IR 05000263/2015008: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{Adams
{{Adams
| number = ML15203B187
| number = ML15355A459
| issue date = 07/23/2015
| issue date = 12/21/2015
| title = NRC Inspection Report 05000263/2015008; 07200058/2014001 and Results of NRC Office of Investigation Report No. 3-2014-004
| title = EA-14-193; Confirmatory Order Related to NRC Reports No. 05000263/2015008; 07200058/2014001 and OI Report 3-2014-004; Monticello Nuclear Generating Plant
| author name = Louden P
| author name = Pederson C
| author affiliation = NRC/RGN-III/DNMS
| author affiliation = NRC/RGN-III
| addressee name = Gardner P
| addressee name = Gardner P
| addressee affiliation = Northern States Power Co
| addressee affiliation = Northern States Power Co
| docket = 05000263, 07200058
| docket = 05000263, 07200058
| license number = DPR-022
| license number = DPR-022
| contact person =  
| contact person = Lambert, Kenneth
| case reference number = 3-2014-004, EA-14-193
| case reference number = 3-2014-004, EA-14-193, IR 2015008
| document report number = IR 2014001, IR 2015008
| document type = Enforcement Action
| document type = Inspection Report, Letter
| page count = 20
| page count = 23
}}
}}


Line 19: Line 18:


=Text=
=Text=
{{#Wiki_filter:P. Gardn UNITED STATES uly 23, 2015
{{#Wiki_filter:UNITED STATES ber 21, 2015


==SUBJECT:==
==SUBJECT:==
MONTICELLO NUCLEAR GENERATING PLANT - NRC INSPECTION REPORT 05000263/2015008 AND 07200058/2014001 AND RESULTS OF NRC OFFICE OF INVESTIGATION REPORT NO. 3-2014-004
CONFIRMATORY ORDER RELATED TO NRC REPORTS NO. 05000263/2015008; 07200058/2014001 AND OI REPORT 3-2014-004; MONTICELLO NUCLEAR GENERATING PLANT


==Dear Mr. Gardner:==
==Dear Mr. Gardner:==
This is in reference to an investigation conducted by the U.S. Nuclear Regulatory Commission's (NRC) Office of Investigations (OI). The purpose of the investigation was to determine whether two contractors failed to follow procedural requirements while performing non-destructive examinations on Dry Shielded Canister confinement boundary welds in accordance with Technical Specification requirements, and falsified non-destructive examination report forms. Based on the results of its investigation, the NRC preliminarily determined that the two contractors deliberately violated Monticello procedure requirements and falsified report forms. The OI investigation was completed on November 13, 2014, and a factual summary of the OI Investigation Report is enclosed in Enclosure 1. The results of the investigation were discussed on July 21, 2015, with Peter Gardner and other members of your staff.
The enclosed Confirmatory Order is being issued to Northern States Power Company, Minnesota, as a result of a successful Alternative Dispute Resolution (ADR) session. The enclosed commitments were made by you, as the licensee, as part of a settlement agreement between you and the U.S. Nuclear Regulatory Commission (NRC) concerning apparent violations of NRC requirements, as discussed in the enclosure to our letter dated July 23, 2015.


Based on the results of NRCs review of the OI investigation, three apparent violations were identified. It appears to the NRC that parts of these violations were willful as described in the attached factual summary and inspection report. These apparent violations are being considered for escalated enforcement action in accordance with the NRCs Enforcement Policy.
Our July 23, 2015 (ML15203B187), letter provided you with the results of an investigation conducted by the NRCs Office of Investigations to determine whether two contractor technicians at the Monticello Nuclear Generating Plant (Monticello) deliberately failed to perform nondestructive examinations (NDEs) on the Dry Shielded Canisters (DSCs) in accordance with procedural requirements and whether they falsified records when recording the NDE results, contrary to the requirements in Title 10 of the Code of Federal Regulations (10 CFR) 72.158, Control of special processes, 10 CFR 72.11, Completeness and accuracy of information, and 10 CFR 72.154(c), Control of purchased material, equipment, and services.


The current Enforcement Policy is included on the NRCs website at:
Our letter also informed you that the apparent violations were being considered for enforcement action in accordance with the NRCs Enforcement Policy, and provided you with the option of:
http://www.nrc.gov/about-nrc/regulatory/enforcement/enforce-pol.html.
(1) providing a written response to the violation; (2) attending a Predecisional Enforcement Conference; or (3) requesting ADR with the NRC.


The first apparent violation involves the apparent deliberate failure, on the part of two technicians, to perform liquid penetrant nondestructive examinations on the dry shielded canisters in accordance with required procedures. The second apparent violation involves the apparent deliberate failure by the same technicians to accurately record the results of the liquid penetrant nondestructive examinations. The third apparent violation involves the apparent failure to assess the effectiveness of the technicians work. Before the NRC makes its enforcement decisions, we are providing you with the opportunity to: (1) provide a written response to the NRC; (2) request a Predecisional Enforcement Conference (PEC), or (3) request Alternative Dispute Resolution (ADR).
In response to our letter, you requested ADR. An ADR mediation session was held on October 15, 2015, and a preliminary settlement agreement was reached. The elements of the preliminary agreement were formulated and agreed to at the mediation session. Consistent with the purposes of ADR, you and the NRC acknowledged that the session was not for the purposes of reaching any conclusions regarding any facts or circumstances discussed in our letter dated July 23, 2015. At the session, you agreed that a Confirmatory Order would be issued in settlement of a disputed claim in order to avoid further action by the NRC. In light of the corrective actions you took or agreed to take, as described in the Confirmatory Order (Enclosure 1), the NRC is satisfied that its concerns will be addressed by making your commitments legally binding.


If you decide to submit a written response to the apparent violations, it should be clearly marked as a Response to Apparent Violations in NRC Inspection Report 05000263/2015008 and 07200058/2014001; EA-14-193, submitted within 30 days of the date of this letter, and should include: (1) the reason for the apparent violations, or, if contested, the basis for disputing the apparent violations; (2) the corrective steps that have been taken and the results achieved; (3) the corrective steps that will be taken; and (4) the date when full compliance will be achieved. Your response may reference or include previously docketed correspondence, if the correspondence adequately addresses the required response. If an adequate response is not received within the time specified or an extension of time has not been granted by the NRC, the NRC will proceed with its enforcement decision or schedule a PEC.
As evidenced by your signed Consent and Hearing Waiver Form (Enclosure 2), dated December 10, 2015, you agreed to the issuance of the Confirmatory Order.


If you request a PEC, it should be held within 30 days of the receipt of this letter and we encourage you to submit supporting documentation at least one week prior to the conference in an effort to make the conference more efficient and effective. If a PEC is held, the NRC will issue a press release to announce the time and date of the conference; however, it will be closed to public observation because the apparent violations are based on an NRC OI report that has not been publicly disclosed and pertains to whether individuals have committed wrongdoing. If you choose to request a PEC, the conference will afford you the opportunity to provide your perspective on the apparent violations and any other information that you believe the NRC should take into consideration before making an enforcement decision. The decision to hold a PEC does not mean that the NRC has determined that a violation has occurred or that enforcement action will be taken. This conference would be conducted to obtain information to assist the NRC in making an enforcement decision. The topics discussed during the conference may include: (1) information to determine whether the violations occurred; (2) information to determine the significance of the violations; (3) information related to the identification of the violations; and (4) information related to any corrective actions taken or planned to be taken.
Pursuant to Section 223 of the Atomic Energy Act of 1954, as amended, any person who willfully violates, attempts to violate, or conspires to violate, any provision of this Confirmatory Order shall be subject to criminal prosecution, as set forth in that section. Violation of this Confirmatory Order may also subject the person to civil monetary penalties.


In presenting your corrective actions, you should be aware that the promptness and comprehensiveness of your actions will be considered in assessing any civil penalty for the apparent violations.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter, along with its enclosures, will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.


You may also request ADR with the NRC in an attempt to resolve the willful apparent violations.
The Confirmatory Order will be published in the Federal Register. The NRC also publishes Confirmatory Orders on its Web site under Significant Enforcement Actions at http://www.nrc.gov/about-nrc/regulatory/enforcement.html.
 
The term ADR generally encompasses various techniques for resolving conflicts using a neutral third party. The technique that the NRC has decided to employ is mediation. Mediation is a voluntary, informal process in which a trained neutral (the mediator) works with parties to help them reach resolution. If the parties agree to use ADR, they select a mutually agreeable neutral mediator who has no stake in the outcome and no power to make decisions. Mediation gives parties an opportunity to discuss issues, clear up misunderstandings, be creative, find areas of agreement, and reach a final resolution of the issues. Additional information concerning the NRC's program can be obtained at http://www.nrc.gov/about-nrc/regulatory/enforcement/enforce-pol.html. The Institute on Conflict Resolution (ICR) at Cornell University has agreed to facilitate the NRC's program as a neutral third party. Please contact ICR at 877-733-9415 within 10 days of the date of this letter, along with notifying Mr. Orlikowski, if you are interested in pursuing resolution of this issue through ADR. The ADR mediation session is normally held within 30 to 45 days of receipt of this letter, dependent upon availability of a mediator. Please contact Mr. Robert Orlikowski at 630-829-9834 within 10 days from the issue date of this letter to notify the NRC of how you intend to respond to the apparent violations.
 
Please be advised that the number and characterization of apparent violations may change as a result of further NRC review. You will be advised by separate correspondence of the results of our deliberations on this matter.
 
In accordance with Title 10 of the Code of Federal Regulations (CFR) Section 2.390 of the NRC's Rules of Practice, a copy of this letter, its enclosure, and your response, if you choose to provide one, will be made available electronically for public inspection in the NRCs Public Document Room or from the NRCs Agencywide Documents Access and Management System (ADAMS), accessible from the NRCs website at http://www.nrc.gov/reading-rm/adams.htm.
 
To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the public without redaction.
 
If you have any questions concerning this matter, please contact Mr. Robert Orlikowski of my staff at 630-829-9834.


Sincerely,
Sincerely,
/RA/
/RA/
Patrick L. Louden, Director Division of Nuclear Materials Safety Docket Nos: 50-263; 72-058 License No: DPR-22 Enclosures:
Cynthia D. Pederson Regional Administrator Docket Nos. 50-263; 72-058 License No. DPR-22 Enclosures:
1. Factual Summary of NRC Investigation 2. IR 05000263/2015008; 07200058/2014001 w/attachment: Supplemental Information Please contact Mr. Robert Orlikowski at 630-829-9834 within 10 days from the issue date of this letter to notify the NRC of how you intend to respond to the apparent violations.
1. Confirmatory Order 2. Consent and Hearing Waiver cc: Distribution via LISTSERV


Please be advised that the number and characterization of apparent violations may change as a result of further NRC review. You will be advised by separate correspondence of the results of our deliberations on this matter.
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of   )
    ) Docket Nos. 50-263; 72-058 Northern States Power Company, Minnesota ) License No. DPR-22 (Doing business as Xcel Energy)  ) EA-14-193 Monticello Nuclear Generating Plant  )
CONFIRMATORY ORDER MODIFYING LICENSE I
Northern States Power Company, Minnesota, doing business as Xcel Energy, (Licensee) is the holder of Reactor Operating License No. DPR-22 issued by the U.S. Nuclear Regulatory Commission (NRC or Commission) pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Part 50 on September 8, 1970, and renewed on November 8, 2006. The license authorizes the operation of the Monticello Nuclear Generating Plant (Monticello) in accordance with conditions specified therein. The facility is located on the Licensee's site in Monticello, Minnesota.


