ML16172A196: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 13: | Line 13: | ||
| page count = 151 | | page count = 151 | ||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.1-3 Revision 21 PALISADES SCRAM CURVE | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.1-1 Revision 21 CONTROL ROD WITHDRAWAL INCIDENT HZP REACTIVITY INSERTION CURVE | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.1-2 Revision 21 CONTROL ROD WITHDRAWAL INCIDENT HZP REACTIVITY FEEDBACKS | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.1-3 Revision 21 CONTROL ROD WITHDRAWAL INCIDENT HZP TOTAL REACTIVITY | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.1-4 Revision 21 CONTROL ROD WITHDRAWAL INCIDENT HZP POWER AND HEAT FLUX | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.1-5 Revision 21 CONTROL ROD WITHDRAWAL INCIDENT HZP SYSTEM PRESSURE | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.1-6 Revision 21 CONTROL ROD WITHDRAWAL INCIDENT HZP INLET ENTHALPY | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.2-1 Revision 21 REACTIVITIES FOR UNCONTROLLED BANK WITHDRAWAL AT FULL POWER | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.2-2 Revision 21 REACTOR POWER LEVEL FOR UNCONTROLLED BANK WITHDRAWAL FULL POWER | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.2-3 Revision 21 CORE AVERAGE HEAT FLUX FOR UNCONTROLLED BANK WITHDRAWAL AT FULL POWER | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.2-4 Revision 21 PRESSURIZER PRESSURE FOR UNCONTROLLED BANK WITHDRAWAL AT FULL POWER | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.2-5 Revision 21 PRESSURIZER LIQUID LEVEL FOR UNCONTROLLED BANK WITHDRAWAL AT FULL POWER | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.2-6 Revision 21 PCS MASS FLOW RATE FOR UNCONTROLLED BANK WITHDRAWAL AT FULL POWER | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.2-7 Revision 21 PCS TEMPERATURES FOR UNCONTROLLED BANK WITHDRAWAL AT FULL POWER | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.2-8 Revision 21 SECONDARY PRESSURE FOR UNCONTROLLED BANK WITHDRAWAL AT FULL POWER | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.2-9 Revision 21 S/G LIQUID LEVEL FOR UNCONTROLLED BANK WITHDRAWAL AT FULL POWER | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.7.1-1 Revision 21 PRIMARY COOLANT SYSTEM MASS FLOW RATE FOR LOSS OF FORCED FLOW | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.7.1-2 Revision 21 REACTOR POWER LEVEL FOR LOSS OF FORCED FLOW | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.7.1-3 Revision 21 CORE AVERAGE HEAT FLUX FOR LOSS OF FORCED FLOW | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.7.1-4 Revision 21 PRESSURIZER PRESSURE FOR LOSS OF FORCED FLOW | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.7.1-5 Revision 21 PRIMARY COOLANT SYSTEM TEMPERATURES FOR LOSS OF FORCED FLOW | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.7.2-1 Revision 21 PRIMARY COOLANT SYSTEM MASS FLOW RATE FOR REACTOR COOLANT PUMP ROTOR SEIZURE | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.7.2-2 Revision 21 REACTOR POWER LEVEL FOR REACTOR COOLANT PUMP ROTOR SEIZURE | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.7.2-3 Revision 21 CORE AVERAGE HEAT FLUX FOR REACTOR COOLANT PUMP ROTOR SEIZURE | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.7.2-4 Revision 21 PRESSURIZER PRESSURE FOR REACTOR COOLANT PUMP ROTOR SEIZURE | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.7.2-5 Revision 21 PRIMARY COOLANT SYSTEM TEMPERATURES FOR REACTOR COOLANT PUMP ROTOR SEIZURE | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.10-1 Revision 25 POWER COMPARISONS - EXCESS LOAD 130 Actual Reactor Power Decalibrated NI Power Decalibrated Thermal Power 120 VHPT setpoint Power (% RTP) 110 100 90 0 5 10 15 20 25 30 Time (s) | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.10-2 Revision 25 PCS COOLANT TEMPERATURE - EXCESS LOAD 620 610 Thot Tcold 600 590 Temperature ( F) o 580 570 560 550 540 530 520 0 5 10 15 20 25 30 Time (s) | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.10-3 Revision 25 PRESSURIZER PRESSURE - EXCESS LOAD 2200 2100 Pressure (psia) 2000 1900 1800 0 5 10 15 20 25 30 Time (s) | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.10-4 Revision 25 PRESSURIZER COLLAPSED LIQUID LEVEL - EXCESS LOAD 70 60 50 Level (% Span) 40 30 20 0 5 10 15 20 25 30 Time (s) | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.10-5 Revision 25 COMPONENTS OF REACTIVITY - EXCESS LOAD 0.5 0.4 Total Doppler 0.3 Moderator Scram 0.2 0.1 Reactivity ($) | |||
0.0 0.1 0.2 0.3 0.4 0.5 0 5 10 15 20 25 30 Time (s) | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.11-1 Revision 23 Portions of this page have been redacted per 10 CFR 2.390(d)(1). | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.12-1 Revision 23 REACTOR POWER LEVEL FOR LOSS OF EXTERNAL LOAD EVENT | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.12-2 Revision 23 PRIMARY PRESSURES FOR LOSS OF EXTERNAL LOAD EVENT | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.12-3 Revision 23 PRESSURIZER LIQUID VOLUME FOR LOSS OF EXTERNAL LOAD EVENT | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.12-4 Revision 23 PRIMARY COOLANT SYSTEM TEMPERATURES FOR LOSS OF EXTERNAL LOAD EVENT | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.12-5 Revision 23 SECONDARY PRESSURES FOR LOSS OF EXTERNAL LOAD EVENT | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-1 Revision 24 Reactor Power, LNFF Analysis with Off-Site Power Available and Steam Dump System Disabled | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-2 