| issue date = 08/11/2010 | | issue date = 08/11/2010 | ||
| title = | | title = Lr - Draft Telecon Summary 08-03-10 Scoping/Screening and AMR | ||
| author name = | | author name = | ||
| author affiliation = NRC/NRR | | author affiliation = NRC/NRR | ||
Line 47: | Line 47: | ||
As stated cc w/encls: Distribution via Listserv | As stated cc w/encls: Distribution via Listserv | ||
OFFICE LA:DLR PM:RPB2:DLR BC:RPB2:DLR PM:RPB2:DLR NAME NFerrer DWrona NFerrer DATE / /10 / /10 / /10 / /10 | OFFICE LA:DLR PM:RPB2:DLR BC:RPB2:DLR PM:RPB2:DLR NAME NFerrer DWrona NFerrer DATE / /10 / /10 / /10 / /10 TELEPHONE CONFERENCE CALL DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS AUGUST 3, 2010 PARTICIPANTS AFFILIATIONS Nate Ferrer U.S. Nuclear Regulatory Commission (NRC) | ||
TELEPHONE CONFERENCE CALL DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS AUGUST 3, 2010 PARTICIPANTS AFFILIATIONS Nate Ferrer U.S. Nuclear Regulatory Commission (NRC) | |||
Stan Gardocki NRC Garry Armstrong NRC Rachel Vaucher NRC Yogen Garud Argonne National Laboratory Terry Grebel Pacific Gas and Electric Company (PG&E) | Stan Gardocki NRC Garry Armstrong NRC Rachel Vaucher NRC Yogen Garud Argonne National Laboratory Terry Grebel Pacific Gas and Electric Company (PG&E) | ||
Philippe Soenen PG&E Kyle Duke PG&E Chris Beard PG&E Chalmer Myer Strategic Teaming And Resource Sharing (STARS) | Philippe Soenen PG&E Kyle Duke PG&E Chris Beard PG&E Chalmer Myer Strategic Teaming And Resource Sharing (STARS) |
Latest revision as of 19:51, 11 March 2020
ML102530489 | |
Person / Time | |
---|---|
Site: | Diablo Canyon ![]() |
Issue date: | 08/11/2010 |
From: | Office of Nuclear Reactor Regulation |
To: | Division of License Renewal |
References | |
Download: ML102530489 (6) | |
Text
DiabloCanyonNPEm Resource From: Ferrer, Nathaniel Sent: Wednesday, August 11, 2010 2:44 PM To: Grebel, Terence; Soenen, Philippe R Cc: DiabloHearingFile Resource
Subject:
Draft Telecon Summary 08-03-10 Scoping/Screening and AMR Attachments: Telecon Summary 08-03-10 S&S and AMR.doc Terry & Philippe, Attached is a draft of the Teleconference Call Summary from 8/3/2010. Please review and let me know if there are any corrections/changes needed.
Please let me know if you have any questions.
Nathaniel Ferrer Project Manager Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission (301)4151045 1
Hearing Identifier: DiabloCanyon_LicenseRenewal_NonPublic Email Number: 1164 Mail Envelope Properties (Nathaniel.Ferrer@nrc.gov20100811144400)
Subject:
Draft Telecon Summary 08-03-10 Scoping/Screening and AMR Sent Date: 8/11/2010 2:44:04 PM Received Date: 8/11/2010 2:44:00 PM From: Ferrer, Nathaniel Created By: Nathaniel.Ferrer@nrc.gov Recipients:
"DiabloHearingFile Resource" <DiabloHearingFile.Resource@nrc.gov>
Tracking Status: None "Grebel, Terence" <TLG1@PGE.COM>
Tracking Status: None "Soenen, Philippe R" <PNS3@PGE.COM>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 407 8/11/2010 2:44:00 PM Telecon Summary 08-03-10 S&S and AMR.doc 77818 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
LICENSEE: Pacific Gas and Electric Company FACILITY: Diablo Canyon Nuclear Power Plant, Units 1 and 2
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON AUGUST 3, 2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PACIFIC GAS AND ELECTRIC COMPANY CONCERNING DRAFT REQUEST FOR ADDITIONAL INFORMATION RELATED TO THE DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION SCOPING AND SCREENING AND AGING MANAGEMENT REVIEW The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Pacific Gas and Electric Company (PG&E) held a telephone conference call on August 3, 2010, to obtain clarification on the staffs draft request for additional information (D-RAI) regarding the Diablo Canyon Nuclear Power Plant license renewal application (LRA).
By e-mail dated July 22, 2010, the staff sent D-RAIs to PG&E regarding scoping and screening and aging management review. PG&E reviewed the information contained therein, and requested a telephone conference call. The telephone conference call was useful in clarifying the intent of the staffs D-RAIs. Enclosure 2 provides discussions on D-RAIs for which the applicant requested clarification. No changes to other D-RAIs were necessary as a result of this telephone conference call. Formal RAIs will be issued by a separate letter. provides a listing of the participants.
The applicant had an opportunity to comment on this summary.
Nathaniel Ferrer, Safety Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323
Enclosures:
As stated cc w/encls: Distribution via Listserv
OFFICE LA:DLR PM:RPB2:DLR BC:RPB2:DLR PM:RPB2:DLR NAME NFerrer DWrona NFerrer DATE / /10 / /10 / /10 / /10 TELEPHONE CONFERENCE CALL DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS AUGUST 3, 2010 PARTICIPANTS AFFILIATIONS Nate Ferrer U.S. Nuclear Regulatory Commission (NRC)
Stan Gardocki NRC Garry Armstrong NRC Rachel Vaucher NRC Yogen Garud Argonne National Laboratory Terry Grebel Pacific Gas and Electric Company (PG&E)
Philippe Soenen PG&E Kyle Duke PG&E Chris Beard PG&E Chalmer Myer Strategic Teaming And Resource Sharing (STARS)
Dave Kunsemiller STARS Al Saunders STARS Ken Bryant STARS Enclosure 1
Diablo Canyon Nuclear Power Plant, Units 1 and 2 License Renewal Application Draft Request for Additional Information Scoping and Screening/Aging Management Review D-RAI 2.3.3.4-01 On LRA drawings LR-DCPP-14-106714-03 and LR-DCPP-14-107714-03, the applicant depicts the label stuffing box at locations 31-C, 33-C, and 35-C, but the components are not shown.
On the LRA AMR Table 2.3.3-4 for the component cooling water (CCW) system, the stuffing box component is not listed. The staff requests that the applicant justify the exclusion of the stuffing box from LRA Table 2.3.3-4.
Discussion: Based on discussion with the applicant, it was determined that the stuffing box for the pumps were within the scope of license renewal and covered within the pump component type in LRA Table 2.3.3-4. Therefore, this question is withdrawn and will not be sent as a formal RAI.