ML20084F886: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:(3 | {{#Wiki_filter:(3 m | ||
\\Y N/ | |||
,7% | |||
fk U * | fk U * | ||
')..- | |||
October 28, 1974 | 89 EAST AVENUE, RCCHL: STER, N.Y. N64.3 ROCHES TER GAS AND ELECTRIC CORPCRATION e | ||
t e em o v, o n 2, | |||
0c7., . c/j A._ | October 28, 1974 g | ||
b | |||
'p 0c7., | |||
. c/j | |||
~ | |||
A._ | |||
t.: | |||
UQ | |||
,,, Ib)', | |||
~ : | |||
J h[., f.Q.6))%y"- | |||
Mr. Karl Goller 0 | |||
Assistant Director for Operating Reactors | |||
'C/ | |||
[4' Directorate of Licensing t | |||
U. S. Atomic Energy Commission 5w;,__' | |||
Washington, D.C. 20545 | Washington, D.C. 20545 | ||
| Line 39: | Line 48: | ||
==Dear Mr. Goller:== | ==Dear Mr. Goller:== | ||
In accordance with Mr. Skovholt's letter of October 1,1973 con-cerning periodic inspection of hydraulic shock absorbers (snubbers), | In accordance with Mr. Skovholt's letter of October 1,1973 con-cerning periodic inspection of hydraulic shock absorbers (snubbers), | ||
an inspection of all snubbers, both incide and outside of contain-ment, was conducted during the period of October 10, 1974 through October 14, 1974. | an inspection of all snubbers, both incide and outside of contain-ment, was conducted during the period of October 10, 1974 through October 14, 1974. | ||
All snutbers were considered operoble at this inspection. A small quantity of hydraulic fluid was added to three snubbers which were located outside of the containment. This was the first addition of fluid to any of these units in approximately four months. There was no definite indications of leakage in the area. | All snutbers were considered operoble at this inspection. A small quantity of hydraulic fluid was added to three snubbers which were located outside of the containment. This was the first addition of fluid to any of these units in approximately four months. There was no definite indications of leakage in the area. | ||
Very truly yours , | Very truly yours, | ||
p,T'-[m. 7 v-$ | |||
L^ | |||
- s. | |||
/ | |||
L. D. White , Jr. | L. D. White, Jr. | ||
.pel 8304210306 751223 | |||
/)(ud 111< | |||
PDR ADOCK 05000244 | - ~' "> 1 : | ||
LU1'r ti6N1' REGION _ | PDR ADOCK 05000244 PDR O | ||
Z LU1'r ti6N1' REGION _}} | |||
Latest revision as of 04:38, 14 December 2024
| ML20084F886 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 10/28/1974 |
| From: | White L ROCHESTER GAS & ELECTRIC CORP. |
| To: | Goller K US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML20084F681 | List: |
| References | |
| NUDOCS 8304210306 | |
| Download: ML20084F886 (1) | |
Text
(3 m
\\Y N/
,7%
fk U *
')..-
89 EAST AVENUE, RCCHL: STER, N.Y. N64.3 ROCHES TER GAS AND ELECTRIC CORPCRATION e
t e em o v, o n 2,
October 28, 1974 g
b
'p 0c7.,
. c/j
~
A._
t.:
UQ
,,, Ib)',
~ :
J h[., f.Q.6))%y"-
Mr. Karl Goller 0
Assistant Director for Operating Reactors
'C/
[4' Directorate of Licensing t
U. S. Atomic Energy Commission 5w;,__'
Washington, D.C. 20545
Subject:
Inspection of Hydraulic Shock Absorbers (Snubbers)
R. E. Ginna Nuclear Power Plant, Unit No.1 Docket No. 50-244
Dear Mr. Goller:
In accordance with Mr. Skovholt's letter of October 1,1973 con-cerning periodic inspection of hydraulic shock absorbers (snubbers),
an inspection of all snubbers, both incide and outside of contain-ment, was conducted during the period of October 10, 1974 through October 14, 1974.
All snutbers were considered operoble at this inspection. A small quantity of hydraulic fluid was added to three snubbers which were located outside of the containment. This was the first addition of fluid to any of these units in approximately four months. There was no definite indications of leakage in the area.
Very truly yours,
p,T'-[m. 7 v-$
L^
- s.
/
L. D. White, Jr.
.pel 8304210306 751223
/)(ud 111<
- ~' "> 1 :
Z LU1'r ti6N1' REGION _