{{#Wiki_filter:FINAL-AS ADMINISTERED SYSTEMS JPMs DAVIS BESSE INITIAL EXAM (OCTOBER 2-6, 2000) FIVE JPMs SROUs ONLY DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.: 4C Rev. 00 Page 19 of 28 TASK NO.: 000-058-05-0100 TASK DESCRIPTION:
{{#Wiki_filter:FINAL-AS ADMINISTERED SYSTEMS JPMs DAVIS BESSE INITIAL EXAM (OCTOBER 2-6, 2000)
Establishing Long Term Boron Dilution Using LPI Train 2 K/A  
FIVE JPMs SROUs ONLY
 
DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.:   4C                             Rev. 00               Page 19 of 28 TASK NO.:   000-058-05-0100 TASK DESCRIPTION:     Establishing Long Term Boron Dilution Using LPI Train 2 K/A  


==REFERENCE:==
==REFERENCE:==
 
006-K6.03   3.6/3.9, 006-Al.ll 3.1/3.4 006-A2.05   3.4/3.5 APPLICABLE METHOD OF TESTING:         Actual performance Simulator Alternate Path TIME FOR COMPLETION:       10 minutes APPLICABILITY:     [XI RO         [X] SRO TASK STANDARDS:
006-K6.03 3.6/3.9, 006-Al.ll 3.1/3.4 006-A2.05 3.4/3.5 APPLICABLE METHOD OF TESTING: Actual performance Simulator Alternate Path TIME FOR COMPLETION:
: 1. Align HPI Train 1 to supplement core cooling with LPI Train 1.
10 minutes APPLICABILITY:
: 2. Align LPI Train 2 to take a suction off of the DH Drop line and discharge to the RCS.
[XI RO[X] SRO TASK STANDARDS:
: 3. Establish long term boron dilution with LPI Train 2.
: 1. Align HPI Train 1 to supplement core cooling with LPI Train 1. 2. Align LPI Train 2 to take a suction off of the DH Drop line and discharge to the RCS. 3. Establish long term boron dilution with LPI Train 2. 4. Align LPI Train 1 to inject through both LPI injection lines. REQUIRED MATERIALS:
: 4. Align LPI Train 1 to inject through both LPI injection lines.
DB-OP-02000, RPS, SFAS, SFRCS Trip and SG Tube Rupture, Revision 5, C-1 GENERAL  
REQUIRED MATERIALS:
DB-OP-02000,   RPS,   SFAS,   SFRCS Trip and SG Tube Rupture, Revision 5, C-1 GENERAL  


==REFERENCES:==
==REFERENCES:==


DB-OP-02000, RPS, SFAS, SFRCS Trip and SG Tube Rupture, Revision 5, C-i INITIAL CONDITIONS:
DB-OP-02000,   RPS,   SFAS,   SFRCS Trip and SG Tube Rupture, Revision 5, C-i INITIAL CONDITIONS:
A large break LOCA has occurred.
A large break LOCA has occurred.
HPI Pump 2 has failed to start. Both MU pumps and HPI Pump 1 have been stopped per procedure.
HPI Pump 2 has failed to start.
Both LPI pumps have been transferred to the Emergency Sump. INITIATING CUES: You have been directed to establish long term boron dilution according to Attachment 12 of DB-OP-02000, RPS, SFAS, SFRCS Trip and SG Tube Rupture, using LPI Train 2.Step D on Page 1 of Attachment 12 has been completed.
Both MU pumps and HPI Pump 1 have been stopped per procedure.
Page 20 of 28 INITIAL CONDITIONS:
Both LPI pumps have been transferred to the Emergency Sump.
INITIATING CUES:
You have been directed to establish long term boron dilution according to 2 of DB-OP-02000, RPS, SFAS, SFRCS Trip and SG Tube Rupture, using LPI Train 2.
Step D on Page 1 of Attachment 12 has been completed.
 
JPM No. 4C                                                Page 20 of 28 INITIAL CONDITIONS:
A large break LOCA has occurred.
A large break LOCA has occurred.
HPI Pump 2 has failed to start. Both MU pumps and HPI Pump 1 have been stopped per procedure.
HPI Pump 2 has failed to start.
Both LPI pumps have been transferred to the Emergency Sump. INITIATING CUES: You have been directed to establish long term boron dilution according to Attachment 12 of DB-OP-02000, RPS, SFAS, SFRCS Trip and SG Tube Rupture, using LPI Train 2. Step D on Page 1 of Attachment 12 has been completed.
Both MU pumps and HPI Pump 1 have been stopped per procedure.
JPM No. 4C Page 21 of 28 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT assumed unless denoted in the "Comments".
Both LPI pumps have been transferred to the Emergency Sump.
START TIME: 1. PERFORMANCE STEP: Locate the correct step. STANDARD:
INITIATING CUES:
Identifies Step E on Page 1 of Attachment 12 is the correct start point. CUE: None. SAT UNSAT 2. PERFORMANCE STEP: Return control power to DH 11 and DH 12. .. .....C.........
You have been directed to establish long term boron dilution according to 2 of DB-OP-02000, RPS, SFAS, SFRCS Trip and SG Tube Rupture, using LPI Train 2.
STANDARD:
Step D on Page 1 of Attachment 12 has been completed.
Depress the ON pushbutton on HIS DH11A and HIS DH12A. COMMENT: DH 11 and DH 12 must be open to complete the task. CUE: None. SAT UNSAT 3. PERFORMANCE STEP: Verify open DH 11, Normal Suction Isolation.
 
... ... C.........
JPM No. 4C                                                         Page 21 of 28 PERFORMANCE INFORMATION NOTE:   Critical       steps denoted with a "C". Failure to meet any one of these standards for this       item constitutes failure. Sequence is NOT assumed unless denoted in the "Comments".
STANDARD:
START TIME:
Depress the OPEN pushbutton on HIS DHll. CUE: None. SAT UNSAT 4. PERFORMANCE STEP: Verify open DH 12, Normal Suction Isolation.
: 1. PERFORMANCE STEP:         Locate the correct step.
.. ...C.........
STANDARD:     Identifies Step E on Page 1 of Attachment 12 is     the correct start   point.
STANDARD:
CUE:   None.
Depress the OPEN pushbutton on HIS DHI2. COMMENT: Examinee may turn off control power to DH 11 and DH 12 which not required by procedure.
SAT UNSAT
CUE: None. SAT UNSAT JPM No. 4C Page 22 of 28 5. PERFORMANCE STEP: Route to Method 2 using LPI Train 2. STANDARD:
: 2. PERFORMANCE STEP:         Return control power to DH 11 and DH 12.
Route to Page 4 of Attachment
    ..   .....C.........
: 12. CUE: None. SAT UNSAT 6. PERFORMANCE STEP: Check that the suction of LPI and CTMT Spray has been transferred to the Emergency Sump. STANDARD:
STANDARD:     Depress the ON pushbutton on HIS DH11A and HIS DH12A.
Observe the RED lights are lit on HIS DH9B and HIS DH9A. Observe the GREEN lights are lit on HIS DH7B and HIS DH7A. CUE: None. SAT UNSAT 7. PERFORMANCE STEP: Check that both LPI trains are cooling the core. STANDARD:
COMMENT:       DH 11 and DH 12 must be open to complete the task.
Observe >1000 gpm flow on FYI DH2B and FYI DH2A. CUE: (If asked how long LPI has been in operation.)
CUE:   None.
LPI has been operating for 90 minutes.
SAT UNSAT
SAT UNSAT 8. PERFORMANCE STEP: Verify Incores temperatures are < 333 0 F. STANDARD:
: 3. PERFORMANCE STEP:         Verify open DH 11, Normal Suction Isolation.
Rotate Incore temperature selector switches HS 4627 and HS 4628 to verify the Incore Temperature indicators, TI 4627 and TI 4628 are < 333 0 F. CUE: None. SAT UNSAT 9. PERFORMANCE STEP: Check that SCM does not exist. STANDARD:
    ... ... C.........
Observe RCS pressure on one of the various wide range indicators and determine the SCM is < 20 0 F. CUE: None. SAT UNSAT 10. PERFORMANCE STEP: Route to Method 2 using LPI Train 2. STANDARD:
STANDARD:     Depress the OPEN pushbutton on HIS DHll.
Route to Page 8 of Attachment
CUE:   None.
: 12. CUE: None. SAT UNSAT JPM No. 4C Page 23 of 28 11. PERFORMANCE STEP: Identify CCW Train 2 is > 95 0 F. STANDARD:
SAT UNSAT
Identify that CCW Train 2 temperature is 105 0 F using TI 1490. CUE: None. SAT UNSAT 12. PERFORMANCE STEP: Verfiy open DH 64, DHR Cooler 1 Outlet to HPI Pump 1 ........ C ........ Suction.
: 4. PERFORMANCE STEP:         Verify open DH 12, Normal Suction Isolation.
STANDARD:
    .. . .. C.........
Depress the OPEN pushbutton on HIS DH64. CUE: None. SAT UNSAT 13. PERFORMANCE STEP: Verify closed HP 32, HPI Recirc to BWST. STANDARD:
STANDARD:     Depress the OPEN pushbutton on HIS DHI2.
Verify GREEN light is lit on HIS HP32. CUE: None. SAT UNSAT 14. PERFORMANCE STEP: Adjust LPI Train 1 flow to maintain < 4000 gpm. STANDARD:
COMMENT:       Examinee may turn off control power to DH 11 and DH 12 which not required by procedure.
Depress ON control power for DH lB using HIS DHlB-2. Throttle DH 1B, using HIS DHIB, until LPI Train 1 flow is about 3000 gpm on FYI DH2B. COMMENT: Required by Specific Rule 2. CUE: None. SAT UNSAT 15. PERFORMANCE STEP: Start HPI Pump 1. .. .....o Co..... ... STANDARD:
CUE:   None.
Turn the control switch HIS 1524 to START. CUE: None. SAT UNSAT JPM No. 4C Page 24 of 28 16. PERFORMANCE STEP: Verify open HP 2C and HP 2D, HP Injection 1 valves. STANDARD:
SAT UNSAT
Verify RED lights are lit on HIS HP2C and HIS HP2D. CUE: None. SAT UNSAT 17. PERFORMANCE STEP: Verify flow is indicated on HPI Train 1. STANDARD:
 
Verify flow is indicated on FYI HP3C and FYI HP3D. CUE: None. SAT UNSAT 18. PERFORMANCE STEP: Verify closed DH 1A, DH Pump 2 Discharge to RCS ........ C .........
JPM No. 4C                                                       Page 22 of 28
Isolation.
: 5. PERFORMANCE   STEP: Route to Method 2 using LPI Train 2.
STANDARD:
STANDARD:     Route to Page 4 of Attachment   12.
Depress ON control power for DH 1A using HIS DH1A-2. Depress and hold the CLOSE pushbutton HIS DHIA, until only the GREEN light is lit. CUE: None. SAT UNSAT 19. PERFORMANCE STEP: Verify core cooling is adequate.
CUE:   None.
STANDARD:
SAT   UNSAT
Observe the Incore temperature indicators, TI 4627 and TI 4626, are constant.
: 6. PERFORMANCE   STEP:   Check that the suction of LPI and CTMT Spray has been transferred to the Emergency Sump.
CUE: Incore temperature indicators, TI 4627 and TI 4626, are constant and will be monitored by the Shift Manager.
STANDARD:     Observe the RED lights are lit   on HIS DH9B and HIS DH9A.
SAT UNSAT 20. PERFORMANCE STEP: Stop LPI Pump 2. ...... C.........
Observe the GREEN lights are lit   on HIS DH7B and HIS DH7A.
STANDARD:
CUE:   None.
Depress the BLOCK pushbutton on HIS DH6AI and turn the control switch HIS DH6A to STOP. COMMENT: LPI Pump 2 must be stopped prior to repositioning DH 2734. CUE: None. SAT UNSAT JPM No. 4C Page 25 of 28 21. PERFORMANCE STEP: Verify closed DH 2734, DH Pump 2 LPI Suction valve. .C........
SAT   UNSAT
STANDARD:
: 7. PERFORMANCE STEP:     Check that both LPI trains are cooling the core.
Depress the BLOCK pushbutton on HIS 2734A and depress the CLOSE pushbutton on HIS 2734. CUE: None. SAT UNSAT 22. PERFORMANCE STEP: Verify open DH 11 and DH 12, Normal Suction Isolation.
STANDARD:     Observe >1000 gpm flow on FYI DH2B and FYI DH2A.
STANDARD:
CUE:   (If asked how long LPI has been in     operation.)     LPI has been operating for 90 minutes.
Observe the RED lights are lit on HIS DHII and HIS DHI2. CUE: None. SAT UNSAT 23. PERFORMANCE STEP: Verify open DH 1518, DH Pump 2 Suction from RCS. .. ...C.........
SAT UNSAT
STANDARD:
: 8. PERFORMANCE   STEP: Verify Incores temperatures are < 333 0 F.
Depress the OPEN pushbutton on HIS 1518. CUE: None. SAT UNSAT 24. PERFORMANCE STEP: Start LPI Pump 2. .. .....C.........
STANDARD:     Rotate Incore temperature selector switches HS 4627 and HS 4628 to verify the Incore Temperature indicators, TI 4627 and TI 4628 are < 333 0 F.
STANDARD:
CUE:   None.
Turn the control switch HIS DH6A to START. CUE: None. SAT UNSAT 25. PERFORMANCE STEP: Verify no indication of cavitation on LPI Pump 2. STANDARD:
SAT UNSAT
Observe constant amperes and flow on LPI Train 2. CUE: None. SAT UNSAT 26. PERFORMANCE STEP: Adjust LPI Train 2 flow to 300 to 500 gpm. ..... ..C.........
: 9. PERFORMANCE   STEP: Check that SCM does not exist.
STANDARD:
STANDARD:     Observe RCS pressure on one of the various wide range indicators and determine the SCM is   < 20 0 F.
Depress ON control power for DH 1A using HIS DHIA-2. Throttle DH 1A, using HIS DH1A, attempting to establish an LPI Train 2 flow of about 300 to 500 gpm on FYI DH2A. COMMENT: Restoration of control power will not be required if control power was not removed previously.
CUE:   None.
CUE: None. SAT UNSAT JPM No. 4C Page 26 of 28 27. PERFORMANCE STEP: Identify indications of cavitation on LPI Pump 2. ... C..C........
SAT UNSAT
STANDARD:
: 10. PERFORMANCE   STEP: Route to Method 2 using LPI Train 2.
Observe swinging amperes and flow on LPI Train 2. CUE: None. SAT UNSAT 28. PERFORMANCE STEP: Stop LPI Pump 2. .... .. .C ........
STANDARD:     Route to Page 8 of Attachment   12.
STANDARD:
CUE:   None.
Turn the control switch HIS DH6A to STOP. CUE: None. SAT UNSAT 29. PERFORMANCE STEP: Verify closed DH 1518, DH Pump 2 Suction from RCS. ... .. .C ........
SAT UNSAT
STANDARD:
 
Depress the CLOSE pushbutton on HIS 1518. CUE: None. SAT UNSAT 30. PERFORMANCE STEP: Route to Step 10.7. STANDARD:
JPM No.     4C                                                             Page 23 of 28
Route to Step 10.7. CUE: None. SAT UNSAT 31. PERFORMANCE STEP: Verify LPI Pump 2 is off. STANDARD:
: 11. PERFORMANCE             STEP: Identify CCW Train 2 is   > 95 0 F.
Observe the GREEN light is LIT on control switch HIS DH6A. CUE: None. SAT UNSAT 32. PERFORMANCE STEP: Verify closed DH 2734, DH Pump 2 LPI Suction valve. STANDARD:
STANDARD:             Identify that CCW Train 2 temperature is     105 0 F using TI 1490.
Observe the GREEN light is LIT on HIS 2734. CUE: None. SAT UNSAT JPM No. 4C Page 27 of 28 33. PERFORMANCE STEP: .....C.........
CUE:       None.
STANDARD: Verify closed DH 1A, DH Pump 2 Discharge to RCS Isolation.
SAT UNSAT
Depress ON control power for DH 1A using HIS DH1A-2. Depress and hold the CLOSE pushbutton HIS DH1A, until only the GREEN light is lit.COMMENT: Restoration of control power will not be required if control power was not removed previously.
: 12. PERFORMANCE STEP:             Verfiy open DH 64, DHR Cooler 1 Outlet to HPI Pump 1
CUE: None. SAT UNSAT 34. PERFORMANCE STEP: Verify open DH 831, Decay Heat Cooler Disch Xover 1 .... C............
    ........       C ........     Suction.
to 2. STANDARD:
STANDARD:           Depress the OPEN pushbutton on HIS DH64.
Depress the OPEN pushbutton on HIS 831. CUE: None.SAT UNSAT 35. PERFORMANCE STEP: ........C........STANDARD: Adjust LPI Train 1 flow to maintain < 4000 gpm on LPI Pump 1.Depress ON control power for DH lB using HIS DHlB-2. Throttle DH 1B, using HIS DH1B, until LPI Train 1 flow is about 1500 gpm on FYI DH2B.COMMENT: HPI Pump 1 is still running and must be included in the total flow through LPI Pump 1. Required by Specific Rule 2. Restoration of control power will not be required if control power was not removed previously.
CUE:       None.
CUE: None.SAT UNSAT 36. PERFORMANCE STEP: Adjust LPI Train 2 flow to obtain about 1500 gpm. .... C...C........
SAT UNSAT
STANDARD: Depress ON control power for DH 1A using HIS DHlA-2. Throttle DH 1A, using HIS DHIA, attempting to establish an LPI Train 2 flow of about 1500 gpm on FYI DH2A.COMMENT: Restoration of control power will not be required if control power was not removed previously.
: 13. PERFORMANCE STEP:             Verify closed HP 32, HPI Recirc   to BWST.
CUE: None. SAT UNSAT TERMINATING CUES: This JPM is complete.END TIME JPM No. 4C Page 28 of 28 VERIFICATION OF COMPLETION Operator Evaluator SSN Date License: [ ] RO [ ] SRO Validated Completion Time: minutes Actual Completion Time: minutes Acceptable Progress Maintained:
STANDARD:           Verify GREEN light   is lit on HIS HP32.
Yes No N/A Result: [ I SATISFACTORY
CUE:       None.
[ I UNSATISFACTORY NOTE: An "Unsatisfactory" requires Comment and will require subsequent remedial training.
SAT UNSAT
: 14. PERFORMANCE STEP:             Adjust LPI Train 1 flow to maintain < 4000 gpm.
STANDARD:           Depress ON control power for DH lB using HIS DHlB-2.         Throttle DH 1B, using HIS DHIB, until   LPI Train 1 flow is about 3000 gpm on FYI DH2B.
COMMENT:             Required by Specific Rule 2.
CUE:       None.
SAT UNSAT
: 15. PERFORMANCE STEP:             Start HPI Pump 1.
o Co..... ...
STANDARD:           Turn the control switch HIS 1524 to START.
CUE:       None.
SAT UNSAT
 
JPM No.         4C                                                             Page 24 of 28
: 16. PERFORMANCE STEP:                   Verify open HP 2C and HP 2D,   HP Injection 1 valves.
STANDARD:               Verify RED lights are lit       on HIS HP2C and HIS HP2D.
CUE:           None.
SAT UNSAT
: 17. PERFORMANCE                 STEP:   Verify flow is   indicated on HPI Train 1.
STANDARD:               Verify flow is       indicated on FYI HP3C and FYI HP3D.
CUE:           None.
SAT UNSAT
: 18. PERFORMANCE STEP:                   Verify closed DH 1A, DH Pump 2 Discharge to RCS
    ........         C .........         Isolation.
STANDARD:               Depress ON control power for DH 1A using HIS DH1A-2.         Depress and hold the CLOSE pushbutton HIS DHIA, until       only the GREEN light     is lit.
CUE:           None.
SAT UNSAT
: 19. PERFORMANCE STEP:                   Verify core cooling is   adequate.
STANDARD:               Observe the Incore temperature indicators,       TI 4627 and TI 4626, are constant.
CUE:           Incore temperature indicators, TI 4627 and TI 4626,             are constant and will be monitored by the Shift Manager.
SAT UNSAT
: 20. PERFORMANCE                 STEP:   Stop LPI Pump 2.
    .       ..... C.........
STANDARD:               Depress the BLOCK pushbutton on HIS DH6AI and turn the control switch HIS DH6A to STOP.
COMMENT:               LPI Pump 2 must be stopped prior to repositioning DH 2734.
CUE:           None.
SAT UNSAT
 
