ML20196E452: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:*
ADMINISTRATIVE CONTROLS PROCEDURES AND PROGRAMS (Continued)
: 2. Integrated leak test requirements for each system, at refueling cycle intervals or more frequently.
: b. In-Plant Radiation Monitoring A program which will ensure the capability to accurately determine the airborne iodine concentration in vital areas under accident conditions. This program shall include the following:
: 1.      Training of personnel,
: 2.      Procedures for monitoring, and                              .
: 3.      Provisions for maintenance of sampling and analysis equipment.
: c. Post-accident Sampling A program which will ensure the capability to obtain and analyze reactor coolant, radioactive iodines and particulates in plant gaseous effluents and containment atmosphere samples, under accident conditions.      The program shall include the following:
: 1. Training of personnel,
: 2. Procedures for sampling and analysis, and
: 3. Provisions for maintenance of sampling and analysis equipment.
: d. Biofouling Prevention and Detection                                    ,
A program, approv;d by the MC Staf f prior to-4nt-eeduc44cr, of river l                                water to th: :y:t r:, which will include the procedures to prevent l
'                                biofouling of safety-related equipment, to assure detection of Corbicula  .
inserti clarifier influont in the intake embayment and tn g Mississippi Rivec et the River Sc =
Statier. :itt, and to monitor and survey safety-related equipment to de-tect biofouling. Changes to this program will be submitted to and I
approved by the NRC (both the Region and NRR) prior to implementation.
l 6.9 REPORTING REQUIREMENTS ROUTINE REPORTS
        $ca 6.9.1 In addition to the applicable reporting requirements of Title 10, Code i
ggg            of Federal Regulations, the following reports shall be submitted to the U.S.
      <o 88              Nuclear Regulatory Commission, Document Control Desk, Washington, DC 20555, 03 0            with a copy to the Regional Office of the NRC and a copy to the NRC Resident g              Inspector, unless otherwise noted.
l l  40                                                                '
O                STARTUP REPORT l
l  o@
o ce 6.9.1.1 A summary report of plant startup and power escalation testing shall be submitted following (1) receipt of an Operating 1.icense, (2) amendment to Sh 6-15                        Amendment No.17 RIVER BEND - UNIT 1
_.}}

Latest revision as of 03:40, 13 November 2020

Proposed Tech Spec 6.8.4.d Re Asiatic Clam Control Program
ML20196E452
Person / Time
Site: River Bend Entergy icon.png
Issue date: 06/21/1988
From:
GULF STATES UTILITIES CO.
To:
Shared Package
ML20196E451 List:
References
NUDOCS 8807010624
Download: ML20196E452 (1)


Text

ADMINISTRATIVE CONTROLS PROCEDURES AND PROGRAMS (Continued)

2. Integrated leak test requirements for each system, at refueling cycle intervals or more frequently.
b. In-Plant Radiation Monitoring A program which will ensure the capability to accurately determine the airborne iodine concentration in vital areas under accident conditions. This program shall include the following:
1. Training of personnel,
2. Procedures for monitoring, and .
3. Provisions for maintenance of sampling and analysis equipment.
c. Post-accident Sampling A program which will ensure the capability to obtain and analyze reactor coolant, radioactive iodines and particulates in plant gaseous effluents and containment atmosphere samples, under accident conditions. The program shall include the following:
1. Training of personnel,
2. Procedures for sampling and analysis, and
3. Provisions for maintenance of sampling and analysis equipment.
d. Biofouling Prevention and Detection ,

A program, approv;d by the MC Staf f prior to-4nt-eeduc44cr, of river l water to th: :y:t r:, which will include the procedures to prevent l

' biofouling of safety-related equipment, to assure detection of Corbicula .

inserti clarifier influont in the intake embayment and tn g Mississippi Rivec et the River Sc =

Statier. :itt, and to monitor and survey safety-related equipment to de-tect biofouling. Changes to this program will be submitted to and I

approved by the NRC (both the Region and NRR) prior to implementation.

l 6.9 REPORTING REQUIREMENTS ROUTINE REPORTS

$ca 6.9.1 In addition to the applicable reporting requirements of Title 10, Code i

ggg of Federal Regulations, the following reports shall be submitted to the U.S.

<o 88 Nuclear Regulatory Commission, Document Control Desk, Washington, DC 20555, 03 0 with a copy to the Regional Office of the NRC and a copy to the NRC Resident g Inspector, unless otherwise noted.

l l 40 '

O STARTUP REPORT l

l o@

o ce 6.9.1.1 A summary report of plant startup and power escalation testing shall be submitted following (1) receipt of an Operating 1.icense, (2) amendment to Sh 6-15 Amendment No.17 RIVER BEND - UNIT 1

_.