In accordance with Title 10 of the Code of Federal Regulations (CFR) Section 2.390 of the NRC's Rules of Practice, a copy of this letter, its enclosure, and your response, if you choose to provide one, will be made available electronically for public inspection in the NRCs Public Document Room or from the NRCs Agencywide Documents Access and Management System (ADAMS), accessible from the NRCs website at http://www.nrc.gov/reading-rm/adams.html.
This Confirmatory Order is the result of an agreement reached during an alternative dispute resolution (ADR) mediation session conducted on October 15, 2015.


To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the public without redaction.
II On December 18, 2013, the NRC Office of Investigations (OI), Region III Field Office initiated an investigation (OI Case No. 3-2014-004) to determine whether two contractor technicians at the Monticello Nuclear Generating Plant deliberately failed to perform nondestructive examinations (NDEs) on the Dry Shielded Canisters (DSCs) in accordance with procedural requirements, and Enclosure 1


If you have any questions concerning this matter, please contact Mr. Robert Orlikowski of my staff at 630-829-9834.
to determine whether they falsified records when recording the NDE results. The results of the investigation, completed on November 13, 2014, were sent to Xcel Energy in a letter dated July 23, 2015 (ML15203B187). Based on the review of the OI investigation report the NRC determined that both contractor technicians willfully violated 10 CFR 72.158, Control of special processes, and 10 CFR 72.11, Completeness and accuracy of information. In addition, the NRC determined the licensee violated Title 10 CFR 72.154(c), Control of purchased material, equipment, and services.


Sincerely,
Specifically, on October 17, 2013, an NRC inspector observed, by video display, the NDE liquid penetrant testing (PT) of the outer top cover plate weld for DSCs being conducted by a contractor technician. The inspector believed that the technician failed to comply with procedural requirements in conducting the PT. The inspector reviewed the procedure, confirmed that the PT was not being performed in accordance with the procedure, and notified Monticello management. Monticello management and the NDE contractor management reviewed the video, and concluded the PT was not performed properly. Upon further review, the NRC inspector determined that two contractor NDE technicians were involved in performing the PT examinations. These individuals were involved with examining a total of 66 welds on six DSCs.
/RA/
Patrick L. Louden, Director Division of Nuclear Materials Safety Docket Nos: 50-263; 72-058 License No: DPR-22 Enclosures:
1. Factual Summary of NRC Investigation 2. IR 05000263/2015008; 07200058/2014001 w/attachment: Supplemental Information DISTRIBUTION w/ encls:
See next page cc w/ encls: Distribution via LISTSERV ADAMS Accession Number:
Publicly Available  Non-Publicly Available Sensitive  Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl N" = No copy OFFICE RIII DNMS  E RIII  E RIII EICS  E RIII E


NAME  MCLearn:ps  PZurawski *  RSkokowski  JHeck DATE  06/08/15  06/11/15  06/15/15  06/19/15 OFFICE RIII OI E OE  E OGC  E RIII DNMS E
Based on the evidence gathered in the OI investigation, the NRC determined that the two NDE contractors deliberately violated NRC requirements by failing to perform NDE PT of DSCs, a special process, in accordance with procedures by not allowing the developer to dwell for the period of time specified in procedure 12751 QP-9.202, Rev. 1, Color Contrast Liquid Penetrant Examination using the Solvent-Removable Method. Their actions caused the licensee to be in violation of Certificate of Compliance 1004, Amendment 10, Technical Specification 1.2.5, DSC Dye Penetrant Tests of Closure Welds, which was implemented by the procedure, and
      *1   *1 NAME  RGoetz  JWray for NHilton EMonteith for CScott  ROrlikowski DATE  06/15/15  07/13/15  07/13/15  06/30/15 OFFICE RIII DNMS  E RIII  RIII  RIII NAME  PLouden DATE  07/23/15


* - These individuals concurred on the enclosed report; review and concurrence received via e-mail OFFICIAL RECORD COPY
10 CFR 72.158, as NDE testing, a special process, was not accomplished in accordance with the applicable standards and requirements.


Letter to Peter Gardner from Patrick Louden dated July 23, 2015 SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT - NRC INSPECTION REPORT 05000263/2015008 AND 07200058/2014001 AND RESULTS OF NRC OFFICE OF INVESTIGATION REPORT NO. 3-2014-004 DISTRIBUTION w/encl:
The NRC further determined that the two contractors willfully violated NRC requirements by recording false information concerning developer dwell times on the PT examination report for each NDE. This caused the licensee to be in violation of 10 CFR 72.11(a), which requires information required to be maintained by the licensee to be complete and accurate in all material respects.
Kimyata MorganButler RidsNrrDorlLpl3-1 Resource RidsNrrPMMonticello RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Julio Lara Richard Skokowski Allan Barker Paul Pelke Jim Clay Carmen Olteanu Carole Ariano Linda Linn ROPreports.Resource@nrc.gov MCID Branch


FACTUAL
The NRC also determined the licensee failed to assess the effectiveness of the controls of quality by the contractors. Specifically, the licensee did not adequately monitor the work of the contractors performing PT testing on DSCs No. 11 through 16. This caused the licensee to be in violation of 10 CFR 72.154(c), Control of purchased material, equipment, and services, which required, in part, that licensees assess the effectiveness of the control of quality by contractors and subcontractors at intervals consistent with the importance, complexity, and quantity of the product or services.


=SUMMARY=
In response to the NRC's offer, Xcel Energy requested use of the NRC ADR process to resolve differences it had with the NRC. Alternative Dispute Resolution is a process in which a neutral mediator with no decision-making authority assists the parties in reaching an agreement on resolving any differences regarding the dispute. On October 15, 2015, Xcel Energy and the NRC met in an ADR session mediated by a professional mediator, arranged through the Cornell University's Institute on Conflict Resolution.
OF OFFICE OF INVESTIGATIONS REPORT 3-2014-004


On December 18, 2013, the U.S. Nuclear Regulatory Commissions (NRC) Office of Investigations (OI), Region III Field Office, initiated an investigation to determine whether two contractor technicians at the Monticello Nuclear Generating Plant deliberately failed to perform nondestructive examinations (NDEs) on the Dry Shielded Canisters (DSCs) in accordance with procedural requirements and whether they falsified records when recording the NDE results.
III During the ADR session, a preliminary settlement agreement was reached. This Confirmatory Order is issued pursuant to the agreement reached during the ADR process. The elements of the agreement, as signed by both parties, consisted of the following:
1. The licensee shall restore compliance to 10 CFR Part 72 to DSCs 11 through 16 within 5 years of the date the NRC takes final action upon the September 29, 2015, exemption request pending for DSC 16 (ML15275A023), or the exemption request is withdrawn, whichever is earlier.


The NRC completed its investigation on November 13, 2014.
2. Within 180 calendar days of the NRCs final action on the docketed exemption request dated September 29, 2015 (ML15275A023), or the date the exemption request is withdrawn, whichever is earlier, the licensee shall submit a project plan to the Director, Division of Nuclear Materials Safety (DNMS), Region III, for returning DSCs 11 through 16 to compliance to 10 CFR Part 72.


On October 17, 2013, an NRC inspector observed, by video display, the NDE liquid penetrant testing (PT) of the outer top cover plate weld for a DSC being conducted by a contractor technician (Technician A). The inspector believed that the technician failed to comply with procedural requirements in conducting the PT. The inspector reviewed the procedure, confirming that the PT was not being performed in accordance with the procedure and notified plant management. Monticello and the NDE contractor management reviewed the video and also concluded the PT was not performed properly. The inspector, through meetings and reviews of documents developed as part of the PTs completed on the DSCs, determined that two contractor NDE technicians were involved in performing the examinations. These individuals were involved with examining a total of 66 welds on six DSCs.
3. Within 180 calendar days after submittal of the DSCs 11 through 16 project plan, Xcel Energy shall submit a letter to the Director, DNMS, Region III, regarding progress under the plan, and any non-editorial changes to the plan. A letter providing a progress update and any non-editorial plan changes shall be provided every 360 calendar days thereafter to the Director, DNMS, Region III, until the plan is completed.


Technician A indicated in an interview with OI that he was certified by the contractor as an NDE Level II technician for the PT being done at Monticello. Technician A indicated to OI the various steps of the procedure to applying the penetrant and developer, and that he had read and understood the written procedure for PT of the DSC welds. The contractors procedure, which was approved by Monticello staff, included tables for the minimum and maximum dwell times for the different penetrants and developers dependent on the temperature of the surface being examined. The technician stated that he did not read in the procedure that there was a 10-minute dwell time for the developer. The technician indicated that he questioned his supervisor, an NDE Level III technician, regarding the dwell times and was told the maximum dwell time for the developer was 10 minutes. The technician also stated he believed that a dwell time over 10 minutes would create a problem with cleaning the developer off of the weld.
4. Within 90 calendar days of the issuance date of the Confirmatory Order, Xcel Energy shall evaluate Monticellos dry fuel storage procedures and ensure the procedures


Technician A was asked by OI why he recorded dwell times of 10 minutes for the developer when the video showed that he was not completing the required time. Technician A told OI that he thought the recording of the dwell time was a formality. He further admitted that he understood that he was not completing the 10-minute dwell time and should not have recorded that he was. Technician A stated that no one told him to record the dwell time as 10 minutes when the actual time was less.
require direct licensee oversight during the entire evolution of each dye penetrant test performed by contractors on DSC closure welds.


Technician B indicated in an interview with OI that he worked for the NDE contractor from July through October 2013, performing NDE testing at Monticello. The technician indicated that this was his first job working as an NDE Level II technician. The technician indicated that the Level II certification testing included the PT procedure being used at Monticello. Technician B also stated that he knew the testing was real crucial and understood that if a weld defect was not interpreted correctly, a leak in the DSC could occur. The technician also stated the contractor stressed the importance of following the procedure. The technician originally told OI that he thought he was performing the PT in accordance with the procedure and used a wall clock to time the dwell times. Technician B later admitted that he calculated the amount of time to complete certain steps in the PT process and used those times to determine the dwell times for the penetrant and developer. Technician B stated that he understood the contractors written procedure for PT tests at Monticello. The technician stated that he was rushing himself because he had heard contractor management complain about employees working too slowly on their assignments. The technician stated that he was never ordered to complete the PT quickly. Technician B also stated that he thought you could make a determination almost immediately after applying the penetrant and developer. The OI investigator asked Technician B how he recorded the penetrant and developer dwell time in the PT examination report. The technician told OI that he recorded the dwell times that were specified in the procedure even though he was not following this requirement.
5. Within 120 calendar days of the issuance date of the Confirmatory Order, Xcel Energy shall ensure and document that all first line supervisors and above, who oversee contractors performing field work in the Xcel Energy nuclear fleet, review the circumstances and lessons learned from the events that gave rise to the Confirmatory Order.


