ML18219B569: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:9  ucAv/et',
REGULATORY INFORMATION DISTRIBUTIQN SYSTEM (RIDS)
DISTRIBUTION FOR INCOMING MATERIAL                              50-316 REC:  KEPPLER  J G                ORG: SHALLER D V                        DQCDATE: 07/21/78 NRC                              IN 5 MI  PWR                          DATE RCVD: 07/26/78 DQCTYPE:  LETTER      NOTARIZED: NO                                        COPIES RECEIVED
 
==SUBJECT:==
LTR 1    ENCL 1 FORWARDING LICENSEE EVENT REPT (RO 50-316/78-019) ON 04/04/78 CONCERNING DURING NORMAL OPERATIONS ACCUMULATOR 0 is 2 AND 3 WERE FILLED... SAMPLING SURVEILLANCE REQUIREMENTS OF TECH SPEC 4. 5. 1 WERE NOT MET WITHIN THE 6 HOUR TIME LIMIT... W/ATT LER 78-023.
REVIEWER  INITIAL: X JM DISTRIBUTOR  INITIAL:  ~
<<'<<<<<<<<+<<<<<<<<<<<<<<<<<<+<<DISTRIBUTION      GF THIS MATERIAL IS AS FOLLOWS <<<<<<<<<<<<<<<<<<<<<<%<<<<<<<<<<<<
NOTES:
: l. SEND 3 COPIES OF ALL MATERIAL TO      IhE ED REEVFS-1    CY ALL MATERIAL INCIDENT REPORTS (DISTRIBUTION CODE A002)
FGR ACTION:        B~U        ORBSi BC<<<<W/4 ENCL INTERNAL:          REG  FILk<<<<W  NCL                      NRC PDR<<<<W/ENCL
                                    -NCL                      MIPC<<<<W/3 ENCL I 5 C SYSTEMS BR<<<<W/ENCL                EMERGENCY PLAN BR<<<<M/ENCL NOVAK/CHECK<<<<W/ENCL                    EEB<<<<W/ENCL AD FOR ENG<<<<W/ENCL                      PLANT SYSTEMS BR<<<<M/ENCL HANAUER<<<<W/ENCL                        AD FOR PLANT SYSTEMS<<<<W/ENCL AD FOR SYS 8( PROJ<<<<W/ENCL              REACTOR SAFETY BR<<<<W/ENCL ENGINEERING BR<<<<W/ENCL                  VOLLMER/BUNCH<<+W/ENCL KREGER/J. COLLINS<<<<M/ENCL              POWER SYS BR<<<<W/ENCL K SEYFR IT/IE<<<<W/ENCL EXTERNAL:          LPDR'8 ST. JOSEPH'I  <<<<W/ENCL TICI LIZ CARTER<<<<W/ENCL NSI C<<<<W/ENCL ACRS CAT B<<<<W/16 ENCL DISTRIBUTION:      LTR 45    ENCL 45                            CONTROL NBR:    7820101 3 SI ZE: iP+1 P+2P THE END g
 
I) (
I 0
W P
li
 
Op              C ericen yzpp  INDIANA &'I/IICIIIGANPDNER COII/IPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 July 21,    1978                                              rcpt tg LFI
                                                                                  ~C>
                                                              ";,","~c>            C,.'M Ql Mr. J.G. Keppler, Regional        Director Office of Inspection        and Enforcement V7 CD United States Nuclear Regulatory Coranission Region  III 799 Roosevel    t Road Glen  Ellyn, IL    60137 Operating License DPR-74 Docket No. 50-316
 