JPM No. 4C                                                           Page 25 of 28
: 21. PERFORMANCE STEP:           Verify closed DH 2734,   DH Pump 2 LPI Suction valve.
            .C........
STANDARD:           Depress the BLOCK pushbutton on HIS 2734A and depress the CLOSE pushbutton on HIS 2734.
CUE:   None.
SAT UNSAT
: 22. PERFORMANCE         STEP: Verify open DH 11 and DH 12,   Normal Suction Isolation.
STANDARD:           Observe the RED lights are lit   on HIS DHII and HIS DHI2.
CUE:   None.
SAT UNSAT
: 23. PERFORMANCE STEP:           Verify open DH 1518,   DH Pump 2 Suction from RCS.
    .. . .. C.........
STANDARD:         Depress the OPEN pushbutton on HIS 1518.
CUE:   None.
SAT UNSAT
: 24. PERFORMANCE         STEP: Start LPI Pump 2.
    ..   .....C.........
STANDARD:         Turn the control switch HIS DH6A to START.
CUE:   None.
SAT   UNSAT
: 25. PERFORMANCE         STEP: Verify no indication of cavitation on LPI Pump 2.
STANDARD:         Observe constant amperes and flow on LPI Train 2.
CUE:   None.
SAT   UNSAT
: 26. PERFORMANCE STEP:           Adjust LPI Train 2 flow to 300 to 500 gpm.
              .C.........
STANDARD:         Depress ON control power for DH 1A using HIS DHIA-2.     Throttle DH 1A, using HIS DH1A, attempting to establish an LPI Train 2 flow of about 300 to 500 gpm on FYI DH2A.
COMMENT:           Restoration of control power will not be required if     control power was not removed previously.
CUE:   None.
SAT   UNSAT
 
JPM No. 4C                                                         Page 26 of 28
: 27. PERFORMANCE STEP:             Identify indications of cavitation on LPI Pump 2.
      ...       C..C........
STANDARD:           Observe swinging amperes and flow on LPI Train 2.
CUE:     None.
SAT UNSAT
: 28. PERFORMANCE STEP:           Stop LPI Pump 2.
                .C ........
STANDARD:           Turn the control switch HIS DH6A to STOP.
CUE:       None.
SAT UNSAT
: 29. PERFORMANCE STEP:           Verify closed DH 1518, DH Pump 2 Suction from RCS.
    ...   ..   .C ........
STANDARD:         Depress the CLOSE pushbutton on HIS 1518.
CUE:     None.
SAT UNSAT
: 30. PERFORMANCE           STEP: Route to Step 10.7.
STANDARD:         Route to Step 10.7.
CUE:       None.
SAT UNSAT
: 31. PERFORMANCE STEP:           Verify LPI Pump 2 is off.
STANDARD:         Observe the GREEN light   is LIT on control switch HIS DH6A.
CUE:       None.
SAT UNSAT
: 32. PERFORMANCE STEP:           Verify closed DH 2734, DH Pump 2 LPI Suction valve.
STANDARD:         Observe the GREEN light   is LIT on HIS 2734.
CUE:     None.
SAT UNSAT
 
JPM No.     4C                                                         Page 27 of 28
: 33. PERFORMANCE STEP:               Verify closed DH 1A, DH Pump 2 Discharge to RCS
      ..... C.........                Isolation.
STANDARD:           Depress ON control power for DH 1A using HIS DH1A-2.       Depress and hold the CLOSE pushbutton HIS DH1A, until   only the GREEN light   is lit.
COMMENT:             Restoration of control power will not be required if     control power was not removed previously.
CUE:       None.
SAT   UNSAT
: 34. PERFORMANCE STEP:               Verify open DH 831, Decay Heat Cooler Disch Xover 1
    ....         C............ to 2.
STANDARD:           Depress the OPEN pushbutton on HIS 831.
CUE:       None.
SAT   UNSAT
: 35. PERFORMANCE STEP:               Adjust LPI Train 1 flow to maintain < 4000 gpm on
    ........     C........         LPI Pump 1.
STANDARD:            Depress ON control power for DH lB using HIS DHlB-2.       Throttle DH 1B, using HIS DH1B, until     LPI Train 1 flow is about 1500 gpm on FYI DH2B.
COMMENT:             HPI Pump 1 is still   running and must be included in the total flow through LPI Pump 1. Required by Specific Rule 2.
Restoration of control power will not be required if     control power was not removed previously.
CUE:       None.
SAT   UNSAT
: 36. PERFORMANCE STEP:               Adjust LPI Train 2 flow to obtain about 1500 gpm.
    ....         C...C........
STANDARD:           Depress ON control power for DH 1A using HIS DHlA-2.       Throttle DH 1A, using HIS DHIA, attempting to establish an LPI Train 2 flow of about 1500 gpm on FYI DH2A.
COMMENT:             Restoration of control power will not be required if    control power was not removed previously.
CUE:        None.
SAT  UNSAT TERMINATING      CUES:          This JPM is  complete.
END TIME
 
JPM No. 4                                                    Page 28 of 28 VERIFICATION OF COMPLETION Operator                                   Evaluator SSN                                         Date License:       [ ] RO   [ ] SRO Validated   Completion   Time:           minutes Actual   Completion   Time:               minutes Acceptable Progress Maintained:                 Yes         No       N/A Result:     [ I SATISFACTORY     [ I UNSATISFACTORY NOTE:   An "Unsatisfactory" requires Comment and will require subsequent remedial training.
Comments/Feedback:
Comments/Feedback:
!Evaluator' s Signature JPM No. 4 Date DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.: 94B TASK NO.: 000-054-05-0100 Rev. 04 Page 12 of 21 , 040-012-04-0100 TASK DESCRIPTION:
Evaluator' s Signature           Date
Perform Operator Actions for a High Steam Genereator Level A- i-,- &#xfd; (IM K/A  
 
DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.:   94B                                     Rev. 04                          Page 12 of 21 TASK NO.:   000-054-05-0100               , 040-012-04-0100 TASK DESCRIPTION:       Perform Operator Actions for a High Steam Genereator Level U11 A-     i-,- &#xfd;   (IM 7T54kie0          W -C5re-)        K/A                wfrl K/A  


==REFERENCE:==
==REFERENCE:==
040-013-01-0100,              Block an SFRCS Signal    q 000-054-05-0100,              Perform required operator acionfr    f            .ra APPLICABLE  METHO)D OF TESTING:              Actual performance              KAs  0/5- 4 L/    [  /2 Simulator                                    SP TIME FOR COMPLETION:          17 minutes APPLICABILITY:      [X]    RO          [X]    SRO TASK STANDARDS:
: 3. Isolate Steam Generator 1.
: 4. Bypass SFRCS Hi Level Trip on Steam Generator                  1 per Attachment 6.
REQUIRED MATERIALS:
DB-OP-02000,  RPS,  SFAS,        SFRCS Trip or SG Tube Rupture,        Revision 5,  C-i GENERAL 
==REFERENCES:==
DB-OP-02000,  RPS,  SFAS,        SFRCS Trip or SG Tube Rupture,        Revision 5,  C-i INITIAL  CONDITIONS:
The plant is in Mode 3,            post trip,      following a Steam Generator Tube Rupture on Steam Generator 1.
INITIATING CUES:
This Shift Supervisor directs you perform step 8.14.6 of DB-OP-02000,                      RPS, SFAS, SFRCS Trip or SG Tube Rupture.
JPM No. 94B                                                  Page 13 of 21 INITIAL CONDITIONS:
The plant is in Mode 3, post trip,  following a Steam Generator Tube Rupture on Steam Generator 1.
INITIATING  CUES:
This Shift Supervisor directs you perform Step 8.14.6 of DB-OP-02000,  RPS, SFAS, SFRCS Trip or SG Tube Rupture.
JPM No. 94B                                                            Page 14 of 21 PERFORMANCE  INFORMATION NOTE:  Critical    steps denoted with a "C". Failure to meet any one of these standards for this    item constitutes failure.      Sequence is NOT assumed unless denoted in the "Comments".
START TIME:
: 1. PERFORMANCE    STEP:  Identifies the correct procedure step.
STANDARD:      Locate Step 8.14.6 of DB-OP-02000,      as the correct  step.
CUE:  None.
SAT  UNSAT
: 2. PERFORMANCE STEP:      Continue cooldown of the RCS on the good Steam
    ..... C.........        Generator by blocking and opening ICS 11A.
STANDARD:      Place PIC ICS11A in HAND, decrease the demand to zero on PIC ICSllA, depress the BLOCK pushbutton on HIS ICS11C and depress the AUTO pushbutton on HIS ICSIIA.
COMMENT:      Verify the examinee can control SG 2 pressure.
CUE:    Another RO will continue the cooldown on the good Steam Generator.
SAT  UNSAT
: 3. PERFORMANCE STEP:      Verify MSIV 1, MS 101,    is  closed.
STANDARD:      Verify the green light  is  lit on HIS 101.
CUE:  None.
SAT  UNSAT
: 4. PERFORMANCE STEP:      Verify AVV 1, ICSllB,  is    closed.
STANDARD:      Verify PIC ICS11B in HAND and decrease the demand to zero on PIC ICSlIB, and the GREEN light    is lit  on pushbutton HIS ICSllB.
CUE:    None.
SAT  UNSAT
JPM No.      94B                                                            Page 15 of 21
: 5. PERFORMANCE STEP:            Verify MS Line 1 to AFPT 1 Isolation valve,          MS 106,  is
    ........ C ...  ...... closed.
STANDARD:          Depress the BLOCK pushbutton on HIS 106AB and depress the CLOSE on pushbutton on HIS 106A.
CUE:        None.
SAT  UNSAT
: 6. PERFORMANCE STEP:            Verify MS Line 1 to AFPT 2 Isolation valve,          MS  107A,
    ........      C ...  ...... is closed.
STANDARD:          Depress the BLOCK pushbutton on HIS 107EB and depress the CLOSE on pushbutton on HIS 107E.
CUE:        None.
SAT    UNSAT
: 7. PERFORMANCE STEP:            Verify AFW to SG 1 Stop valve,      AF 608,  is  closed.
    .. . .. C.........
STANDARD:          Depress the ON pushbutton on HIS 608E, depress the CLOSE on pushbutton on HIS 608A and depress OFF pushbutton on HIS 608E.
COMMENT:            Depressing OFF on HIS 608E is  NOT critical.
CUE:        None.
SAT    UNSAT
: 8. PERFORMANCE STEP:            Verify SG 1 Main FW Stop valve,      FW 612,  is  closed.
STANDARD:          Depress the BLOCK pushbutton on HIS 612A and depress the CLOSE on pushbutton on HIS 612.
CUE:        None.
SAT    UNSAT
: 9. PERFORMANCE STEP:            Verify AFP 1 Discharge to SG 1 Stop valve,        AF 3870,    is closed.
STANDARD:          Depress the BLOCK pushbutton on HIS 3870B and depress the CLOSE on pushbutton on HIS 3870.
CUE:        None.
SAT    UNSAT
JPM No. 94B                                                              Page 16 of 21
: 10. PERFORMANCE STEP:          Verify AFP 1 Discharge to SG 2 Stop valve,      AF 3869, is open.
STANDARD:          Depress the BLOCK pushbutton on HIS 3869B and depress the OPEN on pushbutton on HIS 3869.
CUE:    None.
SAT  UNSAT
: 11. PERFORMANCE STEP:          Route to Attachment 6,  Overriding a SFRCS High Level Trip.
STANDARD:          Identifies DB-OP-02000, Attachment    6,  Section A,  as the correct procedure section.
CUE:    None.
SAT  UNSAT
: 12. PERFORMANCE STEP:          Obtain the bypass keys and door keys for all      four SFRCS channels.
STANDARD:          Keys obtained from Shift Supervisor.
COMMENT:          If being performed on the simulator,    allow the examinee  to obtain the keys.
CUE:    None.
SAT  UNSAT
: 13. PERFORMANCE STEP:          Open SFRCS Channel 1/3 door.
STANDARD:          Open door.
COMMENT:          If being performed on the simulator,    allow the examinee to open the doors.
CUE:    None.
SAT  UNSAT
: 14. PERFORMANCE STEP:          Bypass Logic Channel 1.
    .....  .. C.........
STANDARD:          Place key in  KS-l and turn to BYPASS.
CUE:    None.
SAT  UNSAT
JPM No.        94B                                                              Page 17 of 21
: 15. PERFORMANCE STEP:                  Bypass Logic Channel 1    (cont.).
      .....        .. C ........
STANDARD:                Put SB switch 071    (SP9B8) to BYP.
CUE:          None.
SAT  UNSAT
: 16. PERFORMANCE STEP:                  Bypass Logic Channel 3.
      ........        C ........
STANDARD:                  Place key in  KS-3 and turn to BYPASS.
CUE:          None.
SAT  UNSAT
: 17. PERFORMANCE                  STEP: Bypass Logic Channel 3  (cont.).
    ........          C........
STANDARD:                Put SB switch 073    (SP9B9)  to BYP.
CUE:          None.
SAT  UNSAT
: 18. PERFORMANCE STEP:                  Close and lock SFRCS Channel 1/3.
STANDARD:                Door closed and locked.
CUE:          None.
SAT  UNSAT
: 19. PERFORMANCE                  STEP:  Open SFRCS Channel 2/4 door.
STANDARD:                Open door.
COMMENT:                  If being performed on the simulator,      allow the examinee to open the doors.
CUE:          None.
SAT  UNSAT
: 20. PERFORMANCE                  STEP:  Bypass Logic Channel 2.
    .      ...... C ........
STANDARD:                Place key in  KS-2 and turn to BYPASS.
CUE:          None.
SAT  UNSAT


APPLICABLE METHO U11 7T54kie0 W -C5re-) K/A wfrl 040-013-01-0100, Block an SFRCS Signal q 000-054-05-0100, Perform required operator acionfr f .ra )D OF TESTING: Actual performance KAs 0/5- 4 L/ [ /2 Simulator SP TIME FOR COMPLETION:
JPM No. 94B                                                        Page 18 of 21
17 minutes APPLICABILITY:
: 21. PERFORMANCE STEP:        Bypass Logic Channel 2  (cont.).
[X] RO[X] SRO TASK STANDARDS:
    .. . .. C.........
: 3. Isolate Steam Generator
STANDARD:      Put SB switch 072  (SP9B6) to BYP.
: 1. 4. Bypass SFRCS Hi Level Trip on Steam Generator 1 per Attachment 6.REQUIRED MATERIALS:
CUE:     None.
DB-OP-02000, RPS, SFAS, SFRCS Trip or SG Tube Rupture, Revision 5, C-i GENERAL
SAT  UNSAT
: 22. PERFORMANCE STEP:        Bypass Logic Channel 4.
    ..    .....C.........
STANDARD:      Place key in  KS-4 and turn to BYPASS.
CUE:     None.
SAT  UNSAT
: 23. PERFORMANCE STEP:      Bypass Logic Channel 4    (cont.).
    .....    .. C.........
STANDARD:     Put SB switch 074  (SP9B7)  to BYP.
CUE:   None.
SAT  UNSAT
: 24. PERFORMANCE STEP:      Close and lock SFRCS Channel 2/4 door.
STANDARD:      Door closed and locked.
CUE:    None.
SAT  UNSAT
: 25. PERFORMANCE STEP:      Return keys to Shift Supervisor.
STANDARD:      Keys returned to Shift Supervisor.
CUE:   None.
SAT  UNSAT
: 26. PERFORMANCE STEP:      Route to DB-OP-06910,   Trip Recovery, Step 4.3.10.
STANDARD:      Identifies DB-OP-06910,   Step 4.3.10 as the correct procedural step.
COMMENT:      If  asked, Condenser vacuum is  available.
CUE:    None.
SAT  UNSAT


==REFERENCES:==
JPM No. 94B                                                              Page 19 of 21
: 27. PERFORMANCE STEP:      Verify Main Steam Non-Return valve,      MS 209,    is  open.
STANDARD:      Depress OPEN on HIS 209.
CUE:    None.
SAT    UNSAT
: 28. PERFORMANCE STEP:      Verify MSIV 2 Bypass valve,    MS 100A,  is  open.
    ...  ....C. ........
STANDARD:      Depress OPEN on HIS 100-1.
CUE:    Differential    Pressure across the MSIV,    MS 100,  is  less than 250 psi.
SAT    UNSAT
: 29. PERFORMANCE    STEP:  Verify AVV 1, ICSIIB,  is  in  hand.
STANDARD:      Verify PIC ICS11B in  HAND.
CUE:  None.
SAT    UNSAT
: 30. PERFORMANCE STEP:      Verify AVV 2,  ICS11A, is  in  hand.
STANDARD:      Verify PIC ICS11A in  HAND.
CUE:  None.
SAT    UNSAT
: 31. PERFORMANCE STEP:      Verify TBVs for Steam Line 1, ICSI2B,        is  in hand and closed.
STANDARD:      Depress HAND on PIC ICS12B and REDUCE demand to ZERO.
CUE:  None.
SAT    UNSAT
: 32. PERFORMANCE STEP:      Verify TBVs for Steam Line 2,    ICSl2A,    is  in hand and closed.
STANDARD:      Depress HAND on PIC ICS12B and REDUCE demand to ZERO.
CUE:  None.
SAT    UNSAT
 
JPM No. 94B                                                              Page 20 of 21
: 33. PERFORMANCE STEP:            Depress closed on MSIV 2,  MS 100.
STANDARD:            Depress CLOSE on HIS 100.
CUE:      None.
SAT  UNSAT
: 34. PERFORMANCE STEP:            Reset SFRCS solenoids for MSIV 2,  MS100.
                .C.........
STANDARD:            Depress REST on HS 100.
CUE:      None.
SAT  UNSAT
: 35. PERFORMANCE STEP:            Verify MSIV 2,  MS 100, is open.
    ..    ..... C.........
STANDARD:            Depress OPEN on HIS 100.
CUE:        (If asked) Differential Pressure across the MSIV,      MS  100, is  less than 250 psi.
SAT  UNSAT TERMINATING CUES:            This JPM is complete.
END TIME


