, conducted pursuant to the CLB, run afoul of these requirements and represent an impermissible challenge to current operations.86 With respect to Entergys current programs and procedures to track transformer performance, and past transformer failures at Indian Point (which were not found to be age-related),87 the Board states: And while these programs are based on the current knowledge of industry practice, we find that Entergys and the NRC Staffs testimony does not demonstrate the effectiveness of these tests and assessments in detecting impending transformer failures.88 The improper challenge to the CLB is further highlighted by the following testimony from NYSs witness, which the Board cited in LBP-13-13: the problem is not that failures arent preventable, but that such preventive measures are not requirements under the Part 50 84 Furthermore, even assuming that the Board is correct in concluding that transformers are only active if a licensee monitors for incremental degradation, the Board reached the wrong conclusion here and erred as a matter of fact. The Board acknowledges testimony by Entergy and the NRC Staff that there is substantial existing monitoring of transformers beyond monitoring of output voltage and current, conducted under ongoing, 10 C.F.R. Part 50 preventive maintenance programs, but still erroneously concluded that an AMP is warranted.

See, e.g., Indian Point, LBP-13-13, slip op. at 222-25; id. at 231 (Beyond measuring voltage and current at the output terminals, numerous other tests and assessments are available to monitor the performance and condition of a transformer, and have been incorporated into the current preventive maintenance programs developed by Entergy.); id. at 232 (To be sure, detailed corporate programs and plant-specific procedures have been developed for [Indian Point] by Entergy and incorporated into its CLB to track transformer performance.); id.

at 234 ([W]e find that Entergy has incorporated the current industry practices to monitor transformer health into its preventive maintenance programs and is using that information to identify degrading trends.).

85 Indian Point, LBP-13-13, slip op. at 26.

86 See, e.g., id. at 230-35. The Board is bound by NRC regulations and cannot impose additional requirements upon licensees. Hydro Res., Inc., LBP-06-1, 63 NRC 41, 59 (2006), affd, CLI-06-14, 63 NRC 510 (2006)

(finding that a board lacks authority to adopt a policy that invalidates a Commission regulation).

87 Entergy Transformers Testimony at 105-06 (A115) (ENTR00091).

88 Indian Point, LBP-13-13, slip op. at 232 (emphasis added).

18

regulations. Mandating an AMP for transformers would force licensees to take such additional steps.89 Forcing such additional steps is particularly troubling given the lack of evidence of age-related failures of Indian Points transformers that perform license renewal intended functions.90 In summary, the Board has imposed a new, additional requirement to determine whether a component is passive; a requirement that challenges the CLB and runs contrary to 10 C.F.R.

Part 54. Thus, the Board erred as a matter of law and abused its discretion by departing from established law.

d. The Board erred by not adequately comparing transformers to the most relevant active components identified in 10 C.F.R. § 54.21(a)(1)(i).

In LBP-08-13, the Board acknowledged that transformers are similar to other items that are excluded from AMR in 10 C.F.R. § 54.21(a)(1).91 Nonetheless, the Board required testimony from the parties regarding whether transformers are more similar to the included or excluded component examples.92 This exercise resulted in the facially deficient Board conclusion that transformers are more closely aligned with mechanical components that require AMR, such as piping, reactor vessels, and steam generators, than with electrical components that do not require AMR, such as transistors, power supplies, and power inverters.93 As Entergys witnesses thoroughly explained, a transformer is more similar to other electrical components in the AMR-excluded list because its 89 Id. at 226-27 (quoting Rebuttal Testimony of Dr. Robert C. Degeneff, D. Eng. Regarding Contention NYS-8 at 34-35 (Aug. 6, 2012) (NYSR00414)).

90 Entergy Transformers Testimony at 105-06 (A115) (ENTR00091).

91 Indian Point, LBP-08-13, 68 NRC at 88.

92 Id. at 89.

93 Indian Point, LBP-13-13, slip op. at 253-56. Furthermore, the Board erred in its consideration of substantial Entergy and Staff evidence about how transformers are more like AMR-excluded electrical components by simply concluding that Entergys and the Staffs arguments ultimately collapse under our finding that transformers do not change properties or state during operation. Id. at 253.

19

terminal voltages and currentslike those of a power supply, battery charger, or power inverterchange as the transformer performs its intended function and can be directly measured and monitored.94 The Boards findings, however, only focused on a few specific examples of AMR-excluded components, including piping, transistors, and batteries.95 The Board did not make specific findings on the myriad of additional relevant examples, such as relays, power inverters, circuit boards, battery chargers, and power supplies. Instead, the Board stated that the difference between transformers and other active components like power supplies, inverters, battery chargers, and circuit boards is debatable.96 Additionally, the Board erred in its comparison of transformers and transistors (perhaps the item in the AMR-excluded list that is most similar to transformers). For example, the change in resistivity in a transistor is directly analogous to the change in the magnetic field inside a transformer, the physical characteristics of both components are independent of the applied power, and the changing parameters in both cases are the internal electromagnetic fields.97 Transistor operation also can be readily observed at the external terminals.98 Furthermore, there is no monitoring of transistors for slow degradation. This fact, which is directly contrary to the Boards new requirement for whether a component is active, is omitted from the Boards 94 Entergy Transformers Testimony at 11 (A24) (ENTR00091).

95 Indian Point, LBP-13-13, slip op. at 251-56.

96 Id. at 252. Indeed, the Board even concluded that comparing transformers to the components in 10 C.F.R. § 54.21(a)(1)(i) is not conclusive. Id. at 251.

97 Entergy Transformers Testimony at 74-75 (A82), 78 (A86) (ENTR000091); see also Official Transcript of Proceedings, Indian Point Nuclear Generating Units 2 & 3 at 4337:4-12 (Dec. 13, 2012) (Dec. 13, 2012 Tr.)

(Dobbs).

98 Entergy Transformers Testimony at 74-75 (A82), 81 (A91) (ENTR00091); Dec. 13, 2012 Tr. at 4337:8-12 (Dobbs), 4431:4-10 (Degeneff).

20

discussion of transistors.99 The Board did not fully consider and address Entergys testimony in its decision and reached an implausible conclusion.

For all of these reasons, the Board erred in its consideration of AMR-included or AMR-excluded components in 10 C.F.R. § 54.21(a)(1)(i), and LBP-13-13 should be reversed.

e. The Board erred by dismissing longstanding regulatory guidance.

In LBP-13-13, the Board rejected over 15 years of NRC guidance and precedent concluding that electrical transformers are active components not subject to AMR.100 This is contrary to Commission precedent, which refers to regulatory guidance documents as having special weight.101 The Commission recently considered this guidance and its purpose and development in Seabrook.102 Notably, the Commission specifically acknowledged that [l]ongstanding Staff guidance directly addresses the classification of electrical transformers for the purposes of license renewal, and has found them to be active components.103 That longstanding guidance includes the 1997 Grimes Letter, Table 2.1-5 of NUREG-1800 (License Renewal Standard Review Plan), and NEI 95-10.104 In dismissing the Seabrook intervenors transformers contention, the Commission noted that the intervenors had disregard[ed] this Staff guidance 99 See Indian Point, LBP-13-13, slip op. at 255-56.

100 Id. at 205, 214 (rejecting the validity of the Grimes Letter as an opinion that, at best, has scant documentation justifying its technical conclusions).

101 See Seabrook, CLI-12-5, 75 NRC at 314 n.78; Yankee Atomic Elec. Co. (Yankee Nuclear Power Station), CLI-05-15, 61 NRC 365, 375 n.26 (2005) (We recognize, of course, that guidance documents do not have the force and effect of law. Nonetheless, guidance is at least implicitly endorsed by the Commission and therefore is entitled to correspondingly special weight) (citations and internal quotation marks omitted); Private Fuel Storage, L.L.C. (Indep. Spent Fuel Storage Installation), CLI-01-22, 54 NRC 255, 264 (2001) (Where the NRC develops a guidance document to assist in compliance with applicable regulations, it is entitled to special weight), petition for review held in abeyance, Devia v. NRC, 492 F.3d 421 (D.C. Cir. 2007).

102 Seabrook, CLI-12-05, 75 NRC at 316-18.

103 Id. at 319.

104 See NEI 95-10, Rev. 6, Industry Guideline for Implementing the Requirements of 10 CFR Part 54 - The License Renewal Rule at B-14 (June 2005) (ENT000098).

21

and relied only on conclusory statements.105 Thus, the Commission in Seabrook implicitly endorsed the Staffs 1997 guidance concerning transformers.106 In LBP-13-13, the Board declined to consider the Commissions decision on transformers in Seabrook, stating that it was not a merits determination.107 Although the procedural posture here differs from Seabrook, the underlying legal and regulatory principles discussed by the Commission are the same, and the extensive testimony proffered in this matter confirmed that the longstanding guidance stands on sound technical bases.108 The Boards conclusion that the Commission has not endorsed the Grimes Letter109 also is contrary to the Commissions statements in Seabrook, discussed above, and to the Commissions treatment of transformers in every license renewal to date as active components not subject to AMR, but rather addressed by the maintenance rule. Therefore, the Commission should reverse LBP-13-13 with respect to NYS-8 because it departs from established law.

3. The Public Interest Supports the Commissions Review and Reversal of the Boards Decisions on NYS-8 Commission review of LBP-08-13 and LBP-13-13 also is warranted under 10 C.F.R.

§§ 2.341(b)(4)(iii) and (v) because the Boards decisions raise substantial policy questions that are in the public interest to be reviewed.

NRC and industry guidance documents have long classified transformers as active components that are excluded from AMR.110 The NRC has never reached a different conclusion 105 Seabrook, CLI-12-05, 75 NRC at 320.

106 See, e.g., Shoreham, ALAB-900, 28 NRC at 290 (holding that guidance documents are at least implicitly endorsed by the Commission [and] entitled to correspondingly special weight).

107 Indian Point, LBP-13-13, slip op. at 204-05.

108 While rejecting the Commissions statements in Seabrook on electrical transformers because of the different procedural posture, the Board cited Seabrook repeatedly in other parts of LBP-13-13 on other topics. See Indian Point, LBP-13-13, slip op. at 29-30, 33-34, 265, 292, 310.

109 See id. at 205.

110 See supra Section III.C.2.e.

22

in approving license renewal applications for 73 reactor units to date.111 In fact, the NRC has never concluded that a Part 54 AMP is necessary to replace or supplement CLB programs and practices as they relate to transformers. Instead, transformer performance is addressed and inspected pursuant to 10 C.F.R. Part 50, including reliance on the maintenance rule.112 The Boards decisions have potentially wide-reaching consequences because they involve a fundamentally generic issue, not one that is specific to Indian Point license renewal or Indian Point transformers.113 The Boards decisions call into question the treatment of electrical transformers for all reactor license renewals, generating considerable confusion for past, present, and future renewals. The decisions also blur the dichotomy between 10 C.F.R. Parts 50 and 54, and would require review of the effectiveness of longstanding Part 50 programs (e.g.,

maintenance rule program) to determine if AMPs are needed for certain SSCs. This is precisely what the Commission sought to avoid in adopting 10 C.F.R. Part 54, in which it determined that to ensure safe operation during the period of extended operation (PEO) it should rely upon existing licensee programs and the regulatory process with only a few exceptions.114 In summary, the Boards decisions regarding electrical transformers raise important and substantial policy questions that are in the public interest to be reviewed. The Commission should review these decisions and reverse them for the reasons discussed above.

111 See Entergy Transformers Testimony at 10-14 (A24), 86-87 (A96) (ENTR00091).

112 Entergy Transformers Testimony at 86-87 (A96) (ENTR00091).

113 See, e.g., Entergy Nuclear Vt. Yankee, LLC (Vt. Yankee Nuclear Power Station), CLI-10-17, 72 NRC 1, 13 (2010) (taking review because a petition raised issues that could affect other license renewal proceedings).

114 1995 License Renewal SOC, 60 Fed. Reg. at 22,464 (NYS000016) (The first principle of license renewal was that, with the exception of age-related degradation unique to license renewal and possibly a few other issues related to safety only during the period of extended operation of nuclear power plants, the regulatory process is adequate to ensure that the licensing bases of all currently operating plants provides and maintains an acceptable level of safety so that operation will not be inimical to public health and safety or common defense and security.).

23

IV. CONTENTION CW-EC-3A (ENVIRONMENTAL JUSTICE)

A. Statement of the Case

1. The Boards Admission of Clearwaters Original Contention CW-EC-3 Entergys LRA includes an environmental report (ER) that identifies EJ populations within 50 miles of Indian Point, as well as any new and significant information regarding environmental impacts addressed in the Generic Environmental Impact Statement (GEIS).

