ML060610466: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:North Anna Inspection / Activity Plan 03/01/2006 | {{#Wiki_filter:Page 1 of 2 North Anna 03/02/2006 10:37:37 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PSB1-RP - RP BASELINE OCCUPATIONAL WK1 3 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 03/13/2006 03/17/2006 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 03/13/2006 03/17/2006 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 03/13/2006 03/17/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 03/13/2006 03/17/2006 Baseline Inspections EB3-ISI - U1 INSERVICE INSPECTION 2 1 IP 7111108P Inservice Inspection Activities - PWR 03/20/2006 03/24/2006 Baseline Inspections EB3SGISI - U1 SG ISI 1 1 IP 7111108P Inservice Inspection Activities - PWR 03/20/2006 03/24/2006 Baseline Inspections PSB1-RP - RP BASELINE OCCUPATIONAL WK2 3 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 03/27/2006 03/31/2006 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 03/27/2006 03/31/2006 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 03/27/2006 03/31/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 03/27/2006 03/31/2006 Baseline Inspections EB3-HS - HEAT SINK 1 1, 2 IP 7111107B Heat Sink Performance 05/01/2006 05/05/2006 Baseline Inspections OL PREP - INITIAL EXAM PREP 3 1 V23257 NORTH ANNA/MAY 2006 EXAM AT POWER FACILITIES 05/01/2006 05/05/2006 Not Applicable OL EXAM - INITIAL EXAM WEEK 1 3 1 V23257 NORTH ANNA/MAY 2006 EXAM AT POWER FACILITIES 05/22/2006 05/26/2006 Not Applicable OL EXAM - INITIAL EXAM WEEK 2 3 1 V23257 NORTH ANNA/MAY 2006 EXAM AT POWER FACILITIES 06/05/2006 06/09/2006 Not Applicable EB1-MODS - MODIFICATIONS/10CFR50.59 4 1, 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 06/12/2006 06/16/2006 Baseline Inspections 1, 2 IP 7111117B Permanent Plant Modifications 06/12/2006 06/16/2006 Baseline Inspections ISFSI-O - 60855.1 - OPERATION OF AN ISFSI 1 1 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 07/03/2006 07/07/2006 Other Routine PS2-EP - EP EXERCISE 3 1, 2 IP 7111401 Exercise Evaluation 12/04/2006 12/08/2006 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 12/04/2006 12/08/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 12/04/2006 12/08/2006 Baseline Inspections EB1-CDB - COMPONENT DESIGN BASES INSPECTION 4 1, 2 IP 7111121 Component Design Bases Inspection 12/11/2006 12/15/2006 Baseline Inspections EB1-CDB - COMPONENT DESIGN BASES INSPECTION 6 1, 2 IP 7111121 Component Design Bases Inspection 01/08/2007 01/12/2007 Baseline Inspections This report does not include INPO and OUTAGE activities. | ||
-09/30/2007 | |||
This report shows only on-site and announced inspection procedures. | This report shows only on-site and announced inspection procedures. | ||
North Anna Inspection / Activity Plan 03/01/2006 | Enclosure | ||
-09/30/2007 | |||
Page 2 of 2 North Anna 03/02/2006 10:37:37 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB1-CDB - COMPONENT DESIGN BASES INSPECTION 6 1, 2 IP 7111121 Component Design Bases Inspection 01/22/2007 01/26/2007 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 02/05/2007 02/09/2007 Baseline Inspections EB3-ISI - U2 INSERVICE INSPECTION 1 2 IP 7111108P Inservice Inspection Activities - PWR 03/26/2007 03/30/2007 Baseline Inspections EB3SGISI - U2 STEAM GENERATOR ISI 1 2 IP 7111108P Inservice Inspection Activities - PWR 04/02/2007 04/06/2007 Baseline Inspections PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 4 1, 2 IP 71152B Identification and Resolution of Problems 04/02/2007 04/06/2007 Baseline Inspections 1, 2 IP 71152B Identification and Resolution of Problems 04/16/2007 04/20/2007 Baseline Inspections EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-2) 1 2 IP 71111 Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity 04/08/2007 04/13/2007 Baseline Inspections PSB1-RP - RP PUBLIC PRE-INSP VISIT/ISFSI 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 05/14/2007 05/16/2007 Baseline Inspections PSB1-RP - RP PUBLIC BASELINE INSPECTION 4 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 06/11/2007 06/15/2007 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 06/11/2007 06/15/2007 Baseline Inspections 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 06/11/2007 06/15/2007 Baseline Inspections 1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 06/11/2007 06/15/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 06/11/2007 06/15/2007 Baseline Inspections PS2-EP - EP INSP 1 1, 2 IP 7111402 Alert and Notification System Testing 08/06/2007 08/10/2007 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 08/06/2007 08/10/2007 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 08/06/2007 08/10/2007 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 08/06/2007 08/10/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 08/06/2007 08/10/2007 Baseline Inspections EB3-ISI - U1 INSERVICE INSPECTION 1 1 IP 7111108P Inservice Inspection Activities - PWR 09/17/2007 09/21/2007 Baseline Inspections EB3SGISI - U1 STEAM GENERATOR ISI 1 1 IP 7111108P Inservice Inspection Activities - PWR 09/24/2007 09/28/2007 Baseline Inspections EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-1) 1 1 IP 71111 Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity 09/30/2007 10/05/2007 Baseline Inspections This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures.}} | This report shows only on-site and announced inspection procedures.}} |