DB-OP-02000, RPS, SFAS, SFRCS Trip or SG Tube Rupture, Revision 5, C-i INITIAL CONDITIONS:
JPM No. 94                                                      Page 21 of 21 VERIFICATION OF COMPLETION Operator                                     Evaluator SSN                                         Date License:       E ] RO   [ ] SRO Validated     Completion   Time:           minutes Actual   Completion   Time:               minutes Acceptable Progress Maintained:                   Yes         No       N/A Result:       [ I SATISFACTORY     [ I UNSATISFACTORY NOTE:   An "Unsatisfactory" requires Comment and will require subsequent remedial training.
The plant is in Mode 3, post trip, following a Steam Generator Tube Rupture on Steam Generator
: 1. INITIATING CUES: This Shift Supervisor directs you perform step 8.14.6 of DB-OP-02000, RPS, SFAS, SFRCS Trip or SG Tube Rupture.
JPM No. 94B Page 13 of 21 INITIAL CONDITIONS:
The plant is in Mode 3, post trip, following a Steam Generator Tube Rupture on Steam Generator
: 1. INITIATING CUES: This Shift Supervisor directs you perform Step 8.14.6 of DB-OP-02000, RPS, SFAS, SFRCS Trip or SG Tube Rupture.
Page 14 of 21 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT assumed unless denoted in the "Comments".
START TIME: 1. PERFORMANCE STEP: Identifies the correct procedure step. STANDARD:
Locate Step 8.14.6 of DB-OP-02000, as the correct step. CUE: None. SAT UNSAT 2. PERFORMANCE STEP: .....C.........
STANDARD: Continue cooldown of the RCS on the good Steam Generator by blocking and opening ICS 11A.Place PIC ICS11A in HAND, decrease the demand to zero on PIC ICSllA, depress the BLOCK pushbutton on HIS ICS11C and depress the AUTO pushbutton on HIS ICSIIA.COMMENT: Verify the examinee can control SG 2 pressure.
CUE: Another RO will continue the cooldown on the good Steam Generator.
SAT UNSAT 3. PERFORMANCE STEP: Verify MSIV 1, MS 101, is closed. STANDARD:
Verify the green light is lit on HIS 101. CUE: None. SAT UNSAT 4. PERFORMANCE STEP: Verify AVV 1, ICSllB, is closed. STANDARD:
Verify PIC ICS11B in HAND and decrease the demand to zero on PIC ICSlIB, and the GREEN light is lit on pushbutton HIS ICSllB. CUE: None. SAT UNSAT JPM No. 94B Page 15 of 21 5. PERFORMANCE STEP: Verify MS Line 1 to AFPT 1 Isolation valve, MS 106, is ........ C ... ...... closed. STANDARD:
Depress the BLOCK pushbutton on HIS 106AB and depress the CLOSE on pushbutton on HIS 106A. CUE: None. SAT UNSAT 6. PERFORMANCE STEP: Verify MS Line 1 to AFPT 2 Isolation valve, MS 107A, ........ C ... ...... is closed. STANDARD:
Depress the BLOCK pushbutton on HIS 107EB and depress the CLOSE on pushbutton on HIS 107E. CUE: None. SAT UNSAT 7. PERFORMANCE STEP: Verify AFW to SG 1 Stop valve, AF 608, is closed.  .. ...C.........
STANDARD:
Depress the ON pushbutton on HIS 608E, depress the CLOSE on pushbutton on HIS 608A and depress OFF pushbutton on HIS 608E. COMMENT: Depressing OFF on HIS 608E is NOT critical.
CUE: None. SAT UNSAT 8. PERFORMANCE STEP: Verify SG 1 Main FW Stop valve, FW 612, is closed. STANDARD:
Depress the BLOCK pushbutton on HIS 612A and depress the CLOSE on pushbutton on HIS 612. CUE: None. SAT UNSAT 9. PERFORMANCE STEP: Verify AFP 1 Discharge to SG 1 Stop valve, AF 3870, is closed. STANDARD:
Depress the BLOCK pushbutton on HIS 3870B and depress the CLOSE on pushbutton on HIS 3870. CUE: None. SAT UNSAT JPM No. 94B Page 16 of 21 10. PERFORMANCE STEP: Verify AFP 1 Discharge to SG 2 Stop valve, AF 3869, is open. STANDARD:
Depress the BLOCK pushbutton on HIS 3869B and depress the OPEN on pushbutton on HIS 3869. CUE: None. SAT UNSAT 11. PERFORMANCE STEP: Route to Attachment 6, Overriding a SFRCS High Level Trip. STANDARD:
Identifies DB-OP-02000, Attachment 6, Section A, as the correct procedure section.
CUE: None. SAT UNSAT 12. PERFORMANCE STEP: Obtain the bypass keys and door keys for all four SFRCS channels.
STANDARD:
Keys obtained from Shift Supervisor.
COMMENT: If being performed on the simulator, allow the examinee to obtain the keys. CUE: None. SAT UNSAT 13. PERFORMANCE STEP: Open SFRCS Channel 1/3 door. STANDARD:
Open door. COMMENT: If being performed on the simulator, allow the examinee to open the doors. CUE: None. SAT UNSAT 14. PERFORMANCE STEP: Bypass Logic Channel 1.  ..... ..C.........
STANDARD:
Place key in KS-l and turn to BYPASS. CUE: None. SAT UNSAT JPM No. 94B Page 17 of 21 15. PERFORMANCE STEP: Bypass Logic Channel 1 (cont.). 
..... .. C ........
STANDARD:
Put SB switch 071 (SP9B8) to BYP. CUE: None. SAT UNSAT 16. PERFORMANCE STEP: Bypass Logic Channel 3.  ........ C ........
STANDARD:
Place key in KS-3 and turn to BYPASS. CUE: None. SAT UNSAT 17. PERFORMANCE STEP: Bypass Logic Channel 3 (cont.). 
........C........
STANDARD:
Put SB switch 073 (SP9B9) to BYP. CUE: None. SAT UNSAT 18. PERFORMANCE STEP: Close and lock SFRCS Channel 1/3. STANDARD:
Door closed and locked. CUE: None. SAT UNSAT 19. PERFORMANCE STEP: Open SFRCS Channel 2/4 door. STANDARD:
Open door. COMMENT: If being performed on the simulator, allow the examinee to open the doors. CUE: None. SAT UNSAT 20. PERFORMANCE STEP: Bypass Logic Channel 2.  .......C ........
STANDARD:
Place key in KS-2 and turn to BYPASS. CUE: None. SAT UNSAT JPM No. 94B Page 18 of 21 21. PERFORMANCE STEP: Bypass Logic Channel 2 (cont.). 
.. ...C.........
STANDARD:
Put SB switch 072 (SP9B6) to BYP. CUE: None. SAT UNSAT 22. PERFORMANCE STEP: Bypass Logic Channel 4.  .. .....C.........
STANDARD:
Place key in KS-4 and turn to BYPASS. CUE: None. SAT UNSAT 23. PERFORMANCE STEP: Bypass Logic Channel 4 (cont.). 
..... ..C.........
STANDARD:
Put SB switch 074 (SP9B7) to BYP. CUE: None. SAT UNSAT 24. PERFORMANCE STEP: Close and lock SFRCS Channel 2/4 door. STANDARD:
Door closed and locked. CUE: None. SAT UNSAT 25. PERFORMANCE STEP: Return keys to Shift Supervisor.
STANDARD:
Keys returned to Shift Supervisor.
CUE: None. SAT UNSAT 26. PERFORMANCE STEP: Route to DB-OP-06910, Trip Recovery, Step 4.3.10. STANDARD:
Identifies DB-OP-06910, Step 4.3.10 as the correct procedural step. COMMENT: If asked, Condenser vacuum is available.
CUE: None. SAT UNSAT JPM No. 94B JPM No. 94B 27. PERFORMANCE STEP: Verify Main Steam Non-Return valve, MS 209, is open. STANDARD:
Depress OPEN on HIS 209. CUE: None. SAT UNSAT 28. PERFORMANCE STEP: Verify MSIV 2 Bypass valve, MS 100A, is open.  ... .... C. ........
STANDARD:
Depress OPEN on HIS 100-1. CUE: Differential Pressure across the MSIV, MS 100, is less than 250 psi. SAT UNSAT 29. PERFORMANCE STEP: Verify AVV 1, ICSIIB, is in hand. STANDARD:
Verify PIC ICS11B in HAND. CUE: None. SAT UNSAT 30. PERFORMANCE STEP: Verify AVV 2, ICS11A, is in hand. STANDARD:
Verify PIC ICS11A in HAND. CUE: None. SAT UNSAT 31. PERFORMANCE STEP: Verify TBVs for Steam Line 1, ICSI2B, is in hand and closed. STANDARD:
Depress HAND on PIC ICS12B and REDUCE demand to ZERO. CUE: None. SAT UNSAT 32. PERFORMANCE STEP: Verify TBVs for Steam Line 2, ICSl2A, is in hand and closed. STANDARD:
Depress HAND on PIC ICS12B and REDUCE demand to ZERO. CUE: None. SAT UNSAT Page 19 of 21 Page 20 of 21 33. PERFORMANCE STEP: Depress closed on MSIV 2, MS 100. STANDARD:
Depress CLOSE on HIS 100. CUE: None. SAT UNSAT 34. PERFORMANCE STEP: Reset SFRCS solenoids for MSIV 2, MS100.  .C.........
STANDARD:
Depress REST on HS 100. CUE: None. SAT UNSAT 35. PERFORMANCE STEP: Verify MSIV 2, MS 100, is open.  .. .....C.........
STANDARD:
Depress OPEN on HIS 100. CUE: (If asked) Differential Pressure across the MSIV, MS 100, is less than 250 psi. SAT UNSAT TERMINATING CUES: This JPM is complete.END TIME JPM No. 94B Page 21 of 21 VERIFICATION OF COMPLETION Operator Evaluator SSN Date License: E ] RO [ ] SRO Validated Completion Time: minutes Actual Completion Time: minutes Acceptable Progress Maintained:
Yes No N/A Result: [ I SATISFACTORY
[ I UNSATISFACTORY NOTE: An "Unsatisfactory" requires Comment and will require subsequent remedial training.
Comments/Feedback:
Comments/Feedback:
!Evaluator's Signature JPM No. 94 Date DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.: 2 Rev. 00 Page 1 of 9 TASK NO.: 000-068-05-0100, 334-017-05-0300 TASK DESCRIPTION:
Evaluator's Signature           Date
Serious Control Room Fire, Assistant Shift Supervisor Actions, Attachment 2 K/A  
 
DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.:   2                             Rev. 00                             Page 1 of 9 TASK NO.:   000-068-05-0100,     334-017-05-0300 TASK DESCRIPTION:       Serious Control Room Fire,       Assistant     Shift   Supervisor Actions,   Attachment 2 K/A  


==REFERENCE:==
==REFERENCE:==
062-A2.04 3.1/3.4,      064-A2.05 3.1/3.2 064-A2.11 2.6/2.9,      BW/A05-AA1.01 4.3/4.2 APPLICABLE METHOD OF TESTING:          Simulate performance In-plant TIME  FOR COMPLETION:      25 minutes APPLICABILITY:      [ ] RO        [XI SRO TASK STANDARDS:
: 1. Cooling  flow  (CCW)  to  EDG 1 is  established.
: 2. All required emergency control transfer switches are in                  LOCAL.
: 3. EDG 1 is protected.
: 4. Isolate B bus and remove bus control power.
REQUIRED MATERIALS:
DB-OP-02519,    Serious Control Room Fire,          Revision 4,      C-3 GENERAL


062-A2.04 3.1/3.4, 064-A2.05 3.1/3.2 064-A2.11 2.6/2.9, BW/A05-AA1.01 4.3/4.2 APPLICABLE METHOD OF TESTING: Simulate performance In-plant TIME FOR COMPLETION:
==REFERENCES:==
25 minutes APPLICABILITY:
[ ] RO [XI SRO TASK STANDARDS:
: 1. Cooling flow (CCW) to EDG 1 is established.
: 2. All required emergency control transfer switches are in LOCAL. 3. EDG 1 is protected.
: 4. Isolate B bus and remove bus control power. REQUIRED MATERIALS:
DB-OP-02519, Serious Control Room Fire, Revision 4, C-3 GENERAL


==REFERENCES:==
DB-OP-02519,    Serious Control Room Fire,          Revision 4,      C-3 INITIAL CONDITIONS:
The Control Room has been evacuated due to a serious Control Room fire.
INITIATING CUES:
You have been directed to perform the Assistant Shift Supervisor actions in  of DB-OP-02519, Serious Control Room Fire.
You have obtained all      the required serious Control Room fire              equipment.
(Hand copy of DB-OP-02519 to examinee.)
 
JPM No. 2                                                    Page 2 of 9 INITIAL  CONDITIONS:
The Control Room has been evacuated due to a Serious Control Room Fire.
INITIATING  CUES:
You have been directed to perform the Assistant Shift Supervisor actions in  of DB-OP-02519, Serious Control Room Fire.
You have obtained all the required Serious Control Room Fire Equipment.
 
JPM No.      2                                                                      Page 3 of 9 PERFORMANCE INFORMATION NOTE:          Critical          steps denoted with a "C". Failure to meet any one of these standards for this            item constitutes failure. Sequence is  NOT required unless denoted in the "Comments".
START TIME:
: 1. PERFORMANCE                  STEP:    Verify the radio is NOT in  silence mode.
STANDARD:                Key radio to transmit.
CUE:          Radio transmitter switch has been depressed and released.
SAT  UNSAT
: 2. PERFORMANCE STEP:                    Establish CCW flow to EDG 1.
              ...    .oC          o.........
STANDARD:                CC 1471 is      OPENED.
CUE:          HV 1471 has been rotated clockwise to CLOSE.
CC 1471 IA regulator drain petcock has been rotated counterclockwise to OPEN.
Position indicator on CC 1471 indicates OPEN.
SAT  UNSAT
: 3. PERFORMANCE STEP:                    Isolate the EDG 1 Engine Control Panel from the
    ........          C ........        Control Room fire.
STANDARD:              On C3621, EDG 1 Engine Control Panel, disconnect switch, Emergency Control Transfer Switch DS-4A, in LOCAL.
CUE:          Emergency Control Transfer Switch DS-4A has been placed in              LOCAL.
SAT  UNSAT
 
JPM No.        2                                                                Page 4 of 9
: 4. PERFORMANCE STEP:                Isolate the EDG Local Control Panel      from the Control
    ........        C ........      Room fire.
STANDARD:              Place disconnect switches on C3615, DG 1 Local Control Panel, ISO SW DS-lB Appendix R in EMERGENCY, and ISO SW DS-l Appendix R for relay SAX/13, in LOCAL.
CUE:          ISO SW DS-lB Appendix R switch has been placed in            EMERGENCY.
ISO SW DS-I Appendix R for relay SAX/13            has been placed in  LOCAL.
SAT  UNSAT
: 5. PERFORMANCE STEP:              Isolate the EDG Local Control Panel from the Control
    ........        C ........      Room fire    (cont.).
STANDARD:              Open the nine TS-4 test    disconnect switches on Panel C3615, DG 1 Local Control Panel.
CUE:          All nine TS-4,      test  disconnect switches,    have been placed in  the OPEN position.
SAT  UNSAT
: 6. PERFORMANCE STEP:              Isolate the EDG Voltage Regulator cabinet        from the
    ........        C ........      Control Room fire    (cont.).
STANDARD:              Disconnect switch ISO SW DS-3 Appendix R on Panel C3617,          DG 1 Voltage Regulator Cabinet, in LOCAL.
CUE:          ISO SW DS-3 Appendix R switch has been placed in            LOCAL.
SAT  UNSAT
: 7. PERFORMANCE              STEP: Force the EDG into the Isochronous Mode.
        ....... C........
STANDARD:              Isochronous droop switch placed in      isochronous.
CUE:          Isochronous droop switch has been placed in            ISOCHRONOUS.
SAT  UNSAT
: 8. PERFORMANCE              STEP: Disable the Voltage Regulator Droop mode.
    ....            C..C STANDARD:              Voltage Regulator droop switch in      OFF.
CUE:          Voltage Regulator droop switch has been placed in            OFF.
SAT  UNSAT
 
JPM No. 2                                                            Page 5 of 9
: 9. PERFORMANCE STEP:          Shutdown EDG 2.
    ..... C..C.......
STANDARD:    Push emergency shutdown on EDG 2 at C3622,        DG 2 Engine Control Panel.
CUE:    Emergency shutdown has been pushed.
EDG 2 is      STOPPED.
SAT  UNSAT
: 10. PERFORMANCE STEP:          Place DG 1 Sycn Selector in  the DG BKR to C1 position.
STANDARD:    Rotate the DG 1 Sycn Selector to the DG BKR to C1 position.
CUE:    The DG 1 Sycn Selector switch has been rotated to the DG BKR to Cl position.
SAT  UNSAT
: 11. PERFORMANCE STEP:          Determine status of EDG 1.
STANDARD:    Verify that EDG 1 is      running unloaded.
COMMENT:      The order of the cues is      respective to the If-Then statements in the step.
CUE:    EDG 1 Running volt meter indicates 124 VAC.
EDG 1 Kilwatt meter indicates 0 KWe.
EDG 1 is      running and ACII0,  Bus Cl to Bus C2 Tie Brkr,  is CLOSED.
SAT  UNSAT
: 12. PERFORMANCE    STEP:      Notify the Shiftf Supervisor EDG 1 is  running unloaded and route to step 1.0.d.4.
STANDARD:    Contact the Shift Supervisor and route to step 1.0.d.4.
CUE:    Shift Supervisor has been notified EDG 1 is        running unloaded.
SAT  UNSAT
 
JPM No. 2                                                        Page 6 of 9
: 13. PERFORMANCE    STEP: Adjust EDG 1 voltage to 4300 VAC.
C ........
            .C.....
STANDARD:    Determine EDG 1 voltage and adjust EDG 1 voltage using DG 1 Voltage regulator switch.
CUE:    EDG 1 voltage is    4220 VAC.
EDG 1 Voltage Regulator switch has been rotated to RAISE.
EDG 1 voltage is  4300 VAC.
EDG 1 Voltage Regulator switch has been released to neutral.
SAT  UNSAT
: 14. PERFORMANCE STEP:    Adjust EDG 1 frequency to 60 Hz.
    ...  ... C........
STANDARD:    Determine EDG 1 frequency and adjust EDG 1 frequency using DG 1 Spd Cntrl switch.
CUE:    EDG 1 Frequency is    60.7 Hz.
EDG 1 Speed Control switch has been rotated to LOWER.
EDG 1 Frequency is    60 Hz.
EDG 1 Speed Control switch has been released to neutral.
SAT  UNSAT
: 15. PERFORMANCE STEP:      Notify the Secondary RO and the SS that EDG 1 is protected.
STANDARD:    Using the radio or Gai-Tronics,  inform the Secondary RO and the SS that EDG 1 is protected.
CUE:  The Secondary RO and SS have been notified EDG 1 is    protected.
SAT  UNSAT
 
JPM No.      2                                                                      Page 7 of 9
: 16. PERFORMANCE STEP:                  At Dl Bus Cubicle 2, remove AACDl close control power
    ........        C ........        fuses AND trip    AACDl using the manual trip    plunger at the base of the breaker.
STANDARD:              AACDl checked open and close fuses pulled and lift            the manual trip  plunger.
CUE:          Breaker AACDI green light            lit,  control fuses pulled.
The manual trip          plunger for breater AACDI has been lifted.          (if asked) Breaker position indicator points to open.
SAT  UNSAT
: 17. PERFORMANCE                STEP:  Remove control power from B bus source breakers.
                  .C.........
STANDARD:              Knife switch in    Cubicle 14 placed in      mid position.
CUE:        Knife switch has been placed in              the MID position.
SAT  UNSAT
: 18. PERFORMANCE STEP:                  Verify OPEN B bus source breakers.
    ........        C.......
STANDARD:              Check OPEN the following B bus source breakers:            HX01B, HX02B, and HXlIB.
CUE:        Breaker HX01B has the Green light                OFF; Red light OFF.
The manual trip          plunger for breater HX01B has been lifted.
(if      asked) Breaker position indicator points to open.
Breaker HXlIB has the Green light                OFF; Red light OFF.
The manual trip          plunger for breater HXllB has been lifted.
(if      asked) Breaker position indicator points to open.
Breaker HX02B has the Green light                OFF; Red light OFF.
The manual trip          plunger for breater HX02B has been lifted.
(if      asked) Breaker position indicator points to open.
SAT  UNSAT
 
JPM No. 2                                                          Page 8 of 9
: 19. PERFORMANCE    STEP:  Remove control power from B bus load breakers.
    ..    .....C.........
STANDARD:      Knife switch in  B Bus Cubicle 1 placed in mid position.
CUE:    Knife switch has been placed in  the MID position.
SAT  UNSAT TERMINATING    CUES:  This JPM is complete.
END TIME


