ML010470479: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 121: | Line 121: | ||
SAT UNSAT | SAT UNSAT | ||
: 15. PERFORMANCE STEP: Start HPI Pump 1. | : 15. PERFORMANCE STEP: Start HPI Pump 1. | ||
o Co..... ... | o Co..... ... | ||
STANDARD: Turn the control switch HIS 1524 to START. | STANDARD: Turn the control switch HIS 1524 to START. | ||
Line 177: | Line 176: | ||
SAT UNSAT | SAT UNSAT | ||
: 26. PERFORMANCE STEP: Adjust LPI Train 2 flow to 300 to 500 gpm. | : 26. PERFORMANCE STEP: Adjust LPI Train 2 flow to 300 to 500 gpm. | ||
.C......... | .C......... | ||
STANDARD: Depress ON control power for DH 1A using HIS DHIA-2. Throttle DH 1A, using HIS DH1A, attempting to establish an LPI Train 2 flow of about 300 to 500 gpm on FYI DH2A. | STANDARD: Depress ON control power for DH 1A using HIS DHIA-2. Throttle DH 1A, using HIS DH1A, attempting to establish an LPI Train 2 flow of about 300 to 500 gpm on FYI DH2A. | ||
Line 192: | Line 190: | ||
: 28. PERFORMANCE STEP: Stop LPI Pump 2. | : 28. PERFORMANCE STEP: Stop LPI Pump 2. | ||
.C ........ | .C ........ | ||
STANDARD: Turn the control switch HIS DH6A to STOP. | STANDARD: Turn the control switch HIS DH6A to STOP. | ||
CUE: None. | CUE: None. | ||
Line 243: | Line 240: | ||
JPM No. 4 Page 28 of 28 VERIFICATION OF COMPLETION Operator Evaluator SSN Date License: [ ] RO [ ] SRO Validated Completion Time: minutes Actual Completion Time: minutes Acceptable Progress Maintained: Yes No N/A Result: [ I SATISFACTORY [ I UNSATISFACTORY NOTE: An "Unsatisfactory" requires Comment and will require subsequent remedial training. | JPM No. 4 Page 28 of 28 VERIFICATION OF COMPLETION Operator Evaluator SSN Date License: [ ] RO [ ] SRO Validated Completion Time: minutes Actual Completion Time: minutes Acceptable Progress Maintained: Yes No N/A Result: [ I SATISFACTORY [ I UNSATISFACTORY NOTE: An "Unsatisfactory" requires Comment and will require subsequent remedial training. | ||
Comments/Feedback: | Comments/Feedback: | ||
Evaluator' s Signature Date | Evaluator' s Signature Date | ||
Line 446: | Line 442: | ||
JPM No. 94 Page 21 of 21 VERIFICATION OF COMPLETION Operator Evaluator SSN Date License: E ] RO [ ] SRO Validated Completion Time: minutes Actual Completion Time: minutes Acceptable Progress Maintained: Yes No N/A Result: [ I SATISFACTORY [ I UNSATISFACTORY NOTE: An "Unsatisfactory" requires Comment and will require subsequent remedial training. | JPM No. 94 Page 21 of 21 VERIFICATION OF COMPLETION Operator Evaluator SSN Date License: E ] RO [ ] SRO Validated Completion Time: minutes Actual Completion Time: minutes Acceptable Progress Maintained: Yes No N/A Result: [ I SATISFACTORY [ I UNSATISFACTORY NOTE: An "Unsatisfactory" requires Comment and will require subsequent remedial training. | ||
Comments/Feedback: | Comments/Feedback: | ||
Evaluator's Signature Date | Evaluator's Signature Date | ||
Line 517: | Line 512: | ||
SAT UNSAT | SAT UNSAT | ||
: 8. PERFORMANCE STEP: Disable the Voltage Regulator Droop mode. | : 8. PERFORMANCE STEP: Disable the Voltage Regulator Droop mode. | ||
.... C..C | .... C..C STANDARD: Voltage Regulator droop switch in OFF. | ||
STANDARD: Voltage Regulator droop switch in OFF. | |||
CUE: Voltage Regulator droop switch has been placed in OFF. | CUE: Voltage Regulator droop switch has been placed in OFF. | ||
SAT UNSAT | SAT UNSAT | ||
Line 578: | Line 571: | ||
: 17. PERFORMANCE STEP: Remove control power from B bus source breakers. | : 17. PERFORMANCE STEP: Remove control power from B bus source breakers. | ||
.C......... | .C......... | ||
STANDARD: Knife switch in Cubicle 14 placed in mid position. | STANDARD: Knife switch in Cubicle 14 placed in mid position. | ||
CUE: Knife switch has been placed in the MID position. | CUE: Knife switch has been placed in the MID position. |
Latest revision as of 10:47, 28 March 2020
ML010470479 | |
Person / Time | |
---|---|
Site: | Davis Besse |
Issue date: | 10/02/2000 |
From: | NRC/RGN-III |
To: | |
References | |
-RFPFR | |
Download: ML010470479 (49) | |
Text
FINAL-AS ADMINISTERED SYSTEMS JPMs DAVIS BESSE INITIAL EXAM (OCTOBER 2-6, 2000)
FIVE JPMs SROUs ONLY
DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.: 4C Rev. 00 Page 19 of 28 TASK NO.: 000-058-05-0100 TASK DESCRIPTION: Establishing Long Term Boron Dilution Using LPI Train 2 K/A
REFERENCE:
006-K6.03 3.6/3.9, 006-Al.ll 3.1/3.4 006-A2.05 3.4/3.5 APPLICABLE METHOD OF TESTING: Actual performance Simulator Alternate Path TIME FOR COMPLETION: 10 minutes APPLICABILITY: [XI RO [X] SRO TASK STANDARDS:
REQUIRED MATERIALS:
DB-OP-02000, RPS, SFAS, SFRCS Trip and SG Tube Rupture, Revision 5, C-1 GENERAL
REFERENCES:
DB-OP-02000, RPS, SFAS, SFRCS Trip and SG Tube Rupture, Revision 5, C-i INITIAL CONDITIONS:
A large break LOCA has occurred.
HPI Pump 2 has failed to start.
Both MU pumps and HPI Pump 1 have been stopped per procedure.
Both LPI pumps have been transferred to the Emergency Sump.
INITIATING CUES:
You have been directed to establish long term boron dilution according to 2 of DB-OP-02000, RPS, SFAS, SFRCS Trip and SG Tube Rupture, using LPI Train 2.
Step D on Page 1 of Attachment 12 has been completed.
JPM No. 4C Page 20 of 28 INITIAL CONDITIONS:
A large break LOCA has occurred.
HPI Pump 2 has failed to start.
Both MU pumps and HPI Pump 1 have been stopped per procedure.
Both LPI pumps have been transferred to the Emergency Sump.
INITIATING CUES:
You have been directed to establish long term boron dilution according to 2 of DB-OP-02000, RPS, SFAS, SFRCS Trip and SG Tube Rupture, using LPI Train 2.
Step D on Page 1 of Attachment 12 has been completed.
JPM No. 4C Page 21 of 28 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT assumed unless denoted in the "Comments".
