e ATTACHMENT 2 PROPOSED TECHNICAL SPECIFICATION CHANGE SURRY POWER STATION UNITS 1 AND 2 REACTOR TRIP BYPASS BREAKER TESTING
TABLE 4.1-1 MINIMUM FREQUENCIES FOR CHECK, CALIBRATIONS, AND TEST OF INSTRUMENT CHANNELS Channel Description
- 33.
Loss of Power
- a.
4.16 KV Emergency Bus Under-voltage (Loss of Voltage)
- b.
4.16 KV Emergency Bus Under-
- 34.
Deleted
- 35.
- 36.
Reactor Trip Bypass Breaker
- 37.
Safety Injection Input from ESF
- 38.
Reactor Coolant Pump Breaker Position Trip Check N.A.
N.A.
N.A.
N.A.
N.A.
N.A.
Calibrate Test Remarks R
R N.A.
N.A.
N.A.
N.A.
M M
R The test shall independently verify the operability of the undervoltage and shunt trip attachments for the manual reactor trip function.
The test shall also verify the opera-bility of the bypass breaker trip circuit.
M(1 ), R(2) ( 1) Remote manual undervoltage prior to placing breaker service.
trip 1 i-i R
R (2) Automatic undervoltage trip.
I CXl
~