(4 intermediate revisions by the same user not shown) |
Line 1: |
Line 1: |
| #REDIRECT [[IR 05000223/2012201]]
| | {{Adams |
| | | number = ML12222A167 |
| | | issue date = 08/13/2012 |
| | | title = IR 05000223/12-201 on July 16-19, 2012 at the University of Massachusetts Lowell - NRC Announced Routine Inspection Report No. 50-223/2012-201 |
| | | author name = Bowman G |
| | | author affiliation = NRC/NRR/DPR/PRTB |
| | | addressee name = Chowdhury P |
| | | addressee affiliation = Univ of Massachusetts - Lowell |
| | | docket = 05000223 |
| | | license number = R-125 |
| | | contact person = Morlang G |
| | | document report number = IR-12-201 |
| | | document type = Inspection Report, Letter |
| | | page count = 17 |
| | }} |
| | |
| | {{IR-Nav| site = 05000223 | year = 2012 | report number = 201 }} |
| | |
| | =Text= |
| | {{#Wiki_filter:ust 13, 2012 |
| | |
| | ==SUBJECT:== |
| | UNIVERSITY OF MASSACHUSETTS LOWELL - NRC ANNOUNCED ROUTINE INSPECTION REPORT NO. 50-223/2012-201 |
| | |
| | ==Dear Dr. Chowdhury:== |
| | A U.S. Nuclear Regulatory Commission (NRC) inspection was conducted from July 16 to 19, 2012, at the University of Massachusetts Lowell Research Reactor Facility. The inspection included a review of activities authorized for your facility. The enclosed report presents the results of that inspection. Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations of activities in progress. |
| | |
| | Based on the results of this inspection, no safety concerns or noncompliances with NRC requirements were identified. No response to this letter is required. |
| | |
| | In accordance with Title 10 of the Code of Federal Regulations Section 2.390 Public inspections, exemptions and requests for withholding, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
| | |
| | Should you have any questions concerning this inspection, please contact Mike Morlang at 301-415-4092 or email at Gary.Morlang@nrc.gov. |
| | |
| | Sincerely, |
| | /RA/ |
| | Gregory T. Bowman, Chief Research and Test Reactors Oversight Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No. 50-223 License No. R-125 Enclosure: As stated cc: w/encl: See next page |
| | |
| | University of Massachusetts - Lowell Docket No. 50-223 cc: |
| | Mayor of Lowell City Hall Lowell, MA 01852 Mr. Leo Bobek Reactor Supervisor University of Massachusetts - Lowell One University Avenue Lowell, MA 01854 Department of Environmental Protection One Winter Street Boston, MA 02108 Director Radiation Control Program Department of Public Health 90 Washington Street Dorchester, MA 02121 ust 13, 2012 |
| | |
| | ==SUBJECT:== |
| | UNIVERSITY OF MASSACHUSETTS LOWELL - NRC ANNOUNCED ROUTINE INSPECTION REPORT NO. 50-223/2012-201 |
| | |
| | Dear D |
| | }} |
Latest revision as of 23:56, 11 November 2019
|
---|
Category:Inspection Report
MONTHYEARIR 05000223/20242012024-11-0404 November 2024 University of Massachusetts Lowell– U.S. Nuclear Regulatory Commission Safety Inspection Report 05000223/2024201 IR 05000223/20244102024-08-0505 August 2024 University of Massachusetts-Lowell - Us Nuclear Regulatory Commission Security Inspection Report 05000223/2024410 (Public) IR 05000223/20232012023-11-24024 November 2023 University of Massachusetts, Lowell – U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000223/2023201 IR 05000223/20222012022-10-16016 October 2022 University of Massachusetts Lowell - U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000223/2022201 IR 05000223/20212022021-12-17017 December 2021 University of Massachusetts Lowell U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000223/2021202 IR 05000223/20212012021-12-17017 December 2021 University of Massachusetts-Lowell - Nuclear Regulatory Commission Security Inspection Report No. 05000223/2021201 - Cover Letter ML20317A1942021-04-13013 April 2021 University of Massachusetts Lowell Routine Reactor Inspection Report - October 2020 IR 05000223/20192012019-07-17017 July 2019 University of Massachusetts Lowell - U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000223/2019201 