ML18153B875: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 31: Line 31:
i-M(1 ), R(2) ( 1) Remote manual undervoltage trip 1 i
i-M(1 ), R(2) ( 1) Remote manual undervoltage trip 1 i
: 37. Safety Injection Input from ESF        N.A.        N.A.          R
: 37. Safety Injection Input from ESF        N.A.        N.A.          R
: 38. Reactor Coolant Pump Breaker          N.A.        N.A.          R Position Trip
: 38. Reactor Coolant Pump Breaker          N.A.        N.A.          R Position Trip I
                                                                                                            ......
CXl
I CXl
                                                                                                             ~}}
                                                                                                             ~}}

Latest revision as of 22:54, 2 February 2020

Proposed Tech Specs,Correcting Error Associated W/Reactor Trip Bypass Breaker Testing
ML18153B875
Person / Time
Site: Surry  Dominion icon.png
Issue date: 09/01/1989
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML18153B874 List:
References
NUDOCS 8909120002
Download: ML18153B875 (2)


Text

e ATTACHMENT 2 PROPOSED TECHNICAL SPECIFICATION CHANGE SURRY POWER STATION UNITS 1 AND 2 REACTOR TRIP BYPASS BREAKER TESTING

TABLE 4.1-1 . ...

MINIMUM FREQUENCIES FOR CHECK, CALIBRATIONS, AND TEST OF INSTRUMENT CHANNELS Channel Description Check Calibrate Test Remarks

33. Loss of Power
a. 4.16 KV Emergency Bus Under- N.A. R M voltage (Loss of Voltage)
b. 4.16 KV Emergency Bus Under- N.A. R M
34. Deleted
35. Manual Reactor Trip N.A. N.A. R The test shall independently verify the operability of the undervoltage and shunt trip attachments for the manual reactor trip function. The test shall also verify the opera-bility of the bypass breaker trip circuit.
36. Reactor Trip Bypass Breaker N.A. N.A.

prior to placing breaker service.

(2) Automatic undervoltage trip.

i-M(1 ), R(2) ( 1) Remote manual undervoltage trip 1 i

37. Safety Injection Input from ESF N.A. N.A. R
38. Reactor Coolant Pump Breaker N.A. N.A. R Position Trip I

CXl

~