Entergy determined that there would be no disproportionally high and adverse impacts on members of minority and low-income populations from the proposed action.115 As originally proposed, CW-EC-3 raised two overarching concerns.116 First, Clearwater claimed that Entergy incorrectly used census Block Group data, rather than census Block data, to identify minority and low income populations.117 Second, Clearwater made multiple assertions,118 including, as relevant to this appeal, the claim that Entergy failed to account for purported disproportionate impacts because minority and low-income populations will be more severely and negatively impacted by an evacuation resulting from a radiological event at Indian Point.119 Clearwater attributed those disproportionate impacts to purported deficiencies in state and local emergency plans for Indian Point. In particular, Clearwater cited alleged significant 115 Indian Point Energy Center License Renewal Application, App, E, Applicants Environmental Report, Operating License Renewal Stage, Indian Point Energy Center §§ 2.6.2, 4.22 (ER) (ENT00015B).

116 Hudson River Sloop Clearwater, Incs Petition to Intervene and Request for Hearing (Dec. 10, 2007)

(Clearwater Petition), available at ADAMS Accession No. ML073520042.

117 See id. at 36-37.

118 Id. at 41-55. Clearwater also argued that Entergy failed to account for purported disproportionate impacts including: 1) cancer rates for minority communities surrounding Indian Point exceed the national average; 2) minority and low-income populations that engage in subsistence fishing in the region ingest radionuclides and other toxic substances from Indian Point at a greater rate, and thus suffer greater harm, than the population at large; and 3) the production, use, and storage of Indian Point nuclear fuel would disproportionately impact Native American populations. See id.

119 Id. at 47-48.

24

difficulties in evacuating low-income and minority populations that rely on public transportation,120 the alleged lack of evacuation plans for Sing Sing Correctional Facility prisoners,121 and extremely problematic evacuations of disabled individuals due to the lack of sufficient emergency planning.122 As further support, Clearwater referenced various reports on emergency preparedness,123 hurricane Katrina,124 and also New York State proposed Contention 29 which alleged that Entergys ER failed to address emergency preparedness and evacuation planning for Indian Point.125 Entergy opposed the admission of CW-EC-3, arguingas relevant herethat emergency planning and the environmental impacts of severe accidents are outside the scope of this license renewal proceeding.126 Entergy also argued that Clearwater failed to provide evidence of any significant and disproportionate adverse impact, noting that allegations of radioactivity releases below regulatory limits are insufficient to demonstrate a significant adverse impact that would support admission of an EJ contention.127 The Staff opposed the contentions admission for similar reasons.128 The Board admitted CW-EC-3 only with respect to Clearwaters claim that 120 See id. at 47-48.

121 See id. at 48-53 122 See id. at 51-52 123 James Lee Witt Associates, LLC, Review of Emergency Preparedness of Area Adjacent to Indian Point and Millstone at 4.5.2.1 at 71 (2003) (ENT000263).

124 American Civil Liberties Union's National Prison Project, Abandoned & Abused Orleans Parish Prisoners in the Wake of Hurricane Katrina (Aug. 9, 2006), available at http://www.aclui.org/prison/conditions/2641.4pub20060809.html.

125 See id. at 47-48 . The Board ultimately rejected NYS-29 for being outside the scope the proceeding. See Indian Point, LBP-08-13, 68 NRC at 149 (finding that Commission regulations and precedent place consideration of emergency plans outside the scope of this proceeding).

126 Answer of Entergy Nuclear Operations, Inc. Opposing Hudson River Sloop Clearwater Incs Petition to Intervene and Request for Hearing at 61 (Jan. 22, 2008), available at ADAMS Accession No. ML080300053.

127 Id. at 66-67 (Clearwater merely assumed a significant adverse impact absent any foundation in law or fact, thus failing to establish a genuine dispute on a material issue). Further, Entergy argued that Clearwater had inappropriately included, in its expansive definition of EJ populations, various segments of the general population, such as children, students, hospital patients, the disabled, and the elderly. Id. at 64.

128 NRC Staff Answer at 98-99.

25

Entergys EJ evaluation failed to address potential disparate severe accident impacts on minority and low-income populations.129

2. The Board Decision Admitting Clearwater Amended Contention CW-EC-3A (July 6, 2011 Order)

Similar to the ER, the Staffs FSEIS identifies minority and low-income populations within a 50-mile radius of Indian Point, and concludes that license renewal would not disproportionately and adversely impact such populations.130 Thereafter, Clearwater submitted amended Contention CW-EC-3A, requesting that CW-EC-3 also apply to the FSEIS analysis of EJ populations.131 Entergy and the NRC Staff opposed Clearwaters proposed amendments to CW-EC-3, again on the grounds that they raised issues beyond the limited scope of license renewal and otherwise failed to meet the Commissions admissibility requirements.132 The Board admitted CW-EC-3A, in part, expanding it to challenge whether the FSEIS adequately assessed whether EJ populations would suffer disproportionate impacts in the event of a severe accident.133 130 NUREG-1437, Supp. 38, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Regarding Indian Point Nuclear Generating Units Nos. 2 and 3, Final Report at 4-53 (Dec. 2010) (FSEIS)

(NYS00133B).

131 Motion for Leave to Amend and Extend Contention EC-3 Regarding Environmental Justice and Petition to Do So (Feb. 3, 2011), available at ADAMS Accession No. ML110410369. Clearwater also sought to expand the contentions scope to challenge the adequacy of the FSEIS assessments of the no-action alternative and the impact of adding closed cycle cooling on local EJ populations. Id. at 16.

132 Applicants Answer to Hudson River Sloop Clearwater, Inc.s Amended Environmental Justice Contention at 2-3, 10 (Mar. 7, 2011), available at ADAMS Accession No. ML110770579; NRC Staffs Answer to Amended and New Contention (EC-3) Filed by Hudson River Sloop Clearwater, Inc. Concerning the Final Supplemental Environmental Impact Statement at 2, 8-18 (Mar. 7, 2011), available at ADAMS Accession No. ML110670293.

133 Licensing Board Memorandum and Order (Ruling on Pending Motions for Leave to File New and Amended Contentions) at 56, 59-60 (July 6, 2011) (finding that other than those portions of the contention updated to refer to the FSEIS rather than the ER, the rest was inadmissible).

26

3. The Boards Decision on Entergys First Motion in Limine (March 6, 2012 Order)

On December 22, 2011, Clearwater submitted its Statement of Position, written direct testimony, and supporting exhibits.134 Contrary to the Boards unambiguous ruling that consideration of emergency plans [is] outside the scope of this proceeding,135 Clearwaters testimony was fundamentally and inappropriately founded on purported emergency planning deficiencies.136 In particular, Clearwaters witnesses offered testimony: (1) challenging evacuation plans for Sing Sing prisoners (and for prisons generally);137 (2) challenging sheltering-in-place as an appropriate protective action recommendation;138 (3) summarizing interviews Clearwater conducted at various facilities regarding emergency preparedness;139 (4) asserting local hospitals are unprepared for an accident at Indian Point;140 (5) asserting difficulties evacuating EJ populations that do not have access to automobiles;141 (6) asserting difficulties evacuating assisted living facilities;142 and (7) alleging that Spanish translations of 134 Initial Statement of Position for Clearwaters Contention EC-3A Regarding Environmental Justice (Dec. 22, 2011) (Clearwater Position Statement) (CLE000002). See Clearwater Exhs. CLE000003 through CLE000010.

135 Indian Point, LBP-08-13, 68 NRC at 149.

136 See, e.g., Clearwater Position Statement at 21 (CLE000002) (arguing that the NRC Staff has repeatedly made the erroneous legal argument that emergency planning issues for environmental justice populations are outside the scope of this proceeding and NEPA.).

137 Testimony of Dr. Michael Edelstein in Support of Hudson River Sloop Clearwater, Inc.s Contention Regarding Environmental Justice at 3-4 (Dec. 22, 2011) (Edelstein Direct Testimony) (CLE000003); Initial Prefiled Testimony of Anthony Papa in Support of Hudson River Sloop Clearwater, Inc.s Contention Regarding Environmental Justice (EC-3A) at 3 (Dec. 22, 2011) (Papa Direct Testimony) (CLE000004).

138 Edelstein Direct Testimony at 3-4 (CLE000003) (stating that radiation-related impacts would be significantly greater in prisons); Papa Direct Testimony at 4 (CLE000004).

139 Initial Prefiled Written Testimony of Manna Jo Greene Regarding Clearwaters Environmental Justice Contention EC-3A at 3 (Dec. 22, 2011) (CLE000010).

140 Initial Prefiled Written Testimony of Erik A. Larsen, MD, FACEP Regarding Clearwaters Environmental Justice Contention EC-3A at 2-3 (Dec. 22, 2011) (CLE000005).

141 Initial Prefiled Written Testimony of Aaron Mair Regarding Clearwaters Environmental Justice Contention at 7-11 (Dec. 22, 2011) (CLE000007); Initial Prefiled Written Testimony of Stephen Filler Regarding Clearwaters Environmental Justice Contention EC-3A at 2-3 (Dec. 22, 2011) (CLE000009).

142 Testimony of John Simms in Support of Hudson River Sloop Clearwater, Inc.s Contention Regarding Environmental Justice at 2 (Dec. 22, 2011) (CLE000006).

27

emergency planning information are not properly distributed.143 Clearwater further requested consideration of feasible mitigation measures to address these purported deficiencies, including numerous emergency planning improvements, as well as IP2 and IP3 plant hardware changes to lessen the impact of severe accidents.144 Entergy filed a Motion in Limine to exclude direct testimony and exhibits that constituted direct challenges to the effectiveness of existing emergency plans.145 The NRC Staff supported Entergys motion.146 The Board denied Entergys First Motion in Limine, noting that at hearing it would be capable of distinguishing between disparaging comments against Indian Points emergency plans and Clearwaters witnesses descriptions of how certain EJ populations will be adversely harmed by a severe accident compared to the general population.147

4. The Boards Denial of Entergys Second Motion in Limine (October 15, 2012)

In June 2012, Clearwater filed rebuttal testimony, which also raised broad emergency planning challenges.148 Entergy and the NRC Staff each filed Motions in Limine seeking again to exclude the portions of Clearwaters testimony and exhibits challenging emergency 143 Initial Prefiled Written Testimony of Dolores Guardado Regarding Clearwaters Environmental Justice Contention EC-3A at 4-5 (Dec. 22, 2011) (CLE000008).

144 See Clearwater Position Statement at 31-32 (CLE000002).

145 See Entergys Motion in Limine to Exclude Portions of Pre-filed Testimony and Exhibits for Contention CW-EC-3A (Environmental Justice) at 7-24 (Jan. 30, 2012), available at ADAMS Accession No. ML12030A200.

Entergy also sought to exclude testimony on impacts to non-EJ populations and testimony by Clearwater witnesses who lacked necessary expertise or personal knowledge.

146 NRC Staffs Response in Support of Entergys Motion in Limine to Exclude Portions of Pre-Filed Testimony and Exhibits for Contention CW-EC-3A (Environmental Justice) (Feb. 9, 2012), available at ADAMS Accession No. ML12040A313; Clearwaters Reply in Opposition to Entergys Motion in Limine (Feb. 17, 2012), available at ADAMS Accession No. ML12048B478.

147 Licensing Board Order (Granting in Part and Denying in Part Applicants Motions in Limine) at 35 (Mar. 6, 2012) (unpublished). Recognizing the Boards Order, but without waiving its arguments that testimony addressing the adequacy of emergency planning is outside the scope of this proceeding, Entergy offered testimony describing the Indian Point emergency plans.

148 See, e.g., Rebuttal Testimony of Michael Edelstein Regarding Clearwaters Environmental Justice Contention EC-3A at 2 (A5) (June 28, 2012) (CLE000047); Rebuttal Testimony of Dr. Andrew S. Kanter , M.D. M.P.H. in Support of Hudson River Sloop Clearwater, Inc.s Contention EC-3A Regarding Clearwaters Environmental Justice at 2-9 (A4-11) (June 28, 2012) (CLE000048); see also Clearwater Exhs. CLE000045 though CLE000059.