IR 05000223/20182012018-09-28028 September 2018 University of Massachusetts Lowell - U.S. Nuclear Regulatory Commission Routine Safety Inspection Report No. 05000223/2018201 IR 05000223/20184102018-08-21021 August 2018 Letter University of Massachusetts-Lowell - U.S. Nuclear Regulatory Commission Security-Related Inspection Report No. 05000223/2018-410 IR 05000223/20172012017-06-12012 June 2017 University of Massachusetts Lowell - NRC Safety Inspection Report 05000223/2017201 IR 05000223/20162012016-05-0909 May 2016 University of Massachusetts Lowell - U.S. Nuclear Regulatory Commission Safety Inspection Report 05000223/2016201, April 4-7, 2016 IR 05000223/20152012015-06-12012 June 2015 IR 05000223/2015201, on 04/06/2015-04/09/2015, University of Massachusetts Lowell, NRC Safety Inspection Report IR 05000223/20132012013-08-0505 August 2013 IR 05000223-13-201, on July 9-11, 2013 at University of Massachusetts Lowell Research Reactor IR 05000223/20122012012-08-13013 August 2012 IR 05000223/12-201 on July 16-19, 2012 at the University of Massachusetts Lowell - NRC Announced Routine Inspection Report No. 50-223/2012-201 IR 05000223/20112022011-06-21021 June 2011 IR 05000223-11-202, on May 23-26, 2011, University of Massachusetts Lowell, Transmittal Letter of NRC Security-Related Inspection Report No. 50-223/2011-202 IR 05000223/20112012011-06-21021 June 2011 IR 05000223-11-201, on 05/23-26/2011, University of Massachusetts Lowell, NRC Announced Routine Inspection IR 05000223/20102012010-06-16016 June 2010 IR 05000223-10-201; University of Massachusetts; May 24-27, 2010; Massachusetts Lowell IR 05000223/20092012009-03-0505 March 2009 IR 05000223-09-201, on 02/02-06/2009, for University of Massachusetts - Lowell Research Reactor Facility IR 05000223/20092022009-02-26026 February 2009 IR 05000223-09-202, on 02/02 to 02/06/2009, University of Massachusetts-Lowell Research Reactor Facility. Cover Letter IR 05000223/20082012008-02-25025 February 2008 NRC Inspection Report No. 50-223/2008-201 ML0711300032007-04-23023 April 2007 NRC Inspection Report No. 50-223/2007-201 on March 26-29, 2007 for Univ. of Massachusetts - Lowell Research Reactor Facility and Notice of Violation IR 05000223/20072012007-04-23023 April 2007 NRC Inspection Report No. 50-223/2007-201 on March 26-29, 2007 for Univ. of Massachusetts - Lowell Research Reactor Facility and Notice of Violation IR 05000223/20072022007-04-0909 April 2007 NRC Inspection Report No. 50-223/2007-202 - Cover Letter IR 05000223/20062012006-04-21021 April 2006 IR 05000223-06-201, on 03/06-09/2006, University of Massachusetts - Lowell IR 05000223/19982001998-04-0707 April 1998 Insp Rept 50-223/98-200 on 980317-20.No Violations Noted. Major Areas Inspected:License Programs Were Directed Toward Protection of Public Health & Safety.Mgt Attention Should Be Directed to Issues Raised by Firefighters During Tours IR 05000223/19972011997-06-26026 June 1997 Insp Rept 50-223/97-201 on 970513-16.No Violations Noted. Major Areas Inspected:Licensee Organization,Operations & Maint Activities IR 05000223/19960021996-10-10010 October 1996 Insp Rept 50-223/96-02 on 961007-10.No Violations Noted. Major Areas Inspected:Radiation Protection Program IR 05000223/19900031990-09-19019 September 1990 Insp Rept 50-223/90-03 on 900827-28.No Violations Noted. Major Areas Inspected:Radiation Protection Program,Including Status of Previously Identified Items,Staffing,External Exposure Controls & Contamination Controls IR 05000223/19880011989-03-29029 March 1989 Submits Results of Investigation of Concern Re Fitness for Duty Noted in Insp Rept 50-223/88-01.Insufficient Evidence Provided to Determine If Fitness for Duty Issue Existed W/Individual Involved IR 05000223/19880061989-02-15015 February 1989 Exam Rept 50-223/88-06OL on 881205.Exam Results:One Reactor Operator Candidate Successfully Completed Exam & Granted License IR 05000223/19880051988-10-29029 October 1988 Insp Rept 50-223/88-05 on 880829.No Violations Noted. Major Areas Inspected:Emergency