| {{#Wiki_filter:January 23, 2007Mr. J. A. StallSenior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420 | | {{#Wiki_filter:January 23, 2007 Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| ST. LUCIE UNIT 2 - EVALUATION OF RESPONSE TO GENERIC LETTER2006-03, "POTENTIALLY NONCONFORMING HEMYC AND MT FIRE BARRIER CONFIGURATIONS" (TAC NO. MD1626) | | ST. LUCIE UNIT 2 - EVALUATION OF RESPONSE TO GENERIC LETTER 2006-03, POTENTIALLY NONCONFORMING HEMYC AND MT FIRE BARRIER CONFIGURATIONS (TAC NO. MD1626) |
|
| |
|
| ==Dear Mr. Stall:== | | ==Dear Mr. Stall:== |
|
| |
|
| The U.S. Nuclear Regulatory Commission (NRC) acknowledges the receipt of your response,dated June 9, 2006, to Generic Letter (GL) 2006-03, "Potentially Nonconforming Hemyc and MT Fire Barrier Configurations," as supplemented by letters dated September 20, and December 19, 2006. Your response states that Hemyc is used for raceway protection inside the St. Lucie Unit 2containment, where it is employed as a flame impingement shield and installed below the lowest tray in each stack of cable trays that contain redundant safe shutdown cables when 20-foot separation is not met on the 23-foot elevation. Following discussions with the NRC staff, your December 19, 2006, letter revised the initial response to state that the installation is outside the original licensing basis to provide a one-half hour fire rated barrier. You have stated that corrective actions are required to resolve the nonconforming condition and that you plan to examine corrective actions associated with the Hemyc installation as part of the St. Lucie transition to NFPA 805. You have previously indicated your intent to transition the St. Lucie site to NFPA 805 in a letter dated December 22, 2005.You have stated that further compensatory measures have not been implemented based on acomparison with the similar configuration that exists at St. Lucie Unit 1, where there are no flame impingement shields or radiant energy shields installed beneath certain cable trays inside containment and where the NRC has granted an exemption from providing any additional protection.Your response also states that other fire barriers that separate redundant safe shutdown trainslocated within the same fire area have been designed and installed in accordance with current NRC guidance. The basis for stating that other fire barriers have been designed and installed in accordance with current NRC guidance should be maintained on site, and will be subject to inspection during the normal NRC inspection process. | | The U.S. Nuclear Regulatory Commission (NRC) acknowledges the receipt of your response, dated June 9, 2006, to Generic Letter (GL) 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations, as supplemented by letters dated September 20, and December 19, 2006. |
| J. Stall-2-Based on the above discussion, the NRC staff has concluded that your overall response toGL 2006-03 for St. Lucie Unit 2 is acceptable. If you have any questions regarding this matter, please contact me at (301) 415-2020.Sincerely,/RA/Brenda L. Mozafari, Senior Project ManagerPlant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-389 cc: See next page
| | Your response states that Hemyc is used for raceway protection inside the St. Lucie Unit 2 containment, where it is employed as a flame impingement shield and installed below the lowest tray in each stack of cable trays that contain redundant safe shutdown cables when 20-foot separation is not met on the 23-foot elevation. Following discussions with the NRC staff, your December 19, 2006, letter revised the initial response to state that the installation is outside the original licensing basis to provide a one-half hour fire rated barrier. You have stated that corrective actions are required to resolve the nonconforming condition and that you plan to examine corrective actions associated with the Hemyc installation as part of the St. Lucie transition to NFPA 805. You have previously indicated your intent to transition the St. Lucie site to NFPA 805 in a letter dated December 22, 2005. |
| | You have stated that further compensatory measures have not been implemented based on a comparison with the similar configuration that exists at St. Lucie Unit 1, where there are no flame impingement shields or radiant energy shields installed beneath certain cable trays inside containment and where the NRC has granted an exemption from providing any additional protection. |
| | Your response also states that other fire barriers that separate redundant safe shutdown trains located within the same fire area have been designed and installed in accordance with current NRC guidance. The basis for stating that other fire barriers have been designed and installed in accordance with current NRC guidance should be maintained on site, and will be subject to inspection during the normal NRC inspection process. |
|
| |
|
| ML070160123 OFFICELPL2-2/PMLPL2-2/PMLPL2-2/LAAFPB/BCLPL2-2/BC(A)NAMEBMoroneyBMozafariBClaytonSWeerakkodyMChernoff DATE01/16/0701/16/0701/16/0701/22/0701/23/07 Mr. J. A. StallST. LUCIE PLANTFlorida Power and Light Company cc:Mr. William E. Webster Vice President, Nuclear Operations Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Senior Resident Inspector St. Lucie Plant U.S. Nuclear Regulatory Commission P.O. Box 6090 Jensen Beach, Florida 34957 Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 M. S. Ross, Managing Attorney Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420
| | J. Stall Based on the above discussion, the NRC staff has concluded that your overall response to GL 2006-03 for St. Lucie Unit 2 is acceptable. |
| | If you have any questions regarding this matter, please contact me at (301) 415-2020. |
| | Sincerely, |
| | /RA/ |
| | Brenda L. Mozafari, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-389 cc: See next page |
|
| |
|
| Marjan Mashhadi, Senior Attorney Florida Power & Light Company 801 Pennsylvania Avenue, NW.