Revision 24 Primary Coolant System Loop Temperatures, LNFF Analysis with Off-Site Power Available and Steam Dump System Disabled | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-3 Revision 24 Primary Coolant System Loop Flow, LNFF Analysis with Off-Site Power Available and Steam Dump System Disabled | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-4 Revision 24 Pressurizer Pressure, LNFF Analysis with Off-Site Power Available and Steam Dump System Disabled | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-5 Revision 24 Pressurizer Spray Flow, LNFF Analysis with Off-Site Power Available and Steam Dump System Disabled | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-6 Revision 24 Pressurizer SRV Flow, LNFF Analysis with Off-Site Power Available and Steam Dump System Disabled | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-7 Revision 24 Pressurizer Level, LNFF Analysis with Off-Site Power Available and Steam Dump System Disabled | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-8 Revision 24 SG Auxiliary Feedwater Flow, LNFF Analysis with Off-Site Power Available and Steam Dump System Disabled | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-9 Revision 24 SG Dome Pressure, LNFF Analysis with Off-Site Power Available and Steam Dump System Disabled | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-10 Revision 24 SG Liquid Mass Inventory, LNFF Analysis with Off-Site Power Available and Steam Dump System Disabled | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-11 Revision 24 Reactor Power, LNFF Analysis with Off-Site Power Available and Steam Dump System Available | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-12 Revision 24 Primary Coolant System Loop Temperatures, LNFF Analysis with Off-Site Power Available and Steam Dump System Available | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-13 Revision 24 Primary Coolant System Loop Flow, LNFF Analysis with Off-Site Power Available and Steam Dump System Available | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-14 Revision 24 Pressurizer Pressure, LNFF Analysis with Off-Site Power Available and Steam Dump System Available | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-15 Revision 24 Pressurizer Spray Flow, LNFF Analysis with Off-Site Power Available and Steam Dump System Available | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-16 Revision 24 Pressurizer SRV Flow, LNFF Analysis with Off-Site Power Available and Steam Dump System Available | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-17 Revision 24 Pressurizer Level, LNFF Analysis with Off-Site Power Available and Steam Dump System Available | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-18 Revision 24 SG Auxiliary Feedwater Flow, LNFF Analysis with Off-Site Power Available and Steam Dump System Available | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-19 Revision 24 SG Dome Pressure, LNFF Analysis with Off-Site Power Available and Steam Dump System Available | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-20 Revision 24 SG Liquid Mass Inventory, LNFF Analysis with Off-Site Power Available and Steam Dump System Available | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-21 Revision 24 Reactor Power, LNFF Analysis without Off-Site Power Available and Steam Dump Systems Disabled | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-22 Revision 24 Primary Coolant System Loop Temperatures, LNFF Analysis without Off-Site Power Available and Steam Dump Systems Disabled | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-23 Revision 24 Primary Coolant System Loop Flow, LNFF Analysis without Off-Site Power Available and Steam Dump Systems Disabled | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-24 Revision 24 Pressurizer Pressure, LNFF Analysis without Off-Site Power Available and Steam Dump Systems Disabled | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-25 Revision 24 Pressurizer Level, LNFF Analysis without Off-Site Power Available and Steam Dump Systems Disabled | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-26 Revision 24 SG Auxiliary Feedwater Flow, LNFF Analysis without Off-Site Power Available and Steam Dump Systems Disabled | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-27 Revision 24 SG Dome Pressure, LNFF Analysis without Off-Site Power Available and Steam Dump Systems Disabled | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-28 Revision 24 SG Liquid Mass Inventory, LNFF Analysis without Off-Site Power Available and Steam Dump Systems Disabled | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-1 Revision 24 Break Flow Rates During LHR-Limiting Transient 6000 From Unaffected SG From Affected SG 5000 Break Flow Rate (lbm/sec) 4000 3000 2000 1000 0 | |||
0 50 100 150 200 250 300 350 Time (sec) | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-2 Revision 24 Steam Generator Pressures During LHR-Limiting Transient 1100 Unaffected SG 1000 Affected SG 900 Steam Generator Pressure (psia) 800 700 600 500 400 300 200 100 0 | |||
0 50 100 150 200 250 300 350 Time (sec) | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-3 Revision 24 Steam Generator Heat Transfer Rates During LHR-Limiting Transient 2500 Unaffected SG Affected SG Steam Generator Heat Transfer Rate (MW) 2000 1500 1000 500 0 | |||
0 50 100 150 200 250 300 350 Time (sec) | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-4 Revision 24 Steam Generator Secondary-Side Total Fluid Inventories During LHR-Limiting Transient 250000 Unaffected SG Steam Generator SecondarySide Total Fluid Inventory (lbm) | |||
