{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA | {{#Wiki_filter:UNITED STATES | ||
NUCLEAR REGULATORY COMMISSION | |||
REGION II | |||
Mr. Mano Nazar Executive Vice President | 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 | ||
Juno Beach, FL 33408-0420 | ATLANTA, GEORGIA 30303-1257 | ||
May 3, 2011 | |||
251/2011008 | Mr. Mano Nazar | ||
Executive Vice President | |||
II Office. | and Chief Nuclear Officer | ||
as designed and to support proper system operation. | Florida Power and Light Company | ||
P.O. Box 14000 | |||
inspection. The schedule is as follows: | Juno Beach, FL 33408-0420 | ||
SUBJECT: NOTIFICATION OF TURKEY POINT NUCLEAR PLANT - COMPONENT | |||
* Onsite weeks: | DESIGN BASES INSPECTION - NRC INSPECTION REPORT 05000250 & | ||
251/2011008 | |||
risk assessment data and identify risk significant components which will be examined during the inspection. | Dear Mr. Nazar: | ||
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC) | |||
Region II staff will conduct a component design bases inspection at your Turkey Point Nuclear | |||
Power Plant during the weeks of July 11 - 15, July 25 - 29 and August 8 - 12, 2011. The | |||
inspection team will be led by David Jones, a Senior Reactor Inspector from the NRC's Region | |||
II Office. This inspection will be conducted in accordance with the baseline inspection | |||
procedure, Procedure 71111.21, Component Design Bases Inspection, issued December 6, | |||
2010. | |||
The inspection will evaluate the capability of risk significant / low margin components to function | |||
as designed and to support proper system operation. The inspection will also include a review | |||
of selected risk significant components and operating experience items. | |||
During a telephone conversation on April 20, 2011, Mr. Jones confirmed with Mr. R. Everett of | |||
your staff, arrangements for an information gathering site visit and the three-week onsite | |||
inspection. The schedule is as follows: | |||
* Information gathering visit: Week of June 27 - July 1, 2011 | |||
* Onsite weeks: July 11 - 15, July 25 - 29 and August 8 - 12, 2011 | |||
The purpose of the information gathering visit is to meet with members of your staff to identify | |||
risk-significant components and operator actions. Information and documentation needed to | |||
support the inspection will also be identified. Mr. John Hanna, a Region II Senior Reactor | |||
Analyst, will accompany Mr. Jones during the information gathering visit to review probabilistic | |||
risk assessment data and identify risk significant components which will be examined during the | |||
inspection. | |||
The enclosure lists documents that will be needed prior to the information gathering visit. | |||
Please provide the referenced information to the Region II office by June 6, 2011. Contact | |||
FPL 2 | |||
Mr. Jones with any questions concerning the requested information. The inspectors will try to | |||
minimize your administrative burden by specifically identifying only those documents required | |||
for inspection preparation. | |||
Additional documents will be requested during the information gathering visit. The additional | |||
information will need to be made available to the team in the Region II office prior to the | |||
inspection teams preparation week of July 5. Mr. Jones, will also discuss the following | |||
inspection support administrative details: availability of knowledgeable plant engineering and | |||
licensing personnel to serve as points of contact during the inspection; method of tracking | |||
inspector requests during the inspection; licensee computer access; working space; | |||
arrangements for site access; and other applicable information. | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its | |||
enclosure will be available electronically for public inspection in the NRC Public Document | |||
Room or from the Publicly Available Records (PARS) component of NRC's document system | |||
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading- | |||
rm/adams.html (the Public Electronic Reading Room). | |||
Thank you for your cooperation in this matter. If you have any questions regarding the | |||
