Other: AECM-81-281, Responds to NRC Providing Addl Guidance for NUREG-0737,Item I.G.1 Re Training During Low Power Testing, as Applied to BWR-OL Applicants.Simulated Loss of Ac Power Test Program Will Be Submitted for NRC Approval, AECM-86-0042, Forwards Station Blackout Evaluati Ept..., for Approval.Rept Provides Justification for Not Performing Simulated Station Blackout Test,Per TMI Item I.G.1.Test Not Recommended Per Generic Ltr 83-24.Fee Paid, ML20003E750, ML20137P712, ML20199L109, ML20203D679, ML20203J963, ML20207G520, ML20212P470, ML20215L243
|
MONTHYEARML20003E7501981-04-0707 April 1981 Responds to NRC Providing Addl Guidance Re NUREG-0737,Item I.G.1.Addl Safety Analyses & Waivers of Certain Tech Specs Would Be Required Re Training During Low Power Testing.Encl Program Completes Response Project stage: Other AECM-81-281, Responds to NRC Providing Addl Guidance for NUREG-0737,Item I.G.1 Re Training During Low Power Testing, as Applied to BWR-OL Applicants.Simulated Loss of Ac Power Test Program Will Be Submitted for NRC Approval1981-08-18018 August 1981 Responds to NRC Providing Addl Guidance for NUREG-0737,Item I.G.1 Re Training During Low Power Testing, as Applied to BWR-OL Applicants.Simulated Loss of Ac Power Test Program Will Be Submitted for NRC Approval Project stage: Other ML20137P6931986-01-29029 January 1986 Application for Amend to License NPF-29,revising Tech Specs to Reflect Design Changes in Progress to Complete Installation of Drywell Chilling Water Sys Project stage: Request ML20137P7121986-01-29029 January 1986 Proposed Tech Spec Changes to Reflect Design Change in Progress to Complete Installation of Drywell Chilling Water Sys Project stage: Other AECM-86-0023, Forwards Application for Amend to License NPF-29,revising Tech Specs to Reflect Design Change in Progress to Complete Installation of Drywell Chilling Water Sys.Fee Paid1986-01-29029 January 1986 Forwards Application for Amend to License NPF-29,revising Tech Specs to Reflect Design Change in Progress to Complete Installation of Drywell Chilling Water Sys.Fee Paid Project stage: Request AECM-86-0042, Forwards Station Blackout Evaluati Ept..., for Approval.Rept Provides Justification for Not Performing Simulated Station Blackout Test,Per TMI Item I.G.1.Test Not Recommended Per Generic Ltr 83-24.Fee Paid1986-04-0303 April 1986 Forwards Station Blackout Evaluati Ept..., for Approval.Rept Provides Justification for Not Performing Simulated Station Blackout Test,Per TMI Item I.G.1.Test Not Recommended Per Generic Ltr 83-24.Fee Paid Project stage: Other ML20199L1091986-04-0303 April 1986 Station Blackout Evaluation Rept,Grand Gulf Nuclear Station Project stage: Other ML20203D6791986-04-14014 April 1986 Proposed Tech Specs Re Design Changes to Scram Discharge Vol & post-LOCA Vacuum Breakers Project stage: Other ML20199E9111986-06-13013 June 1986 Proposed Changes to Tech Specs 3.5.1 & 4.5.1,revising Automatic Depressurization sys-related Air Sys Per Prior Commitments to Add Extrapolated Pressure Decay Test & Instrument Quality Test Project stage: Request AECM-86-0188, Application for Amend to License NPF-29,revising Tech Spec 4.5.1 to Change Automatic Depressurization sys-related Air Sys,Per Prior Commitments to Add Extrapolated Pressure Decay Test & Instrument Air Quality Test.Fee Paid1986-06-13013 June 1986 Application for Amend to License NPF-29,revising Tech Spec 4.5.1 to Change Automatic Depressurization sys-related Air Sys,Per Prior Commitments to Add Extrapolated Pressure Decay Test & Instrument Air Quality Test.Fee Paid Project stage: Request AECM-86-0225, Application for Amend to License NPF-29,combining Drywell Vacuum Relief Requirements for post-LOCA & Combustible Gas Purge Sys Into One Tech Spec.Fee Paid1986-07-16016 July 1986 Application for Amend to License NPF-29,combining Drywell Vacuum Relief Requirements for post-LOCA & Combustible Gas Purge Sys Into One Tech Spec.Fee Paid Project stage: Request ML20207G5201986-07-16016 July 1986 Proposed Tech Specs Combining Drywell Vacuum Relief Requirements w/post-LOCA & Combustible Gas Purge Sys Into One Tech Spec Project stage: Other AECM-86-0198, Application for Amend to License NPF-29,modifying License Condition 2.C.(33)(b) to Allow Use of Alternate Training & Testing to Satisfy NUREG-0694,Item I.G.1 Requirement to Conduct Simulated Loss of Power Test.Fee Paid1986-07-25025 July 1986 Application for Amend to License NPF-29,modifying License Condition 2.C.(33)(b) to Allow Use of Alternate Training & Testing to Satisfy NUREG-0694,Item I.G.1 Requirement to Conduct Simulated Loss of Power Test.Fee Paid Project stage: Request ML20203J9631986-07-25025 July 1986 Proposed Tech Spec,Modifying License Condition 2.C.