ML20203J963

From kanterella
Jump to navigation Jump to search

Proposed Tech Spec,Modifying License Condition 2.C.(33)(b) to Allow Use of Alternate Training to Satisfy NUREG-0694,TMI Action Plan Item I.G.1 Requirement to Conduct Simulated Loss of Power Test
ML20203J963
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 07/25/1986
From:
MISSISSIPPI POWER & LIGHT CO.
To:
Shared Package
ML20203J961 List:
References
RTR-NUREG-0694, RTR-NUREG-694, TASK-1.G.1, TASK-TM TAC-61196, NUDOCS 8608060088
Download: ML20203J963 (2)


Text

.

~

(a)

Control Room Design Review (I.D.1, SER; Appendix E. SSER #2, 55ER #4, 55ER #5)

Priortostartupfollowingthefirstrefuelingoutage,MP&L shall demonstrate the ability to maintain an effective temperature" condition of 85'F or less in the remote shut-down panel (RSP) room for at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> with an ambient outdoor temperature of at least 95'F.

(b)

Training During Low-Power Testing (I.G.I. SER) 11 conauct a special test, simulatee Loss and Offs ating-Carrent Power Te escribed in the MP&L letter date 1

At least 4 weeks INSERT

' prior to performin a

P&L shall provide a safety ana r this test and its pro to NRC for and anoroval.

(c)

Post Accident Sampling (II.B.3, SER, SSER #1, SSER #4, 55ER #5)

Prior to startup following the first refueling outage MP&L shall incorporate the' additional requir ements into the procedure for relating radionuclide gaseous and ionic species to estimate core damage as discussed in Section II.B.3.1 of SSER #4.

(d)

Hydrogen Control (Section II.B.7 SER, SSER #2, SSER #3, SSER #4, SSER #5)

(1)

During the first cycle of operation, MP&L shall maintain a suitable program of analysis and testing of the installed hydrogen ignition system. MP&L shall submit to tF4 MC quarterly reports on the status of their Feses ach programs.

(a) MP&L sha b uus its research program on hydrogen control measures to include, but not be limited to, the following items:

1) Perform containment sensitivity analysis to determine the adequacy of the hydrogen control system for a spectrum of degraded t

core accidents including the determination of accident sequences for which equipment survivability is assured; 8608060008 860725 PDR ADOCK 05000416 P

F' DR i

-P Insert to Operating License Condition 2.C(33)(b)

MP&L shall demonstrate the adverse impact that a Simulated Loss of Onsite and Offsite power test will have on plant equipment and confirm that;.the BWR Owners' recommendations for compliance with I.G.1_will be* implemented.

2 s

I i

(

)

niH Y

i.

e 4