Based on the evidence gathered in the OI investigation, it appears that two contractors deliberately violated NRC requirements by failing to perform NDE PT of DSCs in accordance with procedures. Specifically, contractor NDE technicians apparently violated Title 10 of the Code of Federal Regulations (CFR) 72.12(a)(1) by not allowing the developer to dwell for the period of time specified in the contractors procedure 12751 QP-9.202, Rev. 1, Color Contrast Liquid Penetrant Examination using the Solvent-Removable Method. Their actions caused the licensee to apparently be in violation of Certificate of Compliance 1004, Amendment 10,
6. Within 360 calendar days of the issuance date of the Confirmatory Order, the licensee shall assess and document the effectiveness of improvements in oversight of supplemental workers (e.g., contractors) in the Xcel Energy nuclear fleet, including the actions taken in item 5.
Technical Specification 1.2.5, DSC Dye Penetrant Tests of Closure Welds, which was implemented by the contractors procedure, and 10 CFR 72.158, as NDE testing was not accomplished in accordance with the applicable standards and requirements.


Based on the evidence gathered in the OI investigation, it appears that two contractors willfully violated NRC requirements by recording false information concerning developer dwell times on the PT examination report for each NDE, in violation of 10 CFR 72.12(a)(2). This caused the licensee to apparently be in violation of 10 CFR 72.11(a), which required information required to be maintained by the licensee to be complete and accurate in all material respects.
7. Within 540 calendar days of the issuance date of the Confirmatory Order, Xcel Energy shall develop and make a presentation based on the facts and lessons learned from the events that gave rise to the Confirmatory Order, with emphasis on corrective actions taken as a result. Xcel Energy agrees to make this presentation at an appropriate industry forum such that industry personnel across the entirety of the United States would have the opportunity to receive the material. Xcel Energy shall inform the Director, DNMS, Region III, of where the presentation will be made, and shall make the presentation materials available to the NRC for review at least 30 calendar days in advance of the presentation.


INSPECTION REPORT U.S. NUCLEAR REGULATORY COMMISSION REGION III Docket Nos:        50-263; 72-058 License No:        DPR-22 Report Nos:        05000263/2015008 and 07200058/2014001 Licensee:          Northern States Power Company, Minnesota Facility:          Monticello Nuclear Generating Plant Location:          Monticello, Minnesota Dates:              January 1, 2014, through July 21, 2015 Inspectors:        Matthew C. Learn, Reactor Engineer Rhex A. Edwards, Senior Health Physicist Paul J. Zurawski, Senior Resident Inspector Approved by:        Robert J. Orlikowski, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety
8. Within 360 calendar days of the issuance date of the Confirmatory Order, Xcel Energy shall submit an article to an industry publication, such as UxC Spent Fuel, describing the


SUMMARY OF FINDINGS Inspection Report (IR) 05000263/2015008 and 07200058/2014001, 01/1/2014 - 07/21/2015;
circumstances of the violation, the root and contributing causes, and the corrective actions. The licensee shall provide a draft to the Director, DNMS, Region III, at least 30 calendar days in advance of the submittal.
Monticello Nuclear Generating Plant, Operation of an ISFSI at Operating Plants.


This report covers circumstances behind the failure to perform nondestructive examination (NDE) liquid penetrant testing (PT) in accordance with NRC requirements. The NRC identified three apparent violations (AV) which were processed through the traditional enforcement program because they either involved willfulness or were associated with an ISFSI. All violations of NRC requirements are dispositioned in accordance with the NRC's Enforcement Policy dated July 9, 2013.
9. Upon completion of all terms of the Confirmatory Order, Xcel Energy shall submit to the NRC a letter discussing its basis for concluding that the Order has been satisfied.


The results of the investigation conducted by the NRC Office of Investigations are discussed in 1, Factual Summary of NRC Investigation.
In addition to the elements described above, Xcel Energy took the following corrective actions:
1. Xcel Energy revised its nuclear fleet Nuclear Oversight (NOS) and Supply Chain procedures to require the establishment of a NOS Project Oversight Plan for any Safety-Related or Augmented Quality fabrication or construction activities performed at the nuclear plant sites under a suppliers Quality Assurance (QA) Program. The NOS procedure for project oversight was also revised to address site project implementation in addition to project component fabrication, and associated project risks. Upfront planning of the level and type NOS oversight is based on those risks.


===NRC-Identified===
2. Xcel Energy created a nuclear fleet procedure for oversight of supplemental personnel (e.g., contractors) based upon the Institute of Nuclear Power Operations (INPO) AP-930 Supplemental Personnel Process Description, which includes a requirement that each incoming contract worker have a face-to-face review of station standards, expectations, and requirements with the Maintenance Manager or designee. This includes current and all future contract personnel including contract quality control (QC) inspectors.
and Self-Revealed Findings
* Apparent Violation (AV): The NRC staff identified an AV that is being processed through the traditional enforcement process because it appears to involve willfulness and is associated with an Independent Spent Fuel Storage Installation (ISFSI).


The AV involves Title 10 of the Code of Federal Regulations (CFR) 72.158, Control of Special Processes, which required, in part, that the licensee establish measures to ensure that special processes, including nondestructive testing, are controlled and accomplished by qualified personnel using qualified procedures in accordance with applicable codes, standards, specifications, criteria, and other special requirements.
3. Xcel Energy issued a rapid operational experience notice for this event, which prompted a review of the event by Prairie Island Nuclear Generating Plant staff and shared the


The licensee established TriVis Procedure 12751 QP-9.202, Color Contrast Liquid Penetrant Examination Using the Solvent-Removable Method, Revision 1, as the qualified procedure for use in Dry Shielded Canister (DSC) NDE PT. However, from approximately September 5 to October 17, 2013, the NRC determined that licensee contractors apparently willfully failed to follow the TriVis procedure for developer dwell times, while performing PT on 66 of 66 DSC closure welds examined. The NRC also determined that the licensee contractors apparently failed to follow other parts of the TriVis procedure.
event with the nuclear industry through a process called the INPO Consolidated Event System (ICES).
* Apparent Violation: The NRC staff identified an AV that is being processed through the traditional enforcement process because it appears to involve willfulness, impacts the regulatory process, and is associated with an ISFSI.


The AV involves 10 CFR 72.11, Completeness and accuracy of information, which required, in part, that information required by Commission regulations be maintained by the licensee to be complete and accurate in all material respects. However, from approximately September 5 to October 17, 2013, the NRC determined that licensee contractors apparently willfully completed PT examination forms, a quality assurance record, with inaccurate developer dwell times. The NRC also determined that the licensee contractors apparently completed PT examination forms, a quality assurance record, with other inaccurate information. This information was determined to be material to the NRC because it had the potential to mislead the NRC and the licensee as to the suitability for service of the DSCs.
4. Xcel Energy reviewed its General Access Training to ensure it addresses the consequences of willful violations.
* Apparent Violation: The NRC staff identified an AV that is being processed through the traditional enforcement process because it appears to be associated with an ISFSI, which falls under traditional enforcement.


The AV involves 10 CFR 72.154(c), Control of purchased material, equipment, and services which required, in part, that licensees assess the effectiveness of the control of quality by contractors and subcontractors at intervals consistent with the importance, complexity, and quantity of the product or services. However, from approximately September 5 to October 17, 2013, the NRC determined that the licensee apparently did not assess the effectiveness of the control of quality by contractors in that the licensee apparently did not monitor the work of contractors performing PT testing on DSCs #11 through #16.
In exchange for the commitments and corrective actions taken by the licensee, the NRC agrees to the following conditions:
1. The NRC will consider the Confirmatory Order as an escalated enforcement action for a period of one year from its issuance date.


===Licensee-Identified Violations===
2. The NRC will refrain from issuing a Notice of Violation and a proposed imposition of a civil penalty.
* Violations of very low safety significance or Severity Level IV that were identified by the licensee have been reviewed by the NRC. Corrective actions taken or planned by the licensee have been entered into the licensees corrective action program (CAP). These violations and CAP tracking numbers are listed in Section 4OA7 of this report.


=REPORT DETAILS=
This agreement is binding upon the successors and assigns of Xcel Energy.


{{a|4OA5}}
On December 10, 2015, Xcel Energy consented to issuing this Confirmatory Order with the commitments, as described in Section V below. Xcel Energy further agreed that this Confirmatory Order is to be effective 30 calendar days after issuance of the Confirmatory Order and that it has waived its right to a hearing.
==4OA5 Other Activities==


===.1 Closed Unresolved Item 07200058/2013001-01, Dry Shielded Canister Liquid===
IV Since the licensee agreed to take additional actions to address NRC concerns, as set forth in Section III above, the NRC concluded that its concerns can be resolved through issuance of this Confirmatory Order.


Penetrant Examination
I find that Xcel Energys commitments as set forth in Section V are acceptable and necessary and conclude that with these commitments the public health and safety are reasonably assured.


====a. Inspection Scope====
In view of the foregoing, I have determined that public health and safety require that Xcel Energys commitments be confirmed by this Confirmatory Order. Based on the above and Xcel Energys consent, this Confirmatory Order is effective 30 calendar days after issuance of the Confirmatory Order.
During the 2013 Independent Spent Fuel Storage Installation (ISFSI) cask loading campaign at Northern States Power - Minnesotas (NSPM) Monticello Nuclear Generating Plant (MNGP), beginning approximately on September 5, 2013, six Transnuclear NUHOMS [Nutech Horizontal Modular Storage] 61BTH Type 1 Dry Shielded Canisters (DSCs) were loaded under Certificate of Compliance (CoC) 1004, Amendment 10.


Condition 1 of the CoC allows use of the Standardized NUHOMS system subject to the conditions of Title 10 of the Code of Federal Regulations (CFR) 72.212 and the CoC 1004 Technical Specifications (TS). TS 1.2.5 of CoC 1004 requires that all DSC closure welds not subjected to full volumetric inspection be liquid penetrant tested (PT) in accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (BPV) Code.
V Accordingly, pursuant to Sections 104b, 161b, 161i, 161o, 182, and 186 of the Atomic Energy Act of 1954, as amended, and the Commission's regulations in 10 CFR 2.202, 10 CFR Part 50 and 10 CFR Part 72, IT IS HEREBY ORDERED THAT THE ACTIONS DESCRIBED BELOW WILL BE TAKEN AT MONTICELLO NUCLEAR GENERATING PLANT AND OTHER NUCLEAR PLANTS IN XCEL ENERGYS FLEET WHERE INDICATED AND THAT LICENSE NO. DPR-22 IS MODIFIED AS FOLLOWS WITH RESPECT TO THE ACTIONS TO BE TAKEN AT THE MONTICELLO NUCLEAR GENERATING PLANT:
1. The licensee shall restore compliance to 10 CFR Part 72 to DSCs 11 through 16 within 5 years of the date the NRC takes final action upon the September 29, 2015, exemption request pending for DSC 16 (ML15275A023), or the exemption request is withdrawn, whichever is earlier.