28

planning.149 On the first day of evidentiary hearings, the Board denied Entergys second Motion in Limine on CW-EC-3A.150 It provided no basis for its denial.151

5. The Boards Partial Initial Decision on CW-EC-3A (LBP-13-13)

In LBP-13-13, the Board found that the FSEIS analysis of EJ was flawed, because the Staff did not take the requisite hard look at the environmental impacts of license renewal on the EJ population.152 Specifically, the Board found that the Staff failed to: (1) determine whether the EJ population would suffer disproportionate and adverse effects during the PEO in comparison to the general population; and (2) determine whether members of the low-income population who cannot afford to, or do not have the freedom to, self-evacuate or effectively shelter-in-place due to substandard housing would be disparately and adversely impacted in comparison to those who have the freedom, financial means, and readily-available modes of transportation to self-evacuate or access adequate shelter.153 The Board also found no legal basis for the Staffs conclusion that there would be no disproportionate and significant adverse impact on minority and low-income populations due to a severe accident, despite the Staffs reliance on the GEIS conclusion that the probability-weighted 149 Entergys Motion In Limine to Exclude Portions of Clearwaters Rebuttal Filings On Contention CW-EC-3A (Environmental Justice) (July 30, 2012), available at ADAMS Accession No. ML12212A345; NRC Staffs Motion in Limine to Exclude Portions of Pre-Filed Rebuttal Testimony and Rebuttal Exhibits Regarding Contention CW-EC-3A (Environmental Justice) (July 30, 2012), available at ADAMS Accession No. ML12212A419. Entergy also sought to exclude testimony concerning numerous non-EJ populations and irrelevant new claims concerning environmental impacts from terrorist attacks.

150 Official Transcript of Proceedings, Indian Point Nuclear Generating Units 2 & 3 at 1265:13-22 (Oct. 15, 2012)

(Judge McDade).

151 Id. at 1265:14-17 (Judge McDade) (We have had seven motions in limine that we have not yet ruled on, and let me say up front with regard to those seven, the first seven, we are denying the motions in limine.).

152 LBP-13-13 at 384, 385.

153 Id. at 383-84. The Board, however, found that the NRC Staff used a reasonable method for identifying minority and low-income populations within the 50-mile radius around Indian Point. Id. at 382.

29

consequences of a severe accident are SMALL for all plants.154 Accordingly, the Board found that the FSEIS fails to meet the NEPA reasonableness standard.155 The Board further found that Clearwaters witnesses had presented testimony that sufficiently illustrated the potentially disproportionate and adverse impacts on the EJ population surrounding Indian Point in the event of a severe accident.156 Significantly, while the Board acknowledged that the risk to both the EJ and non-EJ populations [from a severe accident] is small, it nonetheless concluded, based on testimony from Clearwater witnesses, that there is a higher risk of adverse consequences to the EJ population that warranted discussion in the FSEIS, should an accident occur.157 In the end, the Board concluded that because the record of the proceeding included this evidence and would therefore adequately ensure informed decision-making, the Commission, without additional Staff action to revise or supplement the FSEIS, could make an informed decision on whether to grant the requested renewed license.158 The Board therefore ruled that, despite the foregoing perceived deficiencies in the FSEIS, the agency had met its obligations under NEPA, and resolved the contention in the Staffs favor.159 B. Issues Presented in the Boards Resolution of CW-EC-3A

1. Whether it was legal error for the Board to admit CW-EC-3 and CW-EC-3A, as amended, given that (a) Clearwater failed to point to any adverse environmental impacts that would result from license renewal (let alone significant adverse impacts that would disproportionately affect EJ populations); and (b) both the 154 Id. at 386. According to the Board, to accept this position would run counter to the NRC requirement that licenseesdevote resources to protecting the public from the consequences of a severe accident. Id.

155 See id.

156 Id. at 387.

157 Id.

158 Id. at 388.

159 Id. at 387. Entergy does not dispute the Boards authority to augment the NEPA record to include the adjudicatory record. See, e.g., Nuclear Innovation N. Am. LLC (South Texas Project, Units 3 & 4), CLI-11-6, 74 NRC 203, 208-09 (2011). Instead, Entergy challenges the sources and subject matters the Board used to augment the record.

30

original and amended contention are directly founded on purported deficiencies in Indian Point emergency plans and emergency planning guidance generally?

2. Whether it was legal and prejudicial error for the Board to permit Clearwater to present extensive evidence regarding purported deficiencies in the Indian Point emergency plans and emergency planning guidance generally, which are outside the scope of license renewal and the required NEPA analysis?
3. Whether the Board committed legal and factual error in concluding that the Staffs EJ analysis in the FSEIS was inadequate, based on the Boards finding that there could be disproportionate and adverse impacts on EJ populations in the event of a severe accident, given (a) the Staffs reasonable use of the agencys generic finding of SMALL probability-weighted consequences of a severe accident; and (b) the lack of record evidence to support the Boards finding?

C. The Commission Should Review and Reverse Several Board Rulings and Findings Regarding CW-EC-3 Petitions for review are generally considered unnecessary when a party seeks to appeal a decision that was ultimately resolved in the petitioners favor.160 But the Commission will nevertheless take review where a licensing boards holding could have an impact on the course of many licensing hearings and involves a legal issue of recurring importance.161 As discussed below, such circumstances are present here.

1. Legal Standards Applicable to Environmental Reviews of License Renewal Applications Under NEPA Under NEPA and 10 C.F.R. Part 51, the major federal action here is license renewal for IP2 and IP3, and the scope of all license renewal proceedings is defined and purposefully limited, pursuant to 10 C.F.R. Part 54.162 The scope of the Staffs NEPA review is similarly limited and defined by the major federal actioni.e., the renewal of the IP2 and IP3 operating 160 See Marble Hill, ALAB-459, 7 NRC 179, 202 (1978); Midland, ALAB-282, 2 NRC 9, 10 n.1.

161 Prairie Island, ALAB-252, 8 AEC at 1177-78.

162 See Final Rule, Environmental Review for Renewal of Nuclear Power Plant Operating Licenses, 61 Fed. Reg.

28,467, 28,485 (June 5, 1996) (NYS000127).

31

licenses.163 The major federal action is defined by Part 54 and does not include review of the CLB, including emergency plans.164 Two NEPA principles must guide the Commission in its consideration of this petition.

First, NEPA requires agencies to take a hard look at the environmental impacts of a proposed action and reasonable alternatives to that action.165 Second, this hard look is tempered by a practical rule of reason.166 Consequently, [w]ith respect to environmental consequences that are only remote possibilities, an agency must be given some latitude to decide what sorts of risks it will assess.167 Thus, [a]n EIS [environmental impact statement] need not discuss remote and highly speculative consequences.168 The rule of reason also applies to the level of detail required in an EISs analysis of those impacts it does analyze.169

2. Legal Standards Applicable to Environmental Justice Analyses Environmental justice refers to the federal policy established in 1994 by Executive Order 12898.170 In accordance with Executive Order 12898, the NRC has obligated itself to address only the disproportionate distribution of high and adverse effects in its NEPA 163 See La. Energy Servs.L.P. (Claiborne Enrichment Center), CLI-98-3, 47 NRC 77, 87-88 (1998); 42 U.S.C. § 4332(2)(C) (2006).

164 10 C.F.R. §§ 50.47(a)(1(i), 54.30(a).

165 See Claiborne, CLI-98-3, 47 NRC at 87-88; see also v. Methow Valley Citizens Council, 490 U.S. 332, 349 (1989) (holding that NEPA requires agencies to take a hard look at environmental consequences prior to taking major actions).

166 Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-10-22, 72 NRC 202, 208 (2010) (citing Cmtys., Inc. v. Busey, 956 F.2d 619, 626 (6th Cir. 1992); see also Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-10-11, 71 NRC 287, 316 (2010); Hells Canyon Alliance v. U.S. Forest Serv., 227 F.3d 1170, 1184-85 (9th Cir. 2000)); U.S. Dept of Transp. v. Pub. Citizen, 541 U.S. 752, 767-69 (2004) (stating that the rule of reason is inherent in NEPA and its implementing regulations).

167 City of New York v. U.S. Dept of Transp., 715 F.2d 732, 750 (2nd Cir. 1983).

168 Trout Unlimited v. Morton, 509 F.2d 1276, 1283 (9th Cir. 1974) (emphasis added).

169 Utahns for Better Transp. v. U.S. Dept of Transp., 305 F.3d 1152, 1176 (10th Cir. 2002). A [d]etailed analysis is required only where impacts are likely. Id.

170 Executive Order 12898 of February 11, 1994, Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations, 59 Fed. Reg. 7629, 7632 (Feb. 16, 1994) (ENT000259). In 2004, the NRC issued its own Policy Statement on the Treatment of Environmental Justice Matters in NRC Regulatory and Licensing Actions. 69 Fed. Reg. 52,040, 52,041, 52,046 (Aug. 24, 2004) (NRC Environmental Justice Policy Statement) (ENT000260).

32

analysis.171 To that end, [t]he focus of any EJ review should be on identifying and weighing disproportionately significant and adverse environmental impacts on minority and low-income populations that may be different from the impacts on the general population.172 Thus, if no significant and adverse impacts are identified that differ from those on the greater population, then an analysis of disparate impacts is not required.173 Thus, there are two prerequisites to support an admissible contention alleging deficiencies in an EJ analysis. First, support must be presented for the alleged existence of significant and disproportionate adverse impacts or harm on the physical or human environment.174 The mere identification of the presence of an EJ population is insufficient, as are unsupported claims of disparate and adverse impacts.175 Second, support must be proffered for the claim that the purported adverse impacts could disproportionately affect poor or minority communities in the vicinity of the facility at issue.176 Accordingly, small impacts that occur equally across all populations cannot form the basis for an admissible contention.177

3. The Board Erred in Admitting CW-EC-3
a. Clearwaters contention is fundamentally a challenge to the adequacy of the Indian Point emergency plans.

The Board did not admit CW-EC-3 as a challenge to the adequacy of Entergys 171 S. Nuclear Operating Co. (Early Site Permit for Vogtle ESP Site), LBP-07-3, 65 NRC 237, 266 (2007) (citing Private Fuel Storage, L.L.C. (Indep. Spent Fuel Storage Installation), CLI-02-20, 56 NRC 147, 154 (2002))

(emphasis added).

172 NRC Environmental Justice Policy Statement, 69 Fed. Reg. at 52,047 (emphasis added) (internal quotations omitted) (ENT000260).

173 Id.

174 Vogtle ESP, LBP-07-3, 65 NRC at 262 (citing 69 Fed. Reg. at 52,047).

175 See Dominion Nuclear N. Anna, LLC (Early Site Permit for N. Anna ESP Site), CLI-07-27, 66 NRC 215, 247 (2007) (describing EJ issues as those that could lead to a disproportionately high and adverse impact).

176 Vogtle ESP, LBP-07-3, 65 NRC at 262.

177 See N. Anna ESP, CLI-07-27, 66 NRC at 247 (resting its decision in part on the fact that the Staff found a majority of the general environmental impacts set forth in this FEIS to be small or, in a very few cases, moderate.).

33

emergency plan, but rather, as a challenge to Entergys ER for failing to properly consider, and publicly disclose, environmental factors that may cause harm to minority and low-income populations that would be disproportionate to that suffered by the general population.178 But as described above, the only environmental factors alleged in CW-EC-3 were unsupported, alleged deficiencies in the evacuation plans for certain populations. Accordingly, it was clear error for the Board to interpret CW-EC-3 as anything other than a challenge to the effectiveness of the Indian Point offsite emergency plans.

b. Emergency planning issueswhether labeled as safety or environmental issuesare outside the scope of license renewal.

The Board also relied on the rationale that CW-EC-3 was an environmental contention brought under NEPA and not a safety contention brought under Part 54.179 But there simply is no regulatory or legal basis to assert that emergency planning issues can be raised in a license renewal proceeding via NEPA. Since the license renewal rule was first promulgated, the Commission has consistently stated that emergency planning issues are outside the scope of consideration.180 As the Board itself recognized in rejecting other contentions challenging the effectiveness of emergency plans, 10 C.F.R. § 50.47(a)(1)(i) places consideration of emergency plans outside the scope of this proceeding and is supported by NRC case law.181 Furthermore, exclusion of emergency planning issues from license renewal is entirely consistent with NEPA. When considering environmental consequences that are only remote possibilities, the NRC Staff has latitude in determining which risks to assess.182 Statute and regulation require Indian Points emergency plans to provide adequate protection for all 178 Indian Point, LBP-08-13, 68 NRC at 201 (citation omitted).

179 Id.

180 See Final Rule, Nuclear Power Plant License Renewal, 56 Fed. Reg. 64,943 64,966 (Dec. 31, 1991) (There is no need for a licensing review of emergency planning issues in the context of license renewal).

181 Id. at 149 (emphasis added).

182 New York, 715 F.2d at 750.

34

members of the public equally, and the effectiveness of those plans has been demonstrated through continuous regulatory oversight and drills.183 Based on these facts, the NRC has determined that the risks associated with emergency planning need not be considered during license renewal. Under NEPAs rule of reason, the NRC Staff need not analyze these risks simply because of unsupported assertions that certain populations would somehow be disproportionately and significantly adversely impacted by ineffective sheltering and poorly-executed evacuation plans, as they amount to little more than remote and highly-improbable or highly-speculative consequences.

Accordingly, Clearwaters challenges to the effectiveness of the Indian Point emergency planswhether they are characterized as safety or environmental challengesare beyond the scope of this license renewal proceeding and NEPA.

c. Even if emergency planning issues brought under NEPA are not precluded, the Board still erred in admitting the contention.