DB-OP-02519, Serious Control Room Fire, Revision 4, C-3 INITIAL CONDITIONS:
JPM No. 2                                                                   Page 9 of 9 VERIFICATION OF COMPLETION Operator                                       Evaluator SSN                                           Date License:       [ ] RO     [   SRO Validated   Completion     Time:           minutes Actual   Completion Time:                   minutes Acceptable Progress Maintained:                     Yes             No             N/A Result:     [ ] SATISFACTORY       [ I UNSATISFACTORY NOTE:   An "Unsatisfactory" requires Comment and will require subsequent remedial training.
The Control Room has been evacuated due to a serious Control Room fire. INITIATING CUES: You have been directed to perform the Assistant Shift Supervisor actions in Attachment 2 of DB-OP-02519, Serious Control Room Fire. You have obtained all the required serious Control Room fire equipment.  (Hand copy of DB-OP-02519 to examinee.)
JPM No. 2 Page 2 of 9 INITIAL CONDITIONS:
The Control Room has been evacuated due to a Serious Control Room Fire. INITIATING CUES: You have been directed to perform the Assistant Shift Supervisor actions in Attachment 2 of DB-OP-02519, Serious Control Room Fire. You have obtained all the required Serious Control Room Fire Equipment.
Page 3 of 9 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT required unless denoted in the "Comments".
START TIME: 1. PERFORMANCE STEP: Verify the radio is NOT in silence mode. STANDARD:
Key radio to transmit.
CUE: Radio transmitter switch has been depressed and released.
SAT UNSAT 2. PERFORMANCE STEP: Establish CCW flow to EDG 1.  ... .o C o.........
STANDARD:
CC 1471 is OPENED. CUE: HV 1471 has been rotated clockwise to CLOSE. CC 1471 IA regulator drain petcock has been rotated counterclockwise to OPEN. Position indicator on CC 1471 indicates OPEN. SAT UNSAT 3. PERFORMANCE STEP: Isolate the EDG 1 Engine Control Panel from the ........ C ........ Control Room fire. STANDARD:
On C3621, EDG 1 Engine Control Panel, disconnect switch, Emergency Control Transfer Switch DS-4A, in LOCAL. CUE: Emergency Control Transfer Switch DS-4A has been placed in LOCAL. SAT UNSAT JPM No. 2 Page 4 of 9 4. PERFORMANCE STEP: Isolate the EDG Local Control Panel from the Control ........ C ........ Room fire. STANDARD:
Place disconnect switches on C3615, DG 1 Local Control Panel, ISO SW DS-lB Appendix R in EMERGENCY, and ISO SW DS-l Appendix R for relay SAX/13, in LOCAL. CUE: ISO SW DS-lB Appendix R switch has been placed in EMERGENCY.
ISO SW DS-I Appendix R for relay SAX/13 has been placed in LOCAL. SAT UNSAT 5. PERFORMANCE STEP: Isolate the EDG Local Control Panel from the Control ........ C ........ Room fire (cont.).
STANDARD:
Open the nine TS-4 test disconnect switches on Panel C3615, DG 1 Local Control Panel. CUE: All nine TS-4, test disconnect switches, have been placed in the OPEN position.
SAT UNSAT 6. PERFORMANCE STEP: Isolate the EDG Voltage Regulator cabinet from the ........ C ........ Control Room fire (cont.).
STANDARD:
Disconnect switch ISO SW DS-3 Appendix R on Panel C3617, DG 1 Voltage Regulator Cabinet, in LOCAL. CUE: ISO SW DS-3 Appendix R switch has been placed in LOCAL. SAT UNSAT 7. PERFORMANCE STEP: Force the EDG into the Isochronous Mode.  .......C........
STANDARD:
Isochronous droop switch placed in isochronous.
CUE: Isochronous droop switch has been placed in ISOCHRONOUS.
SAT UNSAT 8. PERFORMANCE STEP: Disable the Voltage Regulator Droop mode.  .... C..C ........
STANDARD:
Voltage Regulator droop switch in OFF. CUE: Voltage Regulator droop switch has been placed in OFF. SAT UNSAT JPM No. 2 Page 5 of 9 9. PERFORMANCE STEP: Shutdown EDG 2.  ..... C..C.......
STANDARD:
Push emergency shutdown on EDG 2 at C3622, DG 2 Engine Control Panel. CUE: Emergency shutdown has been pushed. EDG 2 is STOPPED.
SAT UNSAT 10. PERFORMANCE STEP: Place DG 1 Sycn Selector in the DG BKR to C1 position.
STANDARD:
Rotate the DG 1 Sycn Selector to the DG BKR to C1 position.
CUE: The DG 1 Sycn Selector switch has been rotated to the DG BKR to Cl position.SAT UNSAT 11. PERFORMANCE STEP: Determine status of EDG 1. STANDARD:
Verify that EDG 1 is running unloaded.
COMMENT: The order of the cues is respective to the If-Then statements in the step. CUE: EDG 1 Running volt meter indicates 124 VAC. EDG 1 Kilwatt meter indicates 0 KWe. EDG 1 is running and ACII0, Bus Cl to Bus C2 Tie Brkr, is CLOSED. SAT UNSAT 12. PERFORMANCE STEP: Notify the Shiftf Supervisor EDG 1 is running unloaded and route to step 1.0.d.4.
STANDARD:
Contact the Shift Supervisor and route to step 1.0.d.4.
CUE: Shift Supervisor has been notified EDG 1 is running unloaded.
SAT UNSAT JPM No. 2 Page 6 of 9 13. PERFORMANCE STEP: Adjust EDG 1 voltage to 4300 VAC.  .C..... C ........
STANDARD:
Determine EDG 1 voltage and adjust EDG 1 voltage using DG 1 Voltage regulator switch.CUE: EDG 1 voltage is 4220 VAC. EDG 1 Voltage Regulator switch has been rotated to RAISE. EDG 1 voltage is 4300 VAC. EDG 1 Voltage Regulator switch has been released to neutral.
SAT UNSAT 14. PERFORMANCE STEP: Adjust EDG 1 frequency to 60 Hz.  ... ...C........
STANDARD:
Determine EDG 1 frequency and adjust EDG 1 frequency using DG 1 Spd Cntrl switch. CUE: EDG 1 Frequency is 60.7 Hz. EDG 1 Speed Control switch has been rotated to LOWER. EDG 1 Frequency is 60 Hz. EDG 1 Speed Control switch has been released to neutral.
SAT UNSAT 15. PERFORMANCE STEP: Notify the Secondary RO and the SS that EDG 1 is protected.
STANDARD:
Using the radio or Gai-Tronics, inform the Secondary RO and the SS that EDG 1 is protected.
CUE: The Secondary RO and SS have been notified EDG 1 is protected.
SAT UNSAT JPM No. 2 Page 7 of 9 16. PERFORMANCE STEP: At Dl Bus Cubicle 2, remove AACDl close control power ........ C ........ fuses AND trip AACDl using the manual trip plunger at the base of the breaker.
STANDARD:
AACDl checked open and close fuses pulled and lift the manual trip plunger.CUE: Breaker AACDI green light lit, control fuses pulled. The manual trip plunger for breater AACDI has been lifted. asked) Breaker position indicator points to open.(if SAT UNSAT 17. PERFORMANCE STEP: Remove control power from B bus source breakers. 
..... ..C.........
STANDARD:
Knife switch in Cubicle 14 placed in mid position.
CUE: Knife switch has been placed in the MID position.
SAT UNSAT 18. PERFORMANCE STEP: Verify OPEN B bus source breakers. 
........C.......
STANDARD:
Check OPEN the following B bus source breakers:
HX01B, HX02B, and HXlIB. CUE: Breaker HX01B has the Green light OFF; Red light OFF. The manual trip plunger for breater HX01B has been lifted.  (if asked) Breaker position indicator points to open. Breaker HXlIB has the Green light OFF; Red light OFF. The manual trip plunger for breater HXllB has been lifted.  (if asked) Breaker position indicator points to open. Breaker HX02B has the Green light OFF; Red light OFF. The manual trip plunger for breater HX02B has been lifted.  (if asked) Breaker position indicator points to open. SAT UNSAT JPM No. 2 JPM No. 2 Page 8 of 9 19. PERFORMANCE STEP: Remove control power from B bus load breakers. 
.. .....C.........
STANDARD:
Knife switch in B Bus Cubicle 1 placed in mid position.
CUE: Knife switch has been placed in the MID position.
SAT UNSAT TERMINATING CUES: This JPM is complete.
END TIME Page 9 of 9 VERIFICATION OF COMPLETION Operator Evaluator SSN Date License: [ ] RO [ SRO Validated Completion Time: minutes Actual Completion Time: minutes Acceptable Progress Maintained:
Yes No N/A Result: [ ] SATISFACTORY
[ I UNSATISFACTORY NOTE: An "Unsatisfactory" requires Comment and will require subsequent remedial training.
Comments/Feedback:
Comments/Feedback:
___________________________________________/________
___________________________________________/________
JPM No. 2 Date Evaluator's Signature DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.: 1A Rev. 00 Page 1 of 13 TASK NO.: 061-019-04-0100, 061-020-04-0100 TASK DESCRIPTION:
Evaluator's Signature                       Date
Local Operation of the AFW Pump Turbine 1 (Use when Train 2 is protected.)
 
DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.:     1A                           Rev. 00                   Page 1 of 13 TASK NO.:     061-019-04-0100,   061-020-04-0100 TASK DESCRIPTION:       Local Operation of the AFW Pump Turbine 1 (Use when Train 2 is protected.)
K/A  
K/A  


==REFERENCE:==
==REFERENCE:==
 
061-K5.01 3.6/3.9,     061-K6.01 2.5/2.8 061-A2.03 3.1/3.4 APPLICABLE METHOD OF TESTING:         Simulate Performance In-plant Alternate Path TIME FOR COMPLETION:         20 minutes APPLICABILITY:       [X] RO     [X] SRO TASK STANDARDS:
061-K5.01 3.6/3.9, 061-K6.01 2.5/2.8 061-A2.03 3.1/3.4 APPLICABLE METHOD OF TESTING: Simulate Performance In-plant Alternate Path TIME FOR COMPLETION:
20 minutes APPLICABILITY:
[X] RO[X] SRO TASK STANDARDS:
AFW Train 1 manual speed control at the AFPT governor.
AFW Train 1 manual speed control at the AFPT governor.
REQUIRED MATERIALS:
REQUIRED MATERIALS:
DB-OP-06233, Auxiliary Feedwater System, Revision 05 GENERAL  
DB-OP-06233,     Auxiliary Feedwater System,     Revision 05 GENERAL  


==REFERENCES:==
==REFERENCES:==


DB-OP-06233, Auxiliary Feedwater System, Revision 05 INITIAL CONDITIONS:
DB-OP-06233,     Auxiliary Feedwater System,     Revision 05 INITIAL CONDITIONS:
A loss of DlP from 100% power has occurred.
A loss of DlP from 100% power has occurred.
The reactor has tripped and SFRCS actuated on a loss of four (4) RCPs. A loss of AFPT 1 governor speed control and AF 6452, AFW 1 level control valve, failing open is a result of the loss of DlP and is causing an overcooling of the RCS. INITIATING CUES: You have been directed by the Shift Supervisor to locally control AFPT 1 speed by manual speed control at the AFPT 1 governor valve, in accordance with DB-OP-06233.(Hand examinee the procedure.)
The reactor has tripped and SFRCS actuated on a loss of four (4) RCPs.
JPM No. IA Page 2 of 13 INITIAL CONDITIONS:
A loss of AFPT 1 governor speed control and AF 6452, AFW 1 level control valve, failing     open is a result of the loss of DlP and is causing an overcooling of the RCS.
INITIATING CUES:
You have been directed by the Shift Supervisor to locally control AFPT 1 speed by manual speed control at the AFPT 1 governor valve, in accordance with DB-OP-06233.
(Hand examinee   the procedure.)
 
JPM No. IA                                                     Page 2 of 13 INITIAL CONDITIONS:
A loss of DIP from 100% power has occurred.
A loss of DIP from 100% power has occurred.
The reactor has tripped and SFRCS actuated on a loss of four (4) RCPs. A loss of AFPT 1 governor speed control and AF 6452, AFW 1 level control valve, failing open is a result of the loss of DIP and is causing an overcooling of the RCS. INITIATING CUES: You have been directed by the Shift Supervisor to locally control AFPT 1 speed by manual speed control at the AFPT 1 governor valve, in accordance with DB-OP-06233.
The reactor has tripped and SFRCS actuated on a loss of four   (4) RCPs.
Page 3 of 13 NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
A loss of AFPT 1 governor speed control and AF 6452,   AFW 1 level control valve, failing open is a result of the loss of DIP and is causing an overcooling of the RCS.
START TIME: 1. PERFORMANCE STEP: Locate the correct procedure.
INITIATING CUES:
STANDARD:
You have been directed by the Shift Supervisor to locally control AFPT 1 speed by manual speed control at the AFPT 1 governor valve, in accordance with DB-OP-06233.
Identifies Section 5.1 of DB-OP-06233, Auxiliary Feedwater System, as the correct procedure section.
 
CUE: (if asked) ALL prerequisites have been performed.
JPM No. 1A                                                              Page 3 of 13
SAT UNSAT 2. PERFORMANCE STEP: Attempt to unstick governor valve/linkage.
                                  --  -  -- ----- --    w-NOTE:   Critical     steps denoted with a "C". Failure to meet any one of these standards for this       item constitutes failure. Sequence is NOT critical     unless denoted in the "Comments".
STANDARD:
START TIME:
Applies a downward force to the governor valve linkage labeled L1. CUE: Governor valve moves inward slightly and is NOT STUCK. SAT UNSAT 3. PERFORMANCE STEP: Attempt manual speed control from the Control Room or the Auxiliary Shutdown Panel.STANDARD:
: 1. PERFORMANCE STEP:       Locate the correct procedure.
Contacts the Control Room to attempt speed control of AFPT 1. CUE: Control Room operator informs you he has no speed control of AFPT 1. (if necessary)
STANDARD:       Identifies Section 5.1 of DB-OP-06233, Auxiliary Feedwater System, as the correct procedure section.
Shift Supervisor directs you to continue with the procedure.
CUE:   (if   asked) ALL prerequisites have been performed.
SAT UNSAT 4. PERFORMANCE STEP: In AFPT 1 Room, establish communications with the Reactor Operator.
SAT UNSAT
STANDARD:
: 2. PERFORMANCE STEP:       Attempt to unstick governor valve/linkage.
Establish communications with Reactor Operator via Gai-Tronics or radio. CUE: You have established communications with a Reactor Operator.
STANDARD:       Applies a downward force to the governor valve linkage labeled L1.
The Reactor Operator directs you to reduce AFPT 1 speed. SAT UNSAT----- ----- --w-JPM No. 1A Page 4 of 13 5. PERFORMANCE STEP: Unscrew and remove the electrical connector on the ........ C .........
CUE:   Governor valve moves inward slightly         and is NOT STUCK.
face of the governor.
SAT UNSAT
STANDARD:
: 3. PERFORMANCE STEP:       Attempt manual speed control from the Control Room or the Auxiliary Shutdown Panel.
Locates electrical connector and unscrews it. COMMENT: This step must be performed prior to Step 6. CUE: The electrical connector is DISCONNECTED.
STANDARD:       Contacts the Control Room to attempt     speed control of AFPT 1.
SAT UNSAT 6. PERFORMANCE STEP: Turn the manual speed setting control knob as ........ C .........
CUE:   Control Room operator informs you he has no speed control of AFPT 1.
appropriate to control AFPT speed/flow as directed by the Reactor Operator.
(if necessary) Shift Supervisor directs you to continue with the procedure.
STANDARD:
SAT UNSAT
Locate the manual speed setting knob and adjust to reduce the AFPT speed (CCW direction).
: 4. PERFORMANCE STEP:       In AFPT 1 Room, establish communications with the Reactor Operator.
COMMENT: AFPT 1 speed will not change regardless of the examinee's actions.
STANDARD:       Establish communications with Reactor Operator via Gai-Tronics or radio.
CUE: AFPT 1 speed remains constant. (if asked) AFPT speed is 3600 rpm. SAT UNSAT 7. PERFORMANCE STEP: Identify AFPT 1 speed control, using the governor valve, has failed and route to Section 5.3. STANDARD:
CUE:   You have established communications with a Reactor Operator.           The Reactor Operator directs you to reduce AFPT 1 speed.
Locate the correct procedure section. Identifies Section 5.3 of DB-OP-06233, Auxiliary Feedwater System, as correct procedure section.
SAT UNSAT
CUE: (If asked) Shift Supervisor directs you to gain control of AFPT 1 speed. SAT UNSAT 8. PERFORMANCE STEP: Establish communication with Control Room. STANDARD:
 
Utilize the Gai-Tronics or radio to communicate with the Control Room. CUE: (If asked) You have established communications with the Control Room. SAT UNSAT JPM No. 1A Page 5 of 13 9. PERFORMANCE STEP: Unseal the trip throttle valve, ICS 38C. ....C.........
JPM No.     1A                                                               Page 4 of 13
STANDARD:
: 5. PERFORMANCE STEP:                 Unscrew and remove the electrical connector on the
The trip throttle valve seal disconnected.
    ........       C .........       face of the governor.
CUE: The trip throttle valve seal is DISCONNECTED.
STANDARD:             Locates electrical   connector and unscrews it.
SAT UNSAT 10. PERFORMANCE STEP: Close the trip throttle valve, ICS 38C. .. ..C.........
COMMENT:               This step must be performed prior to Step 6.
STANDARD:
CUE:       The electrical         connector is DISCONNECTED.
Valve handwheel rotated clockwise to CLOSE. CUE Valve handwheel is rotated FULLY clockwise (to CLOSE). SAT UNSAT 11. PERFORMANCE STEP: Obtain red governor tool and other required tools. STANDARD:
SAT   UNSAT
Obtain necessary tools at entrance to AFP room. COMMENT: Tools may have already been obtained.
: 6. PERFORMANCE STEP:                 Turn the manual speed setting control knob as
This step can be performed out of sequence.
    ........       C .........       appropriate to control AFPT speed/flow as directed by the Reactor Operator.
CUE: The Red governor tool and other required tools to disconnect linkage have been obtained.
STANDARD:             Locate the manual speed setting knob and adjust to reduce the AFPT speed (CCW direction).
SAT UNSAT 12. PERFORMANCE STEP: Disconnect the linkage between the governor and the ........ C ........ governor valve, where the spring meets linkage.
COMMENT:             AFPT 1 speed will not change regardless of the examinee's actions.
STANDARD:
CUE:       AFPT 1 speed remains constant.
Linkage disconnected where the spring meets the linkage at the second joint from the governor controller with the tools from the emergency hatch cabinet.
(if     asked) AFPT speed is     3600 rpm.
CUE: The linkage is DISCONNECTED.
SAT UNSAT
SAT UNSAT 13. PERFORMANCE STEP: Block the governor valve, ICS 38B, "full open". ... ... C.........
: 7. PERFORMANCE STEP:                 Identify AFPT 1 speed control, using the governor valve, has failed and route to Section 5.3.
STANDARD:
STANDARD:             Locate the correct procedure section. Identifies Section 5.3 of DB-OP-06233, Auxiliary Feedwater System, as correct procedure section.
Pull up on L1, put the Red AFPT governor blocking tool in place above the governor rod in red area on linkage.
CUE:       (If asked)         Shift Supervisor directs you to gain control of AFPT 1 speed.
CUE: Ll has been pulled up. The block is in place above the governor rod in the Red area. SAT UNSAT JPM No. 1A Page 6 of 13 14. PERFORMANCE STEP: Slowly open the trip throttle valve, ICS 38C. .... ..C...... ..STANDARD:
SAT UNSAT
CUE: Trip throttle valve, ICS 38C, OPENED by turning the handwheel (slowly) counterclockwise to raise AFPT speed > 600 rpm. The trip throttle valve, ICS 38C, handwheel is rotated slowly counterclockwise.
: 8. PERFORMANCE               STEP: Establish communication with Control Room.
AFPT 1 speed has INCREASED TO 2800 rpm.SAT UNSAT 15. PERFORMANCE STEP: Control the AFPT 1 speed to maintain the required AFW flow. STANDARD:
STANDARD:             Utilize the Gai-Tronics or radio to communicate with the Control Room.
Ask Control Room for feedback.
CUE:         (If asked) You have established communications with the Control Room.
CUE: The Control Room Operator directs you to maintain speed at the current value until he can evaluate SG level trend. SAT UNSAT TERMINATING CUES: This JPM is complete.END TIME JPM No. 1A DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.: lB Rev. 00 Page 7 of 13 TASK NO.: 061-019-04-0100, 061-020-04-0100 TASK DESCRIPTION:
SAT UNSAT
Local Operation of the AFW Pump Turbine 2 (Use when Train 1 is protected.)
 
