|
|
Line 2: |
Line 2: |
| | number = ML20054E786 | | | number = ML20054E786 |
| | issue date = 05/27/1982 | | | issue date = 05/27/1982 |
| | title = Slide Presentation Entitled, Control Room Design Review at Comanche Peak Steam Electric Station. | | | title = Slide Presentation Entitled, Control Room Design Review at Comanche Peak Steam Electric Station |
| | author name = Estes R | | | author name = Estes R |
| | author affiliation = TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) | | | author affiliation = TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
Latest revision as of 13:11, 21 November 2023
|
---|
Category:ARCHIVE RECORDS
MONTHYEARML20116A0341996-07-17017 July 1996 Rev 0 to Temp Vs Distance Profile for 10 RHR Line Containing Stagnant Water ML20058Q4061993-08-30030 August 1993 Package Consisting of Employee Concerns Programs ML20128G9491993-01-22022 January 1993 Calculation of Weights Due to Fire Protection Matl ML20128G9551992-12-29029 December 1992 Design Validation of Conduits W/Thermolag ML20128G9861992-10-0202 October 1992 Ampacity of Power Cable Wrapped W/330-660 Installed as Free Air Drop ML20105A7981992-08-14014 August 1992 Rev 0 to Calculation of Thermal Response for Sprinkler & Raceway Supports ML20101G0471992-06-17017 June 1992 Rev 3 to Calculation 2-FP-0085 Raceway & Firezone R Cable Supports Analysis ML20115B6851992-03-0202 March 1992 Rev 0 to 2-NP-GENX-544, Reconciliation of Local Stress Evaluation Using ME215 Analysis ML20104B4001992-02-13013 February 1992 Rev 1 to Calculation RXE-TA-CP1/0-027, Undervoltage/ Underfrequency Reactor Trip Setpoints ML20127H2091991-11-12012 November 1991 Calculation 2-NP-GENX-551, Evaluation of NUREG-0797 Suppl 1A (Sser 14) App a Sections 12.1 & 12.2 ML20082U5851991-05-0808 May 1991 Liner Attachment Welds Serviceability ML20055E2881990-03-12012 March 1990 Package Consisting of Event Notification Worksheet Re 900312 Inadvertent Safety Injection from Single Train.No Equipment Malfunction/Failure Noted ML20072A8471990-01-23023 January 1990 Rev 2 to Calculation 071, Review Statement for Safety Related Calculations ML20042D3711989-09-28028 September 1989 Audit Rept ATP-89-146S, Scaling Calculations, on 890821-0928 ML20247G4111989-03-31031 March 1989 Transit Time Flow Meter Calculations ML20151T3841988-08-0101 August 1988 Protocol Between OSP & NRR for Technical Review of Comanche Peak Fsar ML20151K5841988-04-18018 April 1988 Page from Draft Rept on Plant Safeteam Activity & Ofc of Investigations Review IR 05000445/19820141988-03-11011 March 1988 Draft of Insp Rept 50-445/82-14 Originally Withheld from FOIA-84-210 Response & Typing Cover Sheets or Transmittal Pages of Documents Withheld from FOIA-86-181 Response ML20148F8201988-01-21021 January 1988 Rev 0 to Investigation of SIF for Weld Shrinkage ML20148F8631988-01-21021 January 1988 Rev 1 to Parallel Snubbers ML20148F2151987-11-19019 November 1987 Rev 0 to Potential Binding of Lugs in Axial Supports ML20237K9771987-08-19019 August 1987 Press Release 87-115 Informing of NRC Release of Documents Re Investigation of NRC Actions Involving Plant Under Const. Portions of Documents Deleted for Personal Privacy Reasons or Prospective Personnel Matters ML20151M9601987-07-20020 July 1987 Package of NRC Administered Requalification Exam Results Summary ML20148F2521987-05-22022 May 1987 Rev 0 to Evaluation of Fluid Transient Cutoff Forces & Development of Screening Criteria for Piping Sys ML20237K0381987-05-14014 May 1987 Record of 870514 Telcon W/S&W & Util Re Insp Requirements for Pipe Supports (Ref Item 4,SWEC NA-1140 