==Dear Sirs,==
==Dear Sirs,==
                                                     's    .
                                                     's    .
                                                                                                                         /'m    j .f We are in receipt of a letter dated October 2, 1978 from Thomas A. Baxter to you transmitting a letter from John Carroll of                                                                                        I Northern States Power Co. to this commission. The substance of                                                                                      !
                                                                                                                         /'m    j .f We are in receipt of a {{letter dated|date=October 2, 1978|text=letter dated October 2, 1978}} from Thomas A. Baxter to you transmitting a letter from John Carroll of                                                                                        I Northern States Power Co. to this commission. The substance of                                                                                      !
the enclosed letter is that the in-service dette for Tyrone is                                                                                    l being postponed, due to delay in obtaining a certificate of cublic convenience and necessity from this commission.
the enclosed letter is that the in-service dette for Tyrone is                                                                                    l being postponed, due to delay in obtaining a certificate of cublic convenience and necessity from this commission.
It is our understanding from the applicants that the delay is principally caused by three factors; a reassessment of time required to construct the plant, seasonal constraints on con-struction, and an unwillingness on the part of the applicants to make certain pre-certification ec=mitments in the face of this commission's expressed policy to minimize such commitments.
It is our understanding from the applicants that the delay is principally caused by three factors; a reassessment of time required to construct the plant, seasonal constraints on con-struction, and an unwillingness on the part of the applicants to make certain pre-certification ec=mitments in the face of this commission's expressed policy to minimize such commitments.

Latest revision as of 15:58, 1 June 2023

Review of Proj Is Proc on Sched.Will Be Holding Hearing to Determine Whether Plant Is Needed Beginning 781211.W/encl Cert of Svc
ML20062D129
Person / Time
Site: 05000484
Issue date: 10/25/1978
From: Mittness L
WISCONSIN, STATE OF
To: Mike Farrar, Johnson W, Saltzman R
Atomic Safety and Licensing Board Panel
References
CA-5447, NUDOCS 7811200040
Download: ML20062D129 (4)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _

, W N CORDF3PONnPJiC%

DOCU3ENT R003 rf State of W.i. conNRCmPL'LIC,,u a u C seavice Comissios CHARLES J. CICCHETTI CHAIRMAN JOHN C. CESTREtCHER COMMISSaCNER EDWARO M. PARSCNS. JR CCMMIS$1CNER LEWIS T. MiTTNESS. EXECUTIVE SECRETARY

  • nLL Faanes stats o,,ect eve 6cisc haA06Soto, weSCQm$eN $3 70,

<... m .is.:

October 25, 1978 E No- CA-5447 Richard S. Salsman, Esquire Michael C. Farrar, Esquire Chairman Atomic Safety and Licensing Atcmic Safety and Licensing Appeal Board Appeal Board U.S. Nuclear Regulatory i U.S. Nuclear Regulatory Commission Commission l Washington, D.C. 20555 Washington, D.C. 20555 Dr. W. Reed Johnson iI Atomic Safety and Licensing Appeal Board  %

U.S. Nuclear Regulatory Commission ,s */ .,

j.g Washington, D.C. 20555  ;

Q o*y Q,Q%

In the Matter of. C' j L l Northern States Power' Company, et al. (t, c, g .gr (Tyrone Energy Park, UnitN1)

Docket No. STN 50-484 )

\

a,-

h c6' a', s .

N I

/^

Dear Sirs,

's .

/'m j .f We are in receipt of a letter dated October 2, 1978 from Thomas A. Baxter to you transmitting a letter from John Carroll of I Northern States Power Co. to this commission. The substance of  !

the enclosed letter is that the in-service dette for Tyrone is l being postponed, due to delay in obtaining a certificate of cublic convenience and necessity from this commission.

It is our understanding from the applicants that the delay is principally caused by three factors; a reassessment of time required to construct the plant, seasonal constraints on con-struction, and an unwillingness on the part of the applicants to make certain pre-certification ec=mitments in the face of this commission's expressed policy to minimize such commitments.

This ccrmission has accepted an application for Tyrone as of September 1, 1978, and, under the Njsconsin Power Plant Siting Law, section 196.491 Wis. Stats., has 540 days : rem that date to make a decision on it.