JPM No.     1A                                                                           Page 5 of 13
: 9. PERFORMANCE STEP:                 Unseal the trip       throttle   valve,   ICS 38C.
    . . .       .C.........
STANDARD:             The trip       throttle     valve seal disconnected.
CUE:       The trip       throttle       valve seal is     DISCONNECTED.
SAT UNSAT
: 10. PERFORMANCE STEP:                 Close the trip     throttle   valve,   ICS 38C.
    ..         ..C.........
STANDARD:           Valve handwheel rotated clockwise to CLOSE.
CUE       Valve handwheel is                 rotated FULLY clockwise     (to CLOSE).
SAT UNSAT
: 11. PERFORMANCE             STEP:     Obtain red governor tool and other required tools.
STANDARD:             Obtain necessary tools at entrance to AFP room.
COMMENT:             Tools may have already been obtained.                 This step can be performed out of sequence.
CUE:       The Red governor tool and other required tools to disconnect linkage have been obtained.
SAT UNSAT
: 12. PERFORMANCE STEP:                 Disconnect the linkage between the governor and the
    ........       C ........         governor valve, where the spring meets linkage.
STANDARD:           Linkage disconnected where the spring meets the linkage at the second joint         from the governor controller with the tools from the emergency hatch cabinet.
CUE:       The linkage is             DISCONNECTED.
SAT UNSAT
: 13. PERFORMANCE             STEP:     Block the governor valve,         ICS 38B,   "full open".
    ... ... C.........
STANDARD:             Pull up on L1, put the Red AFPT governor blocking tool in place above the governor rod in red area on linkage.
CUE:                 Ll has been pulled up.
The block is           in place above the governor rod in       the Red area.
SAT UNSAT
 
JPM No. 1A                                                                   Page 6 of 13
: 14. PERFORMANCE   STEP:   Slowly open the trip       throttle     valve,   ICS 38C.
    . ...   ..C...... ..
STANDARD:   Trip throttle       valve, ICS 38C, OPENED by turning the handwheel (slowly) counterclockwise to raise AFPT speed > 600 rpm.
CUE:        The trip   throttle     valve, ICS 38C,     handwheel is   rotated slowly counterclockwise.
AFPT 1 speed has INCREASED TO 2800 rpm.
SAT UNSAT
: 15. PERFORMANCE STEP:     Control the AFPT 1 speed to maintain the required AFW flow.
STANDARD:   Ask Control Room for feedback.
CUE:         The Control Room Operator directs you to maintain speed at the current value until       he can evaluate SG level trend.
SAT UNSAT TERMINATING CUES:     This JPM is       complete.
END TIME
 
DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE   MEASURE WORKSHEET JPM NO.:     lB                             Rev. 00               Page 7 of 13 TASK NO.:     061-019-04-0100,     061-020-04-0100 TASK DESCRIPTION:       Local Operation of the AFW Pump Turbine 2 (Use when Train 1 is protected.)
K/A  
K/A  


==REFERENCE:==
==REFERENCE:==
 
061-K5.01 3.6/3.9,       061-K6.01 2.5/2.8 061-A2.03 3.1/3.4 APPLICABLE METHOD OF TESTING:           Simulate Performance In-plant Alternate Path TIME FOR COMPLETION:         20 minutes APPLICABILITY:       [XI RO       [XI SRO TASK STANDARDS:
061-K5.01 3.6/3.9, 061-K6.01 2.5/2.8 061-A2.03 3.1/3.4 APPLICABLE METHOD OF TESTING: Simulate Performance In-plant Alternate Path TIME FOR COMPLETION:
20 minutes APPLICABILITY:
[XI RO[XI SRO TASK STANDARDS:
AFW Train 2 manual speed control at the AFPT governor.
AFW Train 2 manual speed control at the AFPT governor.
REQUIRED MATERIALS:
REQUIRED MATERIALS:
DB-OP-06233, Auxiliary Feedwater System, Revision 05 GENERAL  
DB-OP-06233,     Auxiliary Feedwater System,         Revision 05 GENERAL  


==REFERENCES:==
==REFERENCES:==


DB-OP-06233, Auxiliary Feedwater System, Revision 05 INITIAL CONDITIONS:
DB-OP-06233,     Auxiliary Feedwater System,         Revision 05 INITIAL CONDITIONS:
A loss of D2P from 100% power has occurred.
A loss of D2P from 100% power has occurred.
The reactor has tripped and SFRCS actuated on a loss of four (4) RCPs. A loss of AFPT 2 governor speed control and AF 6451, AFW 2 level control valve, failing open is a result of the loss of D2P and is causing an overcooling of the RCS. INITIATING CUES: You have been directed by the Shift Supervisor to locally control AFPT 2 speed by manual speed control at the AFPT 2 governor valve, in accordance with DB-OP-06233.(Hand examinee the procedure.)
The reactor has tripped and SFRCS actuated on a loss of four (4) RCPs.
JPM No. 1B Page 8 of 13 INITIAL CONDITIONS:
A loss of AFPT 2 governor speed control and AF 6451, AFW 2 level control valve, failing     open is a result of the loss of D2P and is causing an overcooling of the RCS.
INITIATING CUES:
You have been directed by the Shift Supervisor to locally control AFPT 2 speed by manual speed control at the AFPT 2 governor valve, in accordance with DB-OP-06233.
(Hand examinee   the procedure.)
 
JPM No. 1B                                                     Page 8 of 13 INITIAL CONDITIONS:
A loss of D2P from 100% power has occurred.
A loss of D2P from 100% power has occurred.
The reactor has tripped and SFRCS actuated on a loss of four (4) RCPs. A loss of AFPT 2 governor speed control and AF 6451, AFW 2 level control valve, failing open is a result of the loss of D2P and is causing an overcooling of the RCS. INITIATING CUES: You have been directed by the Shift Supervisor to locally control AFPT 2 speed by manual speed control at the AFPT 2 governor valve, in accordance with DB-OP-06233.
The reactor has tripped and SFRCS actuated on a loss of four (4) RCPs.
Page 9 of 13 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
A loss of AFPT 2 governor speed control and AF 6451,   AFW 2 level control valve, failing open is a result of the loss of D2P and is causing an overcooling of the RCS.
START TIME: 1. PERFORMANCE STEP: Locate the correct procedure.
INITIATING CUES:
STANDARD:
You have been directed by the Shift Supervisor to locally control AFPT 2 speed by manual speed control at the AFPT 2 governor valve, in accordance with DB-OP-06233.
Identifies Section 5.2 of DB-OP-06233, Auxiliary Feedwater System, as the correct procedure section.
 
CUE: (if asked) ALL prerequisites have been performed.
JPM No. 1B                                                            Page 9 of 13 PERFORMANCE INFORMATION NOTE:   Critical     steps denoted with a "C". Failure to meet any one of these standards for this       item constitutes failure. Sequence is NOT critical     unless denoted in the "Comments".
SAT UNSAT 2. PERFORMANCE STEP: Attempt to unstick governor valve/linkage.
START TIME:
STANDARD:
: 1. PERFORMANCE STEP:       Locate the correct procedure.
Applies a downward force to the governor valve linkage labeled L1. CUE: Governor valve moves inward slightly and is NOT STUCK. SAT UNSAT 3. PERFORMANCE STEP: Attempt manual speed control from the Control Room or the Auxiliary Shutdown Panel.STANDARD:
STANDARD:       Identifies Section 5.2 of DB-OP-06233, Auxiliary Feedwater System, as the correct procedure section.
Contacts the Control Room to attempt speed control of AFPT 2. CUE: Control Room Operator informs you he has no speed control of AFPT 2. (if necessary)
CUE:   (if   asked) ALL prerequisites have been performed.
Shift Supervisor directs you to continue with the procedure.
SAT UNSAT
SAT UNSAT 4. PERFORMANCE STEP: In AFPT 2 Room, establish communications with the Reactor Operator.
: 2. PERFORMANCE STEP:       Attempt to unstick governor valve/linkage.
STANDARD:
STANDARD:       Applies a downward force to the governor valve linkage labeled L1.
Establish communications with Reactor Operator via Gai-Tronics or radio. CUE: You have established communications with a Reactor Operator.
CUE:   Governor valve moves inward slightly       and is NOT STUCK.
The Reactor Operator directs you to reduce AFPT 2 speed. SAT UNSAT JPM No. 1B Page 10 of 13 5. PERFORMANCE STEP: Unscrew and remove the electrical connector on the ........ C ........ face of the governor.
SAT UNSAT
STANDARD:
: 3. PERFORMANCE     STEP:   Attempt manual speed control from the Control Room or the Auxiliary Shutdown Panel.
Locates electrical connector and unscrews it. COMMENT: This step must be performed prior to Step 6. CUE: The electrical connector is DISCONNECTED.
STANDARD:       Contacts the Control Room to attempt speed control of AFPT 2.
SAT UNSAT 6. PERFORMANCE STEP: Turn the manual speed setting control knob as ........ C .........
CUE:   Control Room Operator informs you he has no speed control of AFPT 2.
appropriate to control AFPT speed/flow as directed by the Reactor Operator.
(if   necessary) Shift Supervisor directs you to continue with the procedure.
STANDARD:
SAT UNSAT
Locate the manual speed setting knob and adjust to reduce the AFPT speed (CCW direction).
: 4. PERFORMANCE STEP:       In AFPT 2 Room, establish communications with the Reactor Operator.
COMMENT: AFPT 2 speed will not change regardless of the examinee's actions.
STANDARD:       Establish communications with Reactor Operator via Gai-Tronics or radio.
CUE: AFPT 2 speed remains constant. (if asked) AFPT speed is 3600 rpm. SAT UNSAT 7. PERFORMANCE STEP: Identify AFPT 2 speed control, using the governor valve, has failed and route to Section 5.4. STANDARD:
CUE:   You have established communications with a Reactor Operator.         The Reactor Operator directs you to reduce AFPT 2 speed.
Locate the correct procedure section Identifies Section 5.4 of DB-OP-06233, Auxiliary Feedwater System, as correct procedure section.
SAT UNSAT
CUE: (If asked) Shift Supervisor directs you to gain control of AFPT 2 speed. SAT UNSAT 8. PERFORMANCE STEP: Establish communication with Control Room. STANDARD:
 
Utilize the Gai-Tronics or radio to communicate with the Control Room. CUE: (If asked) You have established communications with the Control Room.SAT UNSAT JPM No. 1B Page 11 of 13 9. PERFORMANCE STEP: Unseal the trip throttle valve, ICS 38D. .. .....C.........
JPM No.     1B                                                           Page 10 of 13
STANDARD:
: 5. PERFORMANCE STEP:               Unscrew and remove the electrical connector on the
The trip throttle valve seal disconnected.
    ........       C ........     face of the governor.
CUE: The trip throttle valve seal is DISCONNECTED.
STANDARD:             Locates electrical connector and unscrews it.
SAT UNSAT 10. PERFORMANCE STEP: Close the trip throttle valve, ICS 38D. ........ C .........
COMMENT:               This step must be performed prior to Step 6.
STANDARD:
CUE:       The electrical       connector is DISCONNECTED.
Valve handwheel rotated clockwise to CLOSE. CUE Valve handwheel is rotated FULLY clockwise (to CLOSE). SAT UNSAT 11. PERFORMANCE STEP: Obtain red governor tool and other required tools. STANDARD:
SAT UNSAT
Obtain necessary tools at entrance to AFP room. COMMENT: Tools may have already been obtained.
: 6. PERFORMANCE STEP:               Turn the manual speed setting control knob as
This step can be performed out of sequence.
    ........       C ......... appropriate to control AFPT speed/flow as directed by the Reactor Operator.
CUE: The Red governor tool and other required tools to disconnect linkage have been obtained.
STANDARD:             Locate the manual speed setting knob and adjust to reduce the AFPT speed (CCW direction).
SAT UNSAT 12. PERFORMANCE STEP: Disconnect the linkage between the governor and the ........ C ........ governor valve, where the spring meets linkage.
COMMENT:             AFPT 2 speed will not change regardless of the examinee's actions.
STANDARD:
CUE:       AFPT 2 speed remains constant.
Linkage disconnected where the spring meets the linkage at the second joint from the governor controller with the tools from the emergency hatch cabinet.
(if     asked) AFPT speed is   3600 rpm.
CUE: The linkage is DISCONNECTED.
SAT UNSAT
SAT UNSAT 13. PERFORMANCE STEP: Block the governor valve, ICS 38A, "full open". .C... ..Ce........
: 7. PERFORMANCE STEP:               Identify AFPT 2 speed control, using the governor valve, has failed and route to Section 5.4.
STANDARD:
STANDARD:             Locate the correct procedure section Identifies Section 5.4 of DB-OP-06233, Auxiliary Feedwater System, as correct procedure section.
Pull up on L1, put the Red AFPT governor blocking tool in place above the governor rod in red area on linkage.
CUE:       (If     asked) Shift Supervisor directs you to gain control of AFPT 2 speed.
CUE: Ll has been pulled up. The block is in place above the governor rod in the Red area. SAT UNSAT JPM No. 1B Page 12 of 13 14. PERFORMANCE STEP: Slowly open the trip throttle valve, ICS 38D. .....,.C.........
SAT UNSAT
STANDARD:
: 8. PERFORMANCE               STEP: Establish communication with Control Room.
CUE: Trip throttle valve, ICS 38D, OPENED by turning the handwheel (slowly) counterclockwise to raise AFPT speed > 600 rpm. The trip throttle valve, ICS 38D, handwheel is rotated slowly counterclockwise.
STANDARD:             Utilize the Gai-Tronics or radio to communicate with the Control Room.
AFPT 2 speed has INCREASED TO 2800 rpm.SAT UNSAT 15. PERFORMANCE STEP: Control the AFPT 2 speed to maintain the required AFW flow. STANDARD:
CUE:         (If asked) You have established communications       with the Control Room.
Ask Control Room for feedback.
SAT UNSAT
CUE: The Control Room Operator directs you to maintain speed at the current value until he can evaluate SG level trend. SAT UNSAT TERMINATING CUES: This JPM is complete.END TIME JPM No. 1B Page 13 of 13 VERIFICATION OF COMPLETION Operator Evaluator SSN Date License: [ ] RO [ ] SRO Validated Completion Time: minutes Actual Completion Time: minutes Acceptable Progress Maintained:
 
Yes No N/A Result: [ ] SATISFACTORY
JPM No.     1B                                                                             Page 11 of 13
[ I UNSATISFACTORY NOTE: An "Unsatisfactory" requires Comment and will require subsequent remedial training.
: 9. PERFORMANCE STEP:                     Unseal the trip       throttle   valve,   ICS 38D.
Comments/Feedback:  
    ..       ..... C.........
/JPM No. 1 Date Evaluator's Signature DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.: 57 Rev. 06 TASK NO.: 002-008-04-0100 TASK DESCRIPTION:
STANDARD:               The trip       throttle     valve seal disconnected.
Borate the RCS from Outside the Control Room K/A  
CUE:         The trip         throttle       valve seal is     DISCONNECTED.
SAT UNSAT
: 10. PERFORMANCE STEP:                     Close the trip     throttle   valve,   ICS 38D.
    ........         C .........
STANDARD:               Valve handwheel           rotated clockwise to CLOSE.
CUE         Valve handwheel               is   rotated FULLY clockwise     (to CLOSE).
SAT UNSAT
: 11. PERFORMANCE STEP:                     Obtain red governor tool and other required tools.
STANDARD:               Obtain necessary tools at entrance to AFP room.
COMMENT:               Tools may have already been obtained.                 This step can be performed out of sequence.
CUE:           The Red governor tool and other required tools to disconnect linkage have been obtained.
SAT UNSAT
: 12. PERFORMANCE STEP:                     Disconnect the linkage between the governor and the
    ........         C ........           governor valve, where the spring meets linkage.
STANDARD:               Linkage disconnected where the spring meets the linkage at the second joint           from the governor controller with the tools from the emergency hatch cabinet.
CUE:         The linkage is               DISCONNECTED.
SAT UNSAT
: 13. PERFORMANCE                 STEP:     Block the governor valve,         ICS 38A,   "full   open".
              ...C...
Ce........
STANDARD:               Pull up on L1, put the Red AFPT governor blocking tool in place above the governor rod in red area on linkage.
CUE:                   Ll has been pulled up.
The block is           in place above the governor rod in       the Red area.
SAT UNSAT
 
JPM No. 1B                                                                 Page 12 of 13
: 14. PERFORMANCE STEP:     Slowly open the trip       throttle     valve,   ICS 38D.
    . .... ,.C.........
STANDARD:   Trip throttle       valve, ICS 38D, OPENED by turning the handwheel (slowly) counterclockwise to raise AFPT speed > 600 rpm.
CUE:        The trip   throttle     valve, ICS 38D,     handwheel is rotated slowly counterclockwise.
AFPT 2 speed has INCREASED TO 2800 rpm.
SAT UNSAT
: 15. PERFORMANCE   STEP:   Control the AFPT 2 speed to maintain the required AFW flow.
STANDARD:   Ask Control Room for feedback.
CUE:       The Control Room Operator directs you to maintain speed at the current value until       he can evaluate SG level trend.
SAT UNSAT TERMINATING CUES:   This JPM is       complete.
END TIME
 
JPM No. 1                                                      Page 13 of 13 VERIFICATION OF COMPLETION Operator                                   Evaluator SSN                                         Date License:       [ ] RO     [ ] SRO Validated   Completion Time:             minutes Actual   Completion Time:                 minutes Acceptable Progress Maintained:                 Yes         No       N/A Result:     [ ] SATISFACTORY     [ I UNSATISFACTORY NOTE:   An "Unsatisfactory" requires Comment and will require subsequent remedial training.
Comments/Feedback:
                                                                  /
Evaluator's Signature           Date
 
DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.:   57                           Rev. 06                      Page 1 of 6 TASK NO.: 002-008-04-0100 TASK DESCRIPTION:     Borate the RCS   from Outside the Control Room K/A  


==REFERENCE:==
==REFERENCE:==
004-A2.14    3.8/3.9 APPLICABLE METHOD OF TESTING:      Simulate  performance In-Plant TIME FOR COMPLETION:      20 minutes APPLICABILITY:    [XI  RO      [XI SRO TASK STANDARDS:
: 1. Lineup for boric acid addition using local valves.
: 2. Start BA Pump 1.
REQUIRED MATERIALS:
DB-OP-06001,  Boron Concentration Control,      Revision 2, C-1 GENERAL
==REFERENCES:==


004-A2.14 3.8/3.9 APPLICABLE METHOD OF TESTING: Simulate performance In-Plant Page 1 of 6 TIME FOR COMPLETION:
DB-OP-06001,  Boron Concentration Control,      Revision 2, C-l INITIAL CONDITIONS:
20 minutes APPLICABILITY:
The plant is  in Mode 1 at 100% power.
[XI RO [XI SRO TASK STANDARDS:
A load reduction to 50% power is      planned.
: 1. Lineup for boric acid addition using local valves. 2. Start BA Pump 1. REQUIRED MATERIALS:
INITIATING CUES:
DB-OP-06001, Boron Concentration Control, Revision 2, C-1 GENERAL
The normal boric acid addition method cannot be used.
You have been directed to add 50 gallons of boric acid to the MUT from outside the CTRM using Boric Acid Pump 1, per DB-OP-06001.
(Hand copy of DB-OP-06001 to examinee.)


==REFERENCES:==
JPM No. 57                                                Page 2 of 6 INITIAL CONDITIONS:
The plant is  in Mode 1 at 100% power.
A load reduction to 50% power is  planned.
INITIATING CUES:
The normal boric acid addition method cannot be used.
You have been directed to add 50 gallons of boric acid to the MUT from outside the CTRM using Boric Acid Pump 1, per DB-OP-06001.
 
