ML19210D062: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 20: Line 20:
(7-77) o LICENSEE EVENT REPORT CONTROL BLOCo                    l      l    l        l      lh                (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) lo lil8 9I Nl Yl Jl A Fl lj@bl 0                        1#    15
(7-77) o LICENSEE EVENT REPORT CONTROL BLOCo                    l      l    l        l      lh                (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) lo lil8 9I Nl Yl Jl A Fl lj@bl 0                        1#    15
                                                                                 - l 0 -l 0      O ! O l - l O ! 0 l 250 @l26 4 l LICENSE LICENSE NUVBER 1 l 1 lTYPE    1 l JO I l@l57        l CM 58 l@
                                                                                 - l 0 -l 0      O ! O l - l O ! 0 l 250 @l26 4 l LICENSE LICENSE NUVBER 1 l 1 lTYPE    1 l JO I l@l57        l CM 58 l@
7                          LICENSEE CODE CON'T
7                          LICENSEE CODE CON'T 7
                          "
o    i 8
7 o    i 8
s$n$        60 Ll@61015 l 0DO2KET            O!NUV8ER 01 3 3131@l    68  69 IEVENT l 0 DATE 2lSI719 @l111III6171 74        75        REPORT DATE 9@
s$n$        60 Ll@61015 l 0DO2KET            O!NUV8ER 01 3 3131@l    68  69 IEVENT l 0 DATE 2lSI719 @l111III6171 74        75        REPORT DATE 9@
80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h OI2 l                SEE ATTACHMENT                                                                                                                                                        l o    3 i O    4      1                                                                                                                                                                              1 O    s l                                                                                                                                                                                  l l
80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h OI2 l                SEE ATTACHMENT                                                                                                                                                        l o    3 i O    4      1                                                                                                                                                                              1 O    s l                                                                                                                                                                                  l l
Line 28: Line 27:
o    9 8
o    9 8
l Al Bl@
l Al Bl@
9          10          11 E @ l Fl@ lV l A L lV lE lX @ lX@ lHlh 12            13                            18          in                20 SEQUENTIAL              ,      OCCURRENCE            REFORT                        REVISION
9          10          11 E @ l Fl@ lV l A L lV lE lX @ lX@ lHlh 12            13                            18          in                20 SEQUENTIAL              ,      OCCURRENCE            REFORT                        REVISION EVENT YE AR                                REPORT NO                            CODE                TYPE                              NO.
* EVENT YE AR                                REPORT NO                            CODE                TYPE                              NO.
O lLER ROEp,0          l7l9l                  l-l            l0l9l4l                l/            l 013 l                    Ll          l-l            [0_j
O lLER ROEp,0          l7l9l                  l-l            l0l9l4l                l/            l 013 l                    Ll          l-l            [0_j
_ 21          22          23            24            26      27            28    , . 29          30                31            32 TAKE        A T ON              O PLANT              ETH                    HOURS            S 8 IT D        FCFP [UB.          SUPP LI E              MAN FACTURER U@[_2_j@
_ 21          22          23            24            26      27            28    , . 29          30                31            32 TAKE        A T ON              O PLANT              ETH                    HOURS            S 8 IT D        FCFP [UB.          SUPP LI E              MAN FACTURER U@[_2_j@
Line 36: Line 34:
0l0l 40 lY l@
0l0l 40 lY l@
41 lYlh 42 IAl@ lC 2l8I5l@
41 lYlh 42 IAl@ lC 2l8I5l@
43              44                    47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS i    O      I          SEE ATTACHMENT                                                                                                                                                      l 1    1      l li I ?l l                                                                                                                                                                                      l
43              44                    47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS i    O      I          SEE ATTACHMENT                                                                                                                                                      l 1    1      l li I ?l l                                                                                                                                                                                      l 1  3      1 11 141 1 7          8 9                                                                                                                                                                              80 ST      S            % POWER                        OTHE R STATUS              OISCOV RY                              DISCOVERY DESCRIPTION i    5 Uh                  1 0l0lh                    NA                      l    lBl@l                  SURVElLLANCE TEST                                                    j ACTIVITY        CONTENT RELEASED OF RE LE ASE                          AMOUNT OF ACTIVITY                                                      LOCATION OF RELEASE NA                                    l                      NA                                                                          l li 1618 9[z_J @ l10z l@
.
1  3      1
                                    -
11 141 1
                                                                                                                        '
7          8 9                                                                                                                                                                              80 ST      S            % POWER                        OTHE R STATUS              OISCOV RY                              DISCOVERY DESCRIPTION i    5 Uh                  1 0l0lh                    NA                      l    lBl@l                  SURVElLLANCE TEST                                                    j ACTIVITY        CONTENT RELEASED OF RE LE ASE                          AMOUNT OF ACTIVITY                                                      LOCATION OF RELEASE NA                                    l                      NA                                                                          l li 1618 9[z_J @ l10z l@
7                                            11                                          44          45                                                                                    80 PERSONNEL E MPOSURES NUYBER                              DESCRIPTION i 7
7                                            11                                          44          45                                                                                    80 PERSONNEL E MPOSURES NUYBER                              DESCRIPTION i 7
[0 10 01 @ lTYPE                  l        @l        NA
[0 10 01 @ lTYPE                  l        @l        NA PERSONNEL,N;uWitS Nuv8ER                DESCRIPTION                @
    '          " *                    ''
PERSONNEL,N;uWitS
                                                              "                                                                                                                                  "
Nuv8ER                DESCRIPTION                @
i    8 8 9 l0 0l 0l@[                            NA                                                                                                                                      l 7                                  11      12                                                                                                                                              80 LC S OF CH DAMAGE TO FACILITY                                                                                                                        pC TYPE        DESCRIPTION                                                                                                          i      f
i    8 8 9 l0 0l 0l@[                            NA                                                                                                                                      l 7                                  11      12                                                                                                                                              80 LC S OF CH DAMAGE TO FACILITY                                                                                                                        pC TYPE        DESCRIPTION                                                                                                          i      f
                                                                                                                                                                         }}
                                                                                                                                                                         }}
7 1 9 8
7 1 9 8
d @l
d @l
                     '3          10 NA
                     '3          10 NA 80 l
                                                                                                                                                            -
80 l
PUB L ICI T Y NRC USE ONLY
PUB L ICI T Y NRC USE ONLY
* 2 O          [!1_j ISSUED        l        @    DESCRIPTION NA                                                                                                        l        l l I l I l l l l I l l *4 i  7          8 9              10                                                                                                                    68 69                                    80 &
* 2 O          [!1_j ISSUED        l        @    DESCRIPTION NA                                                                                                        l        l l I l I l l l l I l l *4 i  7          8 9              10                                                                                                                    68 69                                    80 &
NAME OF PREPARER                        W. Verne ChiIds                                            PHCNE:            (31        342-1840                          {'
NAME OF PREPARER                        W. Verne ChiIds                                            PHCNE:            (31        342-1840                          {'
.
7 9112 00 i h
7 9112 00 i h