==Dear Mr. Keppler:==
 
Pursuant to the requirements of the Appendix    A Technical Specifications the following reports are submitted:
RO  78-019/03L-1 RO  78-023/03L-1.
Sincerely, D.V. Shaller Plant Manager
  /bab cc:  J.E. Dolan R.W. Jurgensen R.F. Kroeger R. Ki lburn R.J. Vollen BPI K.R Baker RO:
            ~            III R.C. Callen MPSC P.W. Steketee, Esq.
R. Walsh, Esq.
G. Charnoff, Esq.
G. Olson J.M. Hennigan PNSRC J.F. Stietzel                                                JUL 8 I 1S78 R.S. Keith Dir.,    IE (30 copies)
Dir.,    IE (3 copies)
 
r,  '
I    h I
            'i I
                ~ 'V
 
NRC FORM 366 (7.77)                                          "UPDATE REP            T    -  PREVIOUS REPORT DATE                    5/3/78 EVENT REPORT                            'ICENSEE CONTROL BLOCK:
I                                  6 0
                                                                                    '1                (PLEASE PRINT OR TYPE ALI. REQUIRED INFORMATION)
  ~0              M    I    D      C      C      2    Q20          0  0      0    0    0'0        0    0      0    0Q34                    1        1.1        1QE~QE 7        8    9        LICENSEE CODE                14      15                      LICENSE NUMBER                        25      26              LICENSE TYPE        30      57 CAT 58 CON'T
  ~01 7        8 RE'QRT
                                  ~LQB 0 60            61 5      0    0  0 DPCKET NVMBFR 3    1    6 68 QO 69 4    0    4 EVENT DATE 7      8 74 Qs0 75 7    2    1 REPORT DATE 7    8 80 Q
EVENT DESCRIPTION AND PROBABLE CONSEQUENCES ~10 DURING NORIIAL OPERATION, ACCUMULATOR7                                          1,    2 AND 3 WERE FILLED.                                THE SAflPLING
  ~03            SURVEILLANCE REQUIREI'lENTS OF                              T. S. 4.5.1.              b WERE NOT MET WITHIN THE 6 HOUR TIME
  ~04            LIMIT.          ON    APRIL        5, 1978 IT          WAS      REALIZED THAT THE ACCUMULATOR SAMPLES WERE MISSED,
  ~OS            THESE WERE OBTAINED AND ANALYZED AT THAT TIME:
  ~07
  ~os                                                                                                                                                                                              80 7        8 SYSTEM                CAUSE        CAUSE                                                                  COMP            VALVE  ~
CODE                CODE      SUBCODE                    COMPONENT CODE                        SUBCODE                SVBCODE 9
                                    ~SF              Q>>        A    QT2    ~XQTR              Z    Z    Z      Z Z        Z  Q14              ~ZQTE            ~Z 20 QT.
7        8                                    10            11            12              13                                18                  19 QTT LERIRP REPoRT ACTION FUTURE TAKEN ACTION EVENT YEAR L278J 21          22 EFFECT ON PLANT Q
23 SHUTDOWN METHOD
                                                                            ~01 24 SEQUENTIAL REPORT NO.
9 26 HOURS O22 U~
27 M
OCCURRENCE 28 ATTACHMENT SUBMITTED CODE 29 NPRDQ FORM SUB.
REPORT TYPE UL 30 PRIME COMP.
SUPPLIER U U 31 REVISION NO.
32 COMPONENT MANUFACTURER
                            ~ZGR                ~ZQER              ~ZQET              0    0    0              ~NQ33              ~NQ34                      2    QEE        Z    9    9 9    Qss QTR 33        34                    35                36              37                    40      41                42                      43                44              47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS Q27 3        INVESTIGATION REVEALED THAT THE CHEMICAL LAB HAD BEEN NOTIFIED.                                                                            A CHEMICAL SUPERVISOR HAD ASSIGNED THE SAMPLING TO AN                                    INDIVIDUAL.              DUE TO      TIME PROBLEMS THE SAMPLE                                  WAS NOT OBTAINED AND WAS NOT RE-ASSIGNED BY THE SUPERVISOR.                                                      TO PREVENT RECURRENCE,                                ALL 3
CHEMICAL PERSONNEL WERE RETRAINED IN THE ACCUMULATOR SAMPLING REQUIREMENTS.
  ~14 7,8          9                                                                                                                                                                                80 FACILITY STATUS              99 POWER                        OTHER STATUS      Q 'ZQRT
                                                                                      ~30      METHOD OF DISCOVERY                                    DISCOVERY DESCRIPTION Q32 E  Q>>      ~03            0      Qs            NA                                                        NA 7        8  9              10                12      13                              44      45          46                                                                                80 ACTIVITY Z    Q33 CONTENT RELEASED OF RELEASE
                              ~ZQ34 AMOUNT OF ACTIVITY NA
                                                                                    ~                                        NA LOCATION OF RELEASE                  Q3 7        8    9              10            11                                            44            45                                                                                      80 PERSONNEL EXPOSURES NUMBER                TYPE          DESCRIPTION Q39 7      ~00          0    Q        ZQss                  NA 80 7        8  9                11        12          13 PERSONNEL INJURIES NUMBER                DESCRIPTIONQ41
[ll~] ~00 7        8  9 0
11 Q40 12 NA 80 LOSS OF OR DAMAGE TO FACILITY TYPE        DESCRIPTION                      Q43 9        Z  Q42                                          NA
'7        8  9          10                                                                                                                                                                    80 PUBLICITY O
ISSUED
              ~ZQ44 DESCRIPTION        Q                  NA NRC USE ONI Y OE O
7      8    9          10                                                                                                                                68    69                            80  Ts JaCk RiSChling                                                                            1 6 465 5901                            0 NAME OF PREPARER                                                                                            PHDNE6
 