Affected SG 200000 150000 100000 50000 0 | |||
0 50 100 150 200 250 300 350 Time (sec) | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-5 Revision 24 Core Inlet Temperatures During LHR-Limiting Transient 600 Unaffected Sector Affected Sector 550 500 Core Inlet Temperature ( F) o 450 400 350 300 250 0 50 100 150 200 250 300 350 Time (sec) | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-6 Revision 24 Core Inlet Flow Rates During LHR-Limiting Transient 20000 15000 Core Inlet Flow Rate (lbm/sec) | |||
Stuck Rod Region 10000 Rest of Affected Sector Unaffected Sector 5000 0 | |||
0 50 100 150 200 250 300 350 Time (sec) | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-7 Revision 24 Pressurizer Pressure During LHR-Limiting Transient 2200 2000 1800 Pressurizer Pressure (psia) 1600 1400 1200 1000 800 600 0 50 100 150 200 250 300 350 Time (sec) | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-8 Revision 24 Pressurizer Liquid Level During LHR-Limiting Transient 70 60 Pressurizer Liquid Level (% of span) 50 40 30 20 10 0 | |||
0 50 100 150 200 250 300 350 Time (sec) | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-9 Revision 24 Total HPSI Flow Rate During LHR-Limiting Transient 50 40 Total HPSI Flow Rate (lbm/sec) 30 20 10 0 | |||
0 50 100 150 200 250 300 350 Time (sec) | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-10 Revision 24 Reactivity During LHR-Limiting Transient 10 Moderator Doppler Boron Scram Total 5 | |||
Reactivity ($) | |||
0 5 | |||
10 0 50 100 150 200 250 300 350 Time (sec) | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-11 Revision 24 Reactor Power During LHR-Limiting Transient 30 25 Total Reactor Power (% of rated) 20 Stuck Rod Region Rest of Affected Sector Unaffected Sector 15 10 5 | |||
0 0 50 100 150 200 250 300 350 Time (sec) | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-12 Revision 24 Break Flow Rates During DNBR-Limiting Transient 6000 From Unaffected SG From Affected SG 5000 Break Flow Rate (lbm/sec) 4000 3000 2000 1000 0 | |||
0 100 200 300 400 500 600 700 Time (sec) | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-13 Revision 24 Steam Generator Pressures During DNBR-Limiting Transient 1100 Unaffected SG 1000 Affected SG 900 Steam Generator Pressure (psia) 800 700 600 500 400 300 200 100 0 | |||
0 100 200 300 400 500 600 700 Time (sec) | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-14 Revision 24 Steam Generator Heat Transfer Rates During DNBR-Limiting Transient 2500 Unaffected SG Affected SG Steam Generator Heat Transfer Rate (MW) 2000 1500 1000 500 0 | |||
0 100 200 300 400 500 600 700 Time (sec) | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-15 Revision 24 Steam Generator Secondary-Side Total Fluid Inventories During DNBR-Limiting Transient 250000 Unaffected SG Steam Generator SecondarySide Total Fluid Inventory (lbm) | |||
Affected SG 200000 150000 100000 50000 0 | |||
0 100 200 300 400 500 600 700 Time (sec) | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-16 Revision 24 Core Inlet Temperatures During DNBR-Limiting Transient 600 Unaffected Sector Affected Sector 550 500 Core Inlet Temperature ( F) o 450 400 350 300 250 0 100 200 300 400 500 600 700 Time (sec) | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-17 Revision 24 Core Inlet Flow Rates During DNBR-Limiting Transient 20000 Stuck Rod Region Rest of Affected Sector Unaffected Sector 15000 Core Inlet Flow Rate (lbm/sec) 10000 5000 0 | |||
0 100 200 300 400 500 600 700 Time (sec) | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-18 Revision 24 Pressurizer Pressure During DNBR-Limiting Transient 2200 2000 1800 Pressurizer Pressure (psia) 1600 1400 1200 1000 800 600 0 100 200 300 400 500 600 700 Time (sec) | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-19 Revision 24 Pressurizer Liquid Level During DNBR-Limiting Transient 70 60 Pressurizer Liquid Level (% of span) 50 40 30 20 10 0 | |||
0 100 200 300 400 500 600 700 Time (sec) | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-20 Revision 24 Total HPSI Flow Rate During DNBR-Limiting Transient 50 40 Total HPSI Flow Rate (lbm/sec) 30 20 10 0 | |||
0 100 200 300 400 500 600 700 Time (sec) | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-21 Revision 24 Reactivity During DNBR-Limiting Transient 10 Moderator Doppler Boron Scram Total 5 | |||
Reactivity ($) | |||
0 5 | |||
10 0 100 200 300 400 500 600 700 Time (sec) | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-22 Revision 24 Reactor Power During DNBR-Limiting Transient 30 Total Stuck Rod Region Rest of Affected Sector 25 Unaffected Sector Reactor Power (% of rated) 20 15 10 5 | |||
0 0 100 200 300 400 500 600 700 Time (sec) | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-1 Revision 21 SGTR WITH LOAC: CORE POWER vs TIME | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-2 Revision 21 SGTR WITH LOAC: CORE COOLANT TEMPERATURE vs TIME | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-3 Revision 21 SGTR WITH LOAC: PRIMARY COOLANT SYSTEM PRESSURE vs TIME | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-4 Revision 21 SGTR WITH LOAC: STEAM GENERATOR PRESSURE vs TIME | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-5 Revision 21 SGTR WITH LOAC: TUBE LEAK FLOW RATE vs TIME | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-6 Revision 21 SGTR WITH LOAC: INTEGRATED TUBE LEAK FLOW vs TIME | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-7 Revision 21 SGTR WITH LOAC: PRESSURIZER LIQUID VOLUME vs TIME | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-8 Revision 21 SGTR WITH LOAC: AFFECTED STEAM GENERATOR SAFETY VALVE (MSSV) | |||