e
e POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT DOCKET N0. 50-333 ATTACHMENT TO LCR 79-094/03L-0                                Page 1 of 1 During normal operations while conducting Operations Surveillance Test F-ST-76J14, titled " Smoke and Heat Detector Functional Tests -
                                -
.
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT DOCKET N0. 50-333 ATTACHMENT TO LCR 79-094/03L-0                                Page 1 of 1 During normal operations while conducting Operations Surveillance Test F-ST-76J14, titled " Smoke and Heat Detector Functional Tests -
North Cable Room," the master valve associated with the ten ton Cardox system did not open fully. The testing was being conducted to satisfy the requirements of Technical Specifications, Appendix A, Paragraphs 4.12.C.1 and 4.12.E. Continuous fire watch personnel, equipped with portable fire extinguishing equipment were posted for the areas served by the ten ton unit until repair and testing could be completed. The event did not represent a significant hazard to the public health and safety.
North Cable Room," the master valve associated with the ten ton Cardox system did not open fully. The testing was being conducted to satisfy the requirements of Technical Specifications, Appendix A, Paragraphs 4.12.C.1 and 4.12.E. Continuous fire watch personnel, equipped with portable fire extinguishing equipment were posted for the areas served by the ten ton unit until repair and testing could be completed. The event did not represent a significant hazard to the public health and safety.
Disassembly and inspection of the valve revealed that the valve packing had hardened due to age and restricted the valve travel. Follow-ing replacement of the packing, proper operation of the valve was verified by successful completion of F-ST-76J14 and the system was returned to service approximately two-hours after discovery of the problem.
Disassembly and inspection of the valve revealed that the valve packing had hardened due to age and restricted the valve travel. Follow-ing replacement of the packing, proper operation of the valve was verified by successful completion of F-ST-76J14 and the system was returned to service approximately two-hours after discovery of the problem.
                                              .
                                                      $
    .
                                                                   /
                                                                   /
3 e}}
3 e}}

Latest revision as of 04:25, 2 February 2020

LER 79-094/03L-0:on 791025,while Conducting Operations Surveillance Test F-ST-76J14,master Valve on 10-ton Cardox Sys Did Not Fully Open.Caused by Hardening of Valve Packing. Repacking of Valve Corrected Problem
ML19210D062
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 11/16/1979
From: W. Verne Childs
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19210D057 List:
References
LER-79-094-03L, LER-79-94-3L, NUDOCS 7911200487
Download: ML19210D062 (2)


Text

. . . . . . . - . . . . . . . . . . . . . . - . . . . . . . . . . . . . .

