ML15002A205: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 11/24/2014
| issue date = 11/24/2014
| title = 2014 Braidwood Station Initial License Examination Form ES-201-1
| title = 2014 Braidwood Station Initial License Examination Form ES-201-1
| author name = Morris R M
| author name = Morris R
| author affiliation = NRC/RGN-III/DRS/OB
| author affiliation = NRC/RGN-III/DRS/OB
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 1
| page count = 1
}}
}}
=Text=
{{#Wiki_filter:ES-201                                  Examination Preparation Checklist                              Form ES-201-1 Facility:    Braidwood Station                                          Date of Examination: _November 24, 2014 Developed by: Written - Facility              NRC          // Operating - Facility      NRC Target                                                                                                    Chief Date*                                    Task Description (Reference)                                Examiners Initials
    -180          1. Examination administration date confirmed (C.1.a; C.2.a and b)                  RMM
    -120          2. NRC examiners and facility contact assigned (C.1.d; C.2.e)                      RMM
    -120          3. Facility contact briefed on security and other requirements (C.2.c)              RMM
    -120          4. Corporate notification letter sent (C.2.d)                                      RMM
[-90]        [5. Reference material due (C.1.e; C.3.c; Attachment 3)]                            RMM
{-75}        6. Integrated examination outline(s) due, including Forms ES-201-2, ES-201-3, ES-301-1, ES-301-2, ES-301-5, ES-D-1's, ES-401-1/2, ES-401-3, and                RMM ES-401-4, as applicable (C.1.e and f; C.3.d)
{-70}        {7. Examination outline(s) reviewed by NRC and feedback provided to facility licensee (C.2.h; C.3.e)}                                                        RMM
{-45}        8. Proposed examinations (including written, walk-through JPMs, and scenarios, as applicable), supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, and ES-401-6, and any Form              RMM ES-201-3 updates), and reference materials due (C.1.e, f, g and h; C.3.d)
    -30          9. Preliminary license applications (NRC Form 398's) due (C.1.l; C.2.g; ES-202)                                                                          RMM
    -14          10. Final license applications due and Form ES-201-4 prepared (C.1.l; C.2.i; ES-202)                                                                          RMM
    -14          11. Examination approved by NRC supervisor for facility licensee review (C.2.h; C.3.f)                                                                  RMM
    -14          12. Examinations reviewed with facility licensee (C.1.j; C.2.f and h; C.3.g)        RMM
      -7          13. Written examinations and operating tests approved by NRC supervisor (C.2.i; C.3.h)                                                                  RMM
      -7          14. Final applications reviewed; 1 or 2 (if >10) applications audited to confirm qualifications / eligibility; and examination approval and waiver letters sent  RMM (C.2.i; Attachment 5; ES-202, C.2.e; ES-204)
      -7          15. Proctoring/written exam administration guidelines reviewed with facility licensee (C.3.k)                                                  RMM
      -7          16. Approved scenarios, job performance measures, and questions distributed to NRC examiners (C.3.i)                                            RMM
* Target dates are generally based on facility-prepared examinations and are keyed to the examination date identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.
[Applies only] {Does not apply} to examinations prepared by the NRC.}}

Latest revision as of 17:18, 31 October 2019

2014 Braidwood Station Initial License Examination Form ES-201-1
ML15002A205
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 11/24/2014
From: Morris R
Operations Branch III
To:
Exelon Generation Co
Shared Package
ML14344A985 List:
References
Download: ML15002A205 (1)


Text

ES-201 Examination Preparation Checklist Form ES-201-1 Facility: Braidwood Station Date of Examination: _November 24, 2014 Developed by: Written - Facility NRC // Operating - Facility NRC Target Chief Date* Task Description (Reference) Examiners Initials

-180 1. Examination administration date confirmed (C.1.a; C.2.a and b) RMM

-120 2. NRC examiners and facility contact assigned (C.1.d; C.2.e) RMM

-120 3. Facility contact briefed on security and other requirements (C.2.c) RMM

-120 4. Corporate notification letter sent (C.2.d) RMM

[-90] [5. Reference material due (C.1.e; C.3.c; Attachment 3)] RMM

{-75} 6. Integrated examination outline(s) due, including Forms ES-201-2, ES-201-3, ES-301-1, ES-301-2, ES-301-5, ES-D-1's, ES-401-1/2, ES-401-3, and RMM ES-401-4, as applicable (C.1.e and f; C.3.d)

{-70} {7. Examination outline(s) reviewed by NRC and feedback provided to facility licensee (C.2.h; C.3.e)} RMM

{-45} 8. Proposed examinations (including written, walk-through JPMs, and scenarios, as applicable), supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, and ES-401-6, and any Form RMM ES-201-3 updates), and reference materials due (C.1.e, f, g and h; C.3.d)

-30 9. Preliminary license applications (NRC Form 398's) due (C.1.l; C.2.g; ES-202) RMM

-14 10. Final license applications due and Form ES-201-4 prepared (C.1.l; C.2.i; ES-202) RMM

-14 11. Examination approved by NRC supervisor for facility licensee review (C.2.h; C.3.f) RMM

-14 12. Examinations reviewed with facility licensee (C.1.j; C.2.f and h; C.3.g) RMM

-7 13. Written examinations and operating tests approved by NRC supervisor (C.2.i; C.3.h) RMM

-7 14. Final applications reviewed; 1 or 2 (if >10) applications audited to confirm qualifications / eligibility; and examination approval and waiver letters sent RMM (C.2.i; Attachment 5; ES-202, C.2.e; ES-204)

-7 15. Proctoring/written exam administration guidelines reviewed with facility licensee (C.3.k) RMM

-7 16. Approved scenarios, job performance measures, and questions distributed to NRC examiners (C.3.i) RMM

  • Target dates are generally based on facility-prepared examinations and are keyed to the examination date identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.

[Applies only] {Does not apply} to examinations prepared by the NRC.