FLOW RATE vs TIME | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-9 Revision 21 SGTR WITH LOAC: AFFECTED STEAM GENERATOR SAFETY VALVE (MSSV) | |||
INTEGRATED FLOW vs TIME | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-10 Revision 21 SGTR WITH LOAC: STEAM GENERATORS LIQUID MASS vs TIME | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-11 Revision 21 SGTR WITH LOAC: CORE POWER vs TIME | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-12 Revision 21 SGTR WITH LOAC: CORE COOLANT TEMPERATURES vs TIME | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-13 Revision 21 SGTR WITH LOAC: PRIMARY COOLANT SYSTEM PRESSURE vs TIME | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-14 Revision 21 SGTR WITH LOAC: STEAM GENERATORS PRESSURE vs TIME | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-15 Revision 21 SGTR WITH LOAC: PRESSURIZER LIQUID VOLUME vs TIME | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-16 Revision 21 SGTR WITH LOAC: TUBE LEAK FLOW RATE vs TIME | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-17 Revision 21 SGTR INTEGRATED LEAK FLOW vs TIME | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-18 Revision 21 SGTR ADV FLOW RATE vs TIME | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-19 Revision 21 SGTR INTEGRATED ADV FLOW vs TIME | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-20 Revision 21 SGTR PCS SUBCOOLING vs TIME | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-21 Revision 21 SGTR HPSI FLOW RATE vs TIME | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.16-1 Revision 23 CONTROL ROD EJECTION, EOC HZP CASE: CORE POWER | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.16-2 Revision 23 CONTROL ROD EJECTION, EOC HZP CASE: CORE AVERAGE HEAT-FLUX-BASED LHR | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.16-3 Revision 23 CONTROL ROD EJECTION, EOC HZP CASE: TOTAL CORE REACTIVITY | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-6 Revision 28 PEAK CLADDING TEMPERATURE FOR THE LIMITING CASE PCT Trace for Case #22 o | |||
PCT = 1739.1 F, at Time = 27.15 s, on 6% Gad Rod 2000 1500 Mesh Point Temperature ( F) o 1000 500 Hot UO2 Rod 2% Gad Rod 4% Gad Rod 6% Gad Rod 8% Gad Rod 0 | |||
0 100 200 300 Time (s) | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-7 Revision 28 BREAK FLOW FOR THE LIMITING CASE Break Flow 80 Vessel Side Pump Side Total 60 3 | |||
Flow Rate (lbm/s) *10 40 20 0 | |||
20 0 100 200 300 Time (s) | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-8 Revision 28 CORE INLET MASS FLUX FOR THE LIMITING CASE Core Inlet Mass Flux 1000 Hot Assembly Surround Assembly Average Core Outer Core 500 Mass Flux (lbm/ft s) 2 0 | |||
500 0 100 200 300 Time (s) | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-9 Revision 28 CORE OUTLET MASS FLUX FOR THE LIMITING CASE Core Outlet Mass Flux 1000 Hot Assembly Surround Assembly Average Core Outer Core 500 Mass Flux (lbm/ft s) 2 0 | |||
500 1000 0 100 200 300 Time (s) | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-10 Revision 28 VOID FRACTION AT PCS PUMPS FOR THE LIMITING CASE | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-11 Revision 28 ECCS FLOW (INCLUDES SIT, HPSI, AND LPSI) FOR THE LIMITING CASE ECCS Flows 3000 Loop 1 (broken) | |||
Loop 2 Loop 3 Loop 4 2000 Flow Rate (lbm/s) 1000 0 | |||
0 100 200 300 Time (s) | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-12 Revision 28 UPPER PLENUM PRESSURE FOR THE LIMITING CASE Upper Plenum Pressure 3000 2000 Pressure (psia) 1000 0 | |||
0 100 200 300 Time (s) | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-13 Revision 28 COLLAPSED LIQUID LEVEL IN THE DOWNCOMER FOR THE LIMITING CASE Downcomer Liquid Level 30 Sector 1 (broken) | |||
Sector 2 Sector 3 Sector 4 Average 20 Liquid Level (ft) 10 0 | |||
0 100 200 300 Time (s) | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-14 Revision 28 COLLAPSED LIQUID LEVEL IN THE LOWER PLENUM FOR THE LIMITING CASE Lower Vessel Liquid Level 10 8 | |||
6 Level (ft) 4 2 | |||
0 0 100 200 300 Time (s) | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-15 Revision 28 COLLAPSED LIQUID LEVEL IN THE CORE FOR THE LIMITING CASE Core Liquid Level 15 Hot Assembly Center Core Average Core Outer Core 10 Liquid Level (ft) 5 0 | |||
0 100 200 300 Time (s) | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-16 Revision 28 CONTAINMENT AND LOOP PRESSURES FOR THE LIMITING CASE Containment and Loop Pressures 100 Containment 90 SG Outlet (primary side) | |||
Upper Plenum Downcomer Inlet 80 70 60 Pressure (psia) 50 40 30 20 10 0 | |||
0 100 200 300 Time (s) | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-17 Revision 28 CORE EFFECTIVE FLOODING RATE DELETED in Revision 28 | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-18 Revision 28 CORE COLLAPSED LIQUID LEVEL DELETED in Revision 28 | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-19 Revision 28 CORE QUENCH LEVEL DELETED in Revision 28 | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-20 Revision 28 PCT-NODE HEAT TRANSFER COEFFICIENT DELETED in Revision 28 | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-21 Revision 28 PEAK CLADDING AND RUPTURE LOCATION CLADDING TEMPERATURE FOR THE LIMITING CASE DELETED in Revision 28 | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.2-9 Revision 28 Hot Channel Collapsed Level (Limiting Case) | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.18.1-1 Revision 29 LOCA CONTAINMENT PRESSURE PROFILE 60 50 40 Pressure (psig) 30 20 10 0 | |||