(33)(b) to Allow Use of Alternate Training to Satisfy NUREG-0694,TMI Action Plan Item I.G.1 Requirement to Conduct Simulated Loss of Power Test Project stage: Other AECM-86-0243, Application for Amend to License NPF-29,modifying License Condition 2.C(33)(b) Requiring Util to Conduct Simulated Loss of Onsite & Offsite Alternating Current Power Test1986-08-11011 August 1986 Application for Amend to License NPF-29,modifying License Condition 2.C(33)(b) Requiring Util to Conduct Simulated Loss of Onsite & Offsite Alternating Current Power Test Project stage: Request ML20212P4641986-08-26026 August 1986 Revised Application for Amend to License NPF-29,allowing Entry Into Operational Conditions 1 & 2 W/O Performing Surveillance Requirement 4.1.3.1.4.a for Scram Discharge Vol Vents Provided Test Performed at Least Every 18 Months Project stage: Request ML20212P4701986-08-26026 August 1986 Proposed Tech Specs Allowing Entry Into Operational Conditions 1 & 2 W/O Performing Surveillance Requirement 4.1.3.1.4.a for Scram Discharge Vol Vents Provided Test Performed at Least Every 18 Months Project stage: Other AECM-86-0238, Forwards Revised Application for Amend to License NPF-29, Allowing Entry Into Operational Conditions 1 & 2 W/O Performing Surveillance Requirement 4.1.3.1.4.a Provided Test Performed at Least Every 18 Months1986-08-26026 August 1986 Forwards Revised Application for Amend to License NPF-29, Allowing Entry Into Operational Conditions 1 & 2 W/O Performing Surveillance Requirement 4.1.3.1.4.a Provided Test Performed at Least Every 18 Months Project stage: Request ML20215L2431986-10-17017 October 1986 Amend 21 to License NPF-29,revising Tech Specs Re Names & Designation of Certain Plant Svc Water Valves,Record Retention Specs & Control Rod Scram Discharge Vol Project stage: Other ML20215L2481986-10-17017 October 1986 Safety Evaluation Supporting Amend 21 to License NPF-29 Project stage: Approval ML20056A7491990-08-0707 August 1990 Forwards Safety Evaluation Accepting Licensee Fire Barrier Penetration Seal Program & Commitment to Complete 100% Review of All Tech Spec Fire Penetration Seals by 911231 Project stage: Approval 1986-04-03
[Table View] |
Proposed Tech Spec,Modifying License Condition 2.C.(33)(b) to Allow Use of Alternate Training to Satisfy NUREG-0694,TMI Action Plan Item I.G.1 Requirement to Conduct Simulated Loss of Power Test| ML20203J963 |
| Person / Time |
|---|
| Site: |
Grand Gulf  |
|---|
| Issue date: |
07/25/1986 |
|---|
| From: |
MISSISSIPPI POWER & LIGHT CO. |
|---|
| To: |
|
|---|
| Shared Package |
|---|
| ML20203J961 |
List: |
|---|
| References |
|---|
| RTR-NUREG-0694, RTR-NUREG-694, TASK-1.G.1, TASK-TM TAC-61196, NUDOCS 8608060088 |
| Download: ML20203J963 (2) |
|
Text
.
~
(a)
Control Room Design Review (I.D.1, SER; Appendix E. SSER #2, 55ER #4, 55ER #5)
Priortostartupfollowingthefirstrefuelingoutage,MP&L shall demonstrate the ability to maintain an effective temperature" condition of 85'F or less in the remote shut-down panel (RSP) room for at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> with an ambient outdoor temperature of at least 95'F.
(b)
Training During Low-Power Testing (I.G.I. SER) 11 conauct a special test, simulatee Loss and Offs ating-Carrent Power Te escribed in the MP&L letter date 1
At least 4 weeks INSERT
' prior to performin a
P&L shall provide a safety ana r this test and its pro to NRC for and anoroval.
(c)
Post Accident Sampling (II.B.3, SER, SSER #1, SSER #4, 55ER #5)
Prior to startup following the first refueling outage MP&L shall incorporate the' additional requir ements into the procedure for relating radionuclide gaseous and ionic species to estimate core damage as discussed in Section II.B.3.1 of SSER #4.
(d)
Hydrogen Control (Section II.B.7 SER, SSER #2, SSER #3, SSER #4, SSER #5)
(1)
During the first cycle of operation, MP&L shall maintain a suitable program of analysis and testing of the installed hydrogen ignition system. MP&L shall submit to tF4 MC quarterly reports on the status of their Feses ach programs.
(a) MP&L sha b uus its research program on hydrogen control measures to include, but not be limited to, the following items:
- 1) Perform containment sensitivity analysis to determine the adequacy of the hydrogen control system for a spectrum of degraded t
core accidents including the determination of accident sequences for which equipment survivability is assured; 8608060008 860725 PDR ADOCK 05000416 P
F' DR i
-P Insert to Operating License Condition 2.C(33)(b)
MP&L shall demonstrate the adverse impact that a Simulated Loss of Onsite and Offsite power test will have on plant equipment and confirm that;.the BWR Owners' recommendations for compliance with I.G.1_will be* implemented.