START TIME:
- 1. PERFORMANCE STEP: Locate the correct step.
STANDARD: Identifies Step E on Page 1 of Attachment 12 is the correct start point.
CUE: None.
SAT UNSAT
- 2. PERFORMANCE STEP: Return control power to DH 11 and DH 12.
.. .....C.........
STANDARD: Depress the ON pushbutton on HIS DH11A and HIS DH12A.
COMMENT: DH 11 and DH 12 must be open to complete the task.
CUE: None.
SAT UNSAT
- 3. PERFORMANCE STEP: Verify open DH 11, Normal Suction Isolation.
... ... C.........
STANDARD: Depress the OPEN pushbutton on HIS DHll.
CUE: None.
SAT UNSAT
- 4. PERFORMANCE STEP: Verify open DH 12, Normal Suction Isolation.
.. . .. C.........
STANDARD: Depress the OPEN pushbutton on HIS DHI2.
COMMENT: Examinee may turn off control power to DH 11 and DH 12 which not required by procedure.
CUE: None.
SAT UNSAT
JPM No. 4C Page 22 of 28
- 5. PERFORMANCE STEP: Route to Method 2 using LPI Train 2.
STANDARD: Route to Page 4 of Attachment 12.
CUE: None.
SAT UNSAT
- 6. PERFORMANCE STEP: Check that the suction of LPI and CTMT Spray has been transferred to the Emergency Sump.
STANDARD: Observe the RED lights are lit on HIS DH9B and HIS DH9A.
Observe the GREEN lights are lit on HIS DH7B and HIS DH7A.
CUE: None.
SAT UNSAT
- 7. PERFORMANCE STEP: Check that both LPI trains are cooling the core.
STANDARD: Observe >1000 gpm flow on FYI DH2B and FYI DH2A.
CUE: (If asked how long LPI has been in operation.) LPI has been operating for 90 minutes.
SAT UNSAT
- 8. PERFORMANCE STEP: Verify Incores temperatures are < 333 0 F.
STANDARD: Rotate Incore temperature selector switches HS 4627 and HS 4628 to verify the Incore Temperature indicators, TI 4627 and TI 4628 are < 333 0 F.
CUE: None.
SAT UNSAT
- 9. PERFORMANCE STEP: Check that SCM does not exist.
STANDARD: Observe RCS pressure on one of the various wide range indicators and determine the SCM is < 20 0 F.
CUE: None.
SAT UNSAT
- 10. PERFORMANCE STEP: Route to Method 2 using LPI Train 2.
STANDARD: Route to Page 8 of Attachment 12.
CUE: None.
SAT UNSAT
JPM No. 4C Page 23 of 28
- 11. PERFORMANCE STEP: Identify CCW Train 2 is > 95 0 F.
STANDARD: Identify that CCW Train 2 temperature is 105 0 F using TI 1490.
CUE: None.
SAT UNSAT
........ C ........ Suction.
STANDARD: Depress the OPEN pushbutton on HIS DH64.
CUE: None.
SAT UNSAT
STANDARD: Verify GREEN light is lit on HIS HP32.
CUE: None.
SAT UNSAT
- 14. PERFORMANCE STEP: Adjust LPI Train 1 flow to maintain < 4000 gpm.
STANDARD: Depress ON control power for DH lB using HIS DHlB-2. Throttle DH 1B, using HIS DHIB, until LPI Train 1 flow is about 3000 gpm on FYI DH2B.
COMMENT: Required by Specific Rule 2.
CUE: None.
SAT UNSAT
- 15. PERFORMANCE STEP: Start HPI Pump 1.
o Co..... ...
STANDARD: Turn the control switch HIS 1524 to START.
CUE: None.
SAT UNSAT
JPM No. 4C Page 24 of 28
STANDARD: Verify RED lights are lit on HIS HP2C and HIS HP2D.
CUE: None.
SAT UNSAT
- 17. PERFORMANCE STEP: Verify flow is indicated on HPI Train 1.
STANDARD: Verify flow is indicated on FYI HP3C and FYI HP3D.
CUE: None.
SAT UNSAT
- 18. PERFORMANCE STEP: Verify closed DH 1A, DH Pump 2 Discharge to RCS
........ C ......... Isolation.
STANDARD: Depress ON control power for DH 1A using HIS DH1A-2. Depress and hold the CLOSE pushbutton HIS DHIA, until only the GREEN light is lit.
CUE: None.
SAT UNSAT
- 19. PERFORMANCE STEP: Verify core cooling is adequate.
STANDARD: Observe the Incore temperature indicators, TI 4627 and TI 4626, are constant.
CUE: Incore temperature indicators, TI 4627 and TI 4626, are constant and will be monitored by the Shift Manager.
SAT UNSAT
- 20. PERFORMANCE STEP: Stop LPI Pump 2.
. ..... C.........
STANDARD: Depress the BLOCK pushbutton on HIS DH6AI and turn the control switch HIS DH6A to STOP.
COMMENT: LPI Pump 2 must be stopped prior to repositioning DH 2734.
CUE: None.
SAT UNSAT
JPM No. 4C Page 25 of 28
- 21. PERFORMANCE STEP: Verify closed DH 2734, DH Pump 2 LPI Suction valve.
.C........
STANDARD: Depress the BLOCK pushbutton on HIS 2734A and depress the CLOSE pushbutton on HIS 2734.
CUE: None.
SAT UNSAT
- 22. PERFORMANCE STEP: Verify open DH 11 and DH 12, Normal Suction Isolation.
STANDARD: Observe the RED lights are lit on HIS DHII and HIS DHI2.
CUE: None.
SAT UNSAT
- 23. PERFORMANCE STEP: Verify open DH 1518, DH Pump 2 Suction from RCS.
.. . .. C.........
STANDARD: Depress the OPEN pushbutton on HIS 1518.
CUE: None.
SAT UNSAT
- 24. PERFORMANCE STEP: Start LPI Pump 2.
.. .....C.........
STANDARD: Turn the control switch HIS DH6A to START.
CUE: None.
SAT UNSAT
- 25. PERFORMANCE STEP: Verify no indication of cavitation on LPI Pump 2.
STANDARD: Observe constant amperes and flow on LPI Train 2.
CUE: None.
SAT UNSAT
- 26. PERFORMANCE STEP: Adjust LPI Train 2 flow to 300 to 500 gpm.
.C.........
STANDARD: Depress ON control power for DH 1A using HIS DHIA-2. Throttle DH 1A, using HIS DH1A, attempting to establish an LPI Train 2 flow of about 300 to 500 gpm on FYI DH2A.
COMMENT: Restoration of control power will not be required if control power was not removed previously.
CUE: None.
SAT UNSAT
JPM No. 4C Page 26 of 28
- 27. PERFORMANCE STEP: Identify indications of cavitation on LPI Pump 2.
... C..C........
STANDARD: Observe swinging amperes and flow on LPI Train 2.
CUE: None.
SAT UNSAT
- 28. PERFORMANCE STEP: Stop LPI Pump 2.
.C ........
STANDARD: Turn the control switch HIS DH6A to STOP.
CUE: None.
