IR 05000223/1986001
| ML20198H623 | |
| Person / Time | |
|---|---|
| Site: | University of Lowell |
| Issue date: | 05/13/1986 |
| From: | Coe D, Keller R, Kister H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML20198H602 | List: |
| References | |
| 50-223-86-01, 50-223-86-1, NUDOCS 8605300510 | |
| Download: ML20198H623 (2) | |
Text
.
.
.
'i U. S. NUCLEAR REGULATORY COMMISSION REGION I OPERATOR LICENSING EXAMINATION REPORT EXAMINATION REPORT N0. 86-01 (0L)
'
<
FACILITY DOCKET NO. 50-223 FACILITY LICENSE NO. R-125 LICENSEE: University of Lowell
'
1 University Avenue Lowell, MA 01854
<
FACILITY: Lowell Technological Institute Reactor
{
EXAMINATION DATES: April 24, 1986
CHIEF EXAMINER:
f [ af oc p
rd4 8//6
[~ //-Ed D. Coe, Lead attor Engineer (Examiner)
Date REVIEWED BY:
)
[3/O Robert M. Keller, Chief, Projects Section 1C Date APPROVED BY:
5 /3 H&rry'8'. hister, Chief, Projects Branch No.1 Dafe ('
SUMMARY: One R0 candidate was given an operating examination only, having previously passed the written examination. The candidate success-fully passed the operating examination.
,
i 8605300510 860515 PDR ADOCK 05000223.
V PDR
. -.-
. -
.
-
- -
.
- -
- -
-
.
,
REPORT DETAILS TYPE OF EXAMS:
Replacement X
EXAM RESULTS:
l R0 l
l Pass / Fail l
l l
l l
l l Oral Exam l
1/0 l
l l
l l
l l
10verall l
1/0 l
l l
l l
l l
1.
CHIEF EXAMINER AT SITE:
D. H. Coe, NRC 2.
SUMMARY OF GENERIC STRENGTHS OR DEFICIENCIES NOTED ON THE OPERATING EXAM:
None.
3.
PERSONNEL PRESENT AT EXIT INTERVIEW:
NRC Personnel D. Coe, NRC N. Dudley, NRC Facility Personnel T. Wallace 4.
SUMMARY OF NRC COMMENTS MADE AT EXIT INTERVIEW:
Candidate was given a clear pass.
- - - - - -
- -
- - - - -
- - - - - - -
- ----
- - - -
-- ---