ML20134N576: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:L)l)f
: 0. - {. q ,
UNITED STATES OF AMERICA                #C NUCLEAR REGULATORY COMMISSION COMMISSIONERS:
E SEP -4 Pl2:42 Nunzio J. Palladino, Chairman                        CFFL; 3    ..,.
Thomas M. Roberts                                      00CMErina fip).jg.
IRANCH James K. Asselstine Frederick M. Bernthal Lando W. Zech, Jr.
SEM/ED SEP 41985
                                                )
In the Matter of                        )
                                                )
DUKE POWER COMPANEY, ET AL.            )              Docket Nos. 50-413
                                                )                                  50-414 (Catawba Nuclear Station, Units 1 and 2)                                            (10 CFR 2.206)
ORDER Pursuant to 10 CFR 2.772(b), the time for the Commission consideration of ALAB-813 in this matter is hereby extended to October 4, 1985.
It is so ORDERED.
pa REco                      For-the Commission d'                %
h            a        b l
f.' ?    f.0 g                              \l        I
                                                                            .8 x Q 94 %A=jj$fM4' jy                              SAMUEL J.fCHILK g7      w '-    &                ,/ecretaryofthdCommission S
Dated at Washington, DC TA this y lay of September, 1985.
8509050201 850904
{DR ADOCK 05000413    PDR e                                                                              P        col}}

Latest revision as of 18:56, 22 July 2020

Order Extending Time Until 851004 for Commission to Act to Review ALAB-813.Served on 850904
ML20134N576
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 09/04/1985
From: Chilk S
NRC OFFICE OF THE SECRETARY (SECY)
To:
NRC COMMISSION (OCM)
References
CON-#385-422 2.206, ALAB-813, OL, NUDOCS 8509050201
Download: ML20134N576 (1)


Text

L)l)f

0. - {. q ,

UNITED STATES OF AMERICA #C NUCLEAR REGULATORY COMMISSION COMMISSIONERS:

E SEP -4 Pl2:42 Nunzio J. Palladino, Chairman CFFL; 3 ..,.

Thomas M. Roberts 00CMErina fip).jg.

IRANCH James K. Asselstine Frederick M. Bernthal Lando W. Zech, Jr.

SEM/ED SEP 41985

)

In the Matter of )

)

DUKE POWER COMPANEY, ET AL. ) Docket Nos. 50-413

) 50-414 (Catawba Nuclear Station, Units 1 and 2) (10 CFR 2.206)

ORDER Pursuant to 10 CFR 2.772(b), the time for the Commission consideration of ALAB-813 in this matter is hereby extended to October 4, 1985.

It is so ORDERED.

pa REco For-the Commission d'  %

h a b l

f.' ? f.0 g \l I

.8 x Q 94 %A=jj$fM4' jy SAMUEL J.fCHILK g7 w '- & ,/ecretaryofthdCommission S

Dated at Washington, DC TA this y lay of September, 1985.

8509050201 850904

{DR ADOCK 05000413 PDR e P col