SAT UNSAT
- 29. PERFORMANCE STEP: Verify closed DH 1518, DH Pump 2 Suction from RCS.
... .. .C ........
STANDARD: Depress the CLOSE pushbutton on HIS 1518.
CUE: None.
SAT UNSAT
- 30. PERFORMANCE STEP: Route to Step 10.7.
STANDARD: Route to Step 10.7.
CUE: None.
SAT UNSAT
- 31. PERFORMANCE STEP: Verify LPI Pump 2 is off.
STANDARD: Observe the GREEN light is LIT on control switch HIS DH6A.
CUE: None.
SAT UNSAT
- 32. PERFORMANCE STEP: Verify closed DH 2734, DH Pump 2 LPI Suction valve.
STANDARD: Observe the GREEN light is LIT on HIS 2734.
CUE: None.
SAT UNSAT
JPM No. 4C Page 27 of 28
- 33. PERFORMANCE STEP: Verify closed DH 1A, DH Pump 2 Discharge to RCS
..... C......... Isolation.
STANDARD: Depress ON control power for DH 1A using HIS DH1A-2. Depress and hold the CLOSE pushbutton HIS DH1A, until only the GREEN light is lit.
COMMENT: Restoration of control power will not be required if control power was not removed previously.
CUE: None.
SAT UNSAT
- 34. PERFORMANCE STEP: Verify open DH 831, Decay Heat Cooler Disch Xover 1
.... C............ to 2.
STANDARD: Depress the OPEN pushbutton on HIS 831.
CUE: None.
SAT UNSAT
- 35. PERFORMANCE STEP: Adjust LPI Train 1 flow to maintain < 4000 gpm on
........ C........ LPI Pump 1.
STANDARD: Depress ON control power for DH lB using HIS DHlB-2. Throttle DH 1B, using HIS DH1B, until LPI Train 1 flow is about 1500 gpm on FYI DH2B.
COMMENT: HPI Pump 1 is still running and must be included in the total flow through LPI Pump 1. Required by Specific Rule 2.
Restoration of control power will not be required if control power was not removed previously.
CUE: None.
SAT UNSAT
- 36. PERFORMANCE STEP: Adjust LPI Train 2 flow to obtain about 1500 gpm.
.... C...C........
STANDARD: Depress ON control power for DH 1A using HIS DHlA-2. Throttle DH 1A, using HIS DHIA, attempting to establish an LPI Train 2 flow of about 1500 gpm on FYI DH2A.
COMMENT: Restoration of control power will not be required if control power was not removed previously.
CUE: None.
SAT UNSAT TERMINATING CUES: This JPM is complete.
END TIME
JPM No. 4 Page 28 of 28 VERIFICATION OF COMPLETION Operator Evaluator SSN Date License: [ ] RO [ ] SRO Validated Completion Time: minutes Actual Completion Time: minutes Acceptable Progress Maintained: Yes No N/A Result: [ I SATISFACTORY [ I UNSATISFACTORY NOTE: An "Unsatisfactory" requires Comment and will require subsequent remedial training.
Comments/Feedback:
Evaluator' s Signature Date
DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.: 94B Rev. 04 Page 12 of 21 TASK NO.: 000-054-05-0100 , 040-012-04-0100 TASK DESCRIPTION: Perform Operator Actions for a High Steam Genereator Level U11 A- i-,- ý (IM 7T54kie0 W -C5re-) K/A wfrl K/A
REFERENCE:
040-013-01-0100, Block an SFRCS Signal q 000-054-05-0100, Perform required operator acionfr f .ra APPLICABLE METHO)D OF TESTING: Actual performance KAs 0/5- 4 L/ [ /2 Simulator SP TIME FOR COMPLETION: 17 minutes APPLICABILITY: [X] RO [X] SRO TASK STANDARDS:
- 3. Isolate Steam Generator 1.
- 4. Bypass SFRCS Hi Level Trip on Steam Generator 1 per Attachment 6.
REQUIRED MATERIALS:
DB-OP-02000, RPS, SFAS, SFRCS Trip or SG Tube Rupture, Revision 5, C-i GENERAL
REFERENCES:
DB-OP-02000, RPS, SFAS, SFRCS Trip or SG Tube Rupture, Revision 5, C-i INITIAL CONDITIONS:
The plant is in Mode 3, post trip, following a Steam Generator Tube Rupture on Steam Generator 1.
INITIATING CUES:
This Shift Supervisor directs you perform step 8.14.6 of DB-OP-02000, RPS, SFAS, SFRCS Trip or SG Tube Rupture.
JPM No. 94B Page 13 of 21 INITIAL CONDITIONS:
The plant is in Mode 3, post trip, following a Steam Generator Tube Rupture on Steam Generator 1.
INITIATING CUES:
This Shift Supervisor directs you perform Step 8.14.6 of DB-OP-02000, RPS, SFAS, SFRCS Trip or SG Tube Rupture.
JPM No. 94B Page 14 of 21 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT assumed unless denoted in the "Comments".
START TIME:
- 1. PERFORMANCE STEP: Identifies the correct procedure step.
STANDARD: Locate Step 8.14.6 of DB-OP-02000, as the correct step.
CUE: None.
SAT UNSAT
- 2. PERFORMANCE STEP: Continue cooldown of the RCS on the good Steam
..... C......... Generator by blocking and opening ICS 11A.
STANDARD: Place PIC ICS11A in HAND, decrease the demand to zero on PIC ICSllA, depress the BLOCK pushbutton on HIS ICS11C and depress the AUTO pushbutton on HIS ICSIIA.
COMMENT: Verify the examinee can control SG 2 pressure.
CUE: Another RO will continue the cooldown on the good Steam Generator.
SAT UNSAT
- 3. PERFORMANCE STEP: Verify MSIV 1, MS 101, is closed.
STANDARD: Verify the green light is lit on HIS 101.
CUE: None.
SAT UNSAT
- 4. PERFORMANCE STEP: Verify AVV 1, ICSllB, is closed.
STANDARD: Verify PIC ICS11B in HAND and decrease the demand to zero on PIC ICSlIB, and the GREEN light is lit on pushbutton HIS ICSllB.
CUE: None.
SAT UNSAT
JPM No. 94B Page 15 of 21
- 5. PERFORMANCE STEP: Verify MS Line 1 to AFPT 1 Isolation valve, MS 106, is
........ C ... ...... closed.
STANDARD: Depress the BLOCK pushbutton on HIS 106AB and depress the CLOSE on pushbutton on HIS 106A.
CUE: None.
SAT UNSAT
- 6. PERFORMANCE STEP: Verify MS Line 1 to AFPT 2 Isolation valve, MS 107A,
........ C ... ...... is closed.
STANDARD: Depress the BLOCK pushbutton on HIS 107EB and depress the CLOSE on pushbutton on HIS 107E.
CUE: None.
SAT UNSAT
.. . .. C.........
STANDARD: Depress the ON pushbutton on HIS 608E, depress the CLOSE on pushbutton on HIS 608A and depress OFF pushbutton on HIS 608E.
COMMENT: Depressing OFF on HIS 608E is NOT critical.
CUE: None.
SAT UNSAT
STANDARD: Depress the BLOCK pushbutton on HIS 612A and depress the CLOSE on pushbutton on HIS 612.