1.E-01 1.E+00 1.E+01 1.E+02 1.E+03 1.E+04 1.E+05 1.E+06 1.E+07 Time (sec) | |||
D/G 1-1 Failure D/G 1-2 Failure | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.18.2-1 Revision 29 MSLB CONTAINMENT RESPONSE MAXIMUM PRESSURE PROFILE | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.18.2-2 Revision 31 MSLB CONTAINMENT RESPONSE ENVIRONMENTAL QUALIFICATION PROFILE | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.22-1 Revision 25 PALISADES CONTAINMENT HYDROGEN ANALYSIS Deleted per FSAR-2479 | |||
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.22-2 Revision 25 CONTAINMENT TEMPERATURE FOR H2 GENERATION Deleted per FSAR-2479}} |
Latest revision as of 17:34, 30 October 2019
ML16172A196 | |
Person / Time | |
---|---|
Site: | Palisades |
Issue date: | 04/18/2016 |
From: | Jennivine Rankin Plant Licensing Branch III |
To: | |
Rankin J, NRR/DORL/LPLIII-1, 415-1530 | |
References | |
Download: ML16172A196 (151) | |
Text
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.1-3 Revision 21 PALISADES SCRAM CURVE
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.1-1 Revision 21 CONTROL ROD WITHDRAWAL INCIDENT HZP REACTIVITY INSERTION CURVE
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.1-2 Revision 21 CONTROL ROD WITHDRAWAL INCIDENT HZP REACTIVITY FEEDBACKS
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.1-3 Revision 21 CONTROL ROD WITHDRAWAL INCIDENT HZP TOTAL REACTIVITY
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.1-4 Revision 21 CONTROL ROD WITHDRAWAL INCIDENT HZP POWER AND HEAT FLUX
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.1-5 Revision 21 CONTROL ROD WITHDRAWAL INCIDENT HZP SYSTEM PRESSURE
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.1-6 Revision 21 CONTROL ROD WITHDRAWAL INCIDENT HZP INLET ENTHALPY
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.2-1 Revision 21 REACTIVITIES FOR UNCONTROLLED BANK WITHDRAWAL AT FULL POWER
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.2-2 Revision 21 REACTOR POWER LEVEL FOR UNCONTROLLED BANK WITHDRAWAL FULL POWER
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.2-3 Revision 21 CORE AVERAGE HEAT FLUX FOR UNCONTROLLED BANK WITHDRAWAL AT FULL POWER
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.2-4 Revision 21 PRESSURIZER PRESSURE FOR UNCONTROLLED BANK WITHDRAWAL AT FULL POWER
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.2-5 Revision 21 PRESSURIZER LIQUID LEVEL FOR UNCONTROLLED BANK WITHDRAWAL AT FULL POWER
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.2-6 Revision 21 PCS MASS FLOW RATE FOR UNCONTROLLED BANK WITHDRAWAL AT FULL POWER
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.2-7 Revision 21 PCS TEMPERATURES FOR UNCONTROLLED BANK WITHDRAWAL AT FULL POWER
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.2-8 Revision 21 SECONDARY PRESSURE FOR UNCONTROLLED BANK WITHDRAWAL AT FULL POWER
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.2.2-9 Revision 21 S/G LIQUID LEVEL FOR UNCONTROLLED BANK WITHDRAWAL AT FULL POWER
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.7.1-1 Revision 21 PRIMARY COOLANT SYSTEM MASS FLOW RATE FOR LOSS OF FORCED FLOW
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.7.1-2 Revision 21 REACTOR POWER LEVEL FOR LOSS OF FORCED FLOW
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.7.1-3 Revision 21 CORE AVERAGE HEAT FLUX FOR LOSS OF FORCED FLOW
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.7.1-4 Revision 21 PRESSURIZER PRESSURE FOR LOSS OF FORCED FLOW
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.7.1-5 Revision 21 PRIMARY COOLANT SYSTEM TEMPERATURES FOR LOSS OF FORCED FLOW
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.7.2-1 Revision 21 PRIMARY COOLANT SYSTEM MASS FLOW RATE FOR REACTOR COOLANT PUMP ROTOR SEIZURE
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.7.2-2 Revision 21 REACTOR POWER LEVEL FOR REACTOR COOLANT PUMP ROTOR SEIZURE
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.7.2-3 Revision 21 CORE AVERAGE HEAT FLUX FOR REACTOR COOLANT PUMP ROTOR SEIZURE
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.7.2-4 Revision 21 PRESSURIZER PRESSURE FOR REACTOR COOLANT PUMP ROTOR SEIZURE
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.7.2-5 Revision 21 PRIMARY COOLANT SYSTEM TEMPERATURES FOR REACTOR COOLANT PUMP ROTOR SEIZURE
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.10-1 Revision 25 POWER COMPARISONS - EXCESS LOAD 130 Actual Reactor Power Decalibrated NI Power Decalibrated Thermal Power 120 VHPT setpoint Power (% RTP) 110 100 90 0 5 10 15 20 25 30 Time (s)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.10-2 Revision 25 PCS COOLANT TEMPERATURE - EXCESS LOAD 620 610 Thot Tcold 600 590 Temperature ( F) o 580 570 560 550 540 530 520 0 5 10 15 20 25 30 Time (s)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.10-3 Revision 25 PRESSURIZER PRESSURE - EXCESS LOAD 2200 2100 Pressure (psia) 2000 1900 1800 0 5 10 15 20 25 30 Time (s)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.10-4 Revision 25 PRESSURIZER COLLAPSED LIQUID LEVEL - EXCESS LOAD 70 60 50 Level (% Span) 40 30 20 0 5 10 15 20 25 30 Time (s)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.10-5 Revision 25 COMPONENTS OF REACTIVITY - EXCESS LOAD 0.5 0.4 Total Doppler 0.3 Moderator Scram 0.2 0.1 Reactivity ($)
0.0 0.1 0.2 0.3 0.4 0.5 0 5 10 15 20 25 30 Time (s)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.11-1 Revision 23 Portions of this page have been redacted per 10 CFR 2.390(d)(1).