On October 17, 2013, the resident inspectors observed part of the non-destructive examination (NDE) PT activities for the outer top cover plate on DSC No. 16. The inspectors questioned whether the cleaning and dwell times for the penetrant and developer used by a contract NDE PT Level II examiner met procedure requirements demonstrating compliance with the ISFSI TS. The licensee initiated action request report (AR) 1402246 to document the inspectors questions in the corrective action procedure (CAP). The AR established actions to determine if procedure requirements had been met, evaluate operability or reportability, conduct an apparent cause evaluation, and conduct an extent of condition review.
2. Within 180 calendar days of the NRCs final action on the docketed exemption request dated September 29, 2015 (ML15275A023), or the date the exemption request is withdrawn, whichever is earlier, the licensee shall submit a project plan to the Director,


After initial evaluation of recorded video of the work location, the licensee determined that the dwell times for both the penetrant and developer for the outer top closure plate weld appeared not to be in compliance with procedure requirements. Further extensive review of previous PTs conducted on DSCs 11 - 16 revealed additional examinations may not have complied with dwell times specified by the procedure, as well as other potential discrepancies. All of the PTs for these DSCs were performed by two contract NDE PT Level II technicians. As a result, the licensees immediate operability determination declared DSCs 11 - 16 inoperable for the failure to satisfy TS 1.2.5, which specifies all DSC closure welds, except those subjected to full volumetric inspection, be PT in accordance with the requirements of ASME BPV Code, Section III.
Division of Nuclear Materials Safety, Region III, for returning DSCs 11 through 16 to compliance to 10 CFR Part 72.


The continued storage of DSCs 11 - 16, which are not fully compliant with TS 1.2.5, requires either reexamination or an exemption from parts of 10 CFR Part 72 and is being pursued by the licensee. In the interim, the condition of these DSCs has been evaluated by the licensee in accordance with the CAP. In its operability assessment, the licensee concluded that there was reasonable assurance that DSCs 11 - 16 are currently safe in their current configuration. Specifically, since helium leak testing was completed, with acceptable results, during the loading operations for each DSC by a vendor independent from the contract organization that supplied the PT technician. Licensee review concluded the helium leak testing determined each of the DSCs to be leak tight and consequently no concern existed with the confinement function of the DSCs.
3. Within 180 days after submittal of the DSCs 11 through 16 project plan, Xcel Energy shall submit a letter to the Director, DNMS, Region III, regarding progress under the plan, and any non-editorial changes to the plan. A letter providing a progress update and any non-editorial plan changes shall be provided every 360 calendar days thereafter to the Director, DNMS, Region III, until the plan is completed.


The NRC staff required additional information to review and assess work as performed, as compared to procedural requirements. Therefore, in NRC IR 05000263/2013005 and 07200058/2013001, the NRC staff opened unresolved item (URI)07200058/2013001-01. This URI is now closed based on the information documented in this report.
4. Within 90 calendar days of the issuance date of the Confirmatory Order, Xcel Energy shall evaluate Monticellos dry fuel storage procedures and ensure the procedures require direct licensee oversight during the entire evolution of each dye penetrant test performed by contractors on DSC closure welds.


The NRC staff evaluated the actions in regard to operability, reportability, corrective actions, and extent of condition reviews. Specifically, the NRC staff reviewed the videotapes of the contractor performance and compared the videotapes with required procedure times. Additionally, the NRC reviewed the completed NDE PT examination forms and compared the documented times with the times shown on the videotapes. In parallel to the inspection effort, an NRC investigation was conducted.
5. Within 120 calendar days of the issuance date of the Confirmatory Order, Xcel Energy shall ensure and document that all first line supervisors and above, who oversee contractors performing field work in the Xcel Energy nuclear fleet, review the circumstances and lessons learned from the events that gave rise to the Confirmatory Order.


Documents reviewed are listed in the Attachment to this report.
6. Within 360 calendar days of the issuance date of the Confirmatory Order, the licensee shall assess and document the effectiveness of improvements in oversight of supplemental workers (e.g., contractors) in the Xcel Energy nuclear fleet, including the actions taken in item 5.


====b. Findings====
7. Within 540 calendar days of the issuance date of the Confirmatory Order, Xcel Energy shall develop and make a presentation based on the facts and lessons learned from the events that gave rise to the Confirmatory Order, with emphasis on corrective actions taken as a result. Xcel Energy agrees to make this presentation at an appropriate industry forum such that industry personnel across the entirety of the United States would have the opportunity to receive the material. Xcel Energy shall inform the Director, DNMS, Region III, of where the presentation will be made, and make the presentation materials available to the NRC for review at least 30 calendar days in advance of the presentation.
Failure to Perform Penetrant Tests in Accordance with Procedural Requirements Title 10 CFR 72.158, Control of special processes states, in part, that, The licensee shall establish measures to ensure that special processes, including... nondestructive testing, are controlled and accomplished by qualified personnel using qualified procedures in accordance with applicable codes, standards, specifications, criteria, and other special requirements.


Title 10 CFR 72.212(b)(3), Conditions of general license issued under 72.210, states The general licensee must: ensure that each cask used by the general licensee conforms to the terms, conditions, and specification of a CoC or an amended CoC listed in 72.214.
8. Within 360 calendar days of the issuance date of the Confirmatory Order, Xcel Energy shall submit an article to an industry publication, such as UxC Spent Fuel, describing the circumstances of the violation, the root and contributing causes, and the corrective actions. The licensee shall provide a draft to the Director, DNMS, Region III, at least 30 calendar days in advance of the submittal.


Title 10 CFR 72.214, List of approved spent fuel storage casks, states, The following casks are approved for storage of spent fuel under the conditions specified in their Certificate of Compliance Certificate Number: 1004 Amendment Number 10, Effective Date: August 24, 2009.
9. Upon completion of all terms of the Confirmatory Order, Xcel Energy shall submit to the NRC a letter discussing its basis for concluding that the Order has been satisfied.


Certificate of Compliance 1004, Amendment 10, Condition A, states Casks authorized by this certificate are hereby approved for use by holders of 10 CFR Part 50 licenses for nuclear power reactors at reactor sites under the general license issued pursuant to 10 CFR 72.210 subject to the conditions specified by 10 CFR 72.212 and the attached Technical Specifications.
The Regional Administrator, Region III, may, in writing, relax or rescind any of the above conditions upon demonstration by the Licensee of good cause.


Certificate of Compliance 1004, Amendment 10, TS 1.2.5, DSC Dye Penetrant Tests of Closure Welds, states that All DSC closure welds except those subjected to full volumetric inspection shall be dye penetrant tested in accordance with the requirements of the ASME Boiler and Pressure Vessel Code Section III, Division 1, Article NB-5000.
VI Any person adversely affected by this Confirmatory Order, other than Xcel Nuclear, may request a hearing within 30 days of the issuance date of this Confirmatory Order. Where good cause is


The liquid penetrant test acceptance standards shall be those described in Subsection NB-5350 of the Code.
shown, consideration will be given to extending the time to request a hearing. A request for extension of time must be directed to the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, and include a statement of good cause for the extension.


ASME Boiler and Pressure Vessel Code Section III, Division 1, 1998 with Addendum through 2000, Article NB-5000, Subarticle, NB-5111, Methods states that, Nondestructive examinations shall be conducted in accordance with the examination methods of Section B, except as they may be modified by the requirements of this Articleliquid penetrant examination shall be in accordance with Section V, Article 6.
All documents filed in NRC adjudicatory proceedings, including a request for hearing, a petition for leave to intervene, any motion or other document filed in the proceeding prior to the submission of a request for hearing or petition to intervene, and documents filed by interested governmental entities participating under 10 CFR 2.315(c), must be filed in accordance with the NRCs E-Filing rule (72 FR 49139; August 28, 2007), as amended by 77 FR 46562; August 3, 2012 (codified in pertinent part at 10 CFR Part 2, Subpart C). The E-Filing process requires participants to submit and serve all adjudicatory documents over the internet, or in some cases to mail copies on electronic storage media. Participants may not submit paper copies of their filings unless they seek an exemption in accordance with the procedures described below.


ASME Boiler and Pressure Vessel Code Section V, 1998 with Addendum through 2000, Article 6, Subarticle T-621.1, Initial Procedure states that, Liquid penetrant examination shall be performed in accordance with a procedure. Such a procedure shall consider at least the following information:
To comply with the procedural requirements of E-Filing, at least ten (10) days prior to the filing deadline, the participant should contact the Office of the Secretary by e-mail at hearing.docket@nrc.gov, or by telephone at 301-415-1677, to (1) request a digital (ID)
: (a) the materials, shapes, or sizes to be examined, and the extent of the examination;
certificate, which allows the participant (or its counsel or representative) to digitally sign documents and access the E-Submittal server for any proceeding in which it is participating; and (2) advise the Secretary that the participant will be submitting a request or petition for hearing (even in instances in which the participant, or its counsel or representative, already holds an NRC-issued digital ID certificate). Based upon this information, the Secretary will establish an electronic docket for the hearing in this proceeding if the Secretary has not already established an electronic docket.
: (b) type (number or letter designation if available) of each penetrant, penetrant remover, emulsifier, and developer; (c)processing details for pre-examination cleaning and drying, including the cleaning materials used and minimum time allowed for drying;
: (d) processing details for applying the penetrant: the length of time that the penetrant will remain on the surface (dwell time), and the temperature of the surface and penetrant during the examination if outside 50°F to 125°F range;
: (e) processing details for removing excess penetrant from the surface, and for drying the surface before applying the developer;
: (f) processing details for applying the developer, and length of developing time before interpretation;
: (g) processing details for post-examination cleaning.


TriVis Procedure 12751 QP-9.202, Revision 1, Color Contrast Liquid Penetrant Examination Using the Solvent-Removable Method, specifies procedural guidance for performing PT in accordance with ASME BPV Code Section III, Division 1, Article NB-5000 and ASME BPV, Article 6.
Information about applying for a digital ID certificate is available on NRCs public Web site at http://www.nrc.gov/site-help/e-submittals.html. System requirements for accessing the E-Submittal server are detailed in NRCs Guidance for Electronic Submission, which is available on the agencys public Web site at http://www.nrc.gov/site-help/e-submittals.html.


Specifically TriVis Procedure 12751 QP-9.202, Revision 1 specifies the following requirements, and NRC inspectors identified the following apparent procedural non-compliances:
Participants may attempt to use other software not listed on the Web site, but should note that the NRCs E-Filing system does not support unlisted software, and the NRC Meta System Help Desk will not be able to offer assistance in using unlisted software.
* Step 6.1.2 states, in part, Pre-cleaning shall be performed ... Wipe with dry, absorbent, lint free product. Perform a final wipe with demineralized water and absorbent lint free towels. Allow to dry for at least 2 minutes before proceeding.


The inspectors determined that the contractor NDE technicians apparently did not perform a final wipe with demineralized water and an absorbent lint free towel on 66 welds.
If a participant is electronically submitting a document to the NRC in accordance with the E-Filing rule, the participant must file the document using the NRCs online, Web-based submission form. In order to serve documents through the Electronic Information Exchange (EIE), users will be required to install a Web browser plug-in from the NRC Web site.


The inspectors determined that the contractor NDE technicians apparently did not allow 19 welds to dry for at least two minutes before proceeding.
Further information on the Web-based submission form, including the installation of the Web browser plug-in, is available on the NRCs public Web site at http://www.nrc.gov/site-help/e-submittals.html.
* Step 6.2.3 states Apply penetrant by spraying, brushing, or dipping.


The inspectors determined that the contractor NDE technicians apparently failed to apply penetrant to one weld.
Once a participant has obtained a digital ID certificate and a docket has been created, the participant can then submit a request for hearing or petition for leave to intervene through the EIE. Submissions should be in Portable Document Format (PDF) in accordance with NRC guidance available on the NRCs public Web site at http://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the time the documents are submitted through the NRCs E-Filing system. To be timely, an electronic filing must be submitted to the E-Filing system no later than 11:59 p.m. Eastern Time (ET) on the due date. Upon receipt of a transmission, the E-Filing system time-stamps the document and sends the submitter an e-mail notice confirming receipt of the document. The E-Filing system also distributes an e-mail notice that provides access to the document to the NRCs Office of the General Counsel and any
* Step 6.2.5 states, in part, Ensure that the surface remains wet with penetrant for the minimum dwell times for each temperature range as designated below.