CUE: None.
SAT UNSAT
STANDARD: Depress the BLOCK pushbutton on HIS 3870B and depress the CLOSE on pushbutton on HIS 3870.
CUE: None.
SAT UNSAT
JPM No. 94B Page 16 of 21
STANDARD: Depress the BLOCK pushbutton on HIS 3869B and depress the OPEN on pushbutton on HIS 3869.
CUE: None.
SAT UNSAT
- 11. PERFORMANCE STEP: Route to Attachment 6, Overriding a SFRCS High Level Trip.
STANDARD: Identifies DB-OP-02000, Attachment 6, Section A, as the correct procedure section.
CUE: None.
SAT UNSAT
- 12. PERFORMANCE STEP: Obtain the bypass keys and door keys for all four SFRCS channels.
STANDARD: Keys obtained from Shift Supervisor.
COMMENT: If being performed on the simulator, allow the examinee to obtain the keys.
CUE: None.
SAT UNSAT
- 13. PERFORMANCE STEP: Open SFRCS Channel 1/3 door.
STANDARD: Open door.
COMMENT: If being performed on the simulator, allow the examinee to open the doors.
CUE: None.
SAT UNSAT
- 14. PERFORMANCE STEP: Bypass Logic Channel 1.
..... .. C.........
STANDARD: Place key in KS-l and turn to BYPASS.
CUE: None.
SAT UNSAT
JPM No. 94B Page 17 of 21
- 15. PERFORMANCE STEP: Bypass Logic Channel 1 (cont.).
..... .. C ........
STANDARD: Put SB switch 071 (SP9B8) to BYP.
CUE: None.
SAT UNSAT
- 16. PERFORMANCE STEP: Bypass Logic Channel 3.
........ C ........
STANDARD: Place key in KS-3 and turn to BYPASS.
CUE: None.
SAT UNSAT
- 17. PERFORMANCE STEP: Bypass Logic Channel 3 (cont.).
........ C........
STANDARD: Put SB switch 073 (SP9B9) to BYP.
CUE: None.
SAT UNSAT
- 18. PERFORMANCE STEP: Close and lock SFRCS Channel 1/3.
STANDARD: Door closed and locked.
CUE: None.
SAT UNSAT
- 19. PERFORMANCE STEP: Open SFRCS Channel 2/4 door.
STANDARD: Open door.
COMMENT: If being performed on the simulator, allow the examinee to open the doors.
CUE: None.
SAT UNSAT
- 20. PERFORMANCE STEP: Bypass Logic Channel 2.
. ...... C ........
STANDARD: Place key in KS-2 and turn to BYPASS.
CUE: None.
SAT UNSAT
JPM No. 94B Page 18 of 21
- 21. PERFORMANCE STEP: Bypass Logic Channel 2 (cont.).
.. . .. C.........
STANDARD: Put SB switch 072 (SP9B6) to BYP.
CUE: None.
SAT UNSAT
- 22. PERFORMANCE STEP: Bypass Logic Channel 4.
.. .....C.........
STANDARD: Place key in KS-4 and turn to BYPASS.
CUE: None.
SAT UNSAT
- 23. PERFORMANCE STEP: Bypass Logic Channel 4 (cont.).
..... .. C.........
STANDARD: Put SB switch 074 (SP9B7) to BYP.
CUE: None.
SAT UNSAT
- 24. PERFORMANCE STEP: Close and lock SFRCS Channel 2/4 door.
STANDARD: Door closed and locked.
CUE: None.
SAT UNSAT
- 25. PERFORMANCE STEP: Return keys to Shift Supervisor.
STANDARD: Keys returned to Shift Supervisor.
CUE: None.
SAT UNSAT
- 26. PERFORMANCE STEP: Route to DB-OP-06910, Trip Recovery, Step 4.3.10.
STANDARD: Identifies DB-OP-06910, Step 4.3.10 as the correct procedural step.
COMMENT: If asked, Condenser vacuum is available.
CUE: None.
SAT UNSAT
JPM No. 94B Page 19 of 21
- 27. PERFORMANCE STEP: Verify Main Steam Non-Return valve, MS 209, is open.
STANDARD: Depress OPEN on HIS 209.
CUE: None.
SAT UNSAT
- 28. PERFORMANCE STEP: Verify MSIV 2 Bypass valve, MS 100A, is open.
... ....C. ........
STANDARD: Depress OPEN on HIS 100-1.
CUE: Differential Pressure across the MSIV, MS 100, is less than 250 psi.
SAT UNSAT
- 29. PERFORMANCE STEP: Verify AVV 1, ICSIIB, is in hand.
STANDARD: Verify PIC ICS11B in HAND.
CUE: None.
SAT UNSAT
- 30. PERFORMANCE STEP: Verify AVV 2, ICS11A, is in hand.
STANDARD: Verify PIC ICS11A in HAND.
CUE: None.
SAT UNSAT
- 31. PERFORMANCE STEP: Verify TBVs for Steam Line 1, ICSI2B, is in hand and closed.
STANDARD: Depress HAND on PIC ICS12B and REDUCE demand to ZERO.
CUE: None.
SAT UNSAT
- 32. PERFORMANCE STEP: Verify TBVs for Steam Line 2, ICSl2A, is in hand and closed.
STANDARD: Depress HAND on PIC ICS12B and REDUCE demand to ZERO.
CUE: None.
SAT UNSAT
JPM No. 94B Page 20 of 21
- 33. PERFORMANCE STEP: Depress closed on MSIV 2, MS 100.
STANDARD: Depress CLOSE on HIS 100.
CUE: None.
SAT UNSAT
- 34. PERFORMANCE STEP: Reset SFRCS solenoids for MSIV 2, MS100.
.C.........
STANDARD: Depress REST on HS 100.
CUE: None.
SAT UNSAT
- 35. PERFORMANCE STEP: Verify MSIV 2, MS 100, is open.
.. ..... C.........
STANDARD: Depress OPEN on HIS 100.
CUE: (If asked) Differential Pressure across the MSIV, MS 100, is less than 250 psi.
SAT UNSAT TERMINATING CUES: This JPM is complete.
END TIME
JPM No. 94 Page 21 of 21 VERIFICATION OF COMPLETION Operator Evaluator SSN Date License: E ] RO [ ] SRO Validated Completion Time: minutes Actual Completion Time: minutes Acceptable Progress Maintained: Yes No N/A Result: [ I SATISFACTORY [ I UNSATISFACTORY NOTE: An "Unsatisfactory" requires Comment and will require subsequent remedial training.
Comments/Feedback:
Evaluator's Signature Date
DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.: 2 Rev. 00 Page 1 of 9 TASK NO.: 000-068-05-0100, 334-017-05-0300 TASK DESCRIPTION: Serious Control Room Fire, Assistant Shift Supervisor Actions, Attachment 2 K/A
REFERENCE:
062-A2.04 3.1/3.4, 064-A2.05 3.1/3.2 064-A2.11 2.6/2.9, BW/A05-AA1.01 4.3/4.2 APPLICABLE METHOD OF TESTING: Simulate performance In-plant TIME FOR COMPLETION: 25 minutes APPLICABILITY: [ ] RO [XI SRO TASK STANDARDS:
- 2. All required emergency control transfer switches are in LOCAL.