JPM No. 57                                                            Page 3 of 6 PERFORMANCE  INFORMATION NOTE:  Critical    steps denoted with a "C".        Failure to meet any one of these standards for this          item constitutes failure. Sequence is assumed unless denoted in the "Comments".
START TIME:
: 1. PERFORMANCE STEP:      Locate the correct procedure section.
STANDARD:      Identifies DB-OP-06001, Boron Concentration Control, Section 5.1, as the correct procedure section.
COMMENT:      Provide correct procedure to examinee.        When the correct procedure section has been located, provide the CUE.
CUE:    All prerequisites have been completed.
SAT  UNSAT
: 2. PERFORMANCE STEP:      Verify valve MU 348,      Boric Acid Pump 1 Discharge,    is open.
STANDARD:      Handwheel/stem position indicate OPEN.
CUE:    MU 348,    valve stem is      UP.
SAT  UNSAT
: 3. PERFORMANCE STEP:      Verify valve WC 394, from Concentrates Storage Tank to BAATs Discharge, is open.
STANDARD:      Handwheel/stem position indicate OPEN.
CUE:    WC 394,    valve stem is      UP.
SAT  UNSAT
: 4. PERFORMANCE STEP:      Verify valve WC 393, Concentrate Storage Tank to MU Filters      Line 2, is open.
STANDARD:      Handwheel/stem position indicate OPEN.
CUE:    WC 393,    valve stem is      UP.
SAT  UNSAT
 
JPM No.      57                                                            Page 4 of 6
: 5. PERFORMANCE STEP:              Verify MU 351,  Boric Acid Pump 2 to Makeup Filters open.
STANDARD:            MU 351 stem position indicates    OPEN.
CUE:        MU 351 valve stem is        UP.
SAT  UNSAT
: 6. PERFORMANCE STEP:              Close MU 363,  BAAT 1 to Makeup Filters.
    ........      C .......
STANDARD:            Handwheel  to the CLOSE position.
COMMENT:              MU 363 located between BAATs in    CA.
CUE:        MU 363 has been rotated clockwise/CLOSED;          valve stem is  DOWN.
SAT  UNSAT
: 7. PERFORMANCE STEP:              Open MU 366,  BAAT 2 to Makeup Filters.
    ........      C.......
STANDARD:            MU 366 handwheel turned  (CCW) until  FULLY OPEN.
CUE:        MU 366 handwheel has been rotated counterclockwise/OPENED;            valve stem is UP.
SAT  UNSAT
: 8. PERFORMANCE STEP:              Start Boric Acid Pump 1.
    ..      .  .o Co........
STANDARD: BA Pump 1 started from Control Room.
CUE:        Control Room Operator has started BA Pump 1.
SAT  UNSAT
: 9. PERFORMANCE              STEP: Stop Boric Acid Pump 1.
STANDARD:          BA Pump 1 is    stopped from the Control Room.
CUE:        Control Room Operator reports that 50 gallons have been added to the MUT and BA Pump 1 has been stopped.
SAT  UNSAT
 
JPM No. 57                                                          Page 5 of 6
: 10. PERFORMANCE  STEP:  Close MU 366,  BAAT 2 to Makeup Filters.
STANDARD:  Restore L/U, MU 366 handwheel turned  (CW)  until    FULLY CLOSED.
CUE:    MU 366 handwheel  has been rotated clockwise/CLOSED;        Valve stem is DOWN.
SAT  UNSAT
: 11. PERFORMANCE  STEP:  Open MU 363,  BAAT 1 to Makeup Filters.
STANDARD:  Restore L/U, MU 363 handwheel turned  (CCW)  until    FULLY OPEN.
CUE:    MU 363 handwheel has been rotated counterclockwise/OPENED:        valve stem is UP.
SAT  UNSAT TERMINATING CUES:    This JPM is  complete.
END TIME


DB-OP-06001, Boron Concentration Control, Revision 2, C-l INITIAL CONDITIONS:
JPM No. 57                                                   Page 6 of 6 VERIFICATION OF COMPLETION Operator                                   Evaluator SSN                                         Date License:       [ ] RO   [ ] SRO Validated     Completion   Time:           minutes Actual   Completion Time:                 minutes Acceptable Progress Maintained:                 Yes         No         N/A Result:       [ I SATISFACTORY     [ I UNSATISFACTORY NOTE:   An "Unsatisfactory" requires Comment and will require subsequent remedial training.
The plant is in Mode 1 at 100% power. A load reduction to 50% power is planned.
INITIATING CUES: The normal boric acid addition method cannot be used. You have been directed to add 50 gallons of boric acid to the MUT from outside the CTRM using Boric Acid Pump 1, per DB-OP-06001.  (Hand copy of DB-OP-06001 to examinee.)
JPM No. 57 Page 2 of 6 INITIAL CONDITIONS:
The plant is in Mode 1 at 100% power. A load reduction to 50% power is planned.
INITIATING CUES: The normal boric acid addition method cannot be used. You have been directed to add 50 gallons of boric acid to the MUT from outside the CTRM using Boric Acid Pump 1, per DB-OP-06001.
Page 3 of 6 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is assumed unless denoted in the "Comments".
START TIME: 1. PERFORMANCE STEP: Locate the correct procedure section.
STANDARD:
Identifies DB-OP-06001, Boron Concentration Control, Section 5.1, as the correct procedure section.
COMMENT: Provide correct procedure to examinee.
When the correct procedure section has been located, provide the CUE. CUE: All prerequisites have been completed.
SAT UNSAT 2. PERFORMANCE STEP: Verify valve MU 348, Boric Acid Pump 1 Discharge, is open. STANDARD:
Handwheel/stem position indicate OPEN. CUE: MU 348, valve stem is UP. SAT UNSAT 3. PERFORMANCE STEP: Verify valve WC 394, from Concentrates Storage Tank to BAATs Discharge, is open. STANDARD:
Handwheel/stem position indicate OPEN. CUE: WC 394, valve stem is UP. SAT UNSAT 4. PERFORMANCE STEP: Verify valve WC 393, Concentrate Storage Tank to MU Filters Line 2, is open. STANDARD:
Handwheel/stem position indicate OPEN. CUE: WC 393, valve stem is UP. SAT UNSAT JPM No. 57 Page 4 of 6 5. PERFORMANCE STEP: Verify MU 351, Boric Acid Pump 2 to Makeup Filters open. STANDARD:
MU 351 stem position indicates OPEN. CUE: MU 351 valve stem is UP. SAT UNSAT 6. PERFORMANCE STEP: Close MU 363, BAAT 1 to Makeup Filters. 
........ C ....... STANDARD:
Handwheel to the CLOSE position.
COMMENT: MU 363 located between BAATs in CA. CUE: MU 363 has been rotated clockwise/CLOSED; valve stem is DOWN. SAT UNSAT 7. PERFORMANCE STEP: Open MU 366, BAAT 2 to Makeup Filters. 
........C.......
STANDARD:
MU 366 handwheel turned (CCW) until FULLY OPEN. CUE: MU 366 handwheel has been rotated counterclockwise/OPENED; valve stem is UP. SAT UNSAT 8. PERFORMANCE STEP: Start Boric Acid Pump 1.  .. ..o Co........
STANDARD:
BA Pump 1 started from Control Room. CUE: Control Room Operator has started BA Pump 1. SAT UNSAT 9. PERFORMANCE STEP: Stop Boric Acid Pump 1. STANDARD:
BA Pump 1 is stopped from the Control Room. CUE: Control Room Operator reports that 50 gallons have been added to the MUT and BA Pump 1 has been stopped.
SAT UNSAT JPM No. 57 Page 5 of 6 10. PERFORMANCE STEP: Close MU 366, BAAT 2 to Makeup Filters.
STANDARD:
Restore L/U, MU 366 handwheel turned (CW) until FULLY CLOSED. CUE: MU 366 handwheel has been rotated clockwise/CLOSED; Valve stem is DOWN. SAT UNSAT 11. PERFORMANCE STEP: Open MU 363, BAAT 1 to Makeup Filters.
STANDARD:
Restore L/U, MU 363 handwheel turned (CCW) until FULLY OPEN. CUE: MU 363 handwheel has been rotated counterclockwise/OPENED:
valve stem is UP. SAT UNSAT TERMINATING CUES: This JPM is complete.END TIME JPM No. 57 Page 6 of 6 VERIFICATION OF COMPLETION Operator Evaluator SSN Date License: [ ] RO [ ] SRO Validated Completion Time: minutes Actual Completion Time: minutes Acceptable Progress Maintained:
Yes No N/A Result: [ I SATISFACTORY
[ I UNSATISFACTORY NOTE: An "Unsatisfactory" requires Comment and will require subsequent remedial training.
Comments/Feedback:
Comments/Feedback:
Evaluator's Signature JPM No. 57 Date}}
Evaluator's Signature             Date}}

Latest revision as of 10:47, 28 March 2020

Initial Exam (10/2000) System Jpms (October 2-6, 2000) Five JPMs Srous Only
ML010470479
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/02/2000
From:
NRC/RGN-III
To:
References
-RFPFR
Download: ML010470479 (49)


Text

FINAL-AS ADMINISTERED SYSTEMS JPMs DAVIS BESSE INITIAL EXAM (OCTOBER 2-6, 2000)

FIVE JPMs SROUs ONLY

DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.: 4C Rev. 00 Page 19 of 28 TASK NO.: 000-058-05-0100 TASK DESCRIPTION: Establishing Long Term Boron Dilution Using LPI Train 2 K/A

REFERENCE:

006-K6.03 3.6/3.9, 006-Al.ll 3.1/3.4 006-A2.05 3.4/3.5 APPLICABLE METHOD OF TESTING: Actual performance Simulator Alternate Path TIME FOR COMPLETION: 10 minutes APPLICABILITY: [XI RO [X] SRO TASK STANDARDS:

1. Align HPI Train 1 to supplement core cooling with LPI Train 1.
2. Align LPI Train 2 to take a suction off of the DH Drop line and discharge to the RCS.
3. Establish long term boron dilution with LPI Train 2.
4. Align LPI Train 1 to inject through both LPI injection lines.

REQUIRED MATERIALS:

DB-OP-02000, RPS, SFAS, SFRCS Trip and SG Tube Rupture, Revision 5, C-1 GENERAL

REFERENCES:

DB-OP-02000, RPS, SFAS, SFRCS Trip and SG Tube Rupture, Revision 5, C-i INITIAL CONDITIONS:

A large break LOCA has occurred.

HPI Pump 2 has failed to start.

Both MU pumps and HPI Pump 1 have been stopped per procedure.

Both LPI pumps have been transferred to the Emergency Sump.

INITIATING CUES:

You have been directed to establish long term boron dilution according to 2 of DB-OP-02000, RPS, SFAS, SFRCS Trip and SG Tube Rupture, using LPI Train 2.

Step D on Page 1 of Attachment 12 has been completed.

JPM No. 4C Page 20 of 28 INITIAL CONDITIONS:

A large break LOCA has occurred.

HPI Pump 2 has failed to start.

Both MU pumps and HPI Pump 1 have been stopped per procedure.

Both LPI pumps have been transferred to the Emergency Sump.

INITIATING CUES:

You have been directed to establish long term boron dilution according to 2 of DB-OP-02000, RPS, SFAS, SFRCS Trip and SG Tube Rupture, using LPI Train 2.

Step D on Page 1 of Attachment 12 has been completed.

JPM No. 4C Page 21 of 28 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT assumed unless denoted in the "Comments".

START TIME:

1. PERFORMANCE STEP: Locate the correct step.

STANDARD: Identifies Step E on Page 1 of Attachment 12 is the correct start point.

CUE: None.

SAT UNSAT

2. PERFORMANCE STEP: Return control power to DH 11 and DH 12.

.. .....C.........

STANDARD: Depress the ON pushbutton on HIS DH11A and HIS DH12A.

COMMENT: DH 11 and DH 12 must be open to complete the task.

CUE: None.

SAT UNSAT

3. PERFORMANCE STEP: Verify open DH 11, Normal Suction Isolation.

... ... C.........

STANDARD: Depress the OPEN pushbutton on HIS DHll.

CUE: None.

SAT UNSAT

4. PERFORMANCE STEP: Verify open DH 12, Normal Suction Isolation.

.. . .. C.........

STANDARD: Depress the OPEN pushbutton on HIS DHI2.

COMMENT: Examinee may turn off control power to DH 11 and DH 12 which not required by procedure.

CUE: None.

SAT UNSAT

JPM No. 4C Page 22 of 28

5. PERFORMANCE STEP: Route to Method 2 using LPI Train 2.

STANDARD: Route to Page 4 of Attachment 12.

CUE: None.

SAT UNSAT

6. PERFORMANCE STEP: Check that the suction of LPI and CTMT Spray has been transferred to the Emergency Sump.

STANDARD: Observe the RED lights are lit on HIS DH9B and HIS DH9A.

Observe the GREEN lights are lit on HIS DH7B and HIS DH7A.

CUE: None.

SAT UNSAT

7. PERFORMANCE STEP: Check that both LPI trains are cooling the core.

STANDARD: Observe >1000 gpm flow on FYI DH2B and FYI DH2A.

CUE: (If asked how long LPI has been in operation.) LPI has been operating for 90 minutes.

SAT UNSAT

8. PERFORMANCE STEP: Verify Incores temperatures are < 333 0 F.

STANDARD: Rotate Incore temperature selector switches HS 4627 and HS 4628 to verify the Incore Temperature indicators, TI 4627 and TI 4628 are < 333 0 F.

CUE: None.

SAT UNSAT

9. PERFORMANCE STEP: Check that SCM does not exist.

STANDARD: Observe RCS pressure on one of the various wide range indicators and determine the SCM is < 20 0 F.

CUE: None.

SAT UNSAT

10. PERFORMANCE STEP: Route to Method 2 using LPI Train 2.

STANDARD: Route to Page 8 of Attachment 12.

CUE: None.

SAT UNSAT

JPM No. 4C Page 23 of 28

11. PERFORMANCE STEP: Identify CCW Train 2 is > 95 0 F.

STANDARD: Identify that CCW Train 2 temperature is 105 0 F using TI 1490.

CUE: None.

SAT UNSAT

12. PERFORMANCE STEP: Verfiy open DH 64, DHR Cooler 1 Outlet to HPI Pump 1

........ C ........ Suction.

STANDARD: Depress the OPEN pushbutton on HIS DH64.

CUE: None.

SAT UNSAT

13. PERFORMANCE STEP: Verify closed HP 32, HPI Recirc to BWST.

STANDARD: Verify GREEN light is lit on HIS HP32.

CUE: None.

SAT UNSAT

14. PERFORMANCE STEP: Adjust LPI Train 1 flow to maintain < 4000 gpm.

STANDARD: Depress ON control power for DH lB using HIS DHlB-2. Throttle DH 1B, using HIS DHIB, until LPI Train 1 flow is about 3000 gpm on FYI DH2B.

COMMENT: Required by Specific Rule 2.

CUE: None.

SAT UNSAT

15. PERFORMANCE STEP: Start HPI Pump 1.

o Co..... ...

STANDARD: Turn the control switch HIS 1524 to START.

CUE: None.

SAT UNSAT

JPM No. 4C Page 24 of 28

16. PERFORMANCE STEP: Verify open HP 2C and HP 2D, HP Injection 1 valves.

STANDARD: Verify RED lights are lit on HIS HP2C and HIS HP2D.

CUE: None.

SAT UNSAT

17. PERFORMANCE STEP: Verify flow is indicated on HPI Train 1.

STANDARD: Verify flow is indicated on FYI HP3C and FYI HP3D.

CUE: None.

SAT UNSAT

18. PERFORMANCE STEP: Verify closed DH 1A, DH Pump 2 Discharge to RCS

........ C ......... Isolation.

STANDARD: Depress ON control power for DH 1A using HIS DH1A-2. Depress and hold the CLOSE pushbutton HIS DHIA, until only the GREEN light is lit.

CUE: None.

SAT UNSAT

19. PERFORMANCE STEP: Verify core cooling is adequate.

STANDARD: Observe the Incore temperature indicators, TI 4627 and TI 4626, are constant.

CUE: Incore temperature indicators, TI 4627 and TI 4626, are constant and will be monitored by the Shift Manager.

SAT UNSAT

20. PERFORMANCE STEP: Stop LPI Pump 2.

. ..... C.........

STANDARD: Depress the BLOCK pushbutton on HIS DH6AI and turn the control switch HIS DH6A to STOP.

COMMENT: LPI Pump 2 must be stopped prior to repositioning DH 2734.

CUE: None.

SAT UNSAT

JPM No. 4C Page 25 of 28

21. PERFORMANCE STEP: Verify closed DH 2734, DH Pump 2 LPI Suction valve.

.C........

STANDARD: Depress the BLOCK pushbutton on HIS 2734A and depress the CLOSE pushbutton on HIS 2734.

CUE: None.

SAT UNSAT

22. PERFORMANCE STEP: Verify open DH 11 and DH 12, Normal Suction Isolation.

STANDARD: Observe the RED lights are lit on HIS DHII and HIS DHI2.

CUE: None.

SAT UNSAT

23. PERFORMANCE STEP: Verify open DH 1518, DH Pump 2 Suction from RCS.

.. . .. C.........

STANDARD: Depress the OPEN pushbutton on HIS 1518.

CUE: None.

SAT UNSAT

24. PERFORMANCE STEP: Start LPI Pump 2.

.. .....C.........

STANDARD: Turn the control switch HIS DH6A to START.

CUE: None.

SAT UNSAT

25. PERFORMANCE STEP: Verify no indication of cavitation on LPI Pump 2.

STANDARD: Observe constant amperes and flow on LPI Train 2.

CUE: None.

SAT UNSAT

26. PERFORMANCE STEP: Adjust LPI Train 2 flow to 300 to 500 gpm.

.C.........

STANDARD: Depress ON control power for DH 1A using HIS DHIA-2. Throttle DH 1A, using HIS DH1A, attempting to establish an LPI Train 2 flow of about 300 to 500 gpm on FYI DH2A.

COMMENT: Restoration of control power will not be required if control power was not removed previously.

CUE: None.

SAT UNSAT

JPM No. 4C Page 26 of 28

27. PERFORMANCE STEP: Identify indications of cavitation on LPI Pump 2.

... C..C........

STANDARD: Observe swinging amperes and flow on LPI Train 2.

CUE: None.

SAT UNSAT

28. PERFORMANCE STEP: Stop LPI Pump 2.

.C ........

STANDARD: Turn the control switch HIS DH6A to STOP.

CUE: None.

SAT UNSAT

29. PERFORMANCE STEP: Verify closed DH 1518, DH Pump 2 Suction from RCS.

... .. .C ........

STANDARD: Depress the CLOSE pushbutton on HIS 1518.

CUE: None.

SAT UNSAT

30. PERFORMANCE STEP: Route to Step 10.7.

STANDARD: Route to Step 10.7.

CUE: None.

SAT UNSAT

31. PERFORMANCE STEP: Verify LPI Pump 2 is off.

STANDARD: Observe the GREEN light is LIT on control switch HIS DH6A.

CUE: None.

SAT UNSAT

32. PERFORMANCE STEP: Verify closed DH 2734, DH Pump 2 LPI Suction valve.

STANDARD: Observe the GREEN light is LIT on HIS 2734.

CUE: None.

SAT UNSAT

JPM No. 4C Page 27 of 28

33. PERFORMANCE STEP: Verify closed DH 1A, DH Pump 2 Discharge to RCS

..... C......... Isolation.

STANDARD: Depress ON control power for DH 1A using HIS DH1A-2. Depress and hold the CLOSE pushbutton HIS DH1A, until only the GREEN light is lit.

COMMENT: Restoration of control power will not be required if control power was not removed previously.

CUE: None.

SAT UNSAT

34. PERFORMANCE STEP: Verify open DH 831, Decay Heat Cooler Disch Xover 1

.... C............ to 2.

STANDARD: Depress the OPEN pushbutton on HIS 831.

CUE: None.

SAT UNSAT

35. PERFORMANCE STEP: Adjust LPI Train 1 flow to maintain < 4000 gpm on

........ C........ LPI Pump 1.

STANDARD: Depress ON control power for DH lB using HIS DHlB-2. Throttle DH 1B, using HIS DH1B, until LPI Train 1 flow is about 1500 gpm on FYI DH2B.

COMMENT: HPI Pump 1 is still running and must be included in the total flow through LPI Pump 1. Required by Specific Rule 2.

Restoration of control power will not be required if control power was not removed previously.

CUE: None.

SAT UNSAT

36. PERFORMANCE STEP: Adjust LPI Train 2 flow to obtain about 1500 gpm.

.... C...C........

