PLA-6388, Fifteenth Refueling Outage Owner'S Activity Report, PLA-6388: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 34: Line 34:
By signing this certificate neither the Inspectornor his employer makes any warranty, expressed or implied, concerning the repair/ replacement activities and evaluations described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
By signing this certificate neither the Inspectornor his employer makes any warranty, expressed or implied, concerning the repair/ replacement activities and evaluations described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
     /    -
     /    -
Is    c r
Is    c r i at Commissions          N/Ay'l            ..      2rj- 'ys                    A.    ~?i~~L~J
                                *-'"
i at Commissions          N/Ay'l            ..      2rj- 'ys                    A.    ~?i~~L~J
                                                         ,                  ..              National Board, State Province, and Endorsements Date
                                                         ,                  ..              National Board, State Province, and Endorsements Date



Latest revision as of 00:41, 13 March 2020

Fifteenth Refueling Outage Owner'S Activity Report, PLA-6388
ML082040625
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 07/07/2008
From: Mckinney B
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-6388
Download: ML082040625 (7)


Text

'~ V Britt T. McKinney PPL Susquehanna, LLC Sr. Vice President & Chief Nuclear Officer 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.3149 Fax 570.542.1504 btmckinney @pplweb.com P P

  • ~ I TM JUL 7 2008 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-PI-17 Washington, DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION UNIT 1 FIFTEENTH REFUELING OUTAGE OWNER'S ACTIVITY REPORT Docket No. 50-387 PLA-6388 The attached report is for the Susquehanna Unit 1 Fifteenth Refueling Outage, which is the first Unit 1 refueling outage for the 2nd Inspection Period of the 3rd Inspection Interval for Unit 1.

The report was prepared and submitted in accordance with the requirements of ASME Code Case N-532-4.

By copy of this letter, we are transmitting the Owner's Activity Report to the Commonwealth of Pennsylvania..

If you have any questions, please contact Mr. Michael H. Crowthers, Manager Nuclear Regulatory Affairs at (610) 774-7766.

Sincerely, B. T. McKinney

Attachment:

Unit 1 Fifteenth Refueling Outage Owner's Activity Report copy: NRC Region I R. Janati, DEP/BRP F. W. Jaxheimer, NRC Sr. Resident Inspector B. K. Vaidya, NRC Project Manager Commonwealth of Pennsylvania Ac~-r7

Susquehanna Form OAR-1 Owner's Activity Report Report Number OAR-1-102 Plant Susquehanna Steam Electric Station, 769 Salem Blvd., Berwick, PA 18603 Unit No. 1 Commercial service date June 8,1983 Refueling outage no. 15 (if applicable)

Current Inspection Interval 3rd (1st, 2nd, 3rd, 4th, other)

Current Inspection Period 2nd (1st, 2nd, 3rd)

Edition and Addenda of Section Xl applicable to the inspection plans 1998 Edition through the 2000 Addenda Date and Revision of inspection plans December 18, 2007, Revision 3 Edition and Addenda of Section XI applicable to replair/ replacement activities, if different than the inspection plans N/A Code Cases used: N-532-4 N-532-4 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of Refueling Outage 15 conform to the requirements of S tion XI.

Signed 4 1, 62/ ,Gen. Manager - Nuclear Engineering Date __ _/ _ _-____ ___

owner orOwners Desigflee. Title CERTIFICATE OF INSERVICE INSPECTION I, the Undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of PENNSYLVANIA and employed by OneCIS Insurance Co. of Houston, TX have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XA.

By signing this certificate neither the Inspectornor his employer makes any warranty, expressed or implied, concerning the repair/ replacement activities and evaluations described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

/ -

Is c r i at Commissions N/Ay'l .. 2rj- 'ys A. ~?i~~L~J

, .. National Board, State Province, and Endorsements Date

Susquehanna TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRE EVALUATIONS FOR CONTINUED SERVICE Examination Category and Item number Item Description Evaluation Description None Page 1 of]

Susquehanna TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE V'

Item Description Date Repair/Replacement Code Class Description of Work Completed Plan Number 3 4 NPS, HRC3-2 ESW pipe leak Replaced pipe section 6/14/2006 06-024-784934-072 Form R-2 Report of Alteration:

07-147-870306-05 Re-Rate, Feedwater Heater IE 105A 07-147-870319-06 Re-Rate, Feedwater Heater IEl 05B 07-147-870974-07 Re-Rate, Feedwater Heater 1E105C 07-147-912975-016 Re-analyze wall thickness, Feedwater Heater 1El105A 07-147-912975-017 Re-analyze wall thickness, Feedwater Heater lE 105C Page 1 of I

rLI-tA-uJoo - '>'WIIUI S IALAIVILY I-,CpuiL 101 UIe UI 1311 5fI . ragei rage i oiT i

'?(- A- (- Z,-ý 7 O'Rourke, Brenda W From: Crowthers, Michael H Sent: Sunday, June 29, 2008 8:15 PM To: O'Rourke, Brenda W

Subject:

RE: PLA-6388 - Owner's Activity Report for the Ul 15th RFO no comment.