- 3. EDG 1 is protected.
- 4. Isolate B bus and remove bus control power.
REQUIRED MATERIALS:
DB-OP-02519, Serious Control Room Fire, Revision 4, C-3 GENERAL
REFERENCES:
DB-OP-02519, Serious Control Room Fire, Revision 4, C-3 INITIAL CONDITIONS:
The Control Room has been evacuated due to a serious Control Room fire.
INITIATING CUES:
You have been directed to perform the Assistant Shift Supervisor actions in of DB-OP-02519, Serious Control Room Fire.
You have obtained all the required serious Control Room fire equipment.
(Hand copy of DB-OP-02519 to examinee.)
JPM No. 2 Page 2 of 9 INITIAL CONDITIONS:
The Control Room has been evacuated due to a Serious Control Room Fire.
INITIATING CUES:
You have been directed to perform the Assistant Shift Supervisor actions in of DB-OP-02519, Serious Control Room Fire.
You have obtained all the required Serious Control Room Fire Equipment.
JPM No. 2 Page 3 of 9 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT required unless denoted in the "Comments".
START TIME:
- 1. PERFORMANCE STEP: Verify the radio is NOT in silence mode.
STANDARD: Key radio to transmit.
CUE: Radio transmitter switch has been depressed and released.
SAT UNSAT
... .oC o.........
STANDARD: CC 1471 is OPENED.
CUE: HV 1471 has been rotated clockwise to CLOSE.
CC 1471 IA regulator drain petcock has been rotated counterclockwise to OPEN.
Position indicator on CC 1471 indicates OPEN.
SAT UNSAT
- 3. PERFORMANCE STEP: Isolate the EDG 1 Engine Control Panel from the
........ C ........ Control Room fire.
STANDARD: On C3621, EDG 1 Engine Control Panel, disconnect switch, Emergency Control Transfer Switch DS-4A, in LOCAL.
CUE: Emergency Control Transfer Switch DS-4A has been placed in LOCAL.
SAT UNSAT
JPM No. 2 Page 4 of 9
- 4. PERFORMANCE STEP: Isolate the EDG Local Control Panel from the Control
........ C ........ Room fire.
STANDARD: Place disconnect switches on C3615, DG 1 Local Control Panel, ISO SW DS-lB Appendix R in EMERGENCY, and ISO SW DS-l Appendix R for relay SAX/13, in LOCAL.
CUE: ISO SW DS-lB Appendix R switch has been placed in EMERGENCY.
ISO SW DS-I Appendix R for relay SAX/13 has been placed in LOCAL.
SAT UNSAT
- 5. PERFORMANCE STEP: Isolate the EDG Local Control Panel from the Control
........ C ........ Room fire (cont.).
STANDARD: Open the nine TS-4 test disconnect switches on Panel C3615, DG 1 Local Control Panel.
CUE: All nine TS-4, test disconnect switches, have been placed in the OPEN position.
SAT UNSAT
- 6. PERFORMANCE STEP: Isolate the EDG Voltage Regulator cabinet from the
........ C ........ Control Room fire (cont.).
STANDARD: Disconnect switch ISO SW DS-3 Appendix R on Panel C3617, DG 1 Voltage Regulator Cabinet, in LOCAL.
CUE: ISO SW DS-3 Appendix R switch has been placed in LOCAL.
SAT UNSAT
- 7. PERFORMANCE STEP: Force the EDG into the Isochronous Mode.
....... C........
STANDARD: Isochronous droop switch placed in isochronous.
CUE: Isochronous droop switch has been placed in ISOCHRONOUS.
SAT UNSAT
- 8. PERFORMANCE STEP: Disable the Voltage Regulator Droop mode.
.... C..C STANDARD: Voltage Regulator droop switch in OFF.
CUE: Voltage Regulator droop switch has been placed in OFF.
SAT UNSAT
JPM No. 2 Page 5 of 9
- 9. PERFORMANCE STEP: Shutdown EDG 2.
..... C..C.......
STANDARD: Push emergency shutdown on EDG 2 at C3622, DG 2 Engine Control Panel.
CUE: Emergency shutdown has been pushed.
EDG 2 is STOPPED.
SAT UNSAT
STANDARD: Rotate the DG 1 Sycn Selector to the DG BKR to C1 position.
CUE: The DG 1 Sycn Selector switch has been rotated to the DG BKR to Cl position.
SAT UNSAT
- 11. PERFORMANCE STEP: Determine status of EDG 1.
STANDARD: Verify that EDG 1 is running unloaded.
COMMENT: The order of the cues is respective to the If-Then statements in the step.
CUE: EDG 1 Running volt meter indicates 124 VAC.
EDG 1 Kilwatt meter indicates 0 KWe.
EDG 1 is running and ACII0, Bus Cl to Bus C2 Tie Brkr, is CLOSED.
SAT UNSAT
- 12. PERFORMANCE STEP: Notify the Shiftf Supervisor EDG 1 is running unloaded and route to step 1.0.d.4.
STANDARD: Contact the Shift Supervisor and route to step 1.0.d.4.
CUE: Shift Supervisor has been notified EDG 1 is running unloaded.
SAT UNSAT
JPM No. 2 Page 6 of 9
- 13. PERFORMANCE STEP: Adjust EDG 1 voltage to 4300 VAC.
C ........
.C.....
STANDARD: Determine EDG 1 voltage and adjust EDG 1 voltage using DG 1 Voltage regulator switch.
CUE: EDG 1 voltage is 4220 VAC.
EDG 1 Voltage Regulator switch has been rotated to RAISE.
EDG 1 voltage is 4300 VAC.
EDG 1 Voltage Regulator switch has been released to neutral.
SAT UNSAT
- 14. PERFORMANCE STEP: Adjust EDG 1 frequency to 60 Hz.
... ... C........
STANDARD: Determine EDG 1 frequency and adjust EDG 1 frequency using DG 1 Spd Cntrl switch.
CUE: EDG 1 Frequency is 60.7 Hz.
EDG 1 Speed Control switch has been rotated to LOWER.
EDG 1 Frequency is 60 Hz.
EDG 1 Speed Control switch has been released to neutral.
SAT UNSAT
STANDARD: Using the radio or Gai-Tronics, inform the Secondary RO and the SS that EDG 1 is protected.
CUE: The Secondary RO and SS have been notified EDG 1 is protected.
SAT UNSAT
JPM No. 2 Page 7 of 9
- 16. PERFORMANCE STEP: At Dl Bus Cubicle 2, remove AACDl close control power
........ C ........ fuses AND trip AACDl using the manual trip plunger at the base of the breaker.
STANDARD: AACDl checked open and close fuses pulled and lift the manual trip plunger.
CUE: Breaker AACDI green light lit, control fuses pulled.
The manual trip plunger for breater AACDI has been lifted. (if asked) Breaker position indicator points to open.
SAT UNSAT
- 17. PERFORMANCE STEP: Remove control power from B bus source breakers.
.C.........
STANDARD: Knife switch in Cubicle 14 placed in mid position.