Surface Temperature Range              Dwell Time Minimum 76°F to 125°F                      10 Minutes 126°F to 200°F                        3 Minutes 201°F to 325°F                        1 Minute The inspectors determined that the contractor NDE technicians apparently failed to ensure the surface of 34 welds remained wet with penetrant for the minimum dwell times, with times as low as 1 minute when a 3-minute dwell was required.
others who have advised the Office of the Secretary that they wish to participate in the proceeding, so that the filer need not serve the documents on those participants separately.
* Step 6.3.1 states Remove as much excess penetrant as possible with a dry, absorbent, lint free product repeating the operation until most traces of penetrant have been removed.


The inspectors determined that the contractor NDE technicians apparently only used a moistened cloth while removing excess penetrant from 38 welds.
Therefore, any others who wish to participate in the proceeding (or their counsel or representative) must apply for and receive a digital ID certificate before a hearing request/
* Step 6.3.2 states, in part, to Remove remaining traces of penetrant by lightly wiping the surface with a lint free product moistened with the cleaner/remover.
petition to intervene is filed so that they can obtain access to the document via the E-Filing system.


The inspectors determined that the contractor NDE technicians apparently only used a dry cloth while removing remaining penetrant from 26 welds.
A person filing electronically using the NRCs adjudicatory E-Filing system may seek assistance by contacting the NRC Meta System Help Desk through the Contact Us link located on the NRCs Web site at http://www.nrc.gov/site-help/e-submittals.html, by e-mail at MSHD.Resource@nrc.gov, or by a toll-free call at (866) 672-7640. The NRC Meta System Help Desk is available between 8:00 a.m. and 8:00 p.m., ET, Monday through Friday, excluding government holidays.
* Step 6.4.2 states For examinations above 125°F allow a minimum of 1 minute and a maximum of 15 minutes drying time after final wipe and before developer application.


The inspectors determined that the contractor NDE technicians apparently failed to allow a minimum of 1 minute drying time after final wipe and before developer application on 26 welds (16 wet wiped, 10 dry wiped). The drying times ranged from 9 to 43 seconds.
Participants who believe that they have a good cause for not submitting documents electronically must file an exemption request, in accordance with 10 CFR 2.302(g), with their initial paper filing requesting authorization to continue to submit documents in paper format.
* Step 6.5.2, Developer Application states Begin observing for indications as the developer dries. Evaluate examination results for the purpose of acceptance within the minimum and maximum developing times for each temperature range as specified in the following table, beginning after the developer coating is dry.


Dwell Time Minimum      Dwell Time Surface Temperature Range Maximum 72°F to 325°F                  10 Minutes              15 Minutes The inspectors determined that the contractor NDE technicians apparently failed to allow a minimum of 10 minutes on all 66 welds before evaluating examination results for the purpose of acceptance (i.e., moving to the final cleaning).
Such filings must be submitted by: (1) first class mail addressed to the Office of the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: Rulemaking and Adjudications Staff; or (2) courier, express mail, or expedited delivery service to the Office of the Secretary, Sixteenth Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland, 20852, Attention: Rulemaking and Adjudications Staff. Participants filing a document in this manner are responsible for serving the document on all other participants. Filing is considered complete by first-class mail as of the time of deposit in the mail, or by courier, express mail, or expedited delivery service upon depositing the document with the provider of the service. A presiding officer, having granted an exemption


Specifically, the developer dwell times ranged from 23 seconds to a few seconds over 9 minutes.
request from using E-Filing, may require a participant or party to use E-Filing if the presiding officer subsequently determines that the reason for granting the exemption from use of E-Filing no longer exists.


The inspectors identified that in 66 welds, the licensee apparently failed to evaluate examination results within the minimum and maximum developing times.
Documents submitted in adjudicatory proceedings will appear in the NRCs electronic hearing docket, which is available to the public at http://ehd1.nrc.gov/ehd/, unless excluded pursuant to an order of the Commission or the presiding officer. Participants are requested not to include personal privacy information, such as social security numbers, home addresses, or home phone numbers in their filings, unless an NRC regulation or other law requires submission of such information. With respect to copyrighted works, participants are requested not to include copyrighted materials in their submission, except for limited excerpts that serve the purpose of the adjudicatory filings and would constitute a Fair Use application.


The above issues describe an apparent violation (AV) of NRC requirements. The licensee documented the AV in its CAP as AR 1402246 and AR 01486887 (AV 05000263/2015008-01; 07200058/2014001-01 Failure to Perform Penetrant Tests in Accordance with Procedural Requirements).
If a person other than the licensee requests a hearing, that person shall set forth with particularity the manner in which his interest is adversely affected by this Confirmatory Order and shall address the criteria set forth in 10 CFR 2.309(d) and (f).


Inaccurate and Incomplete Information Documented on Liquid Penetrant Test Form During review of the issue, the inspectors determined that the NDE contract technicians apparently did not correctly document the actual dwell times. The procedure required reporting of the penetrant dwell time, the post cleaning drying time, and the developer dwell time in whole minutes. However, instead of recording a time, in minutes, that reflected the actual time spent, the NDE technicians appeared to record the procedural required times. The NRC determined that the recorded times appeared for the majority of the cases to be greater than actually spent, although there were some instances that the recorded times appeared to be less than actually spent and a few occasions where the recorded times appeared to reflect the actual time spent.
If a hearing is requested by a person whose interest is adversely affected, the Commission will issue a separate Order designating the time and place of any hearings, as appropriate. If a hearing is held, the issue to be considered at such hearing shall be whether this Confirmatory Order should be sustained.


10 CFR 72.11, Completeness and accuracy of information, requires, in part, that information required by the Commission's Regulations to be maintained by the licensee shall be complete and accurate in all material respects. 10 CFR Part 72.174, Quality assurance records, requires, in part, that sufficient records be maintained to furnish evidence of activities affecting quality. Records include closely-related data such as qualifications of personnel, procedures, and equipment.
In the absence of any request for hearing, or written approval of an extension of time in which to request a hearing, the provisions specified in Section V above shall be final 30 days after issuance of the Confirmatory Order without further order or proceedings. If an extension of time


CoC 1004, TS 1.2.5, DSC Dye Penetrant Tests of Closure Welds, states that All DSC closure welds except those subjected to full volumetric inspection shall be dye penetrant tested in accordance with the requirements of the ASME BPV Code Section III, Division 1, Article NB-5000. The liquid penetrant test acceptance standards shall be those described in Subsection NB-5350 of the Code.
for requesting a hearing has been approved, the provisions specified in Section V shall be final when the extension expires if a hearing request has not been received.


The licensee utilized TriVis Procedure 12751 QP-9.202, Revision 1, Color Contrast Liquid Penetrant Examination Using the Solvent-Removable Method in order to accomplish this activity affecting quality in accordance with CoC 1004 TS 1.2.5.
Dated at Lisle, Illinois this 21st day of December 2015 For the Nuclear Regulatory Commission
  /RA/
Cynthia D. Pederson Regional Administrator


TriVis Procedure 12751 QP-9.202, Revision 1, Section 9.0, Documentation, required that the licensee record the results of the inspection, and all pertinent information, on the VT[visual testing]/PT examination report form. The VT/PT Examination Report required penetrant dwell time, dry time, and developer dwell time be recorded.
Enclosure 2 At the session, you agreed that a Confirmatory Order would be issued in settlement of a disputed claim in order to avoid further action by the NRC. In light of the corrective actions you took or agreed to take, as described in the Confirmatory Order (Enclosure 1), the NRC is satisfied that its concerns will be addressed by making your commitments legally binding.


An AV has been identified, in that, from September 5, 2013 to October 17, 2013, the completed VT/PT Examination Report form, a Quality Assurance record required by CoC 1004, TS 1.2.5 and TriVis Procedure 12751 QP-9.202, Revision 1, did not appear to be complete and accurate in all material respects. Specifically, the completed VT/PT Examination Report form required penetrant dwell time, dry time, and developer dwell time be recorded. The information appeared to not be accurate because, in comparison with the time shown on the videotapes, of the 66 welds examined:
As evidenced by your signed Consent and Hearing Waiver Form (Enclosure 2), dated December 10, 2015, you agreed to the issuance of the Confirmatory Order.
* 30 penetrant dwell times appeared to be over-reported, 23 penetrant dwell times appeared to be under-reported, 11 appeared to be roughly on time, 1 was not visible on tape, and 1 appeared to have no penetrant applied.
* 42 dry times appeared to be over-reported, 22 of which did not appear to meet the procedural required minimum. There appeared to be 11 under-reports and 6 cases that were roughly on time.
* 66 developer dwell times appeared to be over-reported.


This information was material to the NRC because the completed VT/PT Examination Report forms were a quality record that indicated that the PTs were performed in accordance with the procedure. As the licensee was not required to maintain the video recordings, these quality records would have become the official record of what had been done had the NRC inspector not identified the issue.
Pursuant to Section 223 of the Atomic Energy Act of 1954, as amended, any person who willfully violates, attempts to violate, or conspires to violate, any provision of this Confirmatory Order shall be subject to criminal prosecution, as set forth in that section. Violation of this Confirmatory Order may also subject the person to civil monetary penalties.


The licensee documented the AV in its CAP as AR 1402246 and AR 01486891 (AV 05000263/2015008-02; 07200058/2014001-02; Inaccurate and Incomplete Information Documented on VT/PT Report Forms).
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter, along with its enclosures, will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.


Failure to Assess Contractor Control of Quality During review of the issue, the inspectors determined that both the licensee and the contractor apparently failed to provide adequate assessment of the quality of the NDE PT being performed. The licensee provided advance video recording of the NDE PT being performed. However, the NRC determined that the contractor supervisor apparently was not routinely on site, and did not review the videotapes. Additionally, the licensee apparently did not perform adequate oversight of the contractor performing the PT, including review of the videotapes.
The Confirmatory Order will be published in the Federal Register. The NRC also publishes Confirmatory Orders on its Web site under Significant Enforcement Actions at http://www.nrc.gov/about-nrc/regulatory/enforcement.html.


10 CFR 72.154(c), Control of purchased material, equipment, and services requires, in part, that licensees assess the effectiveness of the control of quality by contractors and subcontractors at intervals consistent with the importance, complexity, and quantity of the product or services.
Sincerely,
 
/RA/
An AV has been identified, in that, from September 5, 2013 to October 17, 2013, the licensee apparently did not adequately assess the effectiveness of the control of quality by contractors in that the licensee apparently failed to monitor the contractors performing PT on the DSCs. The lack of adequate assessment of the quality of the PT being performed on the important, complex, and large number of DSC welds resulted in the DSCs being left in an indeterminate state, due to the consecutive layers of welding.
Cynthia D. Pederson Regional Administrator Docket Nos. 50-263; 72-058 License No. DPR-22 Enclosures:
 
1. Confirmatory Order 2. Consent and Hearing Waiver cc: Distribution via LISTSERV ADAMS Accession Number ML15355A459 OFFICE RIII RIII RIII RIII NAME Lambert Orlikowski Giessner Heck DATE 11/13/15 11/17/15 11/18/15 11/19/15 OFFICE D: NMSS D:OGC D:OE RIII RIII NAME Burgess for Monteith for Hanley for Skokowski Pederson Moore 1 Scott 2 Holahan 3 DATE 12/08/15 11/20/15 11/20/15 12/15/15 12/21/15 OFFICIAL RECORD COPY 1 NMSS concurred per e-mail from M. Burgess dated 12/08/15 2 OGC concurred per e-mail from E. Monteith dated 11/20/15 3 OE concurred per e-mail from K. Hanley dated 11/20/15
The licensee documented the AV in its CAP as AR 1402246 and AR 01486892 (AV 05000263/2015008-03; 07200058/2014001-03; Inaccurate and Incomplete Information Documented on VT/PT Report Forms).
 