The April 1979 target date for a decisica on the state certi-ficate to which Mr. Carroll's letter refers is a target chosen 7811200c40, p

- em. ,

October 25, 1978 Page 2 by the applicants and never discussed with the commission. In fact, it was first proposed in March 1978 in the application filed at that time. Other submissions assumed a 5-1/2 year construction time, for which a September 1979 licensing date would be more than adecuate. Our review of this project is proceeding on schedule, and, in fact, we will be holding hearing to determine whether the plant is needed sta:: ting December 11, 1978.

I have enclosed a notice of this hearing for your information.

the Coe= ion

. / *

.- m .rfs.,zzr.w, Lewis T. Mittness -

Executive secretary ,

LTM:rbj Enclosure I

I cc: Service List l

l 9

(

t.

I- - -

U% %~4,

,- A UNITED STATES OF AMERICA 9_e;oc NUCLEAR REGULATORY COMMISSION -

- N,ghy I6 BEFORE THE ATOMIC SAFETY AND LICENSING APPEAL .

g W

G In the Matter of ) q NORTHERN STATES POWER COMPANY, )

ET AL. ) Docket lio. STN 50-484

)

(Tyrone Energy Park, Unit 1) )

CERTIFICATE OF SERVICE I ::ereby certify that copies of the foregoing letter from the Executive Secretary of the Public Service Commission to the Atomic Safety and Licensing Appeal Board, dated October 25, 1978, without attachments, were served by deposit in the United States mail, first class, postage prepaid, this 25th day of October, 1978, to all those on the attached Service List, k .A r n .

r 1 d Barbara J. Willard Dated: October 25, 1978 e

,- . UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )

)

NORTHERN STATES POWER COMPANY, )

ET AL. ) Docket No. STN 50-484

)

(Tyrone Energy Park, Unit 1) ) .

SERVICE LIST Richard S. Salzman, Esquire, Chairman Peter Peshek, Esquire Atomic Safety and Licensing Appeal Board Assistant Attorney General U.S. Nuclear Regulatory Commission Department of Justice Washing ton, D.C. 20555 ,

State Capitol Madison, Wisconsin 53702 Michael C. Farrar, Esquire Atomic Safety and Licensing Appeal Board Mrs. Harold C. Bauer U.S. Nuclear Regulatory Commission Route 1, Box 191 1hington, D.C. 20555 Rock Falls, Wisconsin 54764 Dr. W. Reed Johnson Jocelyn Furtwangler Olson, Esqui.

Atomic Safety and Licensing Appeal Board Special Assistant Attorney Gener.

U.S. Nuclear Regulatory Commission Minnesota Pollution Control Agen.

Washington, D.C. 20555 1935 W. Country Road B2 Roseville, Minnesota 55113 Ivan W. Smith, Esquire, Chairman Atomic Safety and Licensing Board Richard Ihrig, Esquire U.S. Nuclear Regulatory Commission 400 Exchange Building. ~

Washington, D.C. 20555 4th and Center Uinona, Minnesota 55987 Dr. George C. Anderson Oceanography Department, WB-10 Michael J. Cain, Esquire

.iversity of Washington Bureau of Legal Services Seattle, Washington 98195 Department of Natural Resources Box 7921 Madison, Wisconsin 53707 3

Mr. Lester Kornblith, Jr. g Thomas A. Baxter Atomic Safety and Licensing Board Shaw, Pittman, Potts & Trowbridg U.S. Nuclear Regulatory Commission 1800 M Street, N.W.

Washington, D.C. 20555 Washington, D.C. 20036 .

Stephen H. Lewis, Esquire Mr. Stanley Cider Office of the Executive Legal Director c/o Durand Postmaster U.S. Nuclear Regulatory Cc= mission Tyrone, Wisconsin 54736 Washington, D.C. 20555 Docketing and Service Section ~

Mr. Thomas Gala:en Office of the Secretary Route 2, Box 54 U.S. Nuclear Regulatory Commission Turtle Lake, Wiscens,in 54839*.,

Washington, D.C. 20555