CUE: Knife switch has been placed in the MID position.
SAT UNSAT
- 18. PERFORMANCE STEP: Verify OPEN B bus source breakers.
........ C.......
STANDARD: Check OPEN the following B bus source breakers: HX01B, HX02B, and HXlIB.
CUE: Breaker HX01B has the Green light OFF; Red light OFF.
The manual trip plunger for breater HX01B has been lifted.
(if asked) Breaker position indicator points to open.
Breaker HXlIB has the Green light OFF; Red light OFF.
The manual trip plunger for breater HXllB has been lifted.
(if asked) Breaker position indicator points to open.
Breaker HX02B has the Green light OFF; Red light OFF.
The manual trip plunger for breater HX02B has been lifted.
(if asked) Breaker position indicator points to open.
SAT UNSAT
JPM No. 2 Page 8 of 9
- 19. PERFORMANCE STEP: Remove control power from B bus load breakers.
.. .....C.........
STANDARD: Knife switch in B Bus Cubicle 1 placed in mid position.
CUE: Knife switch has been placed in the MID position.
SAT UNSAT TERMINATING CUES: This JPM is complete.
END TIME
JPM No. 2 Page 9 of 9 VERIFICATION OF COMPLETION Operator Evaluator SSN Date License: [ ] RO [ SRO Validated Completion Time: minutes Actual Completion Time: minutes Acceptable Progress Maintained: Yes No N/A Result: [ ] SATISFACTORY [ I UNSATISFACTORY NOTE: An "Unsatisfactory" requires Comment and will require subsequent remedial training.
Comments/Feedback:
___________________________________________/________
Evaluator's Signature Date
DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.: 1A Rev. 00 Page 1 of 13 TASK NO.: 061-019-04-0100, 061-020-04-0100 TASK DESCRIPTION: Local Operation of the AFW Pump Turbine 1 (Use when Train 2 is protected.)
K/A
REFERENCE:
061-K5.01 3.6/3.9, 061-K6.01 2.5/2.8 061-A2.03 3.1/3.4 APPLICABLE METHOD OF TESTING: Simulate Performance In-plant Alternate Path TIME FOR COMPLETION: 20 minutes APPLICABILITY: [X] RO [X] SRO TASK STANDARDS:
AFW Train 1 manual speed control at the AFPT governor.
REQUIRED MATERIALS:
DB-OP-06233, Auxiliary Feedwater System, Revision 05 GENERAL
REFERENCES:
DB-OP-06233, Auxiliary Feedwater System, Revision 05 INITIAL CONDITIONS:
A loss of DlP from 100% power has occurred.
The reactor has tripped and SFRCS actuated on a loss of four (4) RCPs.
A loss of AFPT 1 governor speed control and AF 6452, AFW 1 level control valve, failing open is a result of the loss of DlP and is causing an overcooling of the RCS.
INITIATING CUES:
You have been directed by the Shift Supervisor to locally control AFPT 1 speed by manual speed control at the AFPT 1 governor valve, in accordance with DB-OP-06233.
(Hand examinee the procedure.)
JPM No. IA Page 2 of 13 INITIAL CONDITIONS:
A loss of DIP from 100% power has occurred.
The reactor has tripped and SFRCS actuated on a loss of four (4) RCPs.
A loss of AFPT 1 governor speed control and AF 6452, AFW 1 level control valve, failing open is a result of the loss of DIP and is causing an overcooling of the RCS.
INITIATING CUES:
You have been directed by the Shift Supervisor to locally control AFPT 1 speed by manual speed control at the AFPT 1 governor valve, in accordance with DB-OP-06233.
JPM No. 1A Page 3 of 13
-- - -- ----- -- w-NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
START TIME:
- 1. PERFORMANCE STEP: Locate the correct procedure.
STANDARD: Identifies Section 5.1 of DB-OP-06233, Auxiliary Feedwater System, as the correct procedure section.
CUE: (if asked) ALL prerequisites have been performed.
SAT UNSAT
- 2. PERFORMANCE STEP: Attempt to unstick governor valve/linkage.
STANDARD: Applies a downward force to the governor valve linkage labeled L1.
CUE: Governor valve moves inward slightly and is NOT STUCK.
SAT UNSAT
- 3. PERFORMANCE STEP: Attempt manual speed control from the Control Room or the Auxiliary Shutdown Panel.
STANDARD: Contacts the Control Room to attempt speed control of AFPT 1.
CUE: Control Room operator informs you he has no speed control of AFPT 1.
(if necessary) Shift Supervisor directs you to continue with the procedure.
SAT UNSAT
- 4. PERFORMANCE STEP: In AFPT 1 Room, establish communications with the Reactor Operator.
STANDARD: Establish communications with Reactor Operator via Gai-Tronics or radio.
CUE: You have established communications with a Reactor Operator. The Reactor Operator directs you to reduce AFPT 1 speed.
SAT UNSAT
JPM No. 1A Page 4 of 13
- 5. PERFORMANCE STEP: Unscrew and remove the electrical connector on the
........ C ......... face of the governor.
STANDARD: Locates electrical connector and unscrews it.
COMMENT: This step must be performed prior to Step 6.
CUE: The electrical connector is DISCONNECTED.
SAT UNSAT
- 6. PERFORMANCE STEP: Turn the manual speed setting control knob as
........ C ......... appropriate to control AFPT speed/flow as directed by the Reactor Operator.
STANDARD: Locate the manual speed setting knob and adjust to reduce the AFPT speed (CCW direction).
COMMENT: AFPT 1 speed will not change regardless of the examinee's actions.
CUE: AFPT 1 speed remains constant.
(if asked) AFPT speed is 3600 rpm.
SAT UNSAT
- 7. PERFORMANCE STEP: Identify AFPT 1 speed control, using the governor valve, has failed and route to Section 5.3.
STANDARD: Locate the correct procedure section. Identifies Section 5.3 of DB-OP-06233, Auxiliary Feedwater System, as correct procedure section.
CUE: (If asked) Shift Supervisor directs you to gain control of AFPT 1 speed.
SAT UNSAT
- 8. PERFORMANCE STEP: Establish communication with Control Room.
STANDARD: Utilize the Gai-Tronics or radio to communicate with the Control Room.
CUE: (If asked) You have established communications with the Control Room.
SAT UNSAT
JPM No. 1A Page 5 of 13
- 9. PERFORMANCE STEP: Unseal the trip throttle valve, ICS 38C.
. . . .C.........
STANDARD: The trip throttle valve seal disconnected.
CUE: The trip throttle valve seal is DISCONNECTED.
SAT UNSAT
- 10. PERFORMANCE STEP: Close the trip throttle valve, ICS 38C.
.. ..C.........
STANDARD: Valve handwheel rotated clockwise to CLOSE.
CUE Valve handwheel is rotated FULLY clockwise (to CLOSE).
SAT UNSAT
- 11. PERFORMANCE STEP: Obtain red governor tool and other required tools.
STANDARD: Obtain necessary tools at entrance to AFP room.
COMMENT: Tools may have already been obtained. This step can be performed out of sequence.
CUE: The Red governor tool and other required tools to disconnect linkage have been obtained.