information requested or the inspection, please contact Mr. Jones at (404) 997-4631 or me at | |||
(404) 997-4519. | |||
Sincerely, | |||
/RA/ | |||
Binoy B. Desai, Chief | |||
Engineering Branch 1 | |||
Division of Reactor Safety | |||
Docket Nos.: 50-250 & 251 | |||
License Nos.: DPR - 31 & 41 | |||
Enclosure: | |||
Information Request for Turkey Point Nuclear Plant - Component Design Bases Inspection | |||
cc w/enc/: (See page 3) | |||
___ML111240445______________________ | ___ML111240445______________________ G SUNSI REVIEW COMPLETE | ||
G | OFFICE RII:DRS RII:DRS | ||
FPL 3 | SIGNATURE RA RA | ||
Alison Brown Nuclear Licensing Florida Power & Light Company Electronic Mail Distribution | NAME DJONES BDESAI | ||
DATE 5/3/2011 5/3/2011 | |||
Larry Nicholson Director Licensing Florida Power & Light Company Electronic Mail Distribution | E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO | ||
FPL 3 | |||
cc w/encl: Ruben D. Almaguer | |||
Alison Brown Director | |||
Nuclear Licensing Division of Emergency Preparedness | |||
Florida Power & Light Company Department of Community Affairs | |||
Electronic Mail Distribution Electronic Mail Distribution | |||
Larry Nicholson Mano Nazar | |||
Director Executive Vice President and Chief Nuclear | |||
Licensing Officer | |||
Florida Power & Light Company Nuclear Division | |||
Electronic Mail Distribution Florida Power & Light Company | |||
P.O. Box 14000 | |||
Michael Kiley Juno Beach, FL 33408 | |||
Site Vice President | |||
Turkey Point Nuclear Plant Senior Resident Inspector | |||
Florida Power and Light Company Turkey Point Nuclear Generating Station | |||
Electronic Mail Distribution U.S. Nuclear Regulatory Commission | |||
9762 SW 344th St. | |||
Niel Batista Florida City, FL 33035 | |||
Emergency Management Coordinator | |||
Department of Emergency Management Attorney General | |||
and Homeland Security Department of Legal Affairs | |||
Electronic Mail Distribution The Capitol PL-01 | |||
Tallahassee, FL 32399-1050 | |||
Robert J. Tomonto | |||
Licensing Manager Mike A. Shehadeh, P.E. | |||
Turkey Point Nuclear Plant City Manager | |||
Florida Power & Light Company City of Homestead | |||
Electronic Mail Distribution Electronic Mail Distribution | |||
Paul Rubin County Manager of Miami-Dade County | |||
Plant General Manager 111 NW 1st Street, 29th Floor | |||
Turkey Point Nuclear Plant Miami, FL 33128 | |||
Florida Power and Light Company | |||
Electronic Mail Distribution Gene St. Pierre | |||
Vice President, Fleet Support | |||
Mitch S. Ross Florida Power & Light Company | |||
Vice President and Associate General Electronic Mail Distribution | |||
Counsel | |||
Florida Power & Light Company | |||
Electronic Mail Distribution | |||
Marjan Mashhadi | |||
Senior Attorney | |||
Florida Power & Light Company | |||
Electronic Mail Distribution | |||
William A. Passetti | |||
Chief | |||
Florida Bureau of Radiation Control | |||
Department of Health | |||
Electronic Mail Distribution | |||
INFORMATION REQUEST FOR TURKEY POINT NUCLEAR POWER PLANT | |||
COMPONENT DESIGN BASES INSPECTION | |||
Please provide the information electronically in .pdf files, Excel, or other searchable format on | |||
CDROM. The CDROM should be indexed and hyperlinked to facilitate ease of use. | |||
1. From your most-recent probabilistic safety analysis (PSA) excluding external events and | |||
fires: | |||
a. Two risk rankings of components from your site-specific probabilistic safety | |||
analysis (PSA): one sorted by Risk Achievement Worth (RAW), and the other | |||
sorted by Birnbaum Importance. | |||
b. A list of the top 500 cutsets. | |||
2. From your most-recent probabilistic safety analysis (PSA) including external events and | |||
fires: | |||
a. Two risk rankings of components from your site-specific probabilistic safety | |||
analysis (PSA): one sorted by Risk Achievement Worth (RAW), and the other | |||
sorted by Birnbaum Importance. | |||
b. A list of the top 500 cutsets. | |||
3. Risk ranking of operator actions from your site specific PSA sorted by RAW. Provide | |||
human reliability worksheets for these items. | |||
4. Contact information for a person to discuss PRA information prior to the information | |||