Even if challenges to emergency plans brought under NEPA are somehow deemed to be within the scope of a license renewal proceedingor more fundamentally, even if CW-EC-3 is not viewed as raising emergency planning issues at allthe Board nonetheless erred in admitting the contention. Clearwater failed to show at the contention admissibility stage that any likely or probable adverse environmental impacts would be visited upon EJ populations as a result of license renewalmuch less significant or high impacts that would disproportionately affect EJ populations.184 In particular, Clearwater provided no evidence showing that license renewal would result 183 See further discussion at Section IV.D.4.c below.

184 Utahns for Better Transp., 305 F.3d at 1176; Trout, 509 F.2d at 1283. See also Vogtle ESP, LBP-07-3, 65 NRC at 263-64 (denying the admission of a similar EJ contention, on the basis that the contention lacks an adequate showing of adverse impacts, without which disparate impacts have no significance, making the potential issue immaterial to the environmental findings associated with the . . . application and thus an inadmissible contention).

35

in any radiological doses above regulatory thresholds.185 Moreover, as discussed below, the Commission has determined generically that the probability-weighted environmental impacts of a severe accident are small (i.e., not detectable or so minor186) for all plants.187

4. The Board Erred in Denying Entergys Motions in Limine Related to CW-EC-3A.

Commission regulations provide that, [o]nly relevant, material, and reliable evidence which is not unduly repetitious will be admitted.188 Accordingly, the Board should have excluded or accorded no weight to testimony and exhibits that are outside the scope of, or not relevant to, this license renewal proceeding.189 In denying Entergys First Motion in Limine, the Board stated that it was capable of distinguishing irrelevant testimony critical of Entergys emergency plan from potentially relevant testimony.190 In doing so, it essentially acknowledged that attacks on Indian Points emergency planning were outside the proceedings scope. But as discussed in Section IV.D.5.b below, despite its assurances and statements, the Board did consider evidence critiquing the adequacy of the emergency plans. In fact, at the hearing, the Board actively elicited such testimony.191 185 Vogtle ESP, LBP-07-3, 65 NRC at 266. Consistent with the Council on Environmental Quality (CEQ) guidance, any dose within EPA guidelines would not be significant (as employed by NEPA), or above generally accepted norms and therefore, could not result in disproportionately high and adverse human health effects. CEQ Environmental Justice Guidance at 25 (Dec. 10, 1997) (ENT000266).

186 10 C.F.R. Pt. 51, Subpt. A, App. B, Tbl. B-1 § 3 (emphasis added); see also Testimony of Entergy Witnesses Donald P. Cleary, Jerry L. Riggs, and Michael J. Slobodien Regarding Contention CW-EC-3A (Environmental Justice) at 44 (A52) (Mar. 29, 2012) (Entergy EJ Testimony) (ENT000258).

187 See further discussion at Section IV.D.4.a below.

188 10 C.F.R. §§ 2.337(a), 2.319(d)-(e).

189 See, e.g., Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), Licensing Board Order (Ruling on Pending Matters and Addressing Preparation of Exhibits for Hearing) at 2 (Mar. 24, 2008) (unpublished)

(granting in part motions to exclude testimony on topics outside the scope of a license renewal proceeding).

190 Licensing Board Order (Granting in Part and Denying in Part Applicants Motions in Limine) at 35 (Mar. 6, 2012) (unpublished). As noted above, the Board provided no explanation for its oral ruling denying Entergys Second Motion in Limine on CW-EC-3A.

191 See, e.g., Official Transcript of Proceedings, Indian Point Nuclear Generating Units 2 & 3 at 2832:10-32 (Oct.

23, 2012) (Oct. 23, 2012, Tr.) (Judge McDade) (Is there anything about the patterns of automobile ownership or public transportation in Peekskill that would affect the [EJ] population), Id. at 2845:4-7 (Judge 36

Moreover, Entergy and Staff witnesseswith decades of emergency planning expertiseprovided substantial testimony directly contrary to the Clearwater testimony cited by the Board.192 The Board did not, however, discuss this directly contrary Entergy and Staff witness testimony in the basis for its decisionfurther indicating that the Board both considered and credited the testimony of Clearwater witnesses (none of whom demonstrated any emergency planning expertise). It was this very error that Entergys Motions in Limine sought to prevent.

Thus, the Board committed clear legal and prejudicial procedural error as well as abused its discretion in denying Entergys Motions in Limine on CW-EC-3A.

5. The Board Erred in Concluding in LBP-13-13 that the FSEIS Environmental Justice Analysis Was Deficient.
a. The Board erred in concluding that there could be potential disproportionate and adverse impacts on environmental justice populations in the event of a severe accident.

As a legal matter, the Board incorrectly determined that the Staff could not rely on the Commissions finding in the GEIS that the probability-weighted consequences of a severe accident are SMALL for all plants.193 The GEIS finding is codified in 10 C.F.R. Part 51, Table B-1 and carries with it the force of law. The Staff had an absolute duty, as well as a rational basis, to rely on the Commissions finding.

NRC regulations define SMALL impacts as environmental impacts that are not detectable or are so minor that they will neither destabilize nor noticeably alter any important attribute of the resource.194 Thus, by definition, SMALL impacts cannot be either high or McDade) ([P]rior to your involvement with this proceeding, were you aware that there were Spanish language sources of information with regard to emergency planning?), Id. at 2847:15-18 (Judge McDade) ([I]n your direct testimony you talked about some of the circumstances that would be applicable to people in assisted living and in nursing homes in the event of a disaster in the area. Correct?).

192 Energy and NRC Staff EJ testimony are described further in Section IV.D.5.c below.

193 See LBP-13-13 at 386.

194 10 C.F.R. Pt. 51, Subpt. A, App. B, Tbl. B-1 § 3 (emphasis added); see also Entergy EJ Testimony at 44 (A52)

(ENT000258).

37

significantly adverse, an important stepping stone in any NEPA-related EJ analysis.

The Commission reaffirmed this GEIS finding in the Pilgrim license renewal proceeding stating that the environmental impacts of severe accidents during the license renewal term already have been addressed generically in bounding fashion.195 In a separate Pilgrim decision, the Commission further stated that no site-specific severe accident impacts analysis need be done in license renewal proceedings.196 Accordingly, the Staff acted well within the bounds of NEPA in declining to pursue any further specific analysis on whether EJ populations would suffer disproportionately significant and adverse impacts in the event of a postulated severe accident at Indian Point.

In rejecting this argument, the Board found that the NRCs emergency planning requirements are a clear indication that the NRC, while cautiously optimistic that a potentially severe accident will not occur at a licensed nuclear reactor, believes it necessary to prepare for just such a possibility.197 But under NEPA, an agency may draw reasonable bounds as to which contingencies and effects it chooses to analyze. Contrary to what the Board appeared to assume as matter of logic, the law is clear that simply because an agency may require certain emergency preparedness or planning in anticipation of potential low-probability events does not dictate that those same low probability events must be fully analyzed under NEPA. Thus, the Ninth Circuit has rejected the claim that simply because the Navy acknowledged a risk that a missile might explode, and designed a base to minimize the potential impacts from such an event, that risk must be 195 Pilgrim, CLI-10-11, 71 NRC at 316; see also Entergy EJ Testimony at 44 (A52) (ENT000258); Entergys Proposed Findings of Fact and Conclusions of Law for Contention CW-EC-3A (Environmental Justice) at 35-36 (¶ 74) (Mar. 22, 2013) (Entergy Proposed Findings), available at ADAMS Accession No. ML13081A746.

196 Pilgrim, CLI-12-15, 75 NRC at 709; see also Entergy Proposed Findings at 36 (¶ 74).

197 LBP-13-13 at 386.

38

evaluated under NEPA.198 Similarly, the Third Circuit has held that the fact that NRC has made certain planning efforts with respect to a potential terrorist attack does not then require detailed NEPA analysis of such attacks in connection with relicensing.199 Finally, while citing and selectively quoting from the D.C. Circuits decision in New York v. NRC,200 the Board misses that this case too is consistent with what the Staff did here.

As the court in New York noted, the finding that the probability of a given harm is nonzero does not, by itself, mandate an EIS: after the agency examines the consequences of the harm in proportion to the likelihood of its occurrence, the overall expected harm could still be insignificant and thus could support a FONSI.201 So too here - the NRC Staff has concluded that the overall expected harm for all populations is SMALL by considering both the expected harm and the likelihood of occurrence. In turn, it need not undertake further analysis of this small effect within its EIS under NEPAs rule of reason. In sum, the fact that for purposes other than satisfying NEPA the Agency may require facilities to plan for emergencies does not then require the Agency to further analyze such eventualities as part of its NEPA EJ analysis. The Board erred as a matter of law in concluding otherwise.

b. The Board failed to explain the basis for its conclusion that there would be disproportionate and adverse impacts to environmental justice populations in the event of a severe accident at Indian Point.

Licensing boards are obliged to explain their rulings202 and articulate in reasonable 198 Ground Zero Center for Non-Violent Action v. U.S., 383 F.3d 1086, 1090-91 (9th Cir. 2004).

199 N.J. Dept. of Envtl. Prot. v. NRC, 561 F.3d 132, 143 (3d Cir. 2009).

200 See LBP-13-13 at 385 (citing N.Y. v. NRC, 681 F.3d 471, 482 (D.C. Cir. 2012)).

201 N.Y. v. NRC. 681 F.3d at 482 (emphasis added).

202 S. Carolina Elec. & Gas Co. (Virgil C. Summer Nuclear Station, Unit 1), ALAB-710, 17 NRC 25, 28 (1983)

(Reviewing courts require agencies to explain their rulings, and, accordingly, we must expect no less from the hearing boards.).

39

detail the basis for the course of action chosen.203 Without further elaboration, however, the Board announced that the testimony provided by Clearwaters witnesses sufficiently illustrated the potentially disproportionate and adverse impacts on the EJ population surrounding Indian Point in the event of a severe accident.204 As discussed below, Clearwaters testimony on these issues was convincingly rebutted by Entergy and Staff witnesses, but the Board did not confront that testimony.205 Given this directly competing evidence, the Boards failure to identify specifically which Clearwater testimony or other evidence supported its conclusion is grounds for Commission review and reversal of the Boards conclusions regarding the adequacy of the FSEIS.

c. The Boards conclusion that there would be potential disproportionate and adverse severe accident impacts to environmental justice populations is not supported by the record.

(i) The record demonstrates that all populations will be adequately protected under the Indian Point, State, and local emergency plans.

Referring only very generally to Clearwater witness testimony on different sectors of the EJ population, the Board concluded that the higher risk to the EJ population should be discussed in an adequate EJ analysis.206 The Board did not, however, identify the testimony that supported its finding. Nor would it have any legal or factual basis to find such a higher risk.

NRC regulations require that licensees include a range of protective actionsincluding sheltering and evacuationwhen developing emergency plans for all members of the public 203 Phila. Elec. Co. (Limerick Generating Station, Units 1 & 2), ALAB-857, 25 NRC 7, 14 (1987) (Licensing boards must confront the facts and articulate in reasonable detail the basis for the course of action chosen.).

(internal quotations omitted).

204 LBP-13-13 at 387.

205 Limerick, ALAB-857, 25 NRC at 14.

206 LBP-13-13 at 387 (emphasis added).

40

within the 10-mile emergency planning zone (EPZ).207 The record also shows that the Federal Emergency Management Agency (FEMA) has reviewed and approved the Indian Point emergency plans.208 Clearwater presented no contrary evidence or testimony on these points.

Given this, it is difficult to imagine how the Staff could, within an FSEIS, discuss a higher risk to EJ populations and thus have satisfied the Boards apparent concern. Such a discussion would have required the Staff to assume and accept the very opposite of FEMAs expert conclusion - i.e., Staff would have had to identify specific EJ populations it anticipated would not be adequately protected and thus would suffer significant adverse impacts disproportionate to the surrounding population. Such a requirement cannot be squared with this Commissions repeated guidance that emergency planning review is outside the scope of license renewal or with a proper respect for the work of companion expert federal agencies. Thus, the Board clearly erred in finding the FSEIS deficient.

(ii) The record demonstrates that no particular population segment will be adversely impacted by a severe accident.

The Staff concluded that the potential impacts of license renewal to EJ populations would mostly consist of radiological effects.209 Given the extensive planning requirements and FEMA findings, it is unsurprising then that Staff witnesses provided further uncontroverted testimony that any radiation doses received by any population as a result of a severe accident at 207 10 C.F.R. § 50.47(b)(10). See also NRC Staff Testimony of Jeffrey J. Rikhoff and Patricia A. Milligan Regarding Contention CW-EC-3A (Environmental Justice) at 23 (A29) (Mar. 30, 2012) (NRC Staff EJ Testimony) (NRC000063).