Latest revision as of 22:38, 23 November 2019
ML060610466 | |
Person / Time | |
---|---|
Site: | North Anna |
Issue date: | 03/02/2006 |
From: | NRC/RGN-II/DRP/RPB5 |
To: | Virginia Electric & Power Co (VEPCO) |
Shared Package | |
ML060610404 | List: |
References | |
IR-06-001 | |
Download: ML060610466 (2) | |
Text
Page 1 of 2 North Anna 03/02/2006 10:37:37 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PSB1-RP - RP BASELINE OCCUPATIONAL WK1 3 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 03/13/2006 03/17/2006 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 03/13/2006 03/17/2006 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 03/13/2006 03/17/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 03/13/2006 03/17/2006 Baseline Inspections EB3-ISI - U1 INSERVICE INSPECTION 2 1 IP 7111108P Inservice Inspection Activities - PWR 03/20/2006 03/24/2006 Baseline Inspections EB3SGISI - U1 SG ISI 1 1 IP 7111108P Inservice Inspection Activities - PWR 03/20/2006 03/24/2006 Baseline Inspections PSB1-RP - RP BASELINE OCCUPATIONAL WK2 3 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 03/27/2006 03/31/2006 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 03/27/2006 03/31/2006 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 03/27/2006 03/31/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 03/27/2006 03/31/2006 Baseline Inspections EB3-HS - HEAT SINK 1 1, 2 IP 7111107B Heat Sink Performance 05/01/2006 05/05/2006 Baseline Inspections OL PREP - INITIAL EXAM PREP 3 1 V23257 NORTH ANNA/MAY 2006 EXAM AT POWER FACILITIES 05/01/2006 05/05/2006 Not Applicable OL EXAM - INITIAL EXAM WEEK 1 3 1 V23257 NORTH ANNA/MAY 2006 EXAM AT POWER FACILITIES 05/22/2006 05/26/2006 Not Applicable OL EXAM - INITIAL EXAM WEEK 2 3 1 V23257 NORTH ANNA/MAY 2006 EXAM AT POWER FACILITIES 06/05/2006 06/09/2006 Not Applicable EB1-MODS - MODIFICATIONS/10CFR50.59 4 1, 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 06/12/2006 06/16/2006 Baseline Inspections 1, 2 IP 7111117B Permanent Plant Modifications 06/12/2006 06/16/2006 Baseline Inspections ISFSI-O - 60855.1 - OPERATION OF AN ISFSI 1 1 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 07/03/2006 07/07/2006 Other Routine PS2-EP - EP EXERCISE 3 1, 2 IP 7111401 Exercise Evaluation 12/04/2006 12/08/2006 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 12/04/2006 12/08/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 12/04/2006 12/08/2006 Baseline Inspections EB1-CDB - COMPONENT DESIGN BASES INSPECTION 4 1, 2 IP 7111121 Component Design Bases Inspection 12/11/2006 12/15/2006 Baseline Inspections EB1-CDB - COMPONENT DESIGN BASES INSPECTION 6 1, 2 IP 7111121 Component Design Bases Inspection 01/08/2007 01/12/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Page 2 of 2 North Anna 03/02/2006 10:37:37 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB1-CDB - COMPONENT DESIGN BASES INSPECTION 6 1, 2 IP 7111121 Component Design Bases Inspection 01/22/2007 01/26/2007 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 02/05/2007 02/09/2007 Baseline Inspections EB3-ISI - U2 INSERVICE INSPECTION 1 2 IP 7111108P Inservice Inspection Activities - PWR 03/26/2007 03/30/2007 Baseline Inspections EB3SGISI - U2 STEAM GENERATOR ISI 1 2 IP 7111108P Inservice Inspection Activities - PWR 04/02/2007 04/06/2007 Baseline Inspections PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 4 1, 2 IP 71152B Identification and Resolution of Problems 04/02/2007 04/06/2007 Baseline Inspections 1, 2 IP 71152B Identification and Resolution of Problems 04/16/2007 04/20/2007 Baseline Inspections EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-2) 1 2 IP 71111 Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity 04/08/2007 04/13/2007 Baseline Inspections PSB1-RP - RP PUBLIC PRE-INSP VISIT/ISFSI 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 05/14/2007 05/16/2007 Baseline Inspections PSB1-RP - RP PUBLIC BASELINE INSPECTION 4 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 06/11/2007 06/15/2007 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 06/11/2007 06/15/2007 Baseline Inspections 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 06/11/2007 06/15/2007 Baseline Inspections 1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 06/11/2007 06/15/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 06/11/2007 06/15/2007 Baseline Inspections PS2-EP - EP INSP 1 1, 2 IP 7111402 Alert and Notification System Testing 08/06/2007 08/10/2007 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 08/06/2007 08/10/2007 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 08/06/2007 08/10/2007 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 08/06/2007 08/10/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 08/06/2007 08/10/2007 Baseline Inspections EB3-ISI - U1 INSERVICE INSPECTION 1 1 IP 7111108P Inservice Inspection Activities - PWR 09/17/2007 09/21/2007 Baseline Inspections EB3SGISI - U1 STEAM GENERATOR ISI 1 1 IP 7111108P Inservice Inspection Activities - PWR 09/24/2007 09/28/2007 Baseline Inspections EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-1) 1 1 IP 71111 Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity 09/30/2007 10/05/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.