Preparedness IR 05000223/19880041988-09-28028 September 1988 Exam Rept 50-223/88-04OL on 880803-05.Exam Results:All Candiates Passed Operating Exams.Senior Reactor Operator & One Reactor Operator Passed Written Exam But One Reactor Operator Failed Section G of Written Exam IR 05000223/19880021988-07-14014 July 1988 Insp Rept 50-223/88-02 on 880414,0512 & 0610.No Violations Noted.Major Areas Inspected:Facility Tour & Organization, Action on Previous NRC Findings,Logs & Records,Procedures, Surveillances & Mgt Oversight IR 05000223/19870011987-03-0909 March 1987 Exam Rept 50-223/87-01OL on 870127-28.Exam Results:All Candidates Passed Written & Operating Exams IR 05000223/19860031986-10-0707 October 1986 Exam Rept 50-223/86-03OL on 860916-17.Exam Results:One Candidate Received License & Other Candidate Failed Written Exam IR 05000223/19860021986-08-19019 August 1986 Insp Rept 50-223/86-02 on 860723.No Violations Noted.Major Areas Inspected:Radiation Protection Program,Including Previously Identified Items,External Exposure Controls & Effluent & Environ Monitoring IR 05000223/19860011986-05-13013 May 1986 Exam Rept 50-223/86-01 on 860424.Exam Results:Candidate Successfully Passed Operating Exam IR 05000223/19850031986-01-24024 January 1986 Physical Security Insp Rept 50-223/85-03 on 850924-25. Licensee in Compliance W/Nrc Requirements.Major Areas Inspected:General Requirements for Physical Protection of SNM of Moderate Strategic Significance IR 05000223/19850021985-08-27027 August 1985 Insp Rept 50-223/85-02 on 850805-07.No Violations Noted. Major Areas Inspected:Health Physics & Radiological Controls Programs,Including Posting & Labeling,Instrument & Monitor Calibr & Surveys & Sampling IR 05000223/20030241985-04-18018 April 1985 Insp Repts 50-321/85-09 & 50-366/85-09 on 850223-0324. Violation Noted:Failure to Establish Procedures as Required Per Tech Spec 6.8.1 & Failure to Correct Reactor Vessel Temp & Pressure Curves for Fluence IR 05000223/20030221985-04-16016 April 1985 Insp Repts 50-424/85-09 & 50-425/85-09 on 850223-0322. Violation Noted:Failure to Follow Procedure to Prevent Dissimilar Metallic Matls from Coming in Direct Contact W/One Another IR 05000223/19780031978-09-15015 September 1978 Insp Rept 50-223/78-03 on 780817-18.Noncompliance Noted: Failure to Comply w/10CFR21 Posting Requirements 2024-08-05
[Table view] Category:Letter
MONTHYEARIR 05000223/20242012024-11-0404 November 2024 University of Massachusetts Lowell– U.S. Nuclear Regulatory Commission Safety Inspection Report 05000223/2024201 ML24227A9662024-08-14014 August 2024 Submittal of Annual Report for the University of Massachusetts Lowell Research Reactor ML24221A1562024-08-0808 August 2024 University of Massachusetts, Umlrr Physical Security Plan – Revision 7 IR 05000223/20244102024-08-0505 August 2024 University of Massachusetts-Lowell - Us Nuclear Regulatory Commission Security Inspection Report 05000223/2024410 (Public) ML24024A2372024-01-31031 January 2024 Examination Confirmation Letter No. 50-223/OL-24-01, University of Massachusetts-Lowell IR 05000223/20232012023-11-24024 November 2023 University of Massachusetts, Lowell – U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000223/2023201 ML23241A0502023-08-29029 August 2023 Univ. of Massachusetts - Lowell, Submittal of Annual Report ML23152A1582023-06-0101 June 2023 To the Emergency Preparedness Plan for the University of Massachusetts Lowell Research Reactor (Umlrr) ML23107A1862023-04-21021 April 2023 Examination Results Letter No. 50-223/OL-23-01 ML23024A1412023-03-0707 March 2023 Examination Confirmation Letter, University of Massachusetts-Lowell, OL-23-01 IR 05000223/20222012022-10-16016 October 2022 University of Massachusetts Lowell - U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000223/2022201 ML22243A1412022-08-30030 August 2022 Annual Report for the University of Massachusetts Lowell Research Reactor ML22154A4812022-06-0909 June 2022 Examination Confirmation Letter No. 50-223/OL-22-01, University of Massachusetts-Lowell