208 Letter from L. Canton, FEMA, to D. Tailleart, NRC (Dec. 5, 2011) (ENT000273) (transmitting the Final Exercise Report for the Indian Point Energy Center Radiological Emergency Preparedness Plume Pathway Exercise Conducted on September 14, 2010 (Nov. 30, 2011)). Entergy and the Staff also presented uncontroverted evidence regarding State and local emergency plan compliance with New York Executive Law Article 2-B, which requires that State and local emergency management plans include programs to assist victims of disasters, with particular attention to the needs of the poor, the elderly, individuals with disabilities and other groups which may be especially affected. See, e.g., Entergy EJ Testimony at 67 (A88)

(ENT000258); Entergy Proposed Findings at 78 (¶157).

209 Oct. 23, 2012 Tr. at 2774:18-20 (Rikhoff ); see also NRC Staff EJ Testimony at 12 (A11) (NRC000063).

41

Indian Point would be within acceptable federal guidelines set by the U.S. Environmental Protection Agency (EPA).210 Clearwater presented no testimony or evidence to the contrary.

To support its finding that there would be disproportionate impacts on EJ populations, the Board focused on Ms. Milligans testimony that, in the event of a severe accident, certain populations, such as those incarcerated at Sing Sing, could receive radiation doses higher than other populations that are immediately able to self-evacuate.211 However, the Board failed to adequately address Ms. Milligans testimony that, any doses received would be within the EPA dose guidelines.212 Thus, even if certain individuals might hypothetically receive a different or higher dose than others, such impacts would not be adverse, much less significant and adverse.213 Accordingly, Commission review and reversal of the Boards clearly erroneous finding regarding potential disproportionate and adverse impacts to EJ populations is warranted.

6. The Public Interest Warrants Commission Review of the Boards Decisions on CW-EC-3A.

Permitting these Board rulings to stand would have potential wide-ranging impacts, in that the door would be opened for petitioners to raise emergency planning issues through NEPA in license renewal proceedings. Furthermore, Clearwaters arguments regarding the potential for problematic evacuations and ineffective sheltering, to the extent they are even considered, are 210 NRC Staff EJ Testimony at 12 (A11) (NRC000063); Oct. 23, 2012 Tr. at 2774:20-23 (Rikhoff), 2762:6-25 (Milligan) (All of these doses are well within the established federal guidelines.), 2780:17-25 (Milligan)

(agreeing that nobody would receive an inappropriate dose beyond the regulatory limits).

211 LBP-13-13 at 384 (quoting Oct. 23, 2012 Tr. at 2760:22-2761:2 (Milligan).

212 Oct. 23, 2012 Tr. at 2760:22-2761:2 (Milligan) (emphasis added).

213 Oct. 23, 2012 Tr. at 2762:24-2763:12, 2779:2-5 (Milligan). As discussed above, [a] dosage increase that remains well under regulatory limits is not a high and adverse effect. Vogtle ESP, LBP-07-3, 65 NRC at 266.

Consistent with CEQ guidance, any dose within EPA guidelines would not be significant (as employed by NEPA), or above generally accepted norms. CEQ Environmental Justice Guidance at 25 (Dec. 10, 1997)

(ENT000266). The dose limits identified in the EPA guidelines were selected to safeguard public health.

EPA Guidance 400-R-92-001, Manual of Protective Action Guides and Protective Actions for Nuclear Incidents at iii (1991) (ENT00284A).

42

fundamentally generic. Thus, the Boards finding that there is a higher risk of adverse consequences for those without cars or those who shelter in place necessarily is a criticism of the overall effectiveness of all emergency plans.

For these reasons and the reasons discussed above, the Commission should: (1) review and reverse the Boards decisions to admit the original and amended contention; or (2) in the alternative, review and reverse (a) the Boards rulings denying Entergys January 30, 2012 and July 30, 2012 Motions in Limine, and (b) the Boards finding in LBP-13-13 that the FSEIS EJ analysis was deficient.

V. CONTENTION NYS-35/36 (SAMA COST ESTIMATES)

A. Statement of the Case

1. Entergys SAMA Analyses for Indian Point In its original LRA, Entergy submitted a detailed site-specific evaluation of potentially cost-beneficial SAMAs.214 Entergy prepared this analysis using state-of the-art practices and in full accordance with NEPA and the NRC-endorsed guidance in NEI 05-01.215 The ER identified twelve potentially cost-beneficial SAMAs, but because they do not relate to adequately managing the effects of aging, those SAMAs were submitted for further engineering project cost-benefit analysis216 as part of ongoing plant operation. This fully satisfied the requirement in 10 C.F.R. § 51.53(c)(3)(ii)(L) to provide a SAMA analysis for IP2 and IP3 license renewal.

The Staff issued its Draft Supplemental Environmental Impact Statement (DSEIS) in December 2008. In it, the Staff documented its independent and detailed technical review of 214 See ER § 4.21, & App. E (ENT00015B).

215 See id.; see also Pilgrim, CLI-10-11, 71 NRC at 291 n.11 (citing NEI 05-01, Rev. A, Severe Accident Mitigation Alternatives (SAMA) Analysis, Guidance Document (Nov. 2005) (NEI 05-01); Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-12-01, 75 NRC 39, 55 (2012) (noting NRC endorsement of NEI 05-01).

216 ER at 4-73 (ENT00015B); see also id. at 4-73 to -77 (ENT00015B) (listing and describing potentially cost-beneficial SAMAs).

43

Entergys SAMA analyses, and concluded that they were reasonable and sufficient for the license renewal submittal.217 The Staff also stated that because the SAMAs identified as potentially cost-beneficial do not relate to adequately managing the effects of aging during the PEO, they need not be implemented as part of license renewal pursuant to Part 54.218 As demonstrated in Section V.C.2.b.ii, below, this analysis is fully consistent with unbroken precedent establishing that conditions of a renewed license must be related to managing aging effects.219 Approximately one year later, the Staff sought clarification regarding certain wind direction data used as inputs into the Indian Points SAMA analysis, and Entergy addressed the Staffs specific questions by revising the SAMA analysis.220 The only changes to the SAMA analysis related to wind direction inputs, but as a result, the number of cost-beneficial SAMAs changed. Three months later, NYS filed contentions NYS-35 and NYS-36, challenging Entergys revised analysis.

217 See NUREG-1437, Supp. 38, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Regarding Indian Point Nuclear Generating Unit Nos. 2 and 3, Draft Report for Comment at 5-10 (Dec. 2008)

(DSEIS) (NYS00132G).

218 See id. at G-36 (NYS00132G).

219 See Pilgrim, CLI-10-11, 71 NRC at 293 n.26 (because none of the SAMAs identified as potentially cost-effective bear on adequately managing the effects of aging, none need be implemented as part of the license renewal safety review, pursuant to 10 C.F.R. Part 54); Duke Energy Corp. (McGuire Nuclear Station, Units 1

& 2; Catawba Nuclear Station, Units 1 & 2), CLI-02-28, 56 NRC 373, 388 n.77 (2002) (upholding a DSEISs conclusion that a SAMA did not relate to adequately managing the effects of aging during the PEO and

[t]herefore, it need not be implemented as part of license renewal pursuant to 10 CFR Part 54).

220 See NL-09-165, Letter from Fred Dacimo, Entergy, to NRC, License Renewal Application: Revised SAMA Analysis Using Alternate Meteorological Data (Dec. 11, 2009) (Revised SAMA Analysis), available at ADAMS Accession No. ML093580089. The revisions identified three more potentially cost-beneficial SAMAs for IP2, and three more for IP3, raising the total number of potentially cost beneficial SAMAs for Indian Point from 16 to 22. See id. at 31-32.

44

2. The Boards Admission of Contention NYS-35/36 More than two years into this proceeding, NYS-35 alleged for the first time that Entergy had not sufficiently completed the SAMA cost-benefit analysis.221 Focusing on Entergys stated intention to conduct further engineering project cost-benefit analysis to evaluate potential implementation, NYS argued that the failure to complete this evaluation violated NEPA.222 NYS further alleged that SAMAs ultimately found sufficiently cost-effective must be added as license conditions for the renewed licenses.223 NYS-36 alleged that for nine specific SAMAs, refined estimates are unlikely to change the outcome.224 NYS further asserted that the SAMA analysis would be meaningless without implementation of such clearly cost-effective SAMAs, and that the Staff had failed to provide a rational basis for not requiring implementation.225 Entergy objected to these contentions as untimely, because the revised SAMA analysis did not provide any materially-different information about the nature or content of the SAMA cost estimates, so any question about their completeness under NEPA should have been raised at the outset of the proceeding.226 Entergy also argued that the SAMA analysis was complete as a matter of fact and law, and that NYS improperly conflated the Part 54 license renewal regulations with the Part 50 backfit process.227 The Staff raised similar objections.228 221 See Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 & 3), CLI-10-30, 72 NRC 564-66 (2010) (citing State of New Yorks New and Amended Contentions Concerning the December 2009 Renalysis of Severe Accident Mitigation Alternatives at 13, 15-17, 22-35 (Mar. 11, 2010) (New Yorks New and Amended Contentions), available at ADAMS Accession No. ML00780366).

222 See id. (citing New Yorks New and Amended Contentions at 15-17, 22-35).

223 See id. (citing New Yorks New and Amended Contentions at 13).

224 See id. at 567 (citing New Yorks New and Amended Contentions at 36, 37, 39).

225 See New Yorks New and Amended Contentions at 40-41; Indian Point, CLI-10-30, 72 NRC at 567.

226 See Applicants Answer to New York States New and Amended Contentions Concerning Entergys December 2009 Revised SAMA Analysis at 21-24 (Apr. 5, 2010) (Entergy Answer to SAMA Contentions), available at ADAMS Accession No. ML101450328.

227 See id. at 24-31.

45

In LBP-10-13, the Board admitted NYS-35 insofar as the contention alleged the DSEIS did not provide a rational basis for granting license renewal without mandating a CLB backfit to mandate implementation of cost-effective SAMAs.229 The Board also admitted the portion of NYS-35 calling for completion of the SAMA analyses through further engineering cost analyses, and the portion of NYS-36 that alleged the Staff had violated NEPA by failing to explain why license renewal could be granted without requiring implementation of cost-beneficial SAMAs.230

3. Appeals of Contention Admissibility Entergy and the Staff sought interlocutory review arguing, among other things, that LBP-10-13 ignored controlling NEPA precedent, improperly conflated Part 54 license renewal regulations with the Part 50 backfit process, and failed to distinguish between conceptual environmental alternative cost estimates prepared for purposes of NEPA and detailed engineering project cost estimates performed to assess the viability of a particular plant modification for current plant operations.231 The Commission denied interlocutory review, but referring to the Boards importation of Part 50 backfit matters into a NEPA analysis and a Part 54 proceeding, it observed that

[p]ortions of the Boards decision appear problematic, and that arguments against admissibility were not without force.232 Thus, review might be warranted later in the proceeding.233 228 See NRC Staffs Answer to State of New Yorks New and Amended Contentions Concerning the December 2009 Severe Accident Mitigation Alternative Reanalysis at 16-35 (Apr. 5, 2010), available at ADAMS Accession No. ML100960165.

229 Indian Point, CLI-10-30, 72 NRC at 567 (quoting Indian Point, LBP-10-13, 71 NRC at 698).

230 See id. at 567-68 (quoting Indian Point, LBP-10-13, 71 NRC at 702).

231 See generally Applicants Petition for Interlocutory Review of LBP-10-13 (July 15, 2010), available at ADAMS Accession No. ML102030050; see also NRC Staffs Petition for Interlocutory Review of the Atomic Safety and Licensing Boards Decision Admitting New York State Contentions 35 and 36 on Severe Accident Mitigation Alternatives (LBP-10-13) (July 15, 2010), available at ADAMS Accession No. ML101970197.

232 Indian Point, CLI-10-30, 72 NRC at 568.

46

4. Issuance of the FSEIS In December 2010, the Staff issued its FSEIS, which, like the ER and DSEIS, concluded that none of the potentially cost-beneficial SAMAs were related to aging management and that they, therefore, would be addressed under the agencys oversight of the current operating licenses.234 To specifically address the Boards ruling in LBP-10-13, the Staff substantially expanded its explanation of the SAMA implementation process.235 It concluded, again, that there is no regulatory basis to suggest that potentially cost-beneficial SAMAs unrelated to Part 54 requirements must be imposed as a backfit to the CLB, as a condition for license renewal.236
5. Motions for Summary Disposition Following issuance of the FSEIS, NYS sought summary disposition of NYS-35/36, requesting that the FSEIS be revised to either direct all cost-effective SAMAs to be implemented as a condition of license renewal, or else provide a rational basis as to why implementation is not required.237 Alternatively, NYS asked that the application be denied.238 Entergy and the Staff each filed cross-motions for summary disposition, arguing that the SAMA analysis was complete as a matter of fact and law, and that neither Part 54 nor Part 51 compels changes to the CLB as part of the license renewal process or implementation of mitigation measures unrelated to aging management.239 233 See id.