gathering trip (name, title, phone number, and e-mail address) | |||
5. List of time critical operator actions with a brief description of each action. | |||
6. List of Emergency and Abnormal Operating Procedures revised (significant) since January | |||
1, 2008 with a brief description of each revision. | |||
7. List of components with low design margins (i.e., pumps closest to the design limit for flow | |||
or pressure, diesel generator close to design required output, heat exchangers close to | |||
rated design heat removal, MOV risk-margin rankings, etc.) and associated evaluations or | |||
calculations. | |||
8. List of station operating experience evaluations/reviews performed and documented in the | |||
stations corrective action program for industry events and safety-related equipment | |||
failures/vulnerabilities [as communicated by NRC generic communications, industry | |||
communications, 10 CFR part 21 notifications, etc.] since January 1, 2008. | |||
9. List and brief description of safety-related SSC design modifications implemented since | |||
January 1, 2008. | |||
10. List and brief description of common-cause component failures that have occurred since | |||
January 1, 2008. | |||
11. Operability Determination Procedure(s) | |||
12. List and brief description of operability evaluations completed since January 1, 2008. | |||
Enclosure | |||
2 | |||
13. List of equipment on the sites Station Equipment Reliability Issues List, including a | |||
description of the reason(s) why each component is on that list and summaries (if available) | |||
of your plans to address the issue(s). | |||
14. List and brief description of equipment currently in degraded or nonconforming status as | |||
described in RIS 05-020. | |||
15. List and reason for equipment classified in maintenance rule (a)(1) status since January 1, | |||
2008 to present. | |||
16. Copy of UFSAR(s) | |||
17. Copy of Technical Specification(s) | |||
18. Copy of Technical Specifications Bases | |||
19. Copy of Technical Requirements Manual(s) | |||
20. Corrective Action Program Procedure(s) | |||
21. Condition reports associated with findings from NRC Inspection Report 2008006 | |||
22. List and brief description of Root Cause Evaluations that have been performed since | |||
January 1, 2008. | |||
23. In-service Testing Program Procedure(s) | |||
24. Copies of System Descriptions (or the like) for safety-related systems (mechanical & | |||
electrical) | |||
25. Design bases documents for safety-related systems (mechanical & electrical) | |||
26. Primary AC calculation(s) for safety-related buses | |||
27. Primary DC calculation(s) for safety-related buses | |||
28. One line diagram of electrical plant (electronic and full size) | |||
29. Index and legend for electrical plant one-line diagrams | |||
30. PI&Ds for ECCS systems (electronic and 1/2 size) | |||
31. Index and Legend for PI&Ds | |||
Enclosure | |||
2 | |||
of your plans to address the issue(s). | |||
}} | }} |
Latest revision as of 01:12, 13 November 2019
ML111240445 | |
Person / Time | |
---|---|
Site: | Turkey Point |
Issue date: | 05/03/2011 |
From: | Binoy Desai NRC/RGN-II/DRS/EB1 |
To: | Nazar M Florida Power & Light Co |
References | |
IR-11-008 | |
Download: ML111240445 (6) | |
See also: IR 05000250/2011008
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200
ATLANTA, GEORGIA 30303-1257
May 3, 2011
Mr. Mano Nazar
Executive Vice President
and Chief Nuclear Officer
Florida Power and Light Company
P.O. Box 14000
Juno Beach, FL 33408-0420
SUBJECT: NOTIFICATION OF TURKEY POINT NUCLEAR PLANT - COMPONENT
DESIGN BASES INSPECTION - NRC INSPECTION REPORT 05000250 &
251/2011008
Dear Mr. Nazar:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
Region II staff will conduct a component design bases inspection at your Turkey Point Nuclear
Power Plant during the weeks of July 11 - 15, July 25 - 29 and August 8 - 12, 2011. The
inspection team will be led by David Jones, a Senior Reactor Inspector from the NRC's Region
II Office. This inspection will be conducted in accordance with the baseline inspection
procedure, Procedure 71111.21, Component Design Bases Inspection, issued December 6,
2010.