{{a|4OA6}}
==4OA6 Management Meetings==
 
===.1 Exit Meeting Summary===
 
On June 21, 2015, the NRC staff presented the inspection results to Mr. Peter Gardner and other members of the licensee staff. The licensee acknowledged the issues presented. The NRC staff confirmed that none of the potential report input discussed was considered proprietary.
 
{{a|4OA7}}
==4OA7 Licensee-Identified Violations==
 
The following violation of very low significance was identified by the licensee and is a violation of NRC requirements which meets the criteria of the NRC Enforcement Policy for being dispositioned as an NCV:
* Title 10 CFR 72.158, Control of special processes, requires, in part, that licensees establish measures to ensure that special processes, including welding... and nondestructive testing, are controlled and accomplished by qualified personnel using qualified procedures in accordance with applicable codes, standards, specifications, criteria, and other special requirements.
 
Contrary to the above, the licensee identified on May 10, 2014, the licensee failed to perform verifications of a calibrated leak test instrument used on DSC lid to shell welds in accordance with Procedure TN 61BT-61BTH-HSMLD, Helium Leak Testing for NUHOMS Systems, Revision 1. Procedure TN 61BT-61BTH-HSMLD, Revision 1, performs helium leak tests to demonstrate compliance with TS 1.2.4.a, 61BTH DSC Helium Leak rate of Inner Seal Weld.
 
Additionally, contrary to 10 CFR 72.158, on April 2, 2014, the licensee failed to ensure enough filler material was deposited to achieve the minimum depth of the shell to outer top cover plate weld on DSC 16 in accordance with Procedure 12751-MNGP-OPS, Spent Fuel Cask Welding: 61BT/BTH NUHOMS Canisters, Revision 0. Instructions for welding operations are provided in Procedure 12751 MNGP-OPS, Revision 0, to ensure in field fabrication is performed in accordance with the Final Safety Analysis Report design basis drawings.
 
During a nuclear oversight review of 2013 dry cask storage loading operations, the licensee identified that the helium mass spectrometer leak detection, calibrated leak instrument verification stabilizations, were not performed in accordance with TN 61BT-61BTH-HSMLD, Revision 1. Specifically TN 61BT-61BTH-HSMLD, Revision 1, Steps 8.3 and 8.4, require the user to determine the final instrument indicated leakage rate with the calibrated standard open and closed. The procedure step requires the user to ensure the system stabilizes while determining these results. TN 61BT-61BTH-HSMLD, Revision 1, Note 2, defines a stable signal as no more than a 1.0 E-8 std cm3/sec deviation in the indicated signal in 60 seconds. The licensee determined that for DSC 11, 12, 14, 15 and 16, stabilization times were less than 60 seconds. Specifically for DSC 12, stabilization times with the calibrated standard open were performed in 24 seconds, and stabilization times with the calibrated standard closed were performed in 22 seconds.
 
The licensee entered this issue into its CAP as AR 01430236 and AR 01486895, and initiated actions to evaluate the condition. The licensee determined that these procedural errors did not affect the helium leak test performance.
 
Following identification of weld concerns on DSC 16, further weld examinations were performed on the outer top cover plate weld of DSC 16. The weld depth was originally measured during the placement of the weld in October 2013, with all weld depths verified to be greater than the procedural minimum requirement of 0.500. The licensee identified during the new weld examinations that in 13 of 21 areas measured, the weld depth was less than 0.500 with a minimum depth of 0.463.
 
The licensee entered this issue into its CAP as AR 01425235 and AR 01486895, and initiated actions to evaluate the condition. The weld depth was repaired by adding additional weld material to approximately 3/4 of the circumference of the outer top cover plate weld. After the repair was completed, satisfactory non-destructive examinations were performed.
 
The inspectors determined that these issues were more than minor in significance using Inspection Manual Chapter 0612, Appendix E, Examples of Minor Issues, example 3h. Specifically, multiple examples were identified of a failure to ensure control of a special process.
 
The inspectors determined that the violation was a Severity Level IV violation and similar to example 6.5.d.1 of the NRCs Enforcement Policy in that the licensee failed to meet a regulatory requirement, including one quality assurance criteria, that has more than minor safety significance. The licensee identified violation is being processed through the traditional enforcement process because it is associated with an ISFSI, which falls under traditional enforcement.
 
ATTACHMENT:
 
=SUPPLEMENTAL INFORMATION=
 
==KEY POINTS OF CONTACT==
 
Licensee
* Peter Gardner, Site Vice President
* Harlan Hanson, Plant Manager
* Mark Lingenfelter, Engineering Director
Michael Baumann, Nuclear Fuels Director
* Sandra OConnor, Regulatory Affairs Analyst
Nuclear Regulatory Commission
*
: [[contact::M. Learn]], Reactor Engineer
: [[contact::R. Edwards]], Senior Health Physicist
*
: [[contact::P. Zurawski]], Senior Resident Inspector
 
==LIST OF ITEMS==
 
===OPENED, CLOSED AND DISCUSSED===
 
===Opened===
: 05000263/2015008-01;  AV    Failure to Perform Penetrant Tests in Accordance with 200058/2014001-01          Procedural Requirements
: 05000263/2015008-02;  AV    Inaccurate and Incomplete Information Documented on 200058/2014001-02          VT/PT Report Forms
: 05000263/2015008-03;  AV    Failure to Assess Contractor Control of Quality 200058/2014001-03
 
===Closed===
 
200058/2013001-01    URI  Dry Shielded Canister Liquid Penetrant Examination
 
==LIST OF DOCUMENTS REVIEWED==


Letter to Mr. Peter from Ms. Cynthia D. Pederson dated December 21, 2015 SUBJECT: CONFIRMATORY ORDER RELATED TO NRC REPORTS NO. 05000263/2015008; 07200058/2014001 AND OI REPORT 3-2014-004; MONTICELLO NUCLEAR GENERATING PLANT DISTRIBUTION:
RidsSecyMailCenter Resource  Cheryl McCrary OCADistribution  David DAbate Victor McCree  Cindy Rosales-Cooper Michael Johnson  Janelle Jessie Glenn Tracy  RidsNrrDorlLpl3-1 Resource Patricia Holahan  RidsNrrPMMonticello Nick Hilton  RidsNrrDirsIrib Resource Kyle Hanley  Richard Skokowski Cynthia Pederson  Allan Barker Darrell Roberts  Harral Logaras Daniel Dorman  Viktoria Mitlyng Len Wert  Prema Chandrathil Marc Dapas  Kenneth Lambert Marian Zobler  Paul Pelke Catherine Scott  Magdalena Gryglak Emily Monteith  Sarah Bahksh Michelle Burgess  Jorge Corujo-Sandin Lauren Casey  Carole Ariano Brice Bickett  Linda Linn David Gamberoni  DRPIII Michael Hay  DRSIII Holly Harrington  Jim Clay Hubert Bell  Carmen Olteanu Anthony Hsia  RidsOemailCenter OEWEB Resource ROPassessment.Resource@nrc.gov
}}
}}

Latest revision as of 19:24, 4 December 2019

EA-14-193; Confirmatory Order Related to NRC Reports No. 05000263/2015008; 07200058/2014001 and OI Report 3-2014-004; Monticello Nuclear Generating Plant
ML15355A459
Person / Time
Site: Monticello  Xcel Energy icon.png
Issue date: 12/21/2015
From: Pederson C
NRC/RGN-III
To: Gardner P
Northern States Power Co
Lambert, Kenneth
References
3-2014-004, EA-14-193, IR 2015008
Download: ML15355A459 (20)


Text

UNITED STATES ber 21, 2015

SUBJECT:

CONFIRMATORY ORDER RELATED TO NRC REPORTS NO. 05000263/2015008; 07200058/2014001 AND OI REPORT 3-2014-004; MONTICELLO NUCLEAR GENERATING PLANT

Dear Mr. Gardner:

The enclosed Confirmatory Order is being issued to Northern States Power Company, Minnesota, as a result of a successful Alternative Dispute Resolution (ADR) session. The enclosed commitments were made by you, as the licensee, as part of a settlement agreement between you and the U.S. Nuclear Regulatory Commission (NRC) concerning apparent violations of NRC requirements, as discussed in the enclosure to our letter dated July 23, 2015.

Our July 23, 2015 (ML15203B187), letter provided you with the results of an investigation conducted by the NRCs Office of Investigations to determine whether two contractor technicians at the Monticello Nuclear Generating Plant (Monticello) deliberately failed to perform nondestructive examinations (NDEs) on the Dry Shielded Canisters (DSCs) in accordance with procedural requirements and whether they falsified records when recording the NDE results, contrary to the requirements in Title 10 of the Code of Federal Regulations (10 CFR) 72.158, Control of special processes, 10 CFR 72.11, Completeness and accuracy of information, and 10 CFR 72.154(c), Control of purchased material, equipment, and services.

Our letter also informed you that the apparent violations were being considered for enforcement action in accordance with the NRCs Enforcement Policy, and provided you with the option of:

(1) providing a written response to the violation; (2) attending a Predecisional Enforcement Conference; or (3) requesting ADR with the NRC.

In response to our letter, you requested ADR. An ADR mediation session was held on October 15, 2015, and a preliminary settlement agreement was reached. The elements of the preliminary agreement were formulated and agreed to at the mediation session. Consistent with the purposes of ADR, you and the NRC acknowledged that the session was not for the purposes of reaching any conclusions regarding any facts or circumstances discussed in our letter dated July 23, 2015. At the session, you agreed that a Confirmatory Order would be issued in settlement of a disputed claim in order to avoid further action by the NRC. In light of the corrective actions you took or agreed to take, as described in the Confirmatory Order (Enclosure 1), the NRC is satisfied that its concerns will be addressed by making your commitments legally binding.

As evidenced by your signed Consent and Hearing Waiver Form (Enclosure 2), dated December 10, 2015, you agreed to the issuance of the Confirmatory Order.

Pursuant to Section 223 of the Atomic Energy Act of 1954, as amended, any person who willfully violates, attempts to violate, or conspires to violate, any provision of this Confirmatory Order shall be subject to criminal prosecution, as set forth in that section. Violation of this Confirmatory Order may also subject the person to civil monetary penalties.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter, along with its enclosures, will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

The Confirmatory Order will be published in the Federal Register. The NRC also publishes Confirmatory Orders on its Web site under Significant Enforcement Actions at http://www.nrc.gov/about-nrc/regulatory/enforcement.html.