ML22075A1172022-03-15015 March 2022 University of Massachusetts-Lowell Research Reactor - Designation of Level-1 and Level-2 Per License Technical Specifications 6.1.2(1 and 2) and 6.7.2(3) ML21168A0532022-02-0303 February 2022 University of Massachusetts Lowell, Transmittal Letter for Renewal of Facility Operating License No. R-125 IR 05000223/20212012021-12-17017 December 2021 University of Massachusetts-Lowell - Nuclear Regulatory Commission Security Inspection Report No. 05000223/2021201 - Cover Letter IR 05000223/20212022021-12-17017 December 2021 University of Massachusetts Lowell U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000223/2021202 ML21302A0552021-11-0909 November 2021 University of Massachusetts Lowell Update Regarding the Renewal of Facility Operating License No. R-125 ML21229A0812021-08-30030 August 2021 University of Massachusetts Lowell, Update Regarding the Renewal of Facility Operating License No. R-125 ML21214A1102021-08-0202 August 2021 Univ of Massachusetts - Lowell, Submittal of Routine Annual Report ML21133A1682021-05-19019 May 2021 University of Massachusetts Lowell, Update Regarding the Renewal of Facility Operating License No. R-125 ML21110A0532021-04-20020 April 2021 University of Massachusetts-Lowell Research Reactor - Draft Renewed License ML20317A1942021-04-13013 April 2021 University of Massachusetts Lowell Routine Reactor Inspection Report - October 2020 ML21095A2452021-04-0505 April 2021 University of Massachusetts, Lowell Research Reactor - Request for Additional Language to Item 2.B of the Proposed Renewed Facility Operating License ML21042B8572021-03-0404 March 2021 University of Massachusetts Lowell, Report on the Regulatory Audit Re the Renewal of Facility Operating License No. R-125 ML21047A2452021-02-16016 February 2021 University of Massachusetts-Lowell Research Reactor - Response to Items Discussed in NRC Telephone Conference with Uml on 02/11/21 ML21030A0052021-01-30030 January 2021 University of Massachusetts-Lowell Research Reactor - Response to NRC License Renewal Audit Letter Dated 12/17/2020 (ML20303A305) ML21007A1722021-01-11011 January 2021 University of Massachusetts Lowell, Status of the Regulatory Audit and Update Regarding the Renewal of Facility Operating License No. R-125 ML21005A2372021-01-0505 January 2021 Univ. of MA-Lowell Research Reactor - Response to NRC Letter Dated December 17, 2020, Report on Regulatory Audits the Renewal of Facility Operating License No. R-125 ML20303A3052020-12-17017 December 2020 University of Massachusetts Lowell, Report on the Regulatory Audits the Renewal of Facility Operating License No. R-125 ML20295A4242020-11-16016 November 2020 Notification of Mailing Address Change Regarding Submittal of Fingerprint Cards ML20274A2492020-09-30030 September 2020 University of Massachusetts-Lowell Research Reactor - Response to NRC License Renewal Audit Letter Dated 9/1/2020 (ML20240A043) ML20274A2552020-09-30030 September 2020 Opto 22 Procedures: Software Quality Assurance Plan ML20240A0432020-09-0101 September 2020 University of Massachusetts Lowell, Status of the Regulatory Audit and Update Regarding the Renewal of Facility Operating License No. R-125 ML20196L9762020-07-16016 July 2020 University of Massachusetts Lowell, Status of the Regulatory Audit and Update Regarding the Renewal of Facility Operating License No. R-125 ML20114E0592020-04-27027 April 2020 University of Massachusetts Lowell, Status of the Regulatory Audit and Update Regarding the Renewal of Facility Operating License No. R-125 ML20055F6042020-02-24024 February 2020 University of Massachusetts-Lowell - Closeout of Open RAI Items 7.4c and 7.5a, NRC Letter Dated July 19, 2019 - Request for Additional Information Regarding the Renewal of Facility Operating License No. R-125 ML20036E5012020-02-13013 February 2020 Request for Withholding of Information from Public Disclosure Documents in Support of Licensing Requests Initiated by the University of Massachusetts Lowell ML20021A3152020-02-0404 February 2020 University of