Rept) ML20237K0201987-05-13013 May 1987 Record of 870513 Telcon W/S&W & Util Re Insp Requirements for Pipe Supports for Plant.S&W Does Not Consider Insp of Designs to Be Warranted ML20236M4011987-04-17017 April 1987 Package Consisting of 870417 Request for Premium Cost Mail Svc & Unsigned & Undated Ltr to Util Forwarding Draft Insp Repts 50-445/87-02 & 50-446/87-02 & Notice of Deviation ML20128G9681987-02-24024 February 1987 Cable Ampacity Derating Factors for Conduits Boxed in W/ Thermolag (TSI Product) ML20236L9091987-02-19019 February 1987 Rev 1 to CT-1-137-701-S25R, Pipe Support Calculation ML20236N4981987-02-0202 February 1987 Package Consisting of Comanche Peak Steam Electric Station Design Change Authorizations & Evaluation Summaries ML20207D7231986-12-23023 December 1986 Pipe Support Calculation:General Calculation for Richmond Insert/Tube Steel Connections Design Mods ML20207D7481986-12-23023 December 1986 Generic Calculation:Evaluation of Npsi Rear Brackets, Dimension for Design Calculation IA-86-386, Package Consisting of Potential Violations Not Included in Proposed Enforcement Package & Violations of Little Safety Significance Not Included in Proposed Enforcement Package1986-12-16016 December 1986 Package Consisting of Potential Violations Not Included in Proposed Enforcement Package & Violations of Little Safety Significance Not Included in Proposed Enforcement Package ML20211P4701986-12-16016 December 1986 Package Consisting of Potential Violations Not Included in Proposed Enforcement Package & Violations of Little Safety Significance Not Included in Proposed Enforcement Package IA-85-799, Partially Withheld Package of Info Re Plant Investigation, Including Draft NRC Ltr to Aslb,Partial Transcript & Handwritten Notes1986-12-0101 December 1986 Partially Withheld Package of Info Re Plant Investigation, Including Draft NRC Ltr to Aslb,Partial Transcript & Handwritten Notes ML20214R3351986-12-0101 December 1986 Partially Withheld Package of Info Re Plant Investigation, Including Draft NRC Ltr to Aslb,Partial Transcript & Handwritten Notes ML20235S1101986-11-15015 November 1986 Package of Documents Re Nomination & Authorization for Cash Awards to NRC Personnel Involved W/Insp Efforts Re Implementation of Util Comanche Peak Response Team Program IA-87-528, Package of Documents Re Nomination & Authorization for Cash Awards to NRC Personnel Involved W/Insp Efforts Re Implementation of Util Comanche Peak Response Team Program1986-11-15015 November 1986 Package of Documents Re Nomination & Authorization for Cash Awards to NRC Personnel Involved W/Insp Efforts Re Implementation of Util Comanche Peak Response Team Program ML20210E5991986-11-0707 November 1986 Rev 2 to Calculation 020-040-M19, Clip Stiffness Production Value ML20210E6811986-10-31031 October 1986 Rev 4 to Calculation M-03, Cable Tray Properties ML20236L8891986-10-31031 October 1986 Rev 1 to CT-1-137-702-S25R, Pipe Support Calculation. Supporting Documentation Encl ML20210E5221986-10-15015 October 1986 Rev 2 to Calculation M-10, Cable Tray - Clip Angle Stiffness ML20210E5751986-10-10010 October 1986 Rev 2 to Calculation M-12, Qualification Procedures for Cable Tray Support Evaluation ML20148F4591986-09-16016 September 1986 Rev 0 to Fatigue Cycle Determination for Pipe Supports ML20148F4921986-09-10010 September 1986 Rev 2 to Documentation of Use of Low Strength A563 Grade a Double Nuts on High Strength SA 193 Grade B-7th D Rod for Richmond Insert Bolt Connection ML20210E6261986-08-31031 August 1986 Rev 0 to Calculation M-28, Justification of Clip Modeling Procedure ML20148F3351986-08-28028 August 1986 Rev 2 to Development of Method for Evaluating Local Stress in Pipe Support Members ML20210E4611986-08-25025 August 1986 Rev 3 to Calculation M-25, Base Plate Prying Action Factors ML20236L9371986-07-31031 July 1986 Rev 1 to Calculation CT-1-032, Texas Util Generating Co Comanche Peak Steam Electric Station Containment Spray Sys 15454-NP(H) ML20211K2971986-06-11011 June 1986 Partially Withheld Package of 850711 & 860611 Lists of Allegations on Comanche Peak 1996-07-17