Mike From: O'Rourke, Brenda W Sent: Wed 6/25/2008 4:40 PM To: Crowthers, Michael H; Wehry, Richard R

Subject:

PLA-6388 - Owner's Activity Report for the Ul 15th RFO

Folks, Attached is the annual Owner's Activity Report (OAR) for the Unit 1 15th RFO. This report is due to the NRC by 7/15/08. Please review the attached PLA and provide comments on the attached review sheet. Comments are due by 7/1/08.

Thank You, Brenda

<<OAR Report for 2008.pdf>> <<PLA-6388 for OAR - 2008 Unit 1.doc>> <<PLA-6388 review sheet.doc>>

6/30/2008

OUTGOING NRC CORRESPONDENCE REVIEW PLA -6388 RELEASE DUE DATE To NRC: 7/15/2008 ORIGINATOR: Brenda O'Rourke

SUBJECT:

UNIT 1 FIFTEENTH REFUELING OUTAGE OWNER'S ACTIVITY REPORT AFFIDAVIT: [: YES [ No VERIFICATION: E] REQUIRED E] REQUESTED E N/A FORM(S) NDAP-QA-0104-1 ATTACHED: LI YES Z N/A NEW OR REVISED REGULATORY COMMITMENTS: (USE CONTINUATION PAGE, IF NEEDED)

NO COMMITMENTS DISTRIBUTION 1 - REVIEW DUE DATE: July 1, 2008 LI M.H. Crowthers LI EI LI j R. R. Wehry Ei El LI DISTRIBUTION 2 - REVIEW DUE DATE: July 7, 2008 ni R. D. Pagodin EI LJ IIEl COMMENTS: (USE CONTINUATION PAGE, IF NEEDED) RESOLUTION: (USE CONTINUATION PAGE, IF NEEDED)

No comments tf! -

COMMENTS PROVIDED BY: R.R. Wehry 6/26/2008 CO)PENT*ESOIVED BY:

SIGNATURE DATE I SIGNATURE DATE Signature indicates technical adequacy and completeness, Signature indicates that comments have been resolved overall suitability and appropriateness of commitments, satisfactorily or that any disagreement between comment integrated effects of the letter meets the letter objective and resolution that can't be resolved by the correspondence except as noted in comments. due date will be brought to the attention of the signer of the correspondence to allow further resolution, if appropriate.

Form NDAP-QA-0729-1, Rev. 9, Page 1 of 2 (Electronic Form)

OUTGOING NRC CORRESPONDENCE REVIEW PLA -6388 RELEASE DUE DATE To NRC: 7/15/2008 ORIGINATOR: Brenda O'Rourke

SUBJECT:

UNIT 1 FIFTEENTH REFUELING OUTAGE OWNER'S ACTIVITY REPORT AFFIDAVIT: El YES E No VERIFICATION: El REQUIRED E] REQUESTED . N/A FORM(S) NDAP-QA-0104-1 ATTACHED: 13 YES [ N/A NEW OR REVISED REGULATORY COMMITMENTS: (USE CONTINUATION PAGE, IF NEEDED)

NO COMMITMENTS DISTRIBUTION 1 - REVIEW DUE DATE: July 1, 2008 F1 M.H. Crowthers D3 LI El El R.R. Wehry E3 0I 13 DISTRIBUTION 2 - REVIEW DUE DATE: July 7, 2008 E R. D. Pagodin El El LI []

COMMENTS: (USE CONTINUATION PAGE, IF NEEDED) RESOLUTION: (USE CONTINUATION PAGE, IFNEEDEDI

-GQ

-- $WENTSPROVIDED BY: COMvMENTS RESOLVED BY:

, SIGNATURE "ATE I

  • SIGNATURE DATE Signature indicates technical adequacy and completeness, Signature indicates that comments have been resolved overall suitability and appropriateness of commitments, satisfactorily or that any disagreement between comment integrated effects of the letter meets the letter objective and resolution that can't be resolved by the correspondence except as noted in comments. due date will be brought to the attention of the signer of the correspondence to allow further resolution, if appropriate.

Form NDAP-QA-0729-1, Rev. 9, Page 1 of 2 (Electronic Form)