Massachusetts Lowell - Regulatory Audit the Renewal of Facility Operating License No. R-125 ML20009E8482020-01-13013 January 2020 University of Massachusetts Lowell, Response to Request for Extension of Time to Respond to Request for Additional Information Regarding the Renewal of Facility Operating License No. R-125 ML20017A1552020-01-0808 January 2020 Request by General Atomics to Withhold Certain Information from Public Disclosure Under 10CFR2.390 ML19354A6102019-12-20020 December 2019 Supplement to University of Massachusetts Lowell Letter Dated 12/19/2019 in Response to Letter from NRC ML19353C5232019-12-19019 December 2019 Second Supplement to Response Dated October 18, 2019 (First Supplement Dated 10/24/19) Regarding NRC Letter Dated July 19, 2019 - Request for Additional Information Regarding the Renewal of Facility Operating License No. R-125 and Second Re ML19296E2792019-10-30030 October 2019 University of Massachusetts Lowell, Response to Request for Extension of Time to Respond to Request for Additional Information Regarding the Renewal of Facility Operating License No. R-125 ML19297F4332019-10-24024 October 2019 University of Massachusetts-Lowell Research Reactor - Supplement to Response Dated October 18, 2019 Regarding NRC Letter Dated July 19, 2019 - Request for Additional Information Regarding the Renewal of Facility Operating License No. R-125 ML19291C2932019-10-18018 October 2019 University of Massachusetts - Lowell - Response to NRC Letter Dated July 19, 2019 - Request for Additional Information Re the Renewal of Facility Operating License No. R-125 Instrumentation and Controls (EPID No. L-2015-RNW-0001) & Request ML19248C1162019-08-30030 August 2019 Submittal of Routine Annual Report for the University of Massachusetts Lowell Research Reactor ML19214A0192019-08-27027 August 2019 University of Massachusetts Lowell, Review of Emergency Plan in Support of License Renewal ML19214A0172019-08-27027 August 2019 University of Massachusetts Lowell, Review of Physical Security Plan in Support of License Renewal ML18092B0902019-07-19019 July 2019 University of Massachusetts Lowell - Request for Additional Information Regarding the Renewal of Facility Operating License No. R-125 for the University of Massachusetts Lowell Research Reactor and Primarily Related to Instrumentation and C 2024-08-08
[Table view] |
Text
ust 13, 2012
SUBJECT:
UNIVERSITY OF MASSACHUSETTS LOWELL - NRC ANNOUNCED ROUTINE INSPECTION REPORT NO. 50-223/2012-201
Dear Dr. Chowdhury:
A U.S. Nuclear Regulatory Commission (NRC) inspection was conducted from July 16 to 19, 2012, at the University of Massachusetts Lowell Research Reactor Facility. The inspection included a review of activities authorized for your facility. The enclosed report presents the results of that inspection. Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations of activities in progress.
Based on the results of this inspection, no safety concerns or noncompliances with NRC requirements were identified. No response to this letter is required.
In accordance with Title 10 of the Code of Federal Regulations Section 2.390 Public inspections, exemptions and requests for withholding, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this inspection, please contact Mike Morlang at 301-415-4092 or email at Gary.Morlang@nrc.gov.
Sincerely,
/RA/
Gregory T. Bowman, Chief Research and Test Reactors Oversight Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No. 50-223 License No. R-125 Enclosure: As stated cc: w/encl: See next page
University of Massachusetts - Lowell Docket No. 50-223 cc:
Mayor of Lowell City Hall Lowell, MA 01852 Mr. Leo Bobek Reactor Supervisor University of Massachusetts - Lowell One University Avenue Lowell, MA 01854 Department of Environmental Protection One Winter Street Boston, MA 02108 Director Radiation Control Program Department of Public Health 90 Washington Street Dorchester, MA 02121 ust 13, 2012
SUBJECT:
UNIVERSITY OF MASSACHUSETTS LOWELL - NRC ANNOUNCED ROUTINE INSPECTION REPORT NO. 50-223/2012-201
Dear D