The inspection will evaluate the capability of risk significant / low margin components to function
as designed and to support proper system operation. The inspection will also include a review
of selected risk significant components and operating experience items.
During a telephone conversation on April 20, 2011, Mr. Jones confirmed with Mr. R. Everett of
your staff, arrangements for an information gathering site visit and the three-week onsite
inspection. The schedule is as follows:
- Information gathering visit: Week of June 27 - July 1, 2011
- Onsite weeks: July 11 - 15, July 25 - 29 and August 8 - 12, 2011
The purpose of the information gathering visit is to meet with members of your staff to identify
risk-significant components and operator actions. Information and documentation needed to
support the inspection will also be identified. Mr. John Hanna, a Region II Senior Reactor
Analyst, will accompany Mr. Jones during the information gathering visit to review probabilistic
risk assessment data and identify risk significant components which will be examined during the
inspection.
The enclosure lists documents that will be needed prior to the information gathering visit.
Please provide the referenced information to the Region II office by June 6, 2011. Contact
FPL 2
Mr. Jones with any questions concerning the requested information. The inspectors will try to
minimize your administrative burden by specifically identifying only those documents required
for inspection preparation.
Additional documents will be requested during the information gathering visit. The additional
information will need to be made available to the team in the Region II office prior to the
inspection teams preparation week of July 5. Mr. Jones, will also discuss the following
inspection support administrative details: availability of knowledgeable plant engineering and
licensing personnel to serve as points of contact during the inspection; method of tracking
inspector requests during the inspection; licensee computer access; working space;
arrangements for site access; and other applicable information.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRC's document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding the
information requested or the inspection, please contact Mr. Jones at (404) 997-4631 or me at
(404) 997-4519.
Sincerely,
/RA/
Binoy B. Desai, Chief
Engineering Branch 1
Division of Reactor Safety
Docket Nos.: 50-250 & 251
License Nos.: DPR - 31 & 41
Enclosure:
Information Request for Turkey Point Nuclear Plant - Component Design Bases Inspection
cc w/enc/: (See page 3)
___ML111240445______________________ G SUNSI REVIEW COMPLETE
OFFICE RII:DRS RII:DRS
NAME DJONES BDESAI
DATE 5/3/2011 5/3/2011
E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO
FPL 3
cc w/encl: Ruben D. Almaguer
Alison Brown Director
Nuclear Licensing Division of Emergency Preparedness
Florida Power & Light Company Department of Community Affairs
Electronic Mail Distribution Electronic Mail Distribution
Larry Nicholson Mano Nazar
Director Executive Vice President and Chief Nuclear
Licensing Officer
Florida Power & Light Company Nuclear Division
Electronic Mail Distribution Florida Power & Light Company
P.O. Box 14000
Michael Kiley Juno Beach, FL 33408
Site Vice President
Turkey Point Nuclear Plant Senior Resident Inspector
Florida Power and Light Company Turkey Point Nuclear Generating Station
Electronic Mail Distribution U.S. Nuclear Regulatory Commission
9762 SW 344th St.
Niel Batista Florida City, FL 33035
Emergency Management Coordinator
Department of Emergency Management Attorney General
and Homeland Security Department of Legal Affairs
Electronic Mail Distribution The Capitol PL-01
Tallahassee, FL 32399-1050
Robert J. Tomonto
Licensing Manager Mike A. Shehadeh, P.E.