(7-77) o LICENSEE EVENT REPORT CONTROL BLOCo l l l l lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) lo lil8 9I Nl Yl Jl A Fl lj@bl 0 1# 15

- l 0 -l 0 O ! O l - l O ! 0 l 250 @l26 4 l LICENSE LICENSE NUVBER 1 l 1 lTYPE 1 l JO I l@l57 l CM 58 l@

7 LICENSEE CODE CON'T 7

o i 8

s$n$ 60 Ll@61015 l 0DO2KET O!NUV8ER 01 3 3131@l 68 69 IEVENT l 0 DATE 2lSI719 @l111III6171 74 75 REPORT DATE 9@

80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h OI2 l SEE ATTACHMENT l o 3 i O 4 1 1 O s l l l

l 0 l6 l l 0 7 l 0 H l l 7 8 9 80 SYSTEM CAUSE CAUSE C O'.? P. VALVE CODE CODE SU8 CODE COYPONENT CODE SU8 CODE SUBCODE 7

o 9 8

l Al Bl@

9 10 11 E @ l Fl@ lV l A L lV lE lX @ lX@ lHlh 12 13 18 in 20 SEQUENTIAL , OCCURRENCE REFORT REVISION EVENT YE AR REPORT NO CODE TYPE NO.

O lLER ROEp,0 l7l9l l-l l0l9l4l l/ l 013 l Ll l-l [0_j

_ 21 22 23 24 26 27 28 , . 29 30 31 32 TAKE A T ON O PLANT ETH HOURS S 8 IT D FCFP [UB. SUPP LI E MAN FACTURER U@[_2_j@

33 34 W@

35 36 Zl@ l0l0 3/

0l0l 40 lY l@

41 lYlh 42 IAl@ lC 2l8I5l@

43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS i O I SEE ATTACHMENT l 1 1 l li I ?l l l 1 3 1 11 141 1 7 8 9 80 ST S  % POWER OTHE R STATUS OISCOV RY DISCOVERY DESCRIPTION i 5 Uh 1 0l0lh NA l lBl@l SURVElLLANCE TEST j ACTIVITY CONTENT RELEASED OF RE LE ASE AMOUNT OF ACTIVITY LOCATION OF RELEASE NA l NA l li 1618 9[z_J @ l10z l@

7 11 44 45 80 PERSONNEL E MPOSURES NUYBER DESCRIPTION i 7

[0 10 01 @ lTYPE l @l NA PERSONNEL,N;uWitS Nuv8ER DESCRIPTION @

i 8 8 9 l0 0l 0l@[ NA l 7 11 12 80 LC S OF CH DAMAGE TO FACILITY pC TYPE DESCRIPTION i f 7 1 9 8 d @l

                   '3           10 NA 80 l

PUB L ICI T Y NRC USE ONLY

  • 2 O [!1_j ISSUED l @ DESCRIPTION NA l l l I l I l l l l I l l *4 i 7 8 9 10 68 69 80 &

NAME OF PREPARER W. Verne ChiIds PHCNE: (31 342-1840 {' 7 9112 00 i h

e POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT DOCKET N0. 50-333 ATTACHMENT TO LCR 79-094/03L-0 Page 1 of 1 During normal operations while conducting Operations Surveillance Test F-ST-76J14, titled " Smoke and Heat Detector Functional Tests - North Cable Room," the master valve associated with the ten ton Cardox system did not open fully. The testing was being conducted to satisfy the requirements of Technical Specifications, Appendix A, Paragraphs 4.12.C.1 and 4.12.E. Continuous fire watch personnel, equipped with portable fire extinguishing equipment were posted for the areas served by the ten ton unit until repair and testing could be completed. The event did not represent a significant hazard to the public health and safety. Disassembly and inspection of the valve revealed that the valve packing had hardened due to age and restricted the valve travel. Follow-ing replacement of the packing, proper operation of the valve was verified by successful completion of F-ST-76J14 and the system was returned to service approximately two-hours after discovery of the problem.

                                                                  /

3 e}}