SAT UNSAT
- 12. PERFORMANCE STEP: Disconnect the linkage between the governor and the
........ C ........ governor valve, where the spring meets linkage.
STANDARD: Linkage disconnected where the spring meets the linkage at the second joint from the governor controller with the tools from the emergency hatch cabinet.
CUE: The linkage is DISCONNECTED.
SAT UNSAT
- 13. PERFORMANCE STEP: Block the governor valve, ICS 38B, "full open".
... ... C.........
STANDARD: Pull up on L1, put the Red AFPT governor blocking tool in place above the governor rod in red area on linkage.
CUE: Ll has been pulled up.
The block is in place above the governor rod in the Red area.
SAT UNSAT
JPM No. 1A Page 6 of 13
- 14. PERFORMANCE STEP: Slowly open the trip throttle valve, ICS 38C.
. ... ..C...... ..
STANDARD: Trip throttle valve, ICS 38C, OPENED by turning the handwheel (slowly) counterclockwise to raise AFPT speed > 600 rpm.
CUE: The trip throttle valve, ICS 38C, handwheel is rotated slowly counterclockwise.
AFPT 1 speed has INCREASED TO 2800 rpm.
SAT UNSAT
- 15. PERFORMANCE STEP: Control the AFPT 1 speed to maintain the required AFW flow.
STANDARD: Ask Control Room for feedback.
CUE: The Control Room Operator directs you to maintain speed at the current value until he can evaluate SG level trend.
SAT UNSAT TERMINATING CUES: This JPM is complete.
END TIME
DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.: lB Rev. 00 Page 7 of 13 TASK NO.: 061-019-04-0100, 061-020-04-0100 TASK DESCRIPTION: Local Operation of the AFW Pump Turbine 2 (Use when Train 1 is protected.)
K/A
REFERENCE:
061-K5.01 3.6/3.9, 061-K6.01 2.5/2.8 061-A2.03 3.1/3.4 APPLICABLE METHOD OF TESTING: Simulate Performance In-plant Alternate Path TIME FOR COMPLETION: 20 minutes APPLICABILITY: [XI RO [XI SRO TASK STANDARDS:
AFW Train 2 manual speed control at the AFPT governor.
REQUIRED MATERIALS:
DB-OP-06233, Auxiliary Feedwater System, Revision 05 GENERAL
REFERENCES:
DB-OP-06233, Auxiliary Feedwater System, Revision 05 INITIAL CONDITIONS:
A loss of D2P from 100% power has occurred.
The reactor has tripped and SFRCS actuated on a loss of four (4) RCPs.
A loss of AFPT 2 governor speed control and AF 6451, AFW 2 level control valve, failing open is a result of the loss of D2P and is causing an overcooling of the RCS.
INITIATING CUES:
You have been directed by the Shift Supervisor to locally control AFPT 2 speed by manual speed control at the AFPT 2 governor valve, in accordance with DB-OP-06233.
(Hand examinee the procedure.)
JPM No. 1B Page 8 of 13 INITIAL CONDITIONS:
A loss of D2P from 100% power has occurred.
The reactor has tripped and SFRCS actuated on a loss of four (4) RCPs.
A loss of AFPT 2 governor speed control and AF 6451, AFW 2 level control valve, failing open is a result of the loss of D2P and is causing an overcooling of the RCS.
INITIATING CUES:
You have been directed by the Shift Supervisor to locally control AFPT 2 speed by manual speed control at the AFPT 2 governor valve, in accordance with DB-OP-06233.
JPM No. 1B Page 9 of 13 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
START TIME:
- 1. PERFORMANCE STEP: Locate the correct procedure.
STANDARD: Identifies Section 5.2 of DB-OP-06233, Auxiliary Feedwater System, as the correct procedure section.
CUE: (if asked) ALL prerequisites have been performed.
SAT UNSAT
- 2. PERFORMANCE STEP: Attempt to unstick governor valve/linkage.
STANDARD: Applies a downward force to the governor valve linkage labeled L1.
CUE: Governor valve moves inward slightly and is NOT STUCK.
SAT UNSAT
- 3. PERFORMANCE STEP: Attempt manual speed control from the Control Room or the Auxiliary Shutdown Panel.
STANDARD: Contacts the Control Room to attempt speed control of AFPT 2.
CUE: Control Room Operator informs you he has no speed control of AFPT 2.
(if necessary) Shift Supervisor directs you to continue with the procedure.
SAT UNSAT
- 4. PERFORMANCE STEP: In AFPT 2 Room, establish communications with the Reactor Operator.
STANDARD: Establish communications with Reactor Operator via Gai-Tronics or radio.
CUE: You have established communications with a Reactor Operator. The Reactor Operator directs you to reduce AFPT 2 speed.
SAT UNSAT
JPM No. 1B Page 10 of 13
- 5. PERFORMANCE STEP: Unscrew and remove the electrical connector on the
........ C ........ face of the governor.
STANDARD: Locates electrical connector and unscrews it.
COMMENT: This step must be performed prior to Step 6.
CUE: The electrical connector is DISCONNECTED.
SAT UNSAT
- 6. PERFORMANCE STEP: Turn the manual speed setting control knob as
........ C ......... appropriate to control AFPT speed/flow as directed by the Reactor Operator.
STANDARD: Locate the manual speed setting knob and adjust to reduce the AFPT speed (CCW direction).
COMMENT: AFPT 2 speed will not change regardless of the examinee's actions.
CUE: AFPT 2 speed remains constant.
(if asked) AFPT speed is 3600 rpm.
SAT UNSAT
- 7. PERFORMANCE STEP: Identify AFPT 2 speed control, using the governor valve, has failed and route to Section 5.4.
STANDARD: Locate the correct procedure section Identifies Section 5.4 of DB-OP-06233, Auxiliary Feedwater System, as correct procedure section.
CUE: (If asked) Shift Supervisor directs you to gain control of AFPT 2 speed.
SAT UNSAT
- 8. PERFORMANCE STEP: Establish communication with Control Room.
STANDARD: Utilize the Gai-Tronics or radio to communicate with the Control Room.
CUE: (If asked) You have established communications with the Control Room.
SAT UNSAT
JPM No. 1B Page 11 of 13
- 9. PERFORMANCE STEP: Unseal the trip throttle valve, ICS 38D.
.. ..... C.........
STANDARD: The trip throttle valve seal disconnected.
CUE: The trip throttle valve seal is DISCONNECTED.
SAT UNSAT
- 10. PERFORMANCE STEP: Close the trip throttle valve, ICS 38D.
........ C .........
STANDARD: Valve handwheel rotated clockwise to CLOSE.
CUE Valve handwheel is rotated FULLY clockwise (to CLOSE).
SAT UNSAT
- 11. PERFORMANCE STEP: Obtain red governor tool and other required tools.
STANDARD: Obtain necessary tools at entrance to AFP room.
COMMENT: Tools may have already been obtained. This step can be performed out of sequence.
CUE: The Red governor tool and other required tools to disconnect linkage have been obtained.
SAT UNSAT
- 12. PERFORMANCE STEP: Disconnect the linkage between the governor and the
........ C ........ governor valve, where the spring meets linkage.
