ML19242A874: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 20: Line 20:
                                                                                                   ~
                                                                                                   ~
(7 77)
(7 77)
LICENSEE EVENT REPORT CONTROL BLOCK: l                      l      l      l      l      l                                  (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)
LICENSEE EVENT REPORT CONTROL BLOCK: l                      l      l      l      l      l                                  (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 0    1 N IY lJ l A lF                      114l@[p l0 - l0                              0        0    0l _        o    0lel@l4                              1l1l1                  lj@l          l    l@
''
6  3        LICE *.SE E CODE                        15                            LIC E'.SE NuY 6 E R                            h          26            L ;ENSE T 4 PE JJ              Si L A I 58 CON'T 0  1 d
0    1 N IY lJ l A lF                      114l@[p l0 - l0                              0        0    0l _        o    0lel@l4                              1l1l1                  lj@l          l    l@
6  3        LICE *.SE E CODE                        15                            LIC E'.SE NuY 6 E R                            h          26            L ;ENSE T 4 PE JJ              Si L A I 58 CON'T
,,
0  1 d
OR qc 60 Ll@l0l5      61 J l 0 10 l 3 3 l3 l@l 630 7EVl1ENT11 DOC K ET NU* *B E R                      bd                        O ATE l
OR qc 60 Ll@l0l5      61 J l 0 10 l 3 3 l3 l@l 630 7EVl1ENT11 DOC K ET NU* *B E R                      bd                        O ATE l
                                                                                                                                                            '
a dl0 18HEPORT 14        75 l0 l2DATE'7      l9 lh 80 EVENT DESCRIPTION                  Please      AND  See PROtuBLE AttaChaent          CCNSEQUENCES h g  7 l o l 31 1                                                                                                                                                                                                                      I o  4      l                                                                                          __
a dl0 18HEPORT 14        75 l0 l2DATE'7      l9 lh 80 EVENT DESCRIPTION                  Please      AND  See PROtuBLE AttaChaent          CCNSEQUENCES h g  7 l o l 31 1                                                                                                                                                                                                                      I o  4      l                                                                                          __
O  5      l                                                                                                                                                                                                              1
O  5      l                                                                                                                                                                                                              1
Line 33: Line 28:
0  6      l                                                                                                                                                                                                              !
0  6      l                                                                                                                                                                                                              !
oIi        l                                                                                                                                                                                                              i O14 OO 7          8 9 S Y S T E '.1            CAUSE              CALSE                                                                            C O*.i P                VALVE CODE                    CODE            SUBCODE                          COYPONENT CODE                                SUBCCDE                SU8 CODE l0l9I 7          6 I: I: l@ l ^1@ IC l@ 1:I:1:I:1:12l@
oIi        l                                                                                                                                                                                                              i O14 OO 7          8 9 S Y S T E '.1            CAUSE              CALSE                                                                            C O*.i P                VALVE CODE                    CODE            SUBCODE                          COYPONENT CODE                                SUBCCDE                SU8 CODE l0l9I 7          6 I: I: l@ l ^1@ IC l@ 1:I:1:I:1:12l@
9            'O            11                  12                    13                                      18
9            'O            11                  12                    13                                      18 13 l@ L:J @        20
:
13 l@ L:J @        20
_                                                    S E Qt:E *.T I A L                          OCCUR P E NCE                      REPOHT                            R E VISiO N LE R RO      EVENT vE AR                                        R E PCH T NO.                                      CODE                          TYPE                                NO.
_                                                    S E Qt:E *.T I A L                          OCCUR P E NCE                      REPOHT                            R E VISiO N LE R RO      EVENT vE AR                                        R E PCH T NO.                                      CODE                          TYPE                                NO.
O .ly.g I7l91                          22
O .ly.g I7l91                          22
Line 46: Line 39:
h            43
h            43
:      lh l: lq l0 l9 lh 44              47 CAUSE DESCRIPTION AND CORRECTIVE ACTICNS h
:      lh l: lq l0 l9 lh 44              47 CAUSE DESCRIPTION AND CORRECTIVE ACTICNS h
[.      - l                                      Please See Att ach',ent
[.      - l                                      Please See Att ach',ent 1          f l
                                                            -
l'I II
                                                                                                                        -
                                                                                                                                                                                  -
1          f
__
l l'I II
       '  'i l 1 4      l 7        a 9                                                                                                                                                                                                              Bo ST      5            % POV.E R                          OTHER STATUS                              S:0    RY                                        DISCON THY DESCRrPTION 1
       '  'i l 1 4      l 7        a 9                                                                                                                                                                                                              Bo ST      5            % POV.E R                          OTHER STATUS                              S:0    RY                                        DISCON THY DESCRrPTION 1
5l                                                                      NA                            l    l45B l@l4o          Surveillance Test                                                                    l 7          3 - G @ l0l0l0 @
5l                                                                      NA                            l    l45B l@l4o          Surveillance Test                                                                    l 7          3 - G @ l0l0l0 @
ACTry Tv
ACTry Tv CON T E NT 12        13                                        44                                                                                            -                80 PELEASED OF AELE ASE                              AYOJNT OF ACTIVITY                                                                                  LOCATION OF RE LE ASE 1  6                        l:                                            NA                                                                    NA                                                                      !
_
CON T E NT 12        13                                        44                                                                                            -                80 PELEASED OF AELE ASE                              AYOJNT OF ACTIVITY                                                                                  LOCATION OF RE LE ASE 1  6                        l:                                            NA                                                                    NA                                                                      !
hEuSCNN L E xP NLYaE a                TYPE IES L SC M I P TI ON
hEuSCNN L E xP NLYaE a                TYPE IES L SC M I P TI ON
(        s h 7
(        s h 7
1
1
          '
                 @l0 OJ 3 : GL      11      12                13 NA 80 9E nSca. ,E t iN;UniE S
            ,
                 @l0 OJ 3 : GL      11      12                13 NA
                                                                                                                                                    ,
80
                                                                                                                                                                                                                                !
9E nSca. ,E t iN;UniE S
                                                                            '
__fqEn                DE SCRIP TION                                                                                                        _
__fqEn                DE SCRIP TION                                                                                                        _
7 i
7 i
1  7 0
1  7 0
l0l0l@l
l0l0l@l 11      ''
* 11      ''
NA                                    ~7% GS iO F3 Q^p-r Omm 6 80 l
NA                                    ~7% GS iO F3 Q^p-r Omm 6
                                                                                                                                                                                                  .
                                                                                                                                                                                                      --
80 l
                                                                                                                                     ' < p{ p ,
                                                                                                                                     ' < p{ p ,
elu6a y m i- .; O s On DAYAbE TO F ACILITY                                                                                                  '
elu6a y m i- .; O s On DAYAbE TO F ACILITY                                                                                                  '
h,
h,
{                                            t w v .'u,L
{                                            t w v .'u,L
                                                                                                                                                                                  -
                                                                                                                                                                                            ,,.
     ,          jp;g[e="'P7                                                    s.,                                    J 7          :s 3            1)
     ,          jp;g[e="'P7                                                    s.,                                    J 7          :s 3            1)
PUBLICITY                                                                                                                                                                        NRC USE ONL Y C b ( ~[
PUBLICITY                                                                                                                                                                        NRC USE ONL Y C b ( ~[
                                                      '
l' _ E D      L                                                                                                                                                                                                      f.
l' _ E D      L                                                                                                                                                                                                      f.
2  o      l N jhl ESCP'PTION                                              NA
2  o      l N jhl ESCP'PTION                                              NA I        ll      llll            IllIII t          d 3              10                                                                                                                                                      G8 69                                80 &
                                                                                                                                                                        '
N A *.M O F P R E P A n E R                                                                                                    PHONE-
I        ll      llll            IllIII t          d 3              10                                                                                                                                                      G8 69                                80 &
* N A *.M O F P R E P A n E R                                                                                                    PHONE-