234 See FSEIS at 5-11 (NYS00133C).

235 See id.

236 Id.

237 State of New Yorks Motion for Summary Disposition of Consolidated Contention NYS-35/36 at 2 (Jan. 14, 2011), available at ADAMS Accession No. ML110270252.

238 See id. at 3.

239 See Applicants Consolidated Memorandum in Opposition to New York States Motion for Summary Disposition of Contention NYS-35/36 and in Support of its Cross-Motion for Summary Disposition (Feb. 3, 2011) ), available at ADAMS Accession No. ML110460187; see also NRC Staffs (1) Cross-Motion for Summary Disposition, and (2) Response to New York States Motion for Summary Disposition, of Contention NYS-35/36 (Severe Accident Mitigation Alternatives) (Feb. 7, 2011), available at ADAMS Accession No. ML110400012.

47

In LBP-11-17, the Board granted NYSs motion and denied the cross-motions.240 It held that Entergys licenses cannot be renewed unless and until the NRC Staff reviews Entergys completed SAMA analyses and either incorporates the result of these reviews into the FSEIS or, in the alternative, modifies its FSEIS to provide a valid reason for recommending the renewal of the licenses before the analysis of potentially cost-effective SAMAs is complete and for not requiring the implementation of cost-beneficial SAMAs.241 The Board reasoned that the NEPA review in license renewal proceedings, which is conducted pursuant to Part 51, is not limited to aging management-related issues.242 Thus, the Staff has the authority to require implementation of non-aging management SAMAs through its CLB backfit review under Part 50 or through setting conditions of the license renewal, and must exercise that authority, or explain why it did not.243

6. Appeal of Summary Disposition Entergy sought Commission review and reversal of LBP-11-17, arguing that the Board erred in holding that: (a) Part 50 backfit rules established requirements that applied to the review of LRAs; (b) Part 54 and 51 regulations authorized the Staff to condition renewed licenses to require implementation of SAMAs unrelated to aging management; and (c) the license renewal SAMA analysis was incomplete.244 The Staff filed an answer arguing that interlocutory review was warranted.245 The Commission concluded that LBP-11-17 did not dispose of a major 240 See Indian Point, LBP-11-17, 74 NRC at 15.

241 See id. at 27.

242 Id. at 21 (citing Pac. Gas & Elec. Co. (Diablo Canyon Nuclear Power Plant, Units 1 & 2), LBP-10-15, 72 NRC 257, 288 (2010), revd in part on other grounds, CLI-11-11, __ NRC __ (Oct. 12, 2011)).

243 Id. at 22; see also id. (citing 10 C.F.R. § 51.103(a)(4)).

244 See generally Applicants Petition for Review of LBP-11-17 Granting Summary Disposition of Consolidated Contention NYS-35/36 (July 29, 2011), available at ADAMS Accession No. ML11217A066.

245 See Entergy Nuclear Operations, Inc. (Indian Point, Units 2 & 3), CLI-11-14, 74 NRC 801, 805-06 (2011).

48

segment of the case, and denied review without reaching the merits, and without prejudice to Entergys ability to seek review after the Boards final decision in this case.246

7. Developments Since CLI-11-14 Given the Boards unambiguous ruling that license renewal cannot be granted without further FSEIS supplementation, Entergy prepared and submitted refined project-level cost estimates to the NRC Staff for potentially cost beneficial SAMAs.247 In making this submittal, Entergy did not waive any rights to appeal the SAMA Orders or concede that its original SAMA cost estimates were in any way insufficient or incomplete.248 The Staffs review of this submittal is ongoing.249 As explained above, the PID, disposed of all Track 1 contentions including all admitted SAMA contentions. The Board also discussed the SAMA Orders and the Staffs review of Entergys refined project-level cost estimates,250 reiterating that:

The FSEIS does not articulate a rational basis for not requiring Entergy to complete its SAMA review and for not requiring the implementation of cost-beneficial SAMAs prior to the relicensing of IP2 and IP3 and, therefore, violates NRC regulations, NEPA, and the APA [Administrative Procedures Act].

Renewed licenses cannot be issued unless and until this deficiency is corrected.251 246 Id. at 811, 813-14. The Commission also noted that two other SAMA contentions were among fourteen contentions pending before the Board. Id. at 811. Those contentions were subsequently resolved in LBP-13-13.

247 NL-13-075, Letter from F. Dacimo, Entergy, to NRC Document Control Desk, License Renewal Application -

Completed Engineering Project Cost Estimates for SAMAs Previously Identified as Potentially Cost-Beneficial (May 6, 2013) (NL-13-075), available at ADAMS Accession No. ML13127A459. The refined estimates were consistent with estimates Entergy prepares for project approvals, including details on construction, equipment, supplies, labor, etc. that are well-beyond the level of detail required for NEPA alternatives. NL 075 also discussed recent and directly-relevant Commission precedent governing SAMAs.

248 See id., encl. at 2.

249 See NRC Staffs 24th Status Report In Response to the Atomic Safety and Licensing Boards Order of February 16, 2012, at 5-6 (Feb. 3, 2014), available at ADAMS Accession No. ML14034A369. Entergys preparation and submission of the additional cost information demanded by the Board does not resolve the Boards decision in LBP-11-17, as the Staff has not yet decided whether Entergys cost estimates will lead to another FSEIS supplement. Prompt Commission review and reversal of the SAMA Orders would obviate the need for review, which is not related to aging management and not required by NEPA or the Commissions regulations.

250 See Indian Point, LBP-13-13, slip op. at 7-8, 10, A-3.

251 Id. at A-3.

49

B. Issues Presented by the Boards SAMA Orders

1. Whether the Board erred in admitting NYS-35/36 when: (a) Entergys Revised SAMA Analysis did not include any materially different information regarding the SAMA cost-benefit analysis or SAMA implementation that could trigger a timely late-filed contention; and (b) the contention sought to require, as a condition of license renewal, either SAMA implementation or further justification for not implementing individual SAMAs, absent a legal or regulatory basis to do so?
2. Whether the Board erred in granting summary judgment to NYS on NYS-35/36, when the Staff has no legal or regulatory authority to require additional cost-benefit analyses as a precondition of license renewal?

C. The Commission Should Take Review and Reverse the SAMA Orders Now

1. Review at this Stage Is Appropriate Following a PID, the parties should assert any claims of error that relate to the subject matter of the partial initial decision, whether the specific issue was admitted for hearing or not, and without regard to whether the issue was originally designated a separate contention or a basis for a contention.252 The Commission should take review of the Boards SAMA Orders now because these decisions relate to the subjects addressed in LBP-13-13, and not to any other pending matters in this proceeding. NYS-35/36 originally was part of the set of Track 1 contentions which were heard in 2012. It was removed from Track 1, however, because the Board granted summary disposition in favor of NYS. Further, LBP-13-13 is a final order on all other pending SAMA issues in this proceeding, and therefore disposes of a major segment of the case.253 252 PFS, CLI-00-24, 52 NRC at 353.

253 See Indian Point, LBP-13-13, slip op. at 293, 313 (resolving NYS-12B and 16B in favor of the NRC Staff); see also Indian Point, CLI-11-14, 74 NRC at 810-11 (In Pilgrim, we explained that the basis for our allowing immediate appellate review of partial initial decisions rests on prior Appeal Board decisions permitting review of a licensing board ruling that disposes of . . . a major segment of the case or terminates a partys right to participate.). NYS has also taken the position that NYS-35/36 is related to its other Track 1 SAMA contentions. See State of New York Motion Seeking Leave to File an Additional Exhibit and Supplemental Proposed Findings of Fact and Conclusions of Law on Contention NYS-16B (May 17, 2013) (asserting that Entergys revised cost estimates in NL-13-075 were related to a different SAMA contention, NYS-16B).

50

Thus, as specified in CLI-00-24, Entergy must seek review now, and the Commission should take review of the SAMA Orders at this juncture.254

2. The Commission Should Review and Reverse the SAMA Orders
a. Legal Standards Governing SAMA Analyses and Implementation The SAMA analysis is a NEPA-driven mitigation alternatives analysis.255 NEPA requires a discussion of possible mitigation measures, but imposes no substantive requirement that mitigation measures actually be taken.256 As the Commission recently confirmed in response to a claim that NRC must require implementation of all possible mitigation alternatives, such a demand is inconsistent with NEPA, which neither requires nor authorizes the NRC to order implementation of mitigation measures analyzed in an environmental analysis.257 Likewise, a NEPA mitigation analysis demands no fully developed plan, or detailed examination of specific measures which will be employed to mitigate adverse environmental effects.258 The scope of license renewal under Part 54 is limited to aging-related matters and does not require applicants to revisit CLB issues that fall outside that limited scope.259 For this reason, and as the Indian Point Board has acknowledged, SAMAs unrelated to aging management need not be implemented pursuant to the NRCs license renewal safety view under Part 54.260 The ultimate decision on whether to require a facility to modify its CLB to 254 See PFS, CLI-00-24, 52 NRC at 353.

255 See Pilgrim, CLI-12-15, 75 NRC at 706 (2012); Pilgrim, CLI-12-01, 75 NRC at 41.

256 Robertson, 490 U.S. at 352, 353 n.16; see also Cnty. of Rockland v. FAA, 335 Fed.Appx. 52, 55 (D.C. Cir.

2009) (quoting Robertson, 490 U.S. at 352).

257 Pilgrim, CLI-12-10, 75 NRC at 488 (emphasis added); see also Mass. v. NRC, 708 F.3d 63, 81 n.27 (1st Cir.

2013) (To the extent Massachusetts seeks to impose a substantive requirement that the NRC must require certain mitigation measures under NEPA, that is foreclosed by the fact that NEPA is not outcome driven.).

258 Pilgrim, CLI-10-11, 71 NRC at 316 (emphasis added).

259 Turkey Point, CLI-01-17, 54 NRC at 7-9 & 21.

260 Indian Point, LBP-11-17, 74 NRC at 25 (citing Pilgrim, CLI-10-11, 71 NRC at 293 n.26).

51

implement any particular SAMA is outside of the scope of the LRA review.261 Consistent with this precedent, the Commission recently reiterated that the NRC will consider any new information on severe accident mitigation under its ongoing reactor oversight.262

b. The Board Should Not Have Admitted Contention NYS-35/36 (i) The Consolidated Contention Was Untimely The Commission should reverse the Boards admission of NYS-35/36 because the proposed contentions were untimely. The purportedly new information that triggered NYS-35/36 was not materially different from what was previously available over two years earlier.263 As a threshold matter, NYS has acknowledged that NYS-35/36 raises purely legal issues.264 Those issues are: (a) whether the Staff must either require implementation of potentially cost-beneficial SAMAs or better explain why particular non-aging related SAMAs were not required as a condition of license renewal; and (b) whether Entergys current SAMA analysis, particularly the SAMA cost estimates, is complete under Part 51 and NEPA as a matter of law. As Entergy argued at the admissibility stage, nothing about the specific inputs or 261 See McGuire/Catawba, CLI-02-28, 56 NRC at 388 n.77 ([T]he ultimate agency decision on whether to require facilities . . . to implement any particular SAMA will fall under a Part 50 current licensing basis review.).

262 Pilgrim, CLI-12-15, 75 NRC at 707-08.

263 See 10 C.F.R. 2.309(f)(2)(ii) (2010). Since LBP-10-13, the Commission has clarified its timeliness rules for late-filed contentions. See Final Rule, Amendments to Adjudicatory Process Rules and Related Requirements, 77 Fed. Reg. 46,562, 46,582-83 (Aug. 3, 2012). The requirements relevant to the appeal of LBP-10-13, however, have not changed, as the current 10 C.F.R. § 2.309(c)(1)(i)-(iii) retain the same standards previously codified at Section 2.309(f)(2)(i)-(iii). Entergy cites to the timeliness regulations in effect in 2010.

264 See State of New Yorks Motion for Leave to File New and Amended Contentions Concerning the December 2009 Renalysis of Severe Accident Mitigation Alternatives at 14 (Mar. 11, 2010), available at ADAMS Accession No. ML100780366 (Contentions 35 and 36 are essentially based on legal deficiencies in the December 2009 Revised SAMA Analysis.). New York later sought to overcome Entergy and the Staffs timeliness objections by disavowing this point. See State of New York Combined Reply to Entergy and the NRC Staff Answers to the States New and Amended Contentions Concerning the December 2009 Severe Accident Mitigation Alternatives Reanalysis at 26 n.7 (Apr. 12, 2010), available at ADAMS Accession No. ML101160415. But it is axiomatic that a contention cannot be amended through a reply. See Nuclear Mgmt.