| | ML070160123 OFFICE LPL2-2/PM LPL2-2/PM LPL2-2/LA AFPB/BC LPL2-2/BC(A) |
| Suite 220 Washington, DC 20004Mr. Douglas Anderson County Administrator St. Lucie County 2300 Virginia Avenue Fort Pierce, Florida 34982
| | NAME BMoroney BMozafari BClayton SWeerakkody MChernoff DATE 01/16/07 01/16/07 01/16/07 01/22/07 01/23/07 Mr. J. A. Stall ST. LUCIE PLANT Florida Power and Light Company cc: |
| | | Mr. William E. Webster Mr. Christopher R. Costanzo Vice President, Nuclear Operations Plant General Manager Florida Power & Light Company St. Lucie Nuclear Plant P.O. Box 14000 6351 South Ocean Drive Juno Beach, FL 33408-0420 Jensen Beach, Florida 34957 Senior Resident Inspector Mr. Terry Patterson St. Lucie Plant Licensing Manager U.S. Nuclear Regulatory Commission St. Lucie Nuclear Plant P.O. Box 6090 6351 South Ocean Drive Jensen Beach, Florida 34957 Jensen Beach, Florida 34957 Craig Fugate, Director Mark Warner, Vice President Division of Emergency Preparedness Nuclear Operations Support Department of Community Affairs Florida Power & Light Company 2740 Centerview Drive P.O. Box 14000 Tallahassee, Florida 32399-2100 Juno Beach, FL 33408-0420 M. S. Ross, Managing Attorney Mr. Rajiv S. Kundalkar Florida Power & Light Company Vice President - Nuclear Engineering P.O. Box 14000 Florida Power & Light Company Juno Beach, FL 33408-0420 P.O. Box 14000 Juno Beach, FL 33408-0420 Marjan Mashhadi, Senior Attorney Florida Power & Light Company Mr. J. Kammel 801 Pennsylvania Avenue, NW. Radiological Emergency Suite 220 Planning Administrator Washington, DC 20004 Department of Public Safety 6000 Southeast Tower Drive Mr. Douglas Anderson Stuart, Florida 34997 County Administrator St. Lucie County Mr. Bill Parks 2300 Virginia Avenue Operations Manager Fort Pierce, Florida 34982 St. Lucie Nuclear Plant 6351 South Ocean Drive Mr. William A. Passetti, Chief Jensen Beach, Florida 34957-2000 Department of Health Bureau of Radiation Control Mr. Seth B. Duston 2020 Capital Circle, SE, Bin #C21 Training Manager Tallahassee, Florida 32399-1741 St. Lucie Nuclear Plant 6351 South Ocean Drive Mr. Gordon L. Johnston Jensen Beach, Florida 34957-2000 Site Vice President St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, Florida 34957-2000}} |
| Mr. William A. Passetti, Chief Department of Health Bureau of Radiation Control 2020 Capital Circle, SE, Bin #C21 Tallahassee, Florida 32399-1741Mr. Gordon L. Johnston Site Vice President St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, Florida 34957-2000Mr. Christopher R. CostanzoPlant General Manager St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, Florida 34957Mr. Terry PattersonLicensing Manager St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, Florida 34957Mark Warner, Vice PresidentNuclear Operations Support Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420Mr. Rajiv S. KundalkarVice President - Nuclear Engineering Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420Mr. J. KammelRadiological Emergency Planning Administrator Department of Public Safety 6000 Southeast Tower Drive Stuart, Florida 34997Mr. Bill ParksOperations Manager St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, Florida 34957-2000Mr. Seth B. DustonTraining Manager St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, Florida 34957-2000}} | |
Letter Sequence Other |
---|
|
|
MONTHYEARML0633104422006-12-0505 December 2006 Potentially Nonconforming Hemyc & MT Fire Barrier Configurations Project stage: Other ML0701601232007-01-23023 January 2007 Evaluation of Response to Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations Project stage: Other 2006-12-05