_
POWER AUT110RITY OF TIIE STATE OF NEh' YORK JAMES A. FIT 2 PATRICK NUCLEAR POWER PLANT DOCKET NO. 50-333 ATTACIIMENT TO LER 79-041/03L-0                      Page _1      of    1 While in a cold shutdown co'idition, during the conduct of Instrument Surveillance Procedure F-ISP-15 titled "Drywell Equipment Drain Sump Functional Test and Cali-bration", the Technicians performing the test noted that the procedure was in error.
  -
POWER AUT110RITY OF TIIE STATE OF NEh' YORK JAMES A. FIT 2 PATRICK NUCLEAR POWER PLANT DOCKET NO. 50-333
.
ATTACIIMENT TO LER 79-041/03L-0                      Page _1      of    1 While in a cold shutdown co'idition, during the conduct of Instrument Surveillance Procedure F-ISP-15 titled "Drywell Equipment Drain Sump Functional Test and Cali-bration", the Technicians performing the test noted that the procedure was in error.
The procedure was immediately corrected, however, investigation revealed that earlier surveillance was conducted on a monthly basis from December, 1978 through June, 1979 utilizing the procedure containing the error.          The procedural error was a result of the implementation of plant modification during the 1978 Refueling Outage in which the equipment sump level control logic was revised. The pre-modification logic re-quired that during the conduct of F-ISP-IS that sump pump operating time be recorded in order to correct the daily total (integrated) flow from the sump since the inte-grator was under test. The modification changed the sump level control in that the pump operates continuously and level control is achieved by automatic operation of the discharge valve. The applicable section of the precedure should have been changed to reflect valve operation instead of pump operation.
The procedure was immediately corrected, however, investigation revealed that earlier surveillance was conducted on a monthly basis from December, 1978 through June, 1979 utilizing the procedure containing the error.          The procedural error was a result of the implementation of plant modification during the 1978 Refueling Outage in which the equipment sump level control logic was revised. The pre-modification logic re-quired that during the conduct of F-ISP-IS that sump pump operating time be recorded in order to correct the daily total (integrated) flow from the sump since the inte-grator was under test. The modification changed the sump level control in that the pump operates continuously and level control is achieved by automatic operation of the discharge valve. The applicable section of the precedure should have been changed to reflect valve operation instead of pump operation.
_
A review of the surveillance conducted since December, 1978, revealed that no actual errors had been introduced into the integrated sump readings, therefore, the event did not represent any significant hazard to the public health and safety.
A review of the surveillance conducted since December, 1978, revealed that no actual errors had been introduced into the integrated sump readings, therefore, the event did not represent any significant hazard to the public health and safety.
Technical Specifications Appendix A, Paragraph 6.8.A.            requires implementation of procedures to control modifications, the update of procedures as the result of modi ficat ions , and certain other work. Contrary to these requirements, F-ISP-1S was not updated as part of the sump . level control nodification.
Technical Specifications Appendix A, Paragraph 6.8.A.            requires implementation of procedures to control modifications, the update of procedures as the result of modi ficat ions , and certain other work. Contrary to these requirements, F-ISP-1S was not updated as part of the sump . level control nodification.
Line 105: Line 70:
                                                                       ~
                                                                       ~
test was successfully completed.                -
test was successfully completed.                -
_
w OM e
w OM e
m
m
        -
              "
                                                         ,o 9
                                                         ,o 9
                                %
                                                                            -
4 O
4 O
O    64}}
O    64}}