Co., LLC (Palisades Nuclear Plant), CLI-06-17, 63 NRC 727, 732 (2006).

52

methods used in its 2009 SAMA revisions was materially different from what was previously available with respect to the legal issues raised in NYS-35/36.265 As to the first legal issue, NYS filed NYS-35/36 following Entergys SAMA analysis revisions that specifically addressed a narrow Staff question concerning meteorological data inputs. This was not a completely new SAMA analysis. While the new data inputs led to changes in the results of the cost-benefit analyses, Entergy used precisely the same NRC-approved methodology used in the original SAMA analysis.266 Thus, the changes in meteorological data inputs are simply irrelevant to the question of whether the Staff must require implementation of identified potentially cost-beneficial SAMAs, or further justify why it is not.

As to the second legal issue, the 2009 revisions provided no materially different information regarding the completeness of the SAMA cost-benefit analysis under NEPA and Part 51.267 The original LRA states that since the SAMA analysis is conservative and is not a complete engineering project cost-benefit analysis, it does not estimate all of the benefits or costs of a SAMA.268 This is fully consistent with NEPA and Commission precedent interpreting NEPA, which do not require a fully developed engineering project cost analysis.269 Nothing in the December 2009 submittal changed these facts about the SAMA analysis. Thus, sufficient information was available to file NYS-35/36 more than two years before NYS did, rendering it untimely under 10 C.F.R. § 2.309(f)(2)(ii) (2010).270 265 See Entergy Answer to SAMA Contentions at 21-24.

266 See id. at 2, 10-11; see also Revised SAMA Analysis at 5, 31-32.

267 Contrary to the Boards statement that Entergy has stated . . . that it will conclude its SAMA review after license renewal is complete, Indian Point, LBP-11-17, 74 NRC at 26, Entergy has never acknowledged nor does it believe that its SAMA analysis is not complete for purposes of compliance with NEPA requirements for license renewal.

268 ER at 4-73 (ENT00015B).

269 Pilgrim, CLI-10-11, 71 NRC at 316.

270 See, e.g., Oyster Creek, CLI-09-07, 69 NRC at 272-75 (upholding the rejection of untimely contentions, despite the existence of some new information, when the specific information challenged by the petitioners in each 53

In response to Entergys and the NRCs timeliness arguments, the Board simply pointed to the allegedly new cost-benefit picture created by the new meteorological inputs.271 But, as explained in Section V.C.2.b.i, above, the changes in meteorological input data and number of cost-beneficial SAMAs are immaterial to the strictly legal issues raised in NYS-35/36.

In sum, NYSs arguments could and should have been raised at the time of its initial petition. The Boards decision that NYS-35/36 was timely is erroneous and should be reversed.

(ii) The Consolidated Contention Is Substantively Inadmissible NYS-35/36 are also inadmissible under 10 C.F.R. § 2.309(f)(1), because NYSs claims are contrary to NEPA and the Commissions regulations.272 The admission of NYS-35/36 rests on the faulty premise that NEPA, when read in conjunction with Parts 50 and 54, authorizes NRC to compel implementation of cost beneficial SAMAs regardless of their nexus to aging management.273 This premise runs counter to one of the most fundamental and settled precepts of NEPA law, as established by the U.S. Supreme Court: NEPA itself does not mandate particular results, but simply prescribes the necessary process.274 contention was long available). At a minimum, NYS should have filed its contentions following the December 2008 DSEIS, which, as shown in Section V.C.2.b.i, above, clearly sets forth the Staffs position on NYSs issues.

271 Indian Point, LBP-10-13, 71 NRC at 696. The Board also cited its own order establishing a fixed deadline for new contentions . . . which arise out of Entergys revised SAMA submissions . . . . Id. at 677; see also id. at 696 n.126. But an administrative deadline for new contentions does not and cannot dispense with the petitioners burden to show that the new information is in fact materially different from what was previously availablewith respect to its actual proposed contention. Tex. Utils. Elec. Co. (Comanche Peak Steam Electric Station, Units 1 & 2), CLI-88-12, 28 NRC 605, 609 (1988) (holding that the petitioner bears the burden of demonstrating the timeliness of its contentions).

272 See Fla. Power & Light Co. (Turkey Point Nuclear Generating Plant, Units 3 & 4), LBP-01-6, 53 NRC 138, 159-60, affd, CLI-01-17, 54 NRC 3 (2001) (rejecting a contention that a license renewal applicant was required to prepare a probabilistic risk assessment that was not required under the regulations).

273 See Indian Point, LBP-10-13, 71 NRC at 696-98. NYS-35/36 raised similar legal issues at both the contention admissibility and summary disposition stages. Therefore, where appropriate, this section addresses the analysis in LBP-11-17, in areas where that decision provides a fuller discussion of the legal issues raised in the contention.

274 Robertson, 490 U.S. at 350 (citing Stryckers Bay Neighborhood Council, Inc. v. Karlen, 444 U.S. 223, 227-228 (1980) (per curiam); Vt. Yankee Nuclear Power Corp. v. Natural Res. Def. Council, Inc., 435 U.S. 519, 558 (1978)).

54

Notably, the Commission has approved dozens of renewed operating licenses which identified potentially cost-beneficial SAMAs. But the NRC has never mandated implementation of SAMAs unrelated to aging management as a condition of license renewal, or required a more detailed explanation for not doing so, beyond the well-established reason that none of the identified SAMAs related to aging management. Indeed, the Boards rationale for the SAMA Orders has been repeatedly rejected, most notably in a series of rulings in the Pilgrim license renewal proceeding that the Commission issued after the Indian Point SAMA Orders.275 The NRC renewed the Pilgrim license in 2012, but the renewed license did not require the implementation of non-aging-related SAMAs.276 Indian Point is no different, and the Boards reasons for departing from longstanding precedent and practice lack legal justification.

(a) Entergys SAMA Cost-Benefit Analysis Satisfies Part 51 and Part 54 The Boards determination rests, in part, on the unfounded supposition that Entergy improperly deferred completion of the necessary SAMA analysis until after license renewal.277 Part 51 requires license renewal applicants to perform site-specific SAMA analyses,278 but this requirement is tempered by a practical rule of reason.279 In this regard, NEPA 275 See Pilgrim, CLI-12-01, 75 NRC at 39 (explaining that the SAMA analysis is intended to indentify additional mitigation measures that might further reduce the already-SMALL severe accident risk, and that the SAMA analysis is supplemental to the NRCs safety regulations); Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-12-06, 75 NRC 352, 374 (2012) (emphasizing that the current regulatory and oversight process provides reasonable assurance of compliance with the CLB, which can be adjusted by the Commission outside of the license renewal process); Pilgrim, CLI-12-10, 75 NRC at 488 (holding that NEPA, neither requires nor authorizes the NRC to order implementation of mitigation measures analyzed in an environmental analysis).

276 See Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station) Docket No. 50-293, Renewed Facility Operating License at 7 (May 9, 2012). This was because [t]he potentially cost-beneficial SAMAs do not relate to adequately managing the effects of aging during the period of extended operation; therefore, they need not be implemented as part of license renewal pursuant to 10 CFR Part 54. NUREG-1437, Supp. 29, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Regarding Pilgrim Nuclear Power Station, Final Report at 5-5 (July 2007), available at ADAMS Accession No. ML071990020.

277 See Indian Point, LBP-10-13, 71 NRC at 698; see also Indian Point, LBP-11-17, 74 NRC at 26.

278 10 C.F.R. § 51.53(c)(3)(ii)(L).

279 Pilgrim, CLI-10-22, 72 NRC at 208 (quoting Cmtys., Inc. v. Busey, 956 F.2d 619, 626 (6th Cir. 1992)).

55

requires [applicants and] the NRC to provide a reasonable mitigation alternatives analysis, containing reasonable estimates.280 Entergys original SAMA analysis and the 2009 revisions did precisely that by following NRC-approved guidance and state-of-the-art practices in providing sufficient information for the Staff to take a hard look at SAMAs for purposes of license renewal.

Entergy has therefore supplied sufficient facts to allow the Staff to explain its conclusions and to fully satisfy its hard look obligations under NEPA,281 so the SAMA analysis is complete for purposes of NEPA and Part 51. NEPA does not require a fully developed engineering project cost estimate.282 Entergys statement, in its ER, that it plans to prepare more refined engineering project cost evaluations of the potentially cost-beneficial SAMAs for possible implementation as part of current plant operation does not negate Entergys and the Staffs demonstrated current compliance with NEPA for purposes of license renewal.

In short, the Board erred as a matter of law by failing to address the key distinction between the conservatively low, conceptual cost estimates prepared under NEPA and subsequent internal engineering project analyses that an applicant may perform to assess the viability of implementing a particular plant modification under its current operating procedures.

(b) NEPA and Part 51 Provide No Authority to Require SAMA Implementation As previously shown, SAMAs unrelated to managing the effects of aging need not be implemented under Part 54, even if they are potentially cost effective.283 The Board found the Commissions precedent from the Pilgrim and McGuire/Catawba proceeding inapposite 280 Id.

281 Indian Point, LBP-10-13, 71 NRC at 698.

282 See Pilgrim, CLI-10-11, 71 NRC at 316.

283 See Pilgrim, CLI-10-11, 71 NRC at 293-94 n.26; McGuire/Catawba, CLI-02-28, 56 NRC at 388 n.77.

56

because the IPEC SAMAs were analyzed under [the NRCs] Part 51 environmental review, not Part 54.284 That explanation does not withstand scrutiny.

First and foremost, as a matter of law, NEPA and Part 51 contain no action-forcing mechanisms.285 Moreover, the situations in the Pilgrim and McGuire/Catawba proceedings are indistinguishable from this proceeding. The IPEC SAMAs were analyzed under [the NRCs]

Part 51 environmental review, exactly as in Pilgrim, McGuire/Catawba, and all other license renewal proceedings.286 Thus, the Board erred as a matter of law when it determined that NEPA and Part 51 provide the Staff with authority for conditioning renewed licenses to require implementation of SAMAs unrelated to aging management.

(c) The Backfit Regulations Do Not Establish License Renewal Requirements In admitting NYS-35/36, the Board erroneously posits that the Staff may institute a backfit prior to license renewal under Part 50 as a result of its SAMA review.287 Again, the Boards ruling is contrary to established law, in that the Board has improperly conflated the disparate regulatory processes set forth in Parts 54, 51, and 50.

284 Indian Point, LBP-11-17, 74 NRC at 25 (citing McGuire/Catawba, CLI-02-28, 56 NRC at 388 n.77; Pilgrim, CLI-10-11, 71 NRC at 293-94 n.26).

285 Robertson, 490 U.S. at 352, 353 n.16 (NEPA imposes no substantive requirement that mitigation measures actually be undertaken.).

286 The Board also erroneously accepted NYSs claim that the Staff could have relied upon 10 C.F.R. § 54.33(c) as a basis for compelling Entergy to implement environmental mitigation measures identified through the Part 51 NEPA process. See Indian Point, LBP-11-17, 74 NRC at 26. SAMA implementation is a matter considered under Part 50, not as a license renewal matter. See, e.g., McGuire/Catawba, CLI-02-28, 56 NRC at 388 n.77.

Further, the only conditions for the license renewal, Indian Point, LBP-11-17, 74 NRC at 26, relevant to Section 54.33(c) are possible amendment or supplementation of current operating license conditions related to a licensees ongoing environmental monitoring, reporting, and recordkeeping obligations under Section 50.36b, not mitigation measures such as plant modifications. Thus, license conditions that were not previously imposed under Section 50.36(b) as part of the current operating license are irrelevant to Section 54.33.

287 Indian Point, LBP-10-13, 71 NRC at 697 (emphasis added); see also Indian Point, LBP-11-17, 72 NRC at 26 (reaching the same conclusion).

57

First, controlling precedent holds that backfit requests under Part 50 are not permissible in a license renewal proceeding.288 Second, the Boards novel view of Section 50.109 is inconsistent with the regulatory history of Part 54, which clarifies the relationship between Part 54 and the backfit rule:

If the staff or the licensee seeks to make changes in a plants licensing basis for reasons other than age-related degradation, they should be pursued either in the existing operating license or the renewed license, once issued. Staff-initiated changes would be evaluated in accordance with the backfit rule, 10 CFR 50.109.289 In its May 1995 revisions to Part 54, the Commission reaffirmed that it does not intend to impose requirements on a licensee that go beyond what is necessary to adequately manage aging effects.290 The Boards reliance on the backfit rule in the SAMA Orders cannot be reconciled with these settled and Commission-endorsed principles.291

c. The Board Erred in Granting Summary Disposition Relying upon the same erroneous conclusions discussed in the previous Sections, the Board granted summary disposition in favor of NYS in LBP-11-17. As shown in Section V.C.2.b.ii, above, this decision was contrary to established law and should be reversed under 10 288 See Entergy Nuclear Operations, Inc. (Pilgrim Nuclear Power Station), CLI-06-26, 64 NRC 225, 226-27 (2006); see also Carolina Power & Light Co. (Shearon Harris Nuclear Power Plant, Unit 1), LBP-07-11, 66 NRC 41, 96-97 (2007) (denying petitioners request for fire barrier system backfits and noting that a petition for backfits is essentially a request for enforcement action and is not cognizable in a license renewal adjudication); N. Anna, CLI-07-27, 66 NRC at 233 (noting the limited applicability of the backfit rule).