STANDARD: Depress ON control power for DH 1A using HIS DHlA-2. Throttle DH 1A, using HIS DHIA, attempting to establish an LPI Train 2 flow of about 1500 gpm on FYI DH2A.

COMMENT: Restoration of control power will not be required if control power was not removed previously.

CUE: None.

SAT UNSAT TERMINATING CUES: This JPM is complete.

END TIME

JPM No. 4 Page 28 of 28 VERIFICATION OF COMPLETION Operator Evaluator SSN Date License: [ ] RO [ ] SRO Validated Completion Time: minutes Actual Completion Time: minutes Acceptable Progress Maintained: Yes No N/A Result: [ I SATISFACTORY [ I UNSATISFACTORY NOTE: An "Unsatisfactory" requires Comment and will require subsequent remedial training.

Comments/Feedback:

Evaluator' s Signature Date

DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.: 94B Rev. 04 Page 12 of 21 TASK NO.: 000-054-05-0100 , 040-012-04-0100 TASK DESCRIPTION: Perform Operator Actions for a High Steam Genereator Level U11 A- i-,- ý (IM 7T54kie0 W -C5re-) K/A wfrl K/A

REFERENCE:

040-013-01-0100, Block an SFRCS Signal q 000-054-05-0100, Perform required operator acionfr f .ra APPLICABLE METHO)D OF TESTING: Actual performance KAs 0/5- 4 L/ [ /2 Simulator SP TIME FOR COMPLETION: 17 minutes APPLICABILITY: [X] RO [X] SRO TASK STANDARDS:

3. Isolate Steam Generator 1.
4. Bypass SFRCS Hi Level Trip on Steam Generator 1 per Attachment 6.

REQUIRED MATERIALS:

DB-OP-02000, RPS, SFAS, SFRCS Trip or SG Tube Rupture, Revision 5, C-i GENERAL

REFERENCES:

DB-OP-02000, RPS, SFAS, SFRCS Trip or SG Tube Rupture, Revision 5, C-i INITIAL CONDITIONS:

The plant is in Mode 3, post trip, following a Steam Generator Tube Rupture on Steam Generator 1.

INITIATING CUES:

This Shift Supervisor directs you perform step 8.14.6 of DB-OP-02000, RPS, SFAS, SFRCS Trip or SG Tube Rupture.

JPM No. 94B Page 13 of 21 INITIAL CONDITIONS:

The plant is in Mode 3, post trip, following a Steam Generator Tube Rupture on Steam Generator 1.

INITIATING CUES:

This Shift Supervisor directs you perform Step 8.14.6 of DB-OP-02000, RPS, SFAS, SFRCS Trip or SG Tube Rupture.

JPM No. 94B Page 14 of 21 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT assumed unless denoted in the "Comments".

START TIME:

1. PERFORMANCE STEP: Identifies the correct procedure step.

STANDARD: Locate Step 8.14.6 of DB-OP-02000, as the correct step.

CUE: None.

SAT UNSAT

2. PERFORMANCE STEP: Continue cooldown of the RCS on the good Steam

..... C......... Generator by blocking and opening ICS 11A.

STANDARD: Place PIC ICS11A in HAND, decrease the demand to zero on PIC ICSllA, depress the BLOCK pushbutton on HIS ICS11C and depress the AUTO pushbutton on HIS ICSIIA.

COMMENT: Verify the examinee can control SG 2 pressure.

CUE: Another RO will continue the cooldown on the good Steam Generator.

SAT UNSAT

3. PERFORMANCE STEP: Verify MSIV 1, MS 101, is closed.

STANDARD: Verify the green light is lit on HIS 101.

CUE: None.

SAT UNSAT

4. PERFORMANCE STEP: Verify AVV 1, ICSllB, is closed.

STANDARD: Verify PIC ICS11B in HAND and decrease the demand to zero on PIC ICSlIB, and the GREEN light is lit on pushbutton HIS ICSllB.

CUE: None.

SAT UNSAT

JPM No. 94B Page 15 of 21

5. PERFORMANCE STEP: Verify MS Line 1 to AFPT 1 Isolation valve, MS 106, is

........ C ... ...... closed.

STANDARD: Depress the BLOCK pushbutton on HIS 106AB and depress the CLOSE on pushbutton on HIS 106A.

CUE: None.

SAT UNSAT

6. PERFORMANCE STEP: Verify MS Line 1 to AFPT 2 Isolation valve, MS 107A,

........ C ... ...... is closed.

STANDARD: Depress the BLOCK pushbutton on HIS 107EB and depress the CLOSE on pushbutton on HIS 107E.

CUE: None.

SAT UNSAT

7. PERFORMANCE STEP: Verify AFW to SG 1 Stop valve, AF 608, is closed.

.. . .. C.........

STANDARD: Depress the ON pushbutton on HIS 608E, depress the CLOSE on pushbutton on HIS 608A and depress OFF pushbutton on HIS 608E.

COMMENT: Depressing OFF on HIS 608E is NOT critical.

CUE: None.

SAT UNSAT

8. PERFORMANCE STEP: Verify SG 1 Main FW Stop valve, FW 612, is closed.

STANDARD: Depress the BLOCK pushbutton on HIS 612A and depress the CLOSE on pushbutton on HIS 612.

CUE: None.

SAT UNSAT

9. PERFORMANCE STEP: Verify AFP 1 Discharge to SG 1 Stop valve, AF 3870, is closed.

STANDARD: Depress the BLOCK pushbutton on HIS 3870B and depress the CLOSE on pushbutton on HIS 3870.

CUE: None.

SAT UNSAT

JPM No. 94B Page 16 of 21

10. PERFORMANCE STEP: Verify AFP 1 Discharge to SG 2 Stop valve, AF 3869, is open.

STANDARD: Depress the BLOCK pushbutton on HIS 3869B and depress the OPEN on pushbutton on HIS 3869.

CUE: None.

SAT UNSAT

11. PERFORMANCE STEP: Route to Attachment 6, Overriding a SFRCS High Level Trip.

STANDARD: Identifies DB-OP-02000, Attachment 6, Section A, as the correct procedure section.

CUE: None.

SAT UNSAT

12. PERFORMANCE STEP: Obtain the bypass keys and door keys for all four SFRCS channels.

STANDARD: Keys obtained from Shift Supervisor.

COMMENT: If being performed on the simulator, allow the examinee to obtain the keys.

CUE: None.

SAT UNSAT

13. PERFORMANCE STEP: Open SFRCS Channel 1/3 door.

STANDARD: Open door.

COMMENT: If being performed on the simulator, allow the examinee to open the doors.

CUE: None.

SAT UNSAT

14. PERFORMANCE STEP: Bypass Logic Channel 1.

..... .. C.........

STANDARD: Place key in KS-l and turn to BYPASS.

CUE: None.

SAT UNSAT

JPM No. 94B Page 17 of 21

15. PERFORMANCE STEP: Bypass Logic Channel 1 (cont.).

..... .. C ........

STANDARD: Put SB switch 071 (SP9B8) to BYP.

CUE: None.

SAT UNSAT

16. PERFORMANCE STEP: Bypass Logic Channel 3.

........ C ........

STANDARD: Place key in KS-3 and turn to BYPASS.

CUE: None.

SAT UNSAT

17. PERFORMANCE STEP: Bypass Logic Channel 3 (cont.).

........ C........

STANDARD: Put SB switch 073 (SP9B9) to BYP.

CUE: None.

SAT UNSAT

18. PERFORMANCE STEP: Close and lock SFRCS Channel 1/3.

STANDARD: Door closed and locked.

CUE: None.

SAT UNSAT

19. PERFORMANCE STEP: Open SFRCS Channel 2/4 door.

STANDARD: Open door.

COMMENT: If being performed on the simulator, allow the examinee to open the doors.

CUE: None.

SAT UNSAT

20. PERFORMANCE STEP: Bypass Logic Channel 2.

. ...... C ........

STANDARD: Place key in KS-2 and turn to BYPASS.

CUE: None.

SAT UNSAT

JPM No. 94B Page 18 of 21

21. PERFORMANCE STEP: Bypass Logic Channel 2 (cont.).

.. . .. C.........

STANDARD: Put SB switch 072 (SP9B6) to BYP.

CUE: None.

SAT UNSAT

22. PERFORMANCE STEP: Bypass Logic Channel 4.

.. .....C.........

STANDARD: Place key in KS-4 and turn to BYPASS.

CUE: None.

SAT UNSAT

23. PERFORMANCE STEP: Bypass Logic Channel 4 (cont.).

..... .. C.........

STANDARD: Put SB switch 074 (SP9B7) to BYP.

CUE: None.

SAT UNSAT

24. PERFORMANCE STEP: Close and lock SFRCS Channel 2/4 door.

STANDARD: Door closed and locked.

CUE: None.

SAT UNSAT

25. PERFORMANCE STEP: Return keys to Shift Supervisor.

STANDARD: Keys returned to Shift Supervisor.

CUE: None.

SAT UNSAT

26. PERFORMANCE STEP: Route to DB-OP-06910, Trip Recovery, Step 4.3.10.

STANDARD: Identifies DB-OP-06910, Step 4.3.10 as the correct procedural step.

COMMENT: If asked, Condenser vacuum is available.

CUE: None.

SAT UNSAT

JPM No. 94B Page 19 of 21

27. PERFORMANCE STEP: Verify Main Steam Non-Return valve, MS 209, is open.

STANDARD: Depress OPEN on HIS 209.

CUE: None.

SAT UNSAT

28. PERFORMANCE STEP: Verify MSIV 2 Bypass valve, MS 100A, is open.

... ....C. ........

STANDARD: Depress OPEN on HIS 100-1.

CUE: Differential Pressure across the MSIV, MS 100, is less than 250 psi.

SAT UNSAT

29. PERFORMANCE STEP: Verify AVV 1, ICSIIB, is in hand.

STANDARD: Verify PIC ICS11B in HAND.

CUE: None.

SAT UNSAT

30. PERFORMANCE STEP: Verify AVV 2, ICS11A, is in hand.

STANDARD: Verify PIC ICS11A in HAND.

CUE: None.

SAT UNSAT

31. PERFORMANCE STEP: Verify TBVs for Steam Line 1, ICSI2B, is in hand and closed.

STANDARD: Depress HAND on PIC ICS12B and REDUCE demand to ZERO.

CUE: None.

SAT UNSAT

32. PERFORMANCE STEP: Verify TBVs for Steam Line 2, ICSl2A, is in hand and closed.

STANDARD: Depress HAND on PIC ICS12B and REDUCE demand to ZERO.

CUE: None.

SAT UNSAT

JPM No. 94B Page 20 of 21

33. PERFORMANCE STEP: Depress closed on MSIV 2, MS 100.

STANDARD: Depress CLOSE on HIS 100.

CUE: None.

SAT UNSAT

34. PERFORMANCE STEP: Reset SFRCS solenoids for MSIV 2, MS100.

.C.........

STANDARD: Depress REST on HS 100.

CUE: None.

SAT UNSAT

35. PERFORMANCE STEP: Verify MSIV 2, MS 100, is open.

.. ..... C.........

STANDARD: Depress OPEN on HIS 100.

CUE: (If asked) Differential Pressure across the MSIV, MS 100, is less than 250 psi.

SAT UNSAT TERMINATING CUES: This JPM is complete.

END TIME

JPM No. 94 Page 21 of 21 VERIFICATION OF COMPLETION Operator Evaluator SSN Date License: E ] RO [ ] SRO Validated Completion Time: minutes Actual Completion Time: minutes Acceptable Progress Maintained: Yes No N/A Result: [ I SATISFACTORY [ I UNSATISFACTORY NOTE: An "Unsatisfactory" requires Comment and will require subsequent remedial training.

Comments/Feedback:

Evaluator's Signature Date

DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.: 2 Rev. 00 Page 1 of 9 TASK NO.: 000-068-05-0100, 334-017-05-0300 TASK DESCRIPTION: Serious Control Room Fire, Assistant Shift Supervisor Actions, Attachment 2 K/A

REFERENCE:

062-A2.04 3.1/3.4, 064-A2.05 3.1/3.2 064-A2.11 2.6/2.9, BW/A05-AA1.01 4.3/4.2 APPLICABLE METHOD OF TESTING: Simulate performance In-plant TIME FOR COMPLETION: 25 minutes APPLICABILITY: [ ] RO [XI SRO TASK STANDARDS:

1. Cooling flow (CCW) to EDG 1 is established.
2. All required emergency control transfer switches are in LOCAL.
3. EDG 1 is protected.
4. Isolate B bus and remove bus control power.

REQUIRED MATERIALS:

DB-OP-02519, Serious Control Room Fire, Revision 4, C-3 GENERAL

REFERENCES:

DB-OP-02519, Serious Control Room Fire, Revision 4, C-3 INITIAL CONDITIONS:

The Control Room has been evacuated due to a serious Control Room fire.

INITIATING CUES:

You have been directed to perform the Assistant Shift Supervisor actions in of DB-OP-02519, Serious Control Room Fire.

You have obtained all the required serious Control Room fire equipment.

(Hand copy of DB-OP-02519 to examinee.)

JPM No. 2 Page 2 of 9 INITIAL CONDITIONS:

The Control Room has been evacuated due to a Serious Control Room Fire.

INITIATING CUES:

You have been directed to perform the Assistant Shift Supervisor actions in of DB-OP-02519, Serious Control Room Fire.

You have obtained all the required Serious Control Room Fire Equipment.

JPM No. 2 Page 3 of 9 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT required unless denoted in the "Comments".

START TIME:

1. PERFORMANCE STEP: Verify the radio is NOT in silence mode.

STANDARD: Key radio to transmit.

CUE: Radio transmitter switch has been depressed and released.

SAT UNSAT

2. PERFORMANCE STEP: Establish CCW flow to EDG 1.

... .oC o.........

STANDARD: CC 1471 is OPENED.

CUE: HV 1471 has been rotated clockwise to CLOSE.

CC 1471 IA regulator drain petcock has been rotated counterclockwise to OPEN.

Position indicator on CC 1471 indicates OPEN.

SAT UNSAT

3. PERFORMANCE STEP: Isolate the EDG 1 Engine Control Panel from the

........ C ........ Control Room fire.

STANDARD: On C3621, EDG 1 Engine Control Panel, disconnect switch, Emergency Control Transfer Switch DS-4A, in LOCAL.

CUE: Emergency Control Transfer Switch DS-4A has been placed in LOCAL.

SAT UNSAT

JPM No. 2 Page 4 of 9

4. PERFORMANCE STEP: Isolate the EDG Local Control Panel from the Control

........ C ........ Room fire.

STANDARD: Place disconnect switches on C3615, DG 1 Local Control Panel, ISO SW DS-lB Appendix R in EMERGENCY, and ISO SW DS-l Appendix R for relay SAX/13, in LOCAL.

CUE: ISO SW DS-lB Appendix R switch has been placed in EMERGENCY.

ISO SW DS-I Appendix R for relay SAX/13 has been placed in LOCAL.

SAT UNSAT

5. PERFORMANCE STEP: Isolate the EDG Local Control Panel from the Control

........ C ........ Room fire (cont.).

STANDARD: Open the nine TS-4 test disconnect switches on Panel C3615, DG 1 Local Control Panel.

CUE: All nine TS-4, test disconnect switches, have been placed in the OPEN position.

SAT UNSAT

6. PERFORMANCE STEP: Isolate the EDG Voltage Regulator cabinet from the

........ C ........ Control Room fire (cont.).

STANDARD: Disconnect switch ISO SW DS-3 Appendix R on Panel C3617, DG 1 Voltage Regulator Cabinet, in LOCAL.

CUE: ISO SW DS-3 Appendix R switch has been placed in LOCAL.

SAT UNSAT

7. PERFORMANCE STEP: Force the EDG into the Isochronous Mode.

....... C........

STANDARD: Isochronous droop switch placed in isochronous.

CUE: Isochronous droop switch has been placed in ISOCHRONOUS.

SAT UNSAT

8. PERFORMANCE STEP: Disable the Voltage Regulator Droop mode.

.... C..C STANDARD: Voltage Regulator droop switch in OFF.

CUE: Voltage Regulator droop switch has been placed in OFF.

SAT UNSAT

JPM No. 2 Page 5 of 9

9. PERFORMANCE STEP: Shutdown EDG 2.

..... C..C.......

STANDARD: Push emergency shutdown on EDG 2 at C3622, DG 2 Engine Control Panel.

CUE: Emergency shutdown has been pushed.

EDG 2 is STOPPED.

SAT UNSAT

10. PERFORMANCE STEP: Place DG 1 Sycn Selector in the DG BKR to C1 position.

STANDARD: Rotate the DG 1 Sycn Selector to the DG BKR to C1 position.

CUE: The DG 1 Sycn Selector switch has been rotated to the DG BKR to Cl position.

SAT UNSAT

11. PERFORMANCE STEP: Determine status of EDG 1.

STANDARD: Verify that EDG 1 is running unloaded.

COMMENT: The order of the cues is respective to the If-Then statements in the step.

CUE: EDG 1 Running volt meter indicates 124 VAC.

EDG 1 Kilwatt meter indicates 0 KWe.

EDG 1 is running and ACII0, Bus Cl to Bus C2 Tie Brkr, is CLOSED.

SAT UNSAT

12. PERFORMANCE STEP: Notify the Shiftf Supervisor EDG 1 is running unloaded and route to step 1.0.d.4.

STANDARD: Contact the Shift Supervisor and route to step 1.0.d.4.

CUE: Shift Supervisor has been notified EDG 1 is running unloaded.

SAT UNSAT

JPM No. 2 Page 6 of 9

13. PERFORMANCE STEP: Adjust EDG 1 voltage to 4300 VAC.

C ........

.C.....

STANDARD: Determine EDG 1 voltage and adjust EDG 1 voltage using DG 1 Voltage regulator switch.

CUE: EDG 1 voltage is 4220 VAC.

EDG 1 Voltage Regulator switch has been rotated to RAISE.

EDG 1 voltage is 4300 VAC.

EDG 1 Voltage Regulator switch has been released to neutral.

SAT UNSAT

14. PERFORMANCE STEP: Adjust EDG 1 frequency to 60 Hz.

... ... C........

STANDARD: Determine EDG 1 frequency and adjust EDG 1 frequency using DG 1 Spd Cntrl switch.

CUE: EDG 1 Frequency is 60.7 Hz.

EDG 1 Speed Control switch has been rotated to LOWER.

EDG 1 Frequency is 60 Hz.

EDG 1 Speed Control switch has been released to neutral.

SAT UNSAT

15. PERFORMANCE STEP: Notify the Secondary RO and the SS that EDG 1 is protected.

STANDARD: Using the radio or Gai-Tronics, inform the Secondary RO and the SS that EDG 1 is protected.

CUE: The Secondary RO and SS have been notified EDG 1 is protected.

SAT UNSAT

JPM No. 2 Page 7 of 9

16. PERFORMANCE STEP: At Dl Bus Cubicle 2, remove AACDl close control power

........ C ........ fuses AND trip AACDl using the manual trip plunger at the base of the breaker.

STANDARD: AACDl checked open and close fuses pulled and lift the manual trip plunger.

CUE: Breaker AACDI green light lit, control fuses pulled.

The manual trip plunger for breater AACDI has been lifted. (if asked) Breaker position indicator points to open.

SAT UNSAT

17. PERFORMANCE STEP: Remove control power from B bus source breakers.

.C.........

STANDARD: Knife switch in Cubicle 14 placed in mid position.

CUE: Knife switch has been placed in the MID position.

SAT UNSAT

18. PERFORMANCE STEP: Verify OPEN B bus source breakers.

........ C.......

STANDARD: Check OPEN the following B bus source breakers: HX01B, HX02B, and HXlIB.

CUE: Breaker HX01B has the Green light OFF; Red light OFF.

The manual trip plunger for breater HX01B has been lifted.

(if asked) Breaker position indicator points to open.

Breaker HXlIB has the Green light OFF; Red light OFF.

The manual trip plunger for breater HXllB has been lifted.

(if asked) Breaker position indicator points to open.

Breaker HX02B has the Green light OFF; Red light OFF.