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.12-1 Revision 23 REACTOR POWER LEVEL FOR LOSS OF EXTERNAL LOAD EVENT
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.12-2 Revision 23 PRIMARY PRESSURES FOR LOSS OF EXTERNAL LOAD EVENT
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.12-3 Revision 23 PRESSURIZER LIQUID VOLUME FOR LOSS OF EXTERNAL LOAD EVENT
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.12-4 Revision 23 PRIMARY COOLANT SYSTEM TEMPERATURES FOR LOSS OF EXTERNAL LOAD EVENT
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.12-5 Revision 23 SECONDARY PRESSURES FOR LOSS OF EXTERNAL LOAD EVENT
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-1 Revision 24 Reactor Power, LNFF Analysis with Off-Site Power Available and Steam Dump System Disabled
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-2 Revision 24 Primary Coolant System Loop Temperatures, LNFF Analysis with Off-Site Power Available and Steam Dump System Disabled
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-3 Revision 24 Primary Coolant System Loop Flow, LNFF Analysis with Off-Site Power Available and Steam Dump System Disabled
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-4 Revision 24 Pressurizer Pressure, LNFF Analysis with Off-Site Power Available and Steam Dump System Disabled
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-5 Revision 24 Pressurizer Spray Flow, LNFF Analysis with Off-Site Power Available and Steam Dump System Disabled
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-6 Revision 24 Pressurizer SRV Flow, LNFF Analysis with Off-Site Power Available and Steam Dump System Disabled
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-7 Revision 24 Pressurizer Level, LNFF Analysis with Off-Site Power Available and Steam Dump System Disabled
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-8 Revision 24 SG Auxiliary Feedwater Flow, LNFF Analysis with Off-Site Power Available and Steam Dump System Disabled
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-9 Revision 24 SG Dome Pressure, LNFF Analysis with Off-Site Power Available and Steam Dump System Disabled
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-10 Revision 24 SG Liquid Mass Inventory, LNFF Analysis with Off-Site Power Available and Steam Dump System Disabled
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-11 Revision 24 Reactor Power, LNFF Analysis with Off-Site Power Available and Steam Dump System Available
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-12 Revision 24 Primary Coolant System Loop Temperatures, LNFF Analysis with Off-Site Power Available and Steam Dump System Available
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-13 Revision 24 Primary Coolant System Loop Flow, LNFF Analysis with Off-Site Power Available and Steam Dump System Available
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-14 Revision 24 Pressurizer Pressure, LNFF Analysis with Off-Site Power Available and Steam Dump System Available
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-15 Revision 24 Pressurizer Spray Flow, LNFF Analysis with Off-Site Power Available and Steam Dump System Available
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-16 Revision 24 Pressurizer SRV Flow, LNFF Analysis with Off-Site Power Available and Steam Dump System Available
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-17 Revision 24 Pressurizer Level, LNFF Analysis with Off-Site Power Available and Steam Dump System Available
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-18 Revision 24 SG Auxiliary Feedwater Flow, LNFF Analysis with Off-Site Power Available and Steam Dump System Available
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-19 Revision 24 SG Dome Pressure, LNFF Analysis with Off-Site Power Available and Steam Dump System Available
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-20 Revision 24 SG Liquid Mass Inventory, LNFF Analysis with Off-Site Power Available and Steam Dump System Available
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-21 Revision 24 Reactor Power, LNFF Analysis without Off-Site Power Available and Steam Dump Systems Disabled
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-22 Revision 24 Primary Coolant System Loop Temperatures, LNFF Analysis without Off-Site Power Available and Steam Dump Systems Disabled
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-23 Revision 24 Primary Coolant System Loop Flow, LNFF Analysis without Off-Site Power Available and Steam Dump Systems Disabled
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-24 Revision 24 Pressurizer Pressure, LNFF Analysis without Off-Site Power Available and Steam Dump Systems Disabled
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-25 Revision 24 Pressurizer Level, LNFF Analysis without Off-Site Power Available and Steam Dump Systems Disabled
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-26 Revision 24 SG Auxiliary Feedwater Flow, LNFF Analysis without Off-Site Power Available and Steam Dump Systems Disabled
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-27 Revision 24 SG Dome Pressure, LNFF Analysis without Off-Site Power Available and Steam Dump Systems Disabled
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.13-28 Revision 24 SG Liquid Mass Inventory, LNFF Analysis without Off-Site Power Available and Steam Dump Systems Disabled
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-1 Revision 24 Break Flow Rates During LHR-Limiting Transient 6000 From Unaffected SG From Affected SG 5000 Break Flow Rate (lbm/sec) 4000 3000 2000 1000 0
0 50 100 150 200 250 300 350 Time (sec)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-2 Revision 24 Steam Generator Pressures During LHR-Limiting Transient 1100 Unaffected SG 1000 Affected SG 900 Steam Generator Pressure (psia) 800 700 600 500 400 300 200 100 0