Latest revision as of 02:48, 2 February 2020

LER 79-041/03L-0 on 790711:procedure for Drywell Equipment Drain Pump Functional Test & Calibr Was in Error.Caused by Implementation of Plant Mod During 1978 Refueling Outage in Which Equipment Pump Level Control Logic Was Revised
ML19242A874
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 08/02/1979
From: W. Verne Childs
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19242A871 List:
References
LER-79-041-03L, LER-79-41-3L, NUDOCS 7908060527
Download: ML19242A874 (2)


Text

.nu run.. o .# im x .*n i

~

(7 77)

LICENSEE EVENT REPORT CONTROL BLOCK: l l l l l l (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 0 1 N IY lJ l A lF 114l@[p l0 - l0 0 0 0l _ o 0lel@l4 1l1l1 lj@l l l@

6 3 LICE *.SE E CODE 15 LIC E'.SE NuY 6 E R h 26 L ;ENSE T 4 PE JJ Si L A I 58 CON'T 0 1 d

OR qc 60 Ll@l0l5 61 J l 0 10 l 3 3 l3 l@l 630 7EVl1ENT11 DOC K ET NU* *B E R bd O ATE l

a dl0 18HEPORT 14 75 l0 l2DATE'7 l9 lh 80 EVENT DESCRIPTION Please AND See PROtuBLE AttaChaent CCNSEQUENCES h g 7 l o l 31 1 I o 4 l __

O 5 l 1

~~

0 6 l  !

oIi l i O14 OO 7 8 9 S Y S T E '.1 CAUSE CALSE C O*.i P VALVE CODE CODE SUBCODE COYPONENT CODE SUBCCDE SU8 CODE l0l9I 7 6 I: I: l@ l ^1@ IC l@ 1:I:1:I:1:12l@

9 'O 11 12 13 18 13 l@ L:J @ 20

_ S E Qt:E *.T I A L OCCUR P E NCE REPOHT R E VISiO N LE R RO EVENT vE AR R E PCH T NO. CODE TYPE NO.