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000335/20230102024-01-26026 January 2024 NRC Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000335/2023010 and 05000389/2023010 L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) IR 05000335/20230042024-01-24024 January 2024 Integrated Inspection Report 05000335/2023004 and 05000389/2023004 L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, ML23332A1772023-11-28028 November 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals IR 05000335/20230032023-11-0606 November 2023 Integrated Inspection Report 05000335/2023003 and 05000389/2023003 ML23270B8882023-10-23023 October 2023 Regulatory Audit Summary Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structure, Systems, and Components for Nuclear Power Reactors EPID L-2022-LLA-0182 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23275A1102023-10-0202 October 2023 License Amendment Request Revision 2 for the Technical Specifications Conversion to NUREG-1432, Revision 5 L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report IR 05000335/20233012023-09-20020 September 2023 NRC Operator License Examination Report 05000335/2023301 and 05000389/2023301 L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 ML23219A0042023-09-0101 September 2023 Transmittal Letter - Safety Evaluation Related to the SLRA of St. Lucie Plant, Units 1and 2, Revision 1 L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 IR 05000335/20230022023-08-0707 August 2023 Integrated Inspection Report 05000335/2023002 and 05000389/2023002 L-2023-105, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment ML23212B2652023-07-27027 July 2023 Operator Licensing Written Examination Approval 05000335/2023301 and 05000389/2023301 L-2023-099, Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2023-07-26026 July 2023 Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-102, Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches2023-07-26026 July 2023 Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches ML23200A1232023-07-21021 July 2023 Transmittal Letter for the St. Lucie SLRA Review L-2023-097, Subsequent License Renewal Application Revision 1 - Supplement 62023-07-13013 July 2023 Subsequent License Renewal Application Revision 1 - Supplement 6 L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) ML23184A0352023-06-30030 June 2023 Notification of St. Lucie Units 1 & 2 Focused Engineering Inspection (FEI) 05000335/2023010 and 05000389/2023010 and Initial Information Request L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) IR 05000335/20234032023-06-29029 June 2023 Security Inspection Report 05000335/2023403 and 05000389/2023403 IR 05000335/20234022023-06-20020 June 2023 Security Baseline Inspection Report 05000335/2023402 and 05000389/2023402 L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal IR 05000335/20234012023-05-16016 May 2023 Cyber Security Inspection Report 05000335/2023401 and 05000389/2023401 (Cover Letter) IR 05000335/20230012023-05-0909 May 2023 Integrated Inspection Report 05000335/2023001 and 05000389/2023001 ML23109A1132023-04-30030 April 2023 SLRA Change Schedule Letter L-2023-059, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response2023-04-21021 April 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response ML23097A1642023-04-17017 April 2023 Summary of March 23, 2023, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests L-2023-055, 2022 Annual Environmental Operating Report2023-04-12012 April 2023 2022 Annual Environmental Operating Report 2024-01-08
[Table view] |
Text
January 23, 2007 Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420
SUBJECT:
ST. LUCIE UNIT 2 - EVALUATION OF RESPONSE TO GENERIC LETTER 2006-03, POTENTIALLY NONCONFORMING HEMYC AND MT FIRE BARRIER CONFIGURATIONS (TAC NO. MD1626)
Dear Mr. Stall:
The U.S. Nuclear Regulatory Commission (NRC) acknowledges the receipt of your response, dated June 9, 2006, to Generic Letter (GL) 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations, as supplemented by letters dated September 20, and December 19, 2006.