The manual trip plunger for breater HX02B has been lifted.

(if asked) Breaker position indicator points to open.

SAT UNSAT

JPM No. 2 Page 8 of 9

19. PERFORMANCE STEP: Remove control power from B bus load breakers.

.. .....C.........

STANDARD: Knife switch in B Bus Cubicle 1 placed in mid position.

CUE: Knife switch has been placed in the MID position.

SAT UNSAT TERMINATING CUES: This JPM is complete.

END TIME

JPM No. 2 Page 9 of 9 VERIFICATION OF COMPLETION Operator Evaluator SSN Date License: [ ] RO [ SRO Validated Completion Time: minutes Actual Completion Time: minutes Acceptable Progress Maintained: Yes No N/A Result: [ ] SATISFACTORY [ I UNSATISFACTORY NOTE: An "Unsatisfactory" requires Comment and will require subsequent remedial training.

Comments/Feedback:

___________________________________________/________

Evaluator's Signature Date

DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.: 1A Rev. 00 Page 1 of 13 TASK NO.: 061-019-04-0100, 061-020-04-0100 TASK DESCRIPTION: Local Operation of the AFW Pump Turbine 1 (Use when Train 2 is protected.)

K/A

REFERENCE:

061-K5.01 3.6/3.9, 061-K6.01 2.5/2.8 061-A2.03 3.1/3.4 APPLICABLE METHOD OF TESTING: Simulate Performance In-plant Alternate Path TIME FOR COMPLETION: 20 minutes APPLICABILITY: [X] RO [X] SRO TASK STANDARDS:

AFW Train 1 manual speed control at the AFPT governor.

REQUIRED MATERIALS:

DB-OP-06233, Auxiliary Feedwater System, Revision 05 GENERAL

REFERENCES:

DB-OP-06233, Auxiliary Feedwater System, Revision 05 INITIAL CONDITIONS:

A loss of DlP from 100% power has occurred.

The reactor has tripped and SFRCS actuated on a loss of four (4) RCPs.

A loss of AFPT 1 governor speed control and AF 6452, AFW 1 level control valve, failing open is a result of the loss of DlP and is causing an overcooling of the RCS.

INITIATING CUES:

You have been directed by the Shift Supervisor to locally control AFPT 1 speed by manual speed control at the AFPT 1 governor valve, in accordance with DB-OP-06233.

(Hand examinee the procedure.)

JPM No. IA Page 2 of 13 INITIAL CONDITIONS:

A loss of DIP from 100% power has occurred.

The reactor has tripped and SFRCS actuated on a loss of four (4) RCPs.

A loss of AFPT 1 governor speed control and AF 6452, AFW 1 level control valve, failing open is a result of the loss of DIP and is causing an overcooling of the RCS.

INITIATING CUES:

You have been directed by the Shift Supervisor to locally control AFPT 1 speed by manual speed control at the AFPT 1 governor valve, in accordance with DB-OP-06233.

JPM No. 1A Page 3 of 13

-- - -- ----- -- w-NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME:

1. PERFORMANCE STEP: Locate the correct procedure.

STANDARD: Identifies Section 5.1 of DB-OP-06233, Auxiliary Feedwater System, as the correct procedure section.

CUE: (if asked) ALL prerequisites have been performed.

SAT UNSAT

2. PERFORMANCE STEP: Attempt to unstick governor valve/linkage.

STANDARD: Applies a downward force to the governor valve linkage labeled L1.

CUE: Governor valve moves inward slightly and is NOT STUCK.

SAT UNSAT

3. PERFORMANCE STEP: Attempt manual speed control from the Control Room or the Auxiliary Shutdown Panel.

STANDARD: Contacts the Control Room to attempt speed control of AFPT 1.

CUE: Control Room operator informs you he has no speed control of AFPT 1.

(if necessary) Shift Supervisor directs you to continue with the procedure.

SAT UNSAT

4. PERFORMANCE STEP: In AFPT 1 Room, establish communications with the Reactor Operator.

STANDARD: Establish communications with Reactor Operator via Gai-Tronics or radio.

CUE: You have established communications with a Reactor Operator. The Reactor Operator directs you to reduce AFPT 1 speed.

SAT UNSAT

JPM No. 1A Page 4 of 13

5. PERFORMANCE STEP: Unscrew and remove the electrical connector on the

........ C ......... face of the governor.

STANDARD: Locates electrical connector and unscrews it.

COMMENT: This step must be performed prior to Step 6.

CUE: The electrical connector is DISCONNECTED.

SAT UNSAT

6. PERFORMANCE STEP: Turn the manual speed setting control knob as

........ C ......... appropriate to control AFPT speed/flow as directed by the Reactor Operator.

STANDARD: Locate the manual speed setting knob and adjust to reduce the AFPT speed (CCW direction).

COMMENT: AFPT 1 speed will not change regardless of the examinee's actions.

CUE: AFPT 1 speed remains constant.

(if asked) AFPT speed is 3600 rpm.

SAT UNSAT

7. PERFORMANCE STEP: Identify AFPT 1 speed control, using the governor valve, has failed and route to Section 5.3.

STANDARD: Locate the correct procedure section. Identifies Section 5.3 of DB-OP-06233, Auxiliary Feedwater System, as correct procedure section.

CUE: (If asked) Shift Supervisor directs you to gain control of AFPT 1 speed.

SAT UNSAT

8. PERFORMANCE STEP: Establish communication with Control Room.

STANDARD: Utilize the Gai-Tronics or radio to communicate with the Control Room.

CUE: (If asked) You have established communications with the Control Room.

SAT UNSAT

JPM No. 1A Page 5 of 13

9. PERFORMANCE STEP: Unseal the trip throttle valve, ICS 38C.

. . . .C.........

STANDARD: The trip throttle valve seal disconnected.

CUE: The trip throttle valve seal is DISCONNECTED.

SAT UNSAT

10. PERFORMANCE STEP: Close the trip throttle valve, ICS 38C.

.. ..C.........

STANDARD: Valve handwheel rotated clockwise to CLOSE.

CUE Valve handwheel is rotated FULLY clockwise (to CLOSE).

SAT UNSAT

11. PERFORMANCE STEP: Obtain red governor tool and other required tools.

STANDARD: Obtain necessary tools at entrance to AFP room.

COMMENT: Tools may have already been obtained. This step can be performed out of sequence.

CUE: The Red governor tool and other required tools to disconnect linkage have been obtained.

SAT UNSAT

12. PERFORMANCE STEP: Disconnect the linkage between the governor and the

........ C ........ governor valve, where the spring meets linkage.

STANDARD: Linkage disconnected where the spring meets the linkage at the second joint from the governor controller with the tools from the emergency hatch cabinet.

CUE: The linkage is DISCONNECTED.

SAT UNSAT

13. PERFORMANCE STEP: Block the governor valve, ICS 38B, "full open".

... ... C.........

STANDARD: Pull up on L1, put the Red AFPT governor blocking tool in place above the governor rod in red area on linkage.

CUE: Ll has been pulled up.

The block is in place above the governor rod in the Red area.

SAT UNSAT

JPM No. 1A Page 6 of 13

14. PERFORMANCE STEP: Slowly open the trip throttle valve, ICS 38C.

. ... ..C...... ..

STANDARD: Trip throttle valve, ICS 38C, OPENED by turning the handwheel (slowly) counterclockwise to raise AFPT speed > 600 rpm.

CUE: The trip throttle valve, ICS 38C, handwheel is rotated slowly counterclockwise.

AFPT 1 speed has INCREASED TO 2800 rpm.

SAT UNSAT

15. PERFORMANCE STEP: Control the AFPT 1 speed to maintain the required AFW flow.

STANDARD: Ask Control Room for feedback.

CUE: The Control Room Operator directs you to maintain speed at the current value until he can evaluate SG level trend.

SAT UNSAT TERMINATING CUES: This JPM is complete.

END TIME

DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.: lB Rev. 00 Page 7 of 13 TASK NO.: 061-019-04-0100, 061-020-04-0100 TASK DESCRIPTION: Local Operation of the AFW Pump Turbine 2 (Use when Train 1 is protected.)

K/A

REFERENCE:

061-K5.01 3.6/3.9, 061-K6.01 2.5/2.8 061-A2.03 3.1/3.4 APPLICABLE METHOD OF TESTING: Simulate Performance In-plant Alternate Path TIME FOR COMPLETION: 20 minutes APPLICABILITY: [XI RO [XI SRO TASK STANDARDS:

AFW Train 2 manual speed control at the AFPT governor.

REQUIRED MATERIALS:

DB-OP-06233, Auxiliary Feedwater System, Revision 05 GENERAL

REFERENCES:

DB-OP-06233, Auxiliary Feedwater System, Revision 05 INITIAL CONDITIONS:

A loss of D2P from 100% power has occurred.

The reactor has tripped and SFRCS actuated on a loss of four (4) RCPs.

A loss of AFPT 2 governor speed control and AF 6451, AFW 2 level control valve, failing open is a result of the loss of D2P and is causing an overcooling of the RCS.

INITIATING CUES:

You have been directed by the Shift Supervisor to locally control AFPT 2 speed by manual speed control at the AFPT 2 governor valve, in accordance with DB-OP-06233.

(Hand examinee the procedure.)

JPM No. 1B Page 8 of 13 INITIAL CONDITIONS:

A loss of D2P from 100% power has occurred.

The reactor has tripped and SFRCS actuated on a loss of four (4) RCPs.

A loss of AFPT 2 governor speed control and AF 6451, AFW 2 level control valve, failing open is a result of the loss of D2P and is causing an overcooling of the RCS.

INITIATING CUES:

You have been directed by the Shift Supervisor to locally control AFPT 2 speed by manual speed control at the AFPT 2 governor valve, in accordance with DB-OP-06233.

JPM No. 1B Page 9 of 13 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME:

1. PERFORMANCE STEP: Locate the correct procedure.

STANDARD: Identifies Section 5.2 of DB-OP-06233, Auxiliary Feedwater System, as the correct procedure section.

CUE: (if asked) ALL prerequisites have been performed.

SAT UNSAT

2. PERFORMANCE STEP: Attempt to unstick governor valve/linkage.

STANDARD: Applies a downward force to the governor valve linkage labeled L1.

CUE: Governor valve moves inward slightly and is NOT STUCK.

SAT UNSAT

3. PERFORMANCE STEP: Attempt manual speed control from the Control Room or the Auxiliary Shutdown Panel.

STANDARD: Contacts the Control Room to attempt speed control of AFPT 2.

CUE: Control Room Operator informs you he has no speed control of AFPT 2.

(if necessary) Shift Supervisor directs you to continue with the procedure.

SAT UNSAT

4. PERFORMANCE STEP: In AFPT 2 Room, establish communications with the Reactor Operator.

STANDARD: Establish communications with Reactor Operator via Gai-Tronics or radio.

CUE: You have established communications with a Reactor Operator. The Reactor Operator directs you to reduce AFPT 2 speed.

SAT UNSAT

JPM No. 1B Page 10 of 13

5. PERFORMANCE STEP: Unscrew and remove the electrical connector on the

........ C ........ face of the governor.

STANDARD: Locates electrical connector and unscrews it.

COMMENT: This step must be performed prior to Step 6.

CUE: The electrical connector is DISCONNECTED.

SAT UNSAT

6. PERFORMANCE STEP: Turn the manual speed setting control knob as

........ C ......... appropriate to control AFPT speed/flow as directed by the Reactor Operator.

STANDARD: Locate the manual speed setting knob and adjust to reduce the AFPT speed (CCW direction).

COMMENT: AFPT 2 speed will not change regardless of the examinee's actions.

CUE: AFPT 2 speed remains constant.

(if asked) AFPT speed is 3600 rpm.

SAT UNSAT

7. PERFORMANCE STEP: Identify AFPT 2 speed control, using the governor valve, has failed and route to Section 5.4.

STANDARD: Locate the correct procedure section Identifies Section 5.4 of DB-OP-06233, Auxiliary Feedwater System, as correct procedure section.

CUE: (If asked) Shift Supervisor directs you to gain control of AFPT 2 speed.

SAT UNSAT

8. PERFORMANCE STEP: Establish communication with Control Room.

STANDARD: Utilize the Gai-Tronics or radio to communicate with the Control Room.

CUE: (If asked) You have established communications with the Control Room.

SAT UNSAT

JPM No. 1B Page 11 of 13

9. PERFORMANCE STEP: Unseal the trip throttle valve, ICS 38D.

.. ..... C.........

STANDARD: The trip throttle valve seal disconnected.

CUE: The trip throttle valve seal is DISCONNECTED.

SAT UNSAT

10. PERFORMANCE STEP: Close the trip throttle valve, ICS 38D.

........ C .........

STANDARD: Valve handwheel rotated clockwise to CLOSE.

CUE Valve handwheel is rotated FULLY clockwise (to CLOSE).

SAT UNSAT

11. PERFORMANCE STEP: Obtain red governor tool and other required tools.

STANDARD: Obtain necessary tools at entrance to AFP room.

COMMENT: Tools may have already been obtained. This step can be performed out of sequence.

CUE: The Red governor tool and other required tools to disconnect linkage have been obtained.

SAT UNSAT

12. PERFORMANCE STEP: Disconnect the linkage between the governor and the

........ C ........ governor valve, where the spring meets linkage.

STANDARD: Linkage disconnected where the spring meets the linkage at the second joint from the governor controller with the tools from the emergency hatch cabinet.

CUE: The linkage is DISCONNECTED.

SAT UNSAT

13. PERFORMANCE STEP: Block the governor valve, ICS 38A, "full open".

...C...

Ce........

STANDARD: Pull up on L1, put the Red AFPT governor blocking tool in place above the governor rod in red area on linkage.

CUE: Ll has been pulled up.

The block is in place above the governor rod in the Red area.

SAT UNSAT

JPM No. 1B Page 12 of 13

14. PERFORMANCE STEP: Slowly open the trip throttle valve, ICS 38D.

. .... ,.C.........

STANDARD: Trip throttle valve, ICS 38D, OPENED by turning the handwheel (slowly) counterclockwise to raise AFPT speed > 600 rpm.

CUE: The trip throttle valve, ICS 38D, handwheel is rotated slowly counterclockwise.

AFPT 2 speed has INCREASED TO 2800 rpm.

SAT UNSAT

15. PERFORMANCE STEP: Control the AFPT 2 speed to maintain the required AFW flow.

STANDARD: Ask Control Room for feedback.

CUE: The Control Room Operator directs you to maintain speed at the current value until he can evaluate SG level trend.

SAT UNSAT TERMINATING CUES: This JPM is complete.

END TIME

JPM No. 1 Page 13 of 13 VERIFICATION OF COMPLETION Operator Evaluator SSN Date License: [ ] RO [ ] SRO Validated Completion Time: minutes Actual Completion Time: minutes Acceptable Progress Maintained: Yes No N/A Result: [ ] SATISFACTORY [ I UNSATISFACTORY NOTE: An "Unsatisfactory" requires Comment and will require subsequent remedial training.

Comments/Feedback:

/

Evaluator's Signature Date

DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.: 57 Rev. 06 Page 1 of 6 TASK NO.: 002-008-04-0100 TASK DESCRIPTION: Borate the RCS from Outside the Control Room K/A

REFERENCE:

004-A2.14 3.8/3.9 APPLICABLE METHOD OF TESTING: Simulate performance In-Plant TIME FOR COMPLETION: 20 minutes APPLICABILITY: [XI RO [XI SRO TASK STANDARDS:

1. Lineup for boric acid addition using local valves.
2. Start BA Pump 1.

REQUIRED MATERIALS:

DB-OP-06001, Boron Concentration Control, Revision 2, C-1 GENERAL

REFERENCES:

DB-OP-06001, Boron Concentration Control, Revision 2, C-l INITIAL CONDITIONS:

The plant is in Mode 1 at 100% power.

A load reduction to 50% power is planned.

INITIATING CUES:

The normal boric acid addition method cannot be used.

You have been directed to add 50 gallons of boric acid to the MUT from outside the CTRM using Boric Acid Pump 1, per DB-OP-06001.

(Hand copy of DB-OP-06001 to examinee.)

JPM No. 57 Page 2 of 6 INITIAL CONDITIONS:

The plant is in Mode 1 at 100% power.

A load reduction to 50% power is planned.

INITIATING CUES:

The normal boric acid addition method cannot be used.

You have been directed to add 50 gallons of boric acid to the MUT from outside the CTRM using Boric Acid Pump 1, per DB-OP-06001.

JPM No. 57 Page 3 of 6 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is assumed unless denoted in the "Comments".

START TIME:

1. PERFORMANCE STEP: Locate the correct procedure section.

STANDARD: Identifies DB-OP-06001, Boron Concentration Control, Section 5.1, as the correct procedure section.

COMMENT: Provide correct procedure to examinee. When the correct procedure section has been located, provide the CUE.

CUE: All prerequisites have been completed.

SAT UNSAT

2. PERFORMANCE STEP: Verify valve MU 348, Boric Acid Pump 1 Discharge, is open.

STANDARD: Handwheel/stem position indicate OPEN.

CUE: MU 348, valve stem is UP.

SAT UNSAT

3. PERFORMANCE STEP: Verify valve WC 394, from Concentrates Storage Tank to BAATs Discharge, is open.

STANDARD: Handwheel/stem position indicate OPEN.

CUE: WC 394, valve stem is UP.

SAT UNSAT

4. PERFORMANCE STEP: Verify valve WC 393, Concentrate Storage Tank to MU Filters Line 2, is open.

STANDARD: Handwheel/stem position indicate OPEN.

CUE: WC 393, valve stem is UP.

SAT UNSAT

JPM No. 57 Page 4 of 6

5. PERFORMANCE STEP: Verify MU 351, Boric Acid Pump 2 to Makeup Filters open.

STANDARD: MU 351 stem position indicates OPEN.

CUE: MU 351 valve stem is UP.

SAT UNSAT

6. PERFORMANCE STEP: Close MU 363, BAAT 1 to Makeup Filters.

........ C .......

STANDARD: Handwheel to the CLOSE position.

COMMENT: MU 363 located between BAATs in CA.

CUE: MU 363 has been rotated clockwise/CLOSED; valve stem is DOWN.

SAT UNSAT

7. PERFORMANCE STEP: Open MU 366, BAAT 2 to Makeup Filters.

........ C.......

STANDARD: MU 366 handwheel turned (CCW) until FULLY OPEN.

CUE: MU 366 handwheel has been rotated counterclockwise/OPENED; valve stem is UP.

SAT UNSAT

8. PERFORMANCE STEP: Start Boric Acid Pump 1.

.. . .o Co........

STANDARD: BA Pump 1 started from Control Room.

CUE: Control Room Operator has started BA Pump 1.

SAT UNSAT

9. PERFORMANCE STEP: Stop Boric Acid Pump 1.

STANDARD: BA Pump 1 is stopped from the Control Room.

CUE: Control Room Operator reports that 50 gallons have been added to the MUT and BA Pump 1 has been stopped.

SAT UNSAT

JPM No. 57 Page 5 of 6

10. PERFORMANCE STEP: Close MU 366, BAAT 2 to Makeup Filters.

STANDARD: Restore L/U, MU 366 handwheel turned (CW) until FULLY CLOSED.

CUE: MU 366 handwheel has been rotated clockwise/CLOSED; Valve stem is DOWN.

SAT UNSAT

11. PERFORMANCE STEP: Open MU 363, BAAT 1 to Makeup Filters.

STANDARD: Restore L/U, MU 363 handwheel turned (CCW) until FULLY OPEN.

CUE: MU 363 handwheel has been rotated counterclockwise/OPENED: valve stem is UP.

SAT UNSAT TERMINATING CUES: This JPM is complete.

END TIME

JPM No. 57 Page 6 of 6 VERIFICATION OF COMPLETION Operator Evaluator SSN Date License: [ ] RO [ ] SRO Validated Completion Time: minutes Actual Completion Time: minutes Acceptable Progress Maintained: Yes No N/A Result: [ I SATISFACTORY [ I UNSATISFACTORY NOTE: An "Unsatisfactory" requires Comment and will require subsequent remedial training.

Comments/Feedback:

Evaluator's Signature Date