289 Proposed Rule: Nuclear Power Plant License Renewal, 55 Fed. Reg. 29,043, 29,047 (July 17, 1990) (emphasis added).

290 1995 License Renewal SOC, 60 Fed. Reg. at 22,490.

291 These same principles are reflected in NRC guidance documents. See, e.g., NRR Office Instruction LIC-202, Rev. 2, Procedures for Managing Plant-Specific Backfits and 50.54(f) Information Requests at 1 (May 17, 2010), available at ADAMS Accession No. ML092010045 ([I]f the NRC proposes to address safety issues outside the [aging management] scope of Part 54 then any actions necessary to address such out-of-scope safety issues are subject to the Backfit Rule.); NUREG-1850, Frequently Asked Questions on License Renewal of Nuclear Power Reactors at 4-34 (Mar. 2006), available at http://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1850/sr1850_faq_lr.pdf (stating that plant enhancements that appear to be cost-beneficial but are unrelated to aging management during the PEO are considered as current operating issues and are further evaluated as changes that might appropriately be made under the current operating license rather than as a license renewal issue).

58

C.F.R. § 2.341(b)(4)(ii). For purposes of brevity, Entergy adopts and incorporates the legal arguments in that Section here, as the legal arguments against admissibility of NYS-35/36 also support reversal of the Boards grant of summary disposition. As demonstrated above, NYS did not carry its burden of showing that it is entitled to a decision as a matter of law.292 Moreover, LBP-11-17 is based upon additional legal and factual errors that warrant reversal under 10 C.F.R. § 2.341(b)(4)(i) and (ii). In LBP-11-17 the Board found that the FSEIS fails to articulate a rational basis for not requiring Entergy to complete its SAMA review and for not requiring the implementation of cost-beneficial SAMAs prior to the license renewal . . . .293 On the contrary, the Staff took the requisite hard look at potential SAMAs under NEPA, as shown in the detailed technical evaluation in Appendix G of the FSEIS, and articulated a rational legal basis for not requiring implementation of potentially cost-beneficial SAMAs as a condition of license renewal.

In Section 5.2.6 of the FSEIS, the Staff fully explained why it was not ordering Entergy to implement the non-aging related SAMAs, logically concluding that it lacked a regulatory basis to require implementation as a condition of license renewal.294 This conclusion is rational and complies with governing law and longstanding precedent.295 Thus, even if the Commission does not reverse the admission of NYS-35/36, the Boards grant of summary disposition to NYS should be reversed, and summary disposition should be granted to Entergy and the Staff.

292 See Pilgrim, CLI-10-11, 71 NRC at 297; AmerGen Energy Co., LLC (Oyster Creek Nuclear Generating Station), CLI-08-28, 68 NRC 658, 673 (2008) (stating that the summary disposition standard places the burden of proof on the moving party).

293 Indian Point, LBP-11-17, 74 NRC at 26.

294 See supra § V.C.2.b.ii.

295 See 10 C.F.R. §§ 54.29(a), 51.95(c).

59

d. The Public Interest Warrants Review of the SAMA Orders This appeal brings to the Commission an important legal question that directly affects the manner in which the Staff must discharge its obligations under NEPA, the AEA, and NRC regulations governing LRAs. As shown above, the evaluation of SAMAs in the FSEIS is entirely consistent with NEPA, the Commissions regulations, and all prior license renewal reviews. Allowing the SAMA Orders to stand would represent a fundamental reversal of policy regarding the scope of license renewal proceedings, and effect a departure from precedent set in more than 70 renewed licenses that the NRC has previously issued. This appeal therefore raises a substantial question of law, policy, and discretion, and review of the SAMA Orders would be in the public interest, consistent with 10 C.F.R. § 2.341(b)(4)(iii) and (v).296 VI. CONCLUSION For the foregoing reasons, the Commission should accept review of LBP-13-13 and its preceding decisions and reverse the Boards rulings related to contentions NYS-8 and NYS-35/36, and uphold the Staffs FSEIS analysis on CW-EC-3A.

Respectfully submitted, Executed in accord with 10 C.F.R. § 2.304(d)

William B. Glew, Jr., Esq. Kathryn M. Sutton, Esq.

William C. Dennis, Esq. Paul M. Bessette, Esq.

Entergy Services, Inc. MORGAN, LEWIS & BOCKIUS LLP 440 Hamilton Avenue 1111 Pennsylvania Avenue, N.W.

White Plains, NY 10601 Washington, D.C. 20004 Phone: (914) 272-3360 Phone: (202) 739-5738 E-mail: wglew@entergy.com E-mail: ksutton@morganlewis.com E-mail: wdennis@entergy.com E-mail: pbessette@morganlewis.com Counsel for Entergy Nuclear Operations, Inc.

Dated at Washington, DC this 14th day of February 2014 296 See Vt. Yankee, CLI-10-17, 72 NRC at 13.

60

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of ) Docket Nos. 50-247-LR and

) 50-286-LR ENTERGY NUCLEAR OPERATIONS, INC. )

)

(Indian Point Nuclear Generating Units 2 and 3) )

) February 14, 2014 CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305 (as revised), I certify that, on this date, copies of Applicants Petition for Review of Board Decisions Regarding Contentions NYS-8 (Electrical Transformers), CW-EC-3A (Environmental Justice), and NYS-35/36 (SAMA Cost Estimates) were served upon the Electronic Information Exchange (the NRCs E-Filing System) in the above-captioned proceeding.

Signed (electronically) by Lance A. Escher Lance A. Escher, Esq.

MORGAN, LEWIS & BOCKIUS LLP 1111 Pennsylvania Ave. N.W.

Washington, DC 20004 Phone: (202) 739-5080 Fax: (202) 739-3001 E-mail: lescher@morganlewis.com Counsel for Entergy Nuclear Operations, Inc.

1

ATTACHMENT 1 Comparison of the Electrical Transformers Contentions in the Indian Point and the Seabrook License Renewal Proceedings Note: This attachment identifies changes from the wording of the electrical transformers contention (Friends/NEC Contention 2) and the Declaration of Mr. Paul Blanch that were submitted in the Seabrook license renewal proceeding to the similar contention (Contention NYS-8) and Declaration of Mr. Paul Blanch that were submitted in the Indian Point license renewal proceeding. Portions that were added from the Seabrook version to the Indian Point version are indentified with an underline, and portions that were deleted are indicated by strikethrough. Simple formatting changes are not tracked.

Contention Language THE LRA FOR SEABROOK IP2 AND IP3 VIOLATES 10 C.F.R. §§ 54.21(a) AND 54.29 BECAUSE IT FAILS TO INCLUDE AN AGING MANAGEMENT PLAN FOR EACH ELECTRICAL TRANSFORMER WHOSE PROPER FUNCTION IS IMPORTANT FOR PLANT SAFETY.

BASIS

1. There are numerous electrical transformers that perform a function described in

§§ 54.4(a)(1)/(2) and (3). Transformers function without moving parts or without a change in configuration or properties as defined in that regulation.

2. Failure to properly manage aging of Electrical Transformers may compromise:
a. The integrity of the reactor coolant pressure boundary;
b. The capability to shut down the reactor and maintain it in a safe shutdown condition; or
c. The capability to prevent or mitigate the consequences of accidents, which could result in potential offsite exposures comparable to those referred to in §§ 50.34(a)(1),

50.67(b)(2), or § 100.11 of this chapter, as applicable. 10 C.F.R. §§ 54.4(a)(1)(2) and (3).

3. The consequence of failures of Electrical Transformers may result in accidents beyond the Design Basis Accidents resulting in exposures to the public exceeding 10 C.F.R. § 100 limits.

1

4. Failure to properly manage aging of electrical transformers could result in loss of emergency power to safety equipment and vital bussesthe 480 volt safety equipment and 6.9kV busses, including all station blackout loads. Appendix A, Page A-35 of the UFSAR supplement describes a Structures Monitoring Program that includes a program for monitoring transformer/switchyard support structures yet there is no APM described for transformers within the scope of 10 C.F.R. § 54.21(a)(1)(I).
5. Attachment 2 of Tthe LRA (p.2.4-22) also discusses the need for an AMP for transformer support structures based on the criterion of 10 CFR § 54.4(a)(3).

SUPPORTING EVIDENCE

6. The role of mostsome of the transformers in providing power for safety functions is normally described in Chapter 8 of the UFSAR for each Unit on pp. 1167-68, 1333-43 of the UFSAR for IP3 and pp. 1039-50 of the UFSAR for IP2. The Seabrook LRA provides an FSAR supplement as required by 10 CFR 54.21.
7. The UFSAR for IP2 is a one line diagram of the electrical plan for IP2, which identifies some of the transformers and their central role in the electrical system of the plant. IP2 UFSAR, figure 8.2.1, 8.2.2. A similar drawing for IP3 has not been provided with the LRA.

While other License renewal applications contained a copy of relevant sections of the UFSAR, Seabrook did not provide a copy and only reference applicable sections of the UFSAR.

8. Without a copy of the UFSAR it is not possible to identify all of the transformers within the scope of 10 CFR 54.4, however it is well known that many transformers perform functions described in 10 CFR 54 and are passive devices in that they contain no moving parts and do not undergo a change of properties or state.

2

9. Transformers are active devices within the scope of 10 CFR 54.4 yet the licensee has not provided any AMP to assure
10. In D-RAI 2.5-1 the Staff identifies some of the transformers for which AMP should be provided but which are not included in the LRA.

For purposes of the license renewal rule, the staff has determined that the plant system portion of the offsite power system that is used to connect the plant to the offsite power source should be included within the scope of the rule. This path typically includes switchyard circuit breakers that connect to the offsite system power transformers (startup transformers), the transformers themselves, the intervening overhead or underground circuits between circuit breaker and transformer and transformer and onsite electrical system, and the associated control circuits and structures. Ensuring that the appropriate offsite power system long-lived passive structures and components that are part of this circuit path are subject to an AMR will assure that the bases underlying the SBO requirements are maintained over the period of extended license.

September 21, 2007 Draft Requests for Additional Information Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application at p. 10.

3

Declaration of Paul Blanch 2821. There are numerous electrical transformers that perform a function described in §§ 54.4(a)(1)/(2) and (3). Transformers function without moving parts or without a change in configuration or properties as defined in that regulation.

2922. Failure to properly manage aging of Electrical Transformers may compromise:

a. The integrity of the reactor coolant pressure boundary;
b. The capability to shut down the reactor and maintain it in a safe shutdown condition; or
c. The capability to prevent or mitigate the consequences of accidents, which could result in potential offsite exposures comparable to those referred to in §§ 50.34(a)(1), 50.67(b)(2), or § 100.11 of this chapter, as applicable. 10 C.F.R. §§ 54.4(a)(1)(2) and (3).

3023. The consequence of failures of Electrical Transformers may result in accidents beyond the Design Basis Accidents resulting in exposures to the public exceeding 10 C.F.R.

§ 100 limits.

3124. Failure to properly manage aging of electrical transformers could result in loss of emergency power to safety equipment and vital bussesthe 480 volt safety equipment and 6.9kV busses, including all station blackout loads. Appendix A, Page A-35 of the UFSAR supplement describes a Structures Monitoring Program that includes a program for monitoring transformer/switchyard support structures yet there is no APM described for transformers within the scope of 10 C.F.R. § 54.21(a)(1)(I).

32. The LRA also discusses the need for an AMP for transformer support structures based on the criterion of 10 CFR § 54.4(a)(3).

4

33. The role of most of the transformers in providing power for safety functions is normally described in Chapter 8 of the UFSAR. The Seabrook LRA provides an FSAR supplement as required by 10 CFR 54.21.
34. While other License renewal applications contained a copy of relevant sections of the UFSAR, Seabrook did not provide such copy and only referenced applicable sections of the UFSAR.
35. Without a copy of the UFSAR it is not possible to identify all of the transformers within the scope of 10 CFR 54.4, however it is well known that many transformers perform functions described in 10 CFR 54 and are passive devices in that they contain no moving parts and do not undergo a change of properties or state.
36. Transformers are active devices within the scope of 10 CFR 54.4 yet the licensee has not provided any AMP to assure ???????