Your response states that Hemyc is used for raceway protection inside the St. Lucie Unit 2 containment, where it is employed as a flame impingement shield and installed below the lowest tray in each stack of cable trays that contain redundant safe shutdown cables when 20-foot separation is not met on the 23-foot elevation. Following discussions with the NRC staff, your December 19, 2006, letter revised the initial response to state that the installation is outside the original licensing basis to provide a one-half hour fire rated barrier. You have stated that corrective actions are required to resolve the nonconforming condition and that you plan to examine corrective actions associated with the Hemyc installation as part of the St. Lucie transition to NFPA 805. You have previously indicated your intent to transition the St. Lucie site to NFPA 805 in a letter dated December 22, 2005.
You have stated that further compensatory measures have not been implemented based on a comparison with the similar configuration that exists at St. Lucie Unit 1, where there are no flame impingement shields or radiant energy shields installed beneath certain cable trays inside containment and where the NRC has granted an exemption from providing any additional protection.
Your response also states that other fire barriers that separate redundant safe shutdown trains located within the same fire area have been designed and installed in accordance with current NRC guidance. The basis for stating that other fire barriers have been designed and installed in accordance with current NRC guidance should be maintained on site, and will be subject to inspection during the normal NRC inspection process.
J. Stall Based on the above discussion, the NRC staff has concluded that your overall response to GL 2006-03 for St. Lucie Unit 2 is acceptable.
If you have any questions regarding this matter, please contact me at (301) 415-2020.
Sincerely,
/RA/
Brenda L. Mozafari, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-389 cc: See next page
ML070160123 OFFICE LPL2-2/PM LPL2-2/PM LPL2-2/LA AFPB/BC LPL2-2/BC(A)
NAME BMoroney BMozafari BClayton SWeerakkody MChernoff DATE 01/16/07 01/16/07 01/16/07 01/22/07 01/23/07 Mr. J. A. Stall ST. LUCIE PLANT Florida Power and Light Company cc:
Mr. William E. Webster Mr. Christopher R. Costanzo Vice President, Nuclear Operations Plant General Manager Florida Power & Light Company St. Lucie Nuclear Plant P.O. Box 14000 6351 South Ocean Drive Juno Beach, FL 33408-0420 Jensen Beach, Florida 34957 Senior Resident Inspector Mr. Terry Patterson St. Lucie Plant Licensing Manager U.S. Nuclear Regulatory Commission St. Lucie Nuclear Plant P.O. Box 6090 6351 South Ocean Drive Jensen Beach, Florida 34957 Jensen Beach, Florida 34957 Craig Fugate, Director Mark Warner, Vice President Division of Emergency Preparedness Nuclear Operations Support Department of Community Affairs Florida Power & Light Company 2740 Centerview Drive P.O. Box 14000 Tallahassee, Florida 32399-2100 Juno Beach, FL 33408-0420 M. S. Ross, Managing Attorney Mr. Rajiv S. Kundalkar Florida Power & Light Company Vice President - Nuclear Engineering P.O. Box 14000 Florida Power & Light Company Juno Beach, FL 33408-0420 P.O. Box 14000 Juno Beach, FL 33408-0420 Marjan Mashhadi, Senior Attorney Florida Power & Light Company Mr. J. Kammel 801 Pennsylvania Avenue, NW. Radiological Emergency Suite 220 Planning Administrator Washington, DC 20004 Department of Public Safety 6000 Southeast Tower Drive Mr. Douglas Anderson Stuart, Florida 34997 County Administrator St. Lucie County Mr. Bill Parks 2300 Virginia Avenue Operations Manager Fort Pierce, Florida 34982 St. Lucie Nuclear Plant 6351 South Ocean Drive Mr. William A. Passetti, Chief Jensen Beach, Florida 34957-2000 Department of Health Bureau of Radiation Control Mr. Seth B. Duston 2020 Capital Circle, SE, Bin #C21 Training Manager Tallahassee, Florida 32399-1741 St. Lucie Nuclear Plant 6351 South Ocean Drive Mr. Gordon L. Johnston Jensen Beach, Florida 34957-2000 Site Vice President St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, Florida 34957-2000