STANDARD: Linkage disconnected where the spring meets the linkage at the second joint from the governor controller with the tools from the emergency hatch cabinet.
CUE: The linkage is DISCONNECTED.
SAT UNSAT
- 13. PERFORMANCE STEP: Block the governor valve, ICS 38A, "full open".
...C...
Ce........
STANDARD: Pull up on L1, put the Red AFPT governor blocking tool in place above the governor rod in red area on linkage.
CUE: Ll has been pulled up.
The block is in place above the governor rod in the Red area.
SAT UNSAT
JPM No. 1B Page 12 of 13
- 14. PERFORMANCE STEP: Slowly open the trip throttle valve, ICS 38D.
. .... ,.C.........
STANDARD: Trip throttle valve, ICS 38D, OPENED by turning the handwheel (slowly) counterclockwise to raise AFPT speed > 600 rpm.
CUE: The trip throttle valve, ICS 38D, handwheel is rotated slowly counterclockwise.
AFPT 2 speed has INCREASED TO 2800 rpm.
SAT UNSAT
- 15. PERFORMANCE STEP: Control the AFPT 2 speed to maintain the required AFW flow.
STANDARD: Ask Control Room for feedback.
CUE: The Control Room Operator directs you to maintain speed at the current value until he can evaluate SG level trend.
SAT UNSAT TERMINATING CUES: This JPM is complete.
END TIME
JPM No. 1 Page 13 of 13 VERIFICATION OF COMPLETION Operator Evaluator SSN Date License: [ ] RO [ ] SRO Validated Completion Time: minutes Actual Completion Time: minutes Acceptable Progress Maintained: Yes No N/A Result: [ ] SATISFACTORY [ I UNSATISFACTORY NOTE: An "Unsatisfactory" requires Comment and will require subsequent remedial training.
Comments/Feedback:
/
Evaluator's Signature Date
DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.: 57 Rev. 06 Page 1 of 6 TASK NO.: 002-008-04-0100 TASK DESCRIPTION: Borate the RCS from Outside the Control Room K/A
REFERENCE:
004-A2.14 3.8/3.9 APPLICABLE METHOD OF TESTING: Simulate performance In-Plant TIME FOR COMPLETION: 20 minutes APPLICABILITY: [XI RO [XI SRO TASK STANDARDS:
- 1. Lineup for boric acid addition using local valves.
- 2. Start BA Pump 1.
REQUIRED MATERIALS:
DB-OP-06001, Boron Concentration Control, Revision 2, C-1 GENERAL
REFERENCES:
DB-OP-06001, Boron Concentration Control, Revision 2, C-l INITIAL CONDITIONS:
The plant is in Mode 1 at 100% power.
A load reduction to 50% power is planned.
INITIATING CUES:
The normal boric acid addition method cannot be used.
You have been directed to add 50 gallons of boric acid to the MUT from outside the CTRM using Boric Acid Pump 1, per DB-OP-06001.
(Hand copy of DB-OP-06001 to examinee.)
JPM No. 57 Page 2 of 6 INITIAL CONDITIONS:
The plant is in Mode 1 at 100% power.
A load reduction to 50% power is planned.
INITIATING CUES:
The normal boric acid addition method cannot be used.
You have been directed to add 50 gallons of boric acid to the MUT from outside the CTRM using Boric Acid Pump 1, per DB-OP-06001.
JPM No. 57 Page 3 of 6 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is assumed unless denoted in the "Comments".
START TIME:
- 1. PERFORMANCE STEP: Locate the correct procedure section.
STANDARD: Identifies DB-OP-06001, Boron Concentration Control, Section 5.1, as the correct procedure section.
COMMENT: Provide correct procedure to examinee. When the correct procedure section has been located, provide the CUE.
CUE: All prerequisites have been completed.
SAT UNSAT
- 2. PERFORMANCE STEP: Verify valve MU 348, Boric Acid Pump 1 Discharge, is open.
STANDARD: Handwheel/stem position indicate OPEN.
CUE: MU 348, valve stem is UP.
SAT UNSAT
- 3. PERFORMANCE STEP: Verify valve WC 394, from Concentrates Storage Tank to BAATs Discharge, is open.
STANDARD: Handwheel/stem position indicate OPEN.
CUE: WC 394, valve stem is UP.
SAT UNSAT
- 4. PERFORMANCE STEP: Verify valve WC 393, Concentrate Storage Tank to MU Filters Line 2, is open.
STANDARD: Handwheel/stem position indicate OPEN.
CUE: WC 393, valve stem is UP.
SAT UNSAT
JPM No. 57 Page 4 of 6
- 5. PERFORMANCE STEP: Verify MU 351, Boric Acid Pump 2 to Makeup Filters open.
STANDARD: MU 351 stem position indicates OPEN.
CUE: MU 351 valve stem is UP.
SAT UNSAT
- 6. PERFORMANCE STEP: Close MU 363, BAAT 1 to Makeup Filters.
........ C .......
STANDARD: Handwheel to the CLOSE position.
COMMENT: MU 363 located between BAATs in CA.
CUE: MU 363 has been rotated clockwise/CLOSED; valve stem is DOWN.
SAT UNSAT
- 7. PERFORMANCE STEP: Open MU 366, BAAT 2 to Makeup Filters.
........ C.......
STANDARD: MU 366 handwheel turned (CCW) until FULLY OPEN.
CUE: MU 366 handwheel has been rotated counterclockwise/OPENED; valve stem is UP.
SAT UNSAT
- 8. PERFORMANCE STEP: Start Boric Acid Pump 1.
.. . .o Co........
STANDARD: BA Pump 1 started from Control Room.
CUE: Control Room Operator has started BA Pump 1.
SAT UNSAT
- 9. PERFORMANCE STEP: Stop Boric Acid Pump 1.
STANDARD: BA Pump 1 is stopped from the Control Room.
CUE: Control Room Operator reports that 50 gallons have been added to the MUT and BA Pump 1 has been stopped.
SAT UNSAT
JPM No. 57 Page 5 of 6
- 10. PERFORMANCE STEP: Close MU 366, BAAT 2 to Makeup Filters.
STANDARD: Restore L/U, MU 366 handwheel turned (CW) until FULLY CLOSED.
CUE: MU 366 handwheel has been rotated clockwise/CLOSED; Valve stem is DOWN.
SAT UNSAT
- 11. PERFORMANCE STEP: Open MU 363, BAAT 1 to Makeup Filters.
STANDARD: Restore L/U, MU 363 handwheel turned (CCW) until FULLY OPEN.
CUE: MU 363 handwheel has been rotated counterclockwise/OPENED: valve stem is UP.
SAT UNSAT TERMINATING CUES: This JPM is complete.
END TIME
JPM No. 57 Page 6 of 6 VERIFICATION OF COMPLETION Operator Evaluator SSN Date License: [ ] RO [ ] SRO Validated Completion Time: minutes Actual Completion Time: minutes Acceptable Progress Maintained: Yes No N/A Result: [ I SATISFACTORY [ I UNSATISFACTORY NOTE: An "Unsatisfactory" requires Comment and will require subsequent remedial training.
Comments/Feedback:
Evaluator's Signature Date