Sincerely,

/RA/

Cynthia D. Pederson Regional Administrator Docket Nos. 50-263;72-058 License No. DPR-22 Enclosures:

1. Confirmatory Order 2. Consent and Hearing Waiver cc: Distribution via LISTSERV

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )

) Docket Nos. 50-263;72-058 Northern States Power Company, Minnesota ) License No. DPR-22 (Doing business as Xcel Energy) ) EA-14-193 Monticello Nuclear Generating Plant )

CONFIRMATORY ORDER MODIFYING LICENSE I

Northern States Power Company, Minnesota, doing business as Xcel Energy, (Licensee) is the holder of Reactor Operating License No. DPR-22 issued by the U.S. Nuclear Regulatory Commission (NRC or Commission) pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Part 50 on September 8, 1970, and renewed on November 8, 2006. The license authorizes the operation of the Monticello Nuclear Generating Plant (Monticello) in accordance with conditions specified therein. The facility is located on the Licensee's site in Monticello, Minnesota.

This Confirmatory Order is the result of an agreement reached during an alternative dispute resolution (ADR) mediation session conducted on October 15, 2015.

II On December 18, 2013, the NRC Office of Investigations (OI), Region III Field Office initiated an investigation (OI Case No. 3-2014-004) to determine whether two contractor technicians at the Monticello Nuclear Generating Plant deliberately failed to perform nondestructive examinations (NDEs) on the Dry Shielded Canisters (DSCs) in accordance with procedural requirements, and Enclosure 1

to determine whether they falsified records when recording the NDE results. The results of the investigation, completed on November 13, 2014, were sent to Xcel Energy in a letter dated July 23, 2015 (ML15203B187). Based on the review of the OI investigation report the NRC determined that both contractor technicians willfully violated 10 CFR 72.158, Control of special processes, and 10 CFR 72.11, Completeness and accuracy of information. In addition, the NRC determined the licensee violated Title 10 CFR 72.154(c), Control of purchased material, equipment, and services.

Specifically, on October 17, 2013, an NRC inspector observed, by video display, the NDE liquid penetrant testing (PT) of the outer top cover plate weld for DSCs being conducted by a contractor technician. The inspector believed that the technician failed to comply with procedural requirements in conducting the PT. The inspector reviewed the procedure, confirmed that the PT was not being performed in accordance with the procedure, and notified Monticello management. Monticello management and the NDE contractor management reviewed the video, and concluded the PT was not performed properly. Upon further review, the NRC inspector determined that two contractor NDE technicians were involved in performing the PT examinations. These individuals were involved with examining a total of 66 welds on six DSCs.

Based on the evidence gathered in the OI investigation, the NRC determined that the two NDE contractors deliberately violated NRC requirements by failing to perform NDE PT of DSCs, a special process, in accordance with procedures by not allowing the developer to dwell for the period of time specified in procedure 12751 QP-9.202, Rev. 1, Color Contrast Liquid Penetrant Examination using the Solvent-Removable Method. Their actions caused the licensee to be in violation of Certificate of Compliance 1004, Amendment 10, Technical Specification 1.2.5, DSC Dye Penetrant Tests of Closure Welds, which was implemented by the procedure, and

10 CFR 72.158, as NDE testing, a special process, was not accomplished in accordance with the applicable standards and requirements.

The NRC further determined that the two contractors willfully violated NRC requirements by recording false information concerning developer dwell times on the PT examination report for each NDE. This caused the licensee to be in violation of 10 CFR 72.11(a), which requires information required to be maintained by the licensee to be complete and accurate in all material respects.

The NRC also determined the licensee failed to assess the effectiveness of the controls of quality by the contractors. Specifically, the licensee did not adequately monitor the work of the contractors performing PT testing on DSCs No. 11 through 16. This caused the licensee to be in violation of 10 CFR 72.154(c), Control of purchased material, equipment, and services, which required, in part, that licensees assess the effectiveness of the control of quality by contractors and subcontractors at intervals consistent with the importance, complexity, and quantity of the product or services.

In response to the NRC's offer, Xcel Energy requested use of the NRC ADR process to resolve differences it had with the NRC. Alternative Dispute Resolution is a process in which a neutral mediator with no decision-making authority assists the parties in reaching an agreement on resolving any differences regarding the dispute. On October 15, 2015, Xcel Energy and the NRC met in an ADR session mediated by a professional mediator, arranged through the Cornell University's Institute on Conflict Resolution.

III During the ADR session, a preliminary settlement agreement was reached. This Confirmatory Order is issued pursuant to the agreement reached during the ADR process. The elements of the agreement, as signed by both parties, consisted of the following:

1. The licensee shall restore compliance to 10 CFR Part 72 to DSCs 11 through 16 within 5 years of the date the NRC takes final action upon the September 29, 2015, exemption request pending for DSC 16 (ML15275A023), or the exemption request is withdrawn, whichever is earlier.

2. Within 180 calendar days of the NRCs final action on the docketed exemption request dated September 29, 2015 (ML15275A023), or the date the exemption request is withdrawn, whichever is earlier, the licensee shall submit a project plan to the Director, Division of Nuclear Materials Safety (DNMS), Region III, for returning DSCs 11 through 16 to compliance to 10 CFR Part 72.

3. Within 180 calendar days after submittal of the DSCs 11 through 16 project plan, Xcel Energy shall submit a letter to the Director, DNMS, Region III, regarding progress under the plan, and any non-editorial changes to the plan. A letter providing a progress update and any non-editorial plan changes shall be provided every 360 calendar days thereafter to the Director, DNMS, Region III, until the plan is completed.

4. Within 90 calendar days of the issuance date of the Confirmatory Order, Xcel Energy shall evaluate Monticellos dry fuel storage procedures and ensure the procedures

require direct licensee oversight during the entire evolution of each dye penetrant test performed by contractors on DSC closure welds.

5. Within 120 calendar days of the issuance date of the Confirmatory Order, Xcel Energy shall ensure and document that all first line supervisors and above, who oversee contractors performing field work in the Xcel Energy nuclear fleet, review the circumstances and lessons learned from the events that gave rise to the Confirmatory Order.

6. Within 360 calendar days of the issuance date of the Confirmatory Order, the licensee shall assess and document the effectiveness of improvements in oversight of supplemental workers (e.g., contractors) in the Xcel Energy nuclear fleet, including the actions taken in item 5.

7. Within 540 calendar days of the issuance date of the Confirmatory Order, Xcel Energy shall develop and make a presentation based on the facts and lessons learned from the events that gave rise to the Confirmatory Order, with emphasis on corrective actions taken as a result. Xcel Energy agrees to make this presentation at an appropriate industry forum such that industry personnel across the entirety of the United States would have the opportunity to receive the material. Xcel Energy shall inform the Director, DNMS, Region III, of where the presentation will be made, and shall make the presentation materials available to the NRC for review at least 30 calendar days in advance of the presentation.

8. Within 360 calendar days of the issuance date of the Confirmatory Order, Xcel Energy shall submit an article to an industry publication, such as UxC Spent Fuel, describing the

circumstances of the violation, the root and contributing causes, and the corrective actions. The licensee shall provide a draft to the Director, DNMS, Region III, at least 30 calendar days in advance of the submittal.

9. Upon completion of all terms of the Confirmatory Order, Xcel Energy shall submit to the NRC a letter discussing its basis for concluding that the Order has been satisfied.

In addition to the elements described above, Xcel Energy took the following corrective actions:

1. Xcel Energy revised its nuclear fleet Nuclear Oversight (NOS) and Supply Chain procedures to require the establishment of a NOS Project Oversight Plan for any Safety-Related or Augmented Quality fabrication or construction activities performed at the nuclear plant sites under a suppliers Quality Assurance (QA) Program. The NOS procedure for project oversight was also revised to address site project implementation in addition to project component fabrication, and associated project risks. Upfront planning of the level and type NOS oversight is based on those risks.

2. Xcel Energy created a nuclear fleet procedure for oversight of supplemental personnel (e.g., contractors) based upon the Institute of Nuclear Power Operations (INPO) AP-930 Supplemental Personnel Process Description, which includes a requirement that each incoming contract worker have a face-to-face review of station standards, expectations, and requirements with the Maintenance Manager or designee. This includes current and all future contract personnel including contract quality control (QC) inspectors.

3. Xcel Energy issued a rapid operational experience notice for this event, which prompted a review of the event by Prairie Island Nuclear Generating Plant staff and shared the

event with the nuclear industry through a process called the INPO Consolidated Event System (ICES).

4. Xcel Energy reviewed its General Access Training to ensure it addresses the consequences of willful violations.

In exchange for the commitments and corrective actions taken by the licensee, the NRC agrees to the following conditions:

1. The NRC will consider the Confirmatory Order as an escalated enforcement action for a period of one year from its issuance date.

2. The NRC will refrain from issuing a Notice of Violation and a proposed imposition of a civil penalty.

This agreement is binding upon the successors and assigns of Xcel Energy.

On December 10, 2015, Xcel Energy consented to issuing this Confirmatory Order with the commitments, as described in Section V below. Xcel Energy further agreed that this Confirmatory Order is to be effective 30 calendar days after issuance of the Confirmatory Order and that it has waived its right to a hearing.

IV Since the licensee agreed to take additional actions to address NRC concerns, as set forth in Section III above, the NRC concluded that its concerns can be resolved through issuance of this Confirmatory Order.

I find that Xcel Energys commitments as set forth in Section V are acceptable and necessary and conclude that with these commitments the public health and safety are reasonably assured.

In view of the foregoing, I have determined that public health and safety require that Xcel Energys commitments be confirmed by this Confirmatory Order. Based on the above and Xcel Energys consent, this Confirmatory Order is effective 30 calendar days after issuance of the Confirmatory Order.

V Accordingly, pursuant to Sections 104b, 161b, 161i, 161o, 182, and 186 of the Atomic Energy Act of 1954, as amended, and the Commission's regulations in 10 CFR 2.202, 10 CFR Part 50 and 10 CFR Part 72, IT IS HEREBY ORDERED THAT THE ACTIONS DESCRIBED BELOW WILL BE TAKEN AT MONTICELLO NUCLEAR GENERATING PLANT AND OTHER NUCLEAR PLANTS IN XCEL ENERGYS FLEET WHERE INDICATED AND THAT LICENSE NO. DPR-22 IS MODIFIED AS FOLLOWS WITH RESPECT TO THE ACTIONS TO BE TAKEN AT THE MONTICELLO NUCLEAR GENERATING PLANT:

1. The licensee shall restore compliance to 10 CFR Part 72 to DSCs 11 through 16 within 5 years of the date the NRC takes final action upon the September 29, 2015, exemption request pending for DSC 16 (ML15275A023), or the exemption request is withdrawn, whichever is earlier.

2. Within 180 calendar days of the NRCs final action on the docketed exemption request dated September 29, 2015 (ML15275A023), or the date the exemption request is withdrawn, whichever is earlier, the licensee shall submit a project plan to the Director,

Division of Nuclear Materials Safety, Region III, for returning DSCs 11 through 16 to compliance to 10 CFR Part 72.

3. Within 180 days after submittal of the DSCs 11 through 16 project plan, Xcel Energy shall submit a letter to the Director, DNMS, Region III, regarding progress under the plan, and any non-editorial changes to the plan. A letter providing a progress update and any non-editorial plan changes shall be provided every 360 calendar days thereafter to the Director, DNMS, Region III, until the plan is completed.

4. Within 90 calendar days of the issuance date of the Confirmatory Order, Xcel Energy shall evaluate Monticellos dry fuel storage procedures and ensure the procedures require direct licensee oversight during the entire evolution of each dye penetrant test performed by contractors on DSC closure welds.