[Table view] Category:PHOTOGRAPHS & SLIDES
MONTHYEARML20137A7031984-05-0707 May 1984 Slide Presentation from 840507 Meeting in Bethesda,Md to Discuss Facility.Ten Oversize Pages of bar-chart Plot Based on Schedule Dates Encl IA-85-547, Slide Presentation from 840507 Meeting in Bethesda,Md to Discuss Facility.Ten Oversize Pages of bar-chart Plot Based on Schedule Dates Encl1984-05-0707 May 1984 Slide Presentation from 840507 Meeting in Bethesda,Md to Discuss Facility.Ten Oversize Pages of bar-chart Plot Based on Schedule Dates Encl ML20091K2901984-02-24024 February 1984 Slide Presentation Entitled, Industry Evaluation of Operating Shift Experience Requirements, Presented at 840224 Meeting Before Commissioners in Washington,Dc ML20054E7861982-05-27027 May 1982 Slide Presentation Entitled, Control Room Design Review at Comanche Peak Steam Electric Station ML19340C4171980-11-0707 November 1980 Nonproprietary Version of Slides Used in Westinghouse Proposal for Addressing Inadvertent Boron Dilution Event at Facility ML20003A0831980-10-15015 October 1980 Slide Presentation Entitled, Inadvertent Boron Dilution. ML19323H1161980-03-25025 March 1980 Slide Presentation Used During 800325 Meeting 1984-05-07
[Table view] |
Text
'
ENCLOSURE 2 t
CONTROL ROOM DESIGN REVIEW AT C0FANCHE PEAX STEAM ELECTRIC STATION .
I 5
I l
l l' Ron ESTES HFE TEAM LEADER IEXAS UTILITIES SERVICES, INC.
i i
i
\
- m. . . - ... .. . . .. .. . .____
Sheet 1 of 3 B206140235 820527 PDR ADOCK 05000445 A PDR
i MILEST0f!ES SEPT. 1980 HUMAN FACTORS ENGINEERING REVIEn IEAM FORMED COMPRISED OF TUSI/TUGCO, G8H Ato ESSEX CORP.
OCT 6-N0v. 17, 1980 PRELIMINARY AUDIT CONDUCTED BY 'iFE REVIEW TEAM N0v. 17, 1980 PRELIMINARY AuoIT REPORT SUBMITTED TO NRC
- BY HFE REVIEW IEAM DEC. 8-12, 1980 ON-SITE HFE AUDIT CONDUCTED BY !!9C
~
MAY 1981 ON-SITE HFE AUDIT FINDINGS OF DECEMBER 1980 SUBMITTED BY NRC MAY 1981 LONG TERM REVIEW STARTED USIns EUoEG-1580 CUIDELINES SEPT. 1981 NUREG-0700 ISSUED BY NRC OCT. 1981 CONTROL BOARD REARRANGEMENT STLOY STARTED BY HFE REVIEW IEAM l JAN. 1982 LONG IERM REVIEW EXPANDED TO I t<2 UDE NEW REQUIREMENTS OF NUPEG-0700 l FEB. 1982 CONTROL 60ARD REARRANGEMENT STU~Y COMPLETED FEB. 1982 RESOLUTION OF H8'S STARTED Sheet 2 of 3
CR REVIEW STATUS
. NUREG-0700 REVIEW COMPLETE EXCEPT FOR:
SOUND AND LIGHTING SURVEYS
- IASK ANALYSIS RELABELING STUDY (* 150 HED'S)
I i
FINAL ANNUNCI ATOR REARRANGEMENT FINAL REPORT i
i i
I ALL HED'S IDENTIFIED TO DATE ARE BEING RESOLVED BY
,! THE TASK TEAM (~ 350 HED'S)
CONTROL BOARD MODIFICATIONS ARE ON-GOING ON A SCHEDULE NOT TO IMPACT THE START-UP EFFORT OR FUEL LOAD. OVER 800 CONTROL BOARD MODIFICATICNS ARE PLANNED TO ENHANCE THE CPSES CONTROL ROOM.
l
. q. .
I k
N Sheet 3 of 3
~~.- - . . . .--- - - -- , --. - , ,-.-- , .- . -. -
r f- . .
MEETffiG
SUMMARY
Document Control (50- 445) & (50-446)
NRC POR L PDR TERA NAY 2 71982 tiSIC LB#1 Rdg.
MRushbrook -
Project Manager S. Burwell Attorney, OELD OIE Regional Administrator, Region IV PARTICIPAllTS (f1RC):
S. Burwell D. Serig D. Tondi L. Beltracchi G. Lipinski J. Kramer V. Moore R. Ramirez
.