ML20203J963: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 15: Line 15:
| document type = TECHNICAL SPECIFICATIONS, TECHNICAL SPECIFICATIONS & TEST REPORTS
| document type = TECHNICAL SPECIFICATIONS, TECHNICAL SPECIFICATIONS & TEST REPORTS
| page count = 2
| page count = 2
| project = TAC:61196
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:.
                                                                    ~
(a)      Control Room Design Review (I.D.1, SER; Appendix E. SSER #2, 55ER #4, 55ER #5)
Priortostartupfollowingthefirstrefuelingoutage,MP&L shall demonstrate the ability to maintain an effective temperature" condition of 85'F or less in the remote shut-down panel (RSP) room for at least 8 hours with an ambient outdoor temperature of at least 95'F.
(b)      Training During Low-Power Testing (I.G.I. SER)
                                      .        11 conauct a special test, simulatee Loss and Offs            .      ating-Carrent Power Te                                                    escribed in
                            '  the MP&L letter date                                                      1            . At least 4 weeks INSERT              '
prior to performin                                                        a                P&L shall provide a safety ana                r this test and its pro                                                    to NRC for and anoroval.
(c)      Post Accident Sampling (II.B.3, SER, SSER #1, SSER #4, 55ER #5)                                                                                                          .
Prior to startup following the first refueling outage MP&L shall incorporate the' additional requir ements into the procedure for relating radionuclide gaseous and ionic species to estimate core damage as discussed in Section II.B.3.1 of SSER #4.
(d)      Hydrogen Control (Section II.B.7 SER, SSER #2, SSER #3, SSER #4, SSER #5)
(1)        During the first cycle of operation, MP&L shall maintain a suitable program of analysis and testing of the installed hydrogen ignition system. MP&L shall submit to tF4 MC quarterly reports on the status of their Feses ach programs.
(a) MP&L sha b uus its research program on hydrogen control measures to include, but not be limited to, the following items:
: 1) Perform containment sensitivity analysis to determine the adequacy of the hydrogen control system for a spectrum of degraded t
core accidents including the determination of accident sequences for which equipment survivability is assured; 8608060008 860725 PDR  ADOCK 05000416
* P                          F' DR i
 
                -P Insert to Operating License Condition 2.C(33)(b)
MP&L shall demonstrate the adverse impact that a Simulated Loss of Onsite and Offsite power test will have on plant equipment and confirm that;.the BWR Owners' recommendations for compliance with I.G.1_will be* implemented.
2 s
I i
(
                                                        )
niH Y
i.
e 4}}

Latest revision as of 09:20, 7 December 2021

Proposed Tech Spec,Modifying License Condition 2.C.(33)(b) to Allow Use of Alternate Training to Satisfy NUREG-0694,TMI Action Plan Item I.G.1 Requirement to Conduct Simulated Loss of Power Test
ML20203J963
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 07/25/1986
From:
MISSISSIPPI POWER & LIGHT CO.
To:
Shared Package
ML20203J961 List:
References
RTR-NUREG-0694, RTR-NUREG-694, TASK-1.G.1, TASK-TM TAC-61196, NUDOCS 8608060088
Download: ML20203J963 (2)


Text

.

~

(a) Control Room Design Review (I.D.1, SER; Appendix E. SSER #2, 55ER #4, 55ER #5)

Priortostartupfollowingthefirstrefuelingoutage,MP&L shall demonstrate the ability to maintain an effective temperature" condition of 85'F or less in the remote shut-down panel (RSP) room for at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> with an ambient outdoor temperature of at least 95'F.

(b) Training During Low-Power Testing (I.G.I. SER)

. 11 conauct a special test, simulatee Loss and Offs . ating-Carrent Power Te escribed in

' the MP&L letter date 1 . At least 4 weeks INSERT '

prior to performin a P&L shall provide a safety ana r this test and its pro to NRC for and anoroval.

(c) Post Accident Sampling (II.B.3, SER, SSER #1, SSER #4, 55ER #5) .

Prior to startup following the first refueling outage MP&L shall incorporate the' additional requir ements into the procedure for relating radionuclide gaseous and ionic species to estimate core damage as discussed in Section II.B.3.1 of SSER #4.

(d) Hydrogen Control (Section II.B.7 SER, SSER #2, SSER #3, SSER #4, SSER #5)

(1) During the first cycle of operation, MP&L shall maintain a suitable program of analysis and testing of the installed hydrogen ignition system. MP&L shall submit to tF4 MC quarterly reports on the status of their Feses ach programs.

(a) MP&L sha b uus its research program on hydrogen control measures to include, but not be limited to, the following items:

1) Perform containment sensitivity analysis to determine the adequacy of the hydrogen control system for a spectrum of degraded t

core accidents including the determination of accident sequences for which equipment survivability is assured; 8608060008 860725 PDR ADOCK 05000416

  • P F' DR i

-P Insert to Operating License Condition 2.C(33)(b)

MP&L shall demonstrate the adverse impact that a Simulated Loss of Onsite and Offsite power test will have on plant equipment and confirm that;.the BWR Owners' recommendations for compliance with I.G.1_will be* implemented.

2 s

I i

(

)

niH Y

i.

e 4