0 50 100 150 200 250 300 350 Time (sec)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-3 Revision 24 Steam Generator Heat Transfer Rates During LHR-Limiting Transient 2500 Unaffected SG Affected SG Steam Generator Heat Transfer Rate (MW) 2000 1500 1000 500 0
0 50 100 150 200 250 300 350 Time (sec)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-4 Revision 24 Steam Generator Secondary-Side Total Fluid Inventories During LHR-Limiting Transient 250000 Unaffected SG Steam Generator SecondarySide Total Fluid Inventory (lbm)
Affected SG 200000 150000 100000 50000 0
0 50 100 150 200 250 300 350 Time (sec)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-5 Revision 24 Core Inlet Temperatures During LHR-Limiting Transient 600 Unaffected Sector Affected Sector 550 500 Core Inlet Temperature ( F) o 450 400 350 300 250 0 50 100 150 200 250 300 350 Time (sec)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-6 Revision 24 Core Inlet Flow Rates During LHR-Limiting Transient 20000 15000 Core Inlet Flow Rate (lbm/sec)
Stuck Rod Region 10000 Rest of Affected Sector Unaffected Sector 5000 0
0 50 100 150 200 250 300 350 Time (sec)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-7 Revision 24 Pressurizer Pressure During LHR-Limiting Transient 2200 2000 1800 Pressurizer Pressure (psia) 1600 1400 1200 1000 800 600 0 50 100 150 200 250 300 350 Time (sec)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-8 Revision 24 Pressurizer Liquid Level During LHR-Limiting Transient 70 60 Pressurizer Liquid Level (% of span) 50 40 30 20 10 0
0 50 100 150 200 250 300 350 Time (sec)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-9 Revision 24 Total HPSI Flow Rate During LHR-Limiting Transient 50 40 Total HPSI Flow Rate (lbm/sec) 30 20 10 0
0 50 100 150 200 250 300 350 Time (sec)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-10 Revision 24 Reactivity During LHR-Limiting Transient 10 Moderator Doppler Boron Scram Total 5
Reactivity ($)
0 5
10 0 50 100 150 200 250 300 350 Time (sec)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-11 Revision 24 Reactor Power During LHR-Limiting Transient 30 25 Total Reactor Power (% of rated) 20 Stuck Rod Region Rest of Affected Sector Unaffected Sector 15 10 5
0 0 50 100 150 200 250 300 350 Time (sec)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-12 Revision 24 Break Flow Rates During DNBR-Limiting Transient 6000 From Unaffected SG From Affected SG 5000 Break Flow Rate (lbm/sec) 4000 3000 2000 1000 0
0 100 200 300 400 500 600 700 Time (sec)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-13 Revision 24 Steam Generator Pressures During DNBR-Limiting Transient 1100 Unaffected SG 1000 Affected SG 900 Steam Generator Pressure (psia) 800 700 600 500 400 300 200 100 0
0 100 200 300 400 500 600 700 Time (sec)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-14 Revision 24 Steam Generator Heat Transfer Rates During DNBR-Limiting Transient 2500 Unaffected SG Affected SG Steam Generator Heat Transfer Rate (MW) 2000 1500 1000 500 0
0 100 200 300 400 500 600 700 Time (sec)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-15 Revision 24 Steam Generator Secondary-Side Total Fluid Inventories During DNBR-Limiting Transient 250000 Unaffected SG Steam Generator SecondarySide Total Fluid Inventory (lbm)
Affected SG 200000 150000 100000 50000 0
0 100 200 300 400 500 600 700 Time (sec)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-16 Revision 24 Core Inlet Temperatures During DNBR-Limiting Transient 600 Unaffected Sector Affected Sector 550 500 Core Inlet Temperature ( F) o 450 400 350 300 250 0 100 200 300 400 500 600 700 Time (sec)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-17 Revision 24 Core Inlet Flow Rates During DNBR-Limiting Transient 20000 Stuck Rod Region Rest of Affected Sector Unaffected Sector 15000 Core Inlet Flow Rate (lbm/sec) 10000 5000 0
0 100 200 300 400 500 600 700 Time (sec)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-18 Revision 24 Pressurizer Pressure During DNBR-Limiting Transient 2200 2000 1800 Pressurizer Pressure (psia) 1600 1400 1200 1000 800 600 0 100 200 300 400 500 600 700 Time (sec)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-19 Revision 24 Pressurizer Liquid Level During DNBR-Limiting Transient 70 60 Pressurizer Liquid Level (% of span) 50 40 30 20 10 0
0 100 200 300 400 500 600 700 Time (sec)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-20 Revision 24 Total HPSI Flow Rate During DNBR-Limiting Transient 50 40 Total HPSI Flow Rate (lbm/sec) 30 20 10 0
0 100 200 300 400 500 600 700 Time (sec)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-21 Revision 24 Reactivity During DNBR-Limiting Transient 10 Moderator Doppler Boron Scram Total 5
Reactivity ($)
0 5
10 0 100 200 300 400 500 600 700 Time (sec)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.14-22 Revision 24 Reactor Power During DNBR-Limiting Transient 30 Total Stuck Rod Region Rest of Affected Sector 25 Unaffected Sector Reactor Power (% of rated) 20 15 10 5
0 0 100 200 300 400 500 600 700 Time (sec)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-1 Revision 21 SGTR WITH LOAC: CORE POWER vs TIME
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-2 Revision 21 SGTR WITH LOAC: CORE COOLANT TEMPERATURE vs TIME
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-3 Revision 21 SGTR WITH LOAC: PRIMARY COOLANT SYSTEM PRESSURE vs TIME
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-4 Revision 21 SGTR WITH LOAC: STEAM GENERATOR PRESSURE vs TIME
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-5 Revision 21 SGTR WITH LOAC: TUBE LEAK FLOW RATE vs TIME
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-6 Revision 21 SGTR WITH LOAC: INTEGRATED TUBE LEAK FLOW vs TIME
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-7 Revision 21 SGTR WITH LOAC: PRESSURIZER LIQUID VOLUME vs TIME
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-8 Revision 21 SGTR WITH LOAC: AFFECTED STEAM GENERATOR SAFETY VALVE (MSSV)
FLOW RATE vs TIME