5. Within 120 calendar days of the issuance date of the Confirmatory Order, Xcel Energy shall ensure and document that all first line supervisors and above, who oversee contractors performing field work in the Xcel Energy nuclear fleet, review the circumstances and lessons learned from the events that gave rise to the Confirmatory Order.

6. Within 360 calendar days of the issuance date of the Confirmatory Order, the licensee shall assess and document the effectiveness of improvements in oversight of supplemental workers (e.g., contractors) in the Xcel Energy nuclear fleet, including the actions taken in item 5.

7. Within 540 calendar days of the issuance date of the Confirmatory Order, Xcel Energy shall develop and make a presentation based on the facts and lessons learned from the events that gave rise to the Confirmatory Order, with emphasis on corrective actions taken as a result. Xcel Energy agrees to make this presentation at an appropriate industry forum such that industry personnel across the entirety of the United States would have the opportunity to receive the material. Xcel Energy shall inform the Director, DNMS, Region III, of where the presentation will be made, and make the presentation materials available to the NRC for review at least 30 calendar days in advance of the presentation.

8. Within 360 calendar days of the issuance date of the Confirmatory Order, Xcel Energy shall submit an article to an industry publication, such as UxC Spent Fuel, describing the circumstances of the violation, the root and contributing causes, and the corrective actions. The licensee shall provide a draft to the Director, DNMS, Region III, at least 30 calendar days in advance of the submittal.

9. Upon completion of all terms of the Confirmatory Order, Xcel Energy shall submit to the NRC a letter discussing its basis for concluding that the Order has been satisfied.

The Regional Administrator, Region III, may, in writing, relax or rescind any of the above conditions upon demonstration by the Licensee of good cause.

VI Any person adversely affected by this Confirmatory Order, other than Xcel Nuclear, may request a hearing within 30 days of the issuance date of this Confirmatory Order. Where good cause is

shown, consideration will be given to extending the time to request a hearing. A request for extension of time must be directed to the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, and include a statement of good cause for the extension.

All documents filed in NRC adjudicatory proceedings, including a request for hearing, a petition for leave to intervene, any motion or other document filed in the proceeding prior to the submission of a request for hearing or petition to intervene, and documents filed by interested governmental entities participating under 10 CFR 2.315(c), must be filed in accordance with the NRCs E-Filing rule (72 FR 49139; August 28, 2007), as amended by 77 FR 46562; August 3, 2012 (codified in pertinent part at 10 CFR Part 2, Subpart C). The E-Filing process requires participants to submit and serve all adjudicatory documents over the internet, or in some cases to mail copies on electronic storage media. Participants may not submit paper copies of their filings unless they seek an exemption in accordance with the procedures described below.

To comply with the procedural requirements of E-Filing, at least ten (10) days prior to the filing deadline, the participant should contact the Office of the Secretary by e-mail at hearing.docket@nrc.gov, or by telephone at 301-415-1677, to (1) request a digital (ID)

certificate, which allows the participant (or its counsel or representative) to digitally sign documents and access the E-Submittal server for any proceeding in which it is participating; and (2) advise the Secretary that the participant will be submitting a request or petition for hearing (even in instances in which the participant, or its counsel or representative, already holds an NRC-issued digital ID certificate). Based upon this information, the Secretary will establish an electronic docket for the hearing in this proceeding if the Secretary has not already established an electronic docket.

Information about applying for a digital ID certificate is available on NRCs public Web site at http://www.nrc.gov/site-help/e-submittals.html. System requirements for accessing the E-Submittal server are detailed in NRCs Guidance for Electronic Submission, which is available on the agencys public Web site at http://www.nrc.gov/site-help/e-submittals.html.

Participants may attempt to use other software not listed on the Web site, but should note that the NRCs E-Filing system does not support unlisted software, and the NRC Meta System Help Desk will not be able to offer assistance in using unlisted software.

If a participant is electronically submitting a document to the NRC in accordance with the E-Filing rule, the participant must file the document using the NRCs online, Web-based submission form. In order to serve documents through the Electronic Information Exchange (EIE), users will be required to install a Web browser plug-in from the NRC Web site.

Further information on the Web-based submission form, including the installation of the Web browser plug-in, is available on the NRCs public Web site at http://www.nrc.gov/site-help/e-submittals.html.

Once a participant has obtained a digital ID certificate and a docket has been created, the participant can then submit a request for hearing or petition for leave to intervene through the EIE. Submissions should be in Portable Document Format (PDF) in accordance with NRC guidance available on the NRCs public Web site at http://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the time the documents are submitted through the NRCs E-Filing system. To be timely, an electronic filing must be submitted to the E-Filing system no later than 11:59 p.m. Eastern Time (ET) on the due date. Upon receipt of a transmission, the E-Filing system time-stamps the document and sends the submitter an e-mail notice confirming receipt of the document. The E-Filing system also distributes an e-mail notice that provides access to the document to the NRCs Office of the General Counsel and any

others who have advised the Office of the Secretary that they wish to participate in the proceeding, so that the filer need not serve the documents on those participants separately.

Therefore, any others who wish to participate in the proceeding (or their counsel or representative) must apply for and receive a digital ID certificate before a hearing request/

petition to intervene is filed so that they can obtain access to the document via the E-Filing system.

A person filing electronically using the NRCs adjudicatory E-Filing system may seek assistance by contacting the NRC Meta System Help Desk through the Contact Us link located on the NRCs Web site at http://www.nrc.gov/site-help/e-submittals.html, by e-mail at MSHD.Resource@nrc.gov, or by a toll-free call at (866) 672-7640. The NRC Meta System Help Desk is available between 8:00 a.m. and 8:00 p.m., ET, Monday through Friday, excluding government holidays.

Participants who believe that they have a good cause for not submitting documents electronically must file an exemption request, in accordance with 10 CFR 2.302(g), with their initial paper filing requesting authorization to continue to submit documents in paper format.

Such filings must be submitted by: (1) first class mail addressed to the Office of the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: Rulemaking and Adjudications Staff; or (2) courier, express mail, or expedited delivery service to the Office of the Secretary, Sixteenth Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland, 20852, Attention: Rulemaking and Adjudications Staff. Participants filing a document in this manner are responsible for serving the document on all other participants. Filing is considered complete by first-class mail as of the time of deposit in the mail, or by courier, express mail, or expedited delivery service upon depositing the document with the provider of the service. A presiding officer, having granted an exemption

request from using E-Filing, may require a participant or party to use E-Filing if the presiding officer subsequently determines that the reason for granting the exemption from use of E-Filing no longer exists.

Documents submitted in adjudicatory proceedings will appear in the NRCs electronic hearing docket, which is available to the public at http://ehd1.nrc.gov/ehd/, unless excluded pursuant to an order of the Commission or the presiding officer. Participants are requested not to include personal privacy information, such as social security numbers, home addresses, or home phone numbers in their filings, unless an NRC regulation or other law requires submission of such information. With respect to copyrighted works, participants are requested not to include copyrighted materials in their submission, except for limited excerpts that serve the purpose of the adjudicatory filings and would constitute a Fair Use application.

If a person other than the licensee requests a hearing, that person shall set forth with particularity the manner in which his interest is adversely affected by this Confirmatory Order and shall address the criteria set forth in 10 CFR 2.309(d) and (f).

If a hearing is requested by a person whose interest is adversely affected, the Commission will issue a separate Order designating the time and place of any hearings, as appropriate. If a hearing is held, the issue to be considered at such hearing shall be whether this Confirmatory Order should be sustained.

In the absence of any request for hearing, or written approval of an extension of time in which to request a hearing, the provisions specified in Section V above shall be final 30 days after issuance of the Confirmatory Order without further order or proceedings. If an extension of time

for requesting a hearing has been approved, the provisions specified in Section V shall be final when the extension expires if a hearing request has not been received.

Dated at Lisle, Illinois this 21st day of December 2015 For the Nuclear Regulatory Commission

/RA/

Cynthia D. Pederson Regional Administrator

Enclosure 2 At the session, you agreed that a Confirmatory Order would be issued in settlement of a disputed claim in order to avoid further action by the NRC. In light of the corrective actions you took or agreed to take, as described in the Confirmatory Order (Enclosure 1), the NRC is satisfied that its concerns will be addressed by making your commitments legally binding.

As evidenced by your signed Consent and Hearing Waiver Form (Enclosure 2), dated December 10, 2015, you agreed to the issuance of the Confirmatory Order.

Pursuant to Section 223 of the Atomic Energy Act of 1954, as amended, any person who willfully violates, attempts to violate, or conspires to violate, any provision of this Confirmatory Order shall be subject to criminal prosecution, as set forth in that section. Violation of this Confirmatory Order may also subject the person to civil monetary penalties.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter, along with its enclosures, will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

The Confirmatory Order will be published in the Federal Register. The NRC also publishes Confirmatory Orders on its Web site under Significant Enforcement Actions at http://www.nrc.gov/about-nrc/regulatory/enforcement.html.

Sincerely,

/RA/

Cynthia D. Pederson Regional Administrator Docket Nos. 50-263;72-058 License No. DPR-22 Enclosures:

1. Confirmatory Order 2. Consent and Hearing Waiver cc: Distribution via LISTSERV ADAMS Accession Number ML15355A459 OFFICE RIII RIII RIII RIII NAME Lambert Orlikowski Giessner Heck DATE 11/13/15 11/17/15 11/18/15 11/19/15 OFFICE D: NMSS D:OGC D:OE RIII RIII NAME Burgess for Monteith for Hanley for Skokowski Pederson Moore 1 Scott 2 Holahan 3 DATE 12/08/15 11/20/15 11/20/15 12/15/15 12/21/15 OFFICIAL RECORD COPY 1 NMSS concurred per e-mail from M. Burgess dated 12/08/15 2 OGC concurred per e-mail from E. Monteith dated 11/20/15 3 OE concurred per e-mail from K. Hanley dated 11/20/15

Letter to Mr. Peter from Ms. Cynthia D. Pederson dated December 21, 2015 SUBJECT: CONFIRMATORY ORDER RELATED TO NRC REPORTS NO. 05000263/2015008; 07200058/2014001 AND OI REPORT 3-2014-004; MONTICELLO NUCLEAR GENERATING PLANT DISTRIBUTION:

RidsSecyMailCenter Resource Cheryl McCrary OCADistribution David DAbate Victor McCree Cindy Rosales-Cooper Michael Johnson Janelle Jessie Glenn Tracy RidsNrrDorlLpl3-1 Resource Patricia Holahan RidsNrrPMMonticello Nick Hilton RidsNrrDirsIrib Resource Kyle Hanley Richard Skokowski Cynthia Pederson Allan Barker Darrell Roberts Harral Logaras Daniel Dorman Viktoria Mitlyng Len Wert Prema Chandrathil Marc Dapas Kenneth Lambert Marian Zobler Paul Pelke Catherine Scott Magdalena Gryglak Emily Monteith Sarah Bahksh Michelle Burgess Jorge Corujo-Sandin Lauren Casey Carole Ariano Brice Bickett Linda Linn David Gamberoni DRPIII Michael Hay DRSIII Holly Harrington Jim Clay Hubert Bell Carmen Olteanu Anthony Hsia RidsOemailCenter OEWEB Resource ROPassessment.Resource@nrc.gov