Turkey Point Nuclear Plant City Manager
Florida Power & Light Company City of Homestead
Electronic Mail Distribution Electronic Mail Distribution
Paul Rubin County Manager of Miami-Dade County
Plant General Manager 111 NW 1st Street, 29th Floor
Turkey Point Nuclear Plant Miami, FL 33128
Florida Power and Light Company
Electronic Mail Distribution Gene St. Pierre
Vice President, Fleet Support
Mitch S. Ross Florida Power & Light Company
Vice President and Associate General Electronic Mail Distribution
Counsel
Florida Power & Light Company
Electronic Mail Distribution
Marjan Mashhadi
Senior Attorney
Florida Power & Light Company
Electronic Mail Distribution
William A. Passetti
Chief
Florida Bureau of Radiation Control
Department of Health
Electronic Mail Distribution
INFORMATION REQUEST FOR TURKEY POINT NUCLEAR POWER PLANT
COMPONENT DESIGN BASES INSPECTION
Please provide the information electronically in .pdf files, Excel, or other searchable format on
CDROM. The CDROM should be indexed and hyperlinked to facilitate ease of use.
1. From your most-recent probabilistic safety analysis (PSA) excluding external events and
fires:
a. Two risk rankings of components from your site-specific probabilistic safety
analysis (PSA): one sorted by Risk Achievement Worth (RAW), and the other
sorted by Birnbaum Importance.
b. A list of the top 500 cutsets.
2. From your most-recent probabilistic safety analysis (PSA) including external events and
fires:
a. Two risk rankings of components from your site-specific probabilistic safety
analysis (PSA): one sorted by Risk Achievement Worth (RAW), and the other
sorted by Birnbaum Importance.
b. A list of the top 500 cutsets.
3. Risk ranking of operator actions from your site specific PSA sorted by RAW. Provide
human reliability worksheets for these items.
4. Contact information for a person to discuss PRA information prior to the information
gathering trip (name, title, phone number, and e-mail address)
5. List of time critical operator actions with a brief description of each action.
6. List of Emergency and Abnormal Operating Procedures revised (significant) since January
1, 2008 with a brief description of each revision.
7. List of components with low design margins (i.e., pumps closest to the design limit for flow
or pressure, diesel generator close to design required output, heat exchangers close to
rated design heat removal, MOV risk-margin rankings, etc.) and associated evaluations or
calculations.
8. List of station operating experience evaluations/reviews performed and documented in the
stations corrective action program for industry events and safety-related equipment
failures/vulnerabilities [as communicated by NRC generic communications, industry
communications, 10 CFR part 21 notifications, etc.] since January 1, 2008.
9. List and brief description of safety-related SSC design modifications implemented since
January 1, 2008.
10. List and brief description of common-cause component failures that have occurred since
January 1, 2008.
11. Operability Determination Procedure(s)
12. List and brief description of operability evaluations completed since January 1, 2008.
Enclosure
2
13. List of equipment on the sites Station Equipment Reliability Issues List, including a
description of the reason(s) why each component is on that list and summaries (if available)
of your plans to address the issue(s).
14. List and brief description of equipment currently in degraded or nonconforming status as
described in RIS 05-020.
15. List and reason for equipment classified in maintenance rule (a)(1) status since January 1,
2008 to present.
16. Copy of UFSAR(s)
17. Copy of Technical Specification(s)
18. Copy of Technical Specifications Bases
19. Copy of Technical Requirements Manual(s)
20. Corrective Action Program Procedure(s)
21. Condition reports associated with findings from NRC Inspection Report 2008006
22. List and brief description of Root Cause Evaluations that have been performed since
January 1, 2008.
23. In-service Testing Program Procedure(s)
24. Copies of System Descriptions (or the like) for safety-related systems (mechanical &
electrical)
25. Design bases documents for safety-related systems (mechanical & electrical)
26. Primary AC calculation(s) for safety-related buses
27. Primary DC calculation(s) for safety-related buses
28. One line diagram of electrical plant (electronic and full size)
29. Index and legend for electrical plant one-line diagrams
30. PI&Ds for ECCS systems (electronic and 1/2 size)
31. Index and Legend for PI&Ds
Enclosure