O .ly.g I7l91 22

-l i OI4 24 1I dj 10 Is i 29 b._l 30

_ 31-l Ln]

32

_ 21 23 .' 6 2/ 23 SUTURE EFFECT SHuiDC.N A TT ACHY E N T N P R D -4 PRlYE COYP_ COYPONENT A C'.i O NAC TI ON TA*EN O N P L A '. T YETHOD HOURS SU 9 =.9 T v & D F ORM bytt SUPP LI E H MANUFACTURER JJ 24 J5 36 Je

- 0 0l0l 4J

[]g 4 47 N

h 43

lh l: lq l0 l9 lh 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTICNS h

[. - l Please See Att ach',ent 1 f l

l'I II

' 'i l 1 4 l 7 a 9 Bo ST 5  % POV.E R OTHER STATUS S:0 RY DISCON THY DESCRrPTION 1

5l NA l l45B l@l4o Surveillance Test l 7 3 - G @ l0l0l0 @

ACTry Tv CON T E NT 12 13 44 - 80 PELEASED OF AELE ASE AYOJNT OF ACTIVITY LOCATION OF RE LE ASE 1 6 l: NA NA  !

hEuSCNN L E xP NLYaE a TYPE IES L SC M I P TI ON

( s h 7

1

@l0 OJ 3 : GL 11 12 13 NA 80 9E nSca. ,E t iN;UniE S

__fqEn DE SCRIP TION _

7 i

1 7 0

l0l0l@l 11

NA ~7% GS iO F3 Q^p-r Omm 6 80 l

' < p{ p ,

elu6a y m i- .; O s On DAYAbE TO F ACILITY '

h,

{ t w v .'u,L

, jp;g[e="'P7 s., J 7 :s 3 1)

PUBLICITY NRC USE ONL Y C b ( ~[

l' _ E D L f.

2 o l N jhl ESCP'PTION NA I ll llll IllIII t d 3 10 G8 69 80 &

N A *.M O F P R E P A n E R PHONE-

POWER AUT110RITY OF TIIE STATE OF NEh' YORK JAMES A. FIT 2 PATRICK NUCLEAR POWER PLANT DOCKET NO. 50-333 ATTACIIMENT TO LER 79-041/03L-0 Page _1 of 1 While in a cold shutdown co'idition, during the conduct of Instrument Surveillance Procedure F-ISP-15 titled "Drywell Equipment Drain Sump Functional Test and Cali-bration", the Technicians performing the test noted that the procedure was in error.

The procedure was immediately corrected, however, investigation revealed that earlier surveillance was conducted on a monthly basis from December, 1978 through June, 1979 utilizing the procedure containing the error. The procedural error was a result of the implementation of plant modification during the 1978 Refueling Outage in which the equipment sump level control logic was revised. The pre-modification logic re-quired that during the conduct of F-ISP-IS that sump pump operating time be recorded in order to correct the daily total (integrated) flow from the sump since the inte-grator was under test. The modification changed the sump level control in that the pump operates continuously and level control is achieved by automatic operation of the discharge valve. The applicable section of the precedure should have been changed to reflect valve operation instead of pump operation.

A review of the surveillance conducted since December, 1978, revealed that no actual errors had been introduced into the integrated sump readings, therefore, the event did not represent any significant hazard to the public health and safety.

Technical Specifications Appendix A, Paragraph 6.8.A. requires implementation of procedures to control modifications, the update of procedures as the result of modi ficat ions , and certain other work. Contrary to these requirements, F-ISP-1S was not updated as part of the sump . level control nodification.

As noted above, the procedure was immediately corrected and the surveillance

~

test was successfully completed. -

w OM e

m

,o 9

4 O

O 64