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-9 Revision 21 SGTR WITH LOAC: AFFECTED STEAM GENERATOR SAFETY VALVE (MSSV)
INTEGRATED FLOW vs TIME
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-10 Revision 21 SGTR WITH LOAC: STEAM GENERATORS LIQUID MASS vs TIME
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-11 Revision 21 SGTR WITH LOAC: CORE POWER vs TIME
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-12 Revision 21 SGTR WITH LOAC: CORE COOLANT TEMPERATURES vs TIME
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-13 Revision 21 SGTR WITH LOAC: PRIMARY COOLANT SYSTEM PRESSURE vs TIME
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-14 Revision 21 SGTR WITH LOAC: STEAM GENERATORS PRESSURE vs TIME
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-15 Revision 21 SGTR WITH LOAC: PRESSURIZER LIQUID VOLUME vs TIME
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-16 Revision 21 SGTR WITH LOAC: TUBE LEAK FLOW RATE vs TIME
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-17 Revision 21 SGTR INTEGRATED LEAK FLOW vs TIME
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-18 Revision 21 SGTR ADV FLOW RATE vs TIME
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-19 Revision 21 SGTR INTEGRATED ADV FLOW vs TIME
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-20 Revision 21 SGTR PCS SUBCOOLING vs TIME
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.15-21 Revision 21 SGTR HPSI FLOW RATE vs TIME
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.16-1 Revision 23 CONTROL ROD EJECTION, EOC HZP CASE: CORE POWER
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.16-2 Revision 23 CONTROL ROD EJECTION, EOC HZP CASE: CORE AVERAGE HEAT-FLUX-BASED LHR
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.16-3 Revision 23 CONTROL ROD EJECTION, EOC HZP CASE: TOTAL CORE REACTIVITY
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-6 Revision 28 PEAK CLADDING TEMPERATURE FOR THE LIMITING CASE PCT Trace for Case #22 o
PCT = 1739.1 F, at Time = 27.15 s, on 6% Gad Rod 2000 1500 Mesh Point Temperature ( F) o 1000 500 Hot UO2 Rod 2% Gad Rod 4% Gad Rod 6% Gad Rod 8% Gad Rod 0
0 100 200 300 Time (s)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-7 Revision 28 BREAK FLOW FOR THE LIMITING CASE Break Flow 80 Vessel Side Pump Side Total 60 3
Flow Rate (lbm/s) *10 40 20 0
20 0 100 200 300 Time (s)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-8 Revision 28 CORE INLET MASS FLUX FOR THE LIMITING CASE Core Inlet Mass Flux 1000 Hot Assembly Surround Assembly Average Core Outer Core 500 Mass Flux (lbm/ft s) 2 0
500 0 100 200 300 Time (s)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-9 Revision 28 CORE OUTLET MASS FLUX FOR THE LIMITING CASE Core Outlet Mass Flux 1000 Hot Assembly Surround Assembly Average Core Outer Core 500 Mass Flux (lbm/ft s) 2 0
500 1000 0 100 200 300 Time (s)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-10 Revision 28 VOID FRACTION AT PCS PUMPS FOR THE LIMITING CASE
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-11 Revision 28 ECCS FLOW (INCLUDES SIT, HPSI, AND LPSI) FOR THE LIMITING CASE ECCS Flows 3000 Loop 1 (broken)
Loop 2 Loop 3 Loop 4 2000 Flow Rate (lbm/s) 1000 0
0 100 200 300 Time (s)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-12 Revision 28 UPPER PLENUM PRESSURE FOR THE LIMITING CASE Upper Plenum Pressure 3000 2000 Pressure (psia) 1000 0
0 100 200 300 Time (s)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-13 Revision 28 COLLAPSED LIQUID LEVEL IN THE DOWNCOMER FOR THE LIMITING CASE Downcomer Liquid Level 30 Sector 1 (broken)
Sector 2 Sector 3 Sector 4 Average 20 Liquid Level (ft) 10 0
0 100 200 300 Time (s)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-14 Revision 28 COLLAPSED LIQUID LEVEL IN THE LOWER PLENUM FOR THE LIMITING CASE Lower Vessel Liquid Level 10 8
6 Level (ft) 4 2
0 0 100 200 300 Time (s)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-15 Revision 28 COLLAPSED LIQUID LEVEL IN THE CORE FOR THE LIMITING CASE Core Liquid Level 15 Hot Assembly Center Core Average Core Outer Core 10 Liquid Level (ft) 5 0
0 100 200 300 Time (s)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-16 Revision 28 CONTAINMENT AND LOOP PRESSURES FOR THE LIMITING CASE Containment and Loop Pressures 100 Containment 90 SG Outlet (primary side)
Upper Plenum Downcomer Inlet 80 70 60 Pressure (psia) 50 40 30 20 10 0
0 100 200 300 Time (s)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-17 Revision 28 CORE EFFECTIVE FLOODING RATE DELETED in Revision 28
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-18 Revision 28 CORE COLLAPSED LIQUID LEVEL DELETED in Revision 28
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-19 Revision 28 CORE QUENCH LEVEL DELETED in Revision 28
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-20 Revision 28 PCT-NODE HEAT TRANSFER COEFFICIENT DELETED in Revision 28
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.1-21 Revision 28 PEAK CLADDING AND RUPTURE LOCATION CLADDING TEMPERATURE FOR THE LIMITING CASE DELETED in Revision 28
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.17.2-9 Revision 28 Hot Channel Collapsed Level (Limiting Case)
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.18.1-1 Revision 29 LOCA CONTAINMENT PRESSURE PROFILE 60 50 40 Pressure (psig) 30 20 10 0
1.E-01 1.E+00 1.E+01 1.E+02 1.E+03 1.E+04 1.E+05 1.E+06 1.E+07 Time (sec)
D/G 1-1 Failure D/G 1-2 Failure
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.18.2-1 Revision 29 MSLB CONTAINMENT RESPONSE MAXIMUM PRESSURE PROFILE
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.18.2-2 Revision 31 MSLB CONTAINMENT RESPONSE ENVIRONMENTAL QUALIFICATION PROFILE
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.22-1 Revision 25 PALISADES CONTAINMENT HYDROGEN ANALYSIS Deleted per FSAR-2479
FSAR CHAPTER 14 - SAFETY ANALYSIS FIGURE 14.22-2 Revision 25 CONTAINMENT TEMPERATURE FOR H2 GENERATION Deleted per FSAR-2479