P 7'RC      FORM 366 (7-74>    7
                '                                          "UPDATE~PORT - PREVIOUS REPORT DATE                                    5/~8" 3
LICENSEE EVENT REPORT CONTROL BLOCK:                                                  Q1                (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 7        8      9 N    I    0 LICENSEE CODE 0
I 0      2 14 000 15 o  o      '
6 LICENSE NUMBER
                                                                                                          '          ' Q'    25      26 LICENSE TYPE      30 Q~S 57 CAT 58 CON'T o            0    0    0    3    1    6    Q70        4    0    8    7        8QBO          7    2    ]  7    8 7        8
                                      ~Q6 60          61              DOCKET NUMBER                68    69        EVENT DATE              74      75      REPORT DATE          80 Qg EVENT DESCRIPTION AND PROBABLE CONSEQUENCES +10 DURING STARTUP AND POWER ASCENSION PROGRAM THE STEAM PRESSURE                                                              BISTABLES, PB-51 6A, 526A, 536A and 546A ( LOlJ PRESSURE-STEAN LINE ISOLATION)                                                            WERE NOT
    ~p4                FUNCTIONALLY TESTED PER                          T.S. TABLE      4. 3-2 P4. e.
    ~OS
    ~ps
    ~O7
    ~OB                                                                                                                                                                                  80 7        8 9 SYSTEM              CAUSE          CAUSE                                                        COMP.          VALVE  ~
CODE                CODE        SUBCODE                  COMPONENT CODE                      SUBCODE        SUBCODE
    ~OB 7        8
                                        ~IB 9          10 Q11 11 A Q>>        ~CQ>>
12            13 I    N    3    T    R 0 18 Q4      ~Q>>
19.
                                                                                                                                                              ~ZQ16 20 SEQUENTIAL                          OCCURRENCE            REPORT.                      REVISION Q>>
LERIRp
                            <<70>>
ACTION FUTURE EVENT YEAR
                                          ~78 21          22 EFFECT
                                                                  +
23 SHUTDOWN
                                                                                ~02 24 REPORT NO.
3 26 Qa 27
                                                                                                                          ~03 28 ATTACHMENT CODE 29 NPRDQ
                                                                                                                                                +L 30 TYPE PRIME COMP.
[J 31 Ql NO.
32 COMPONENT TAKEN ACTION                  ON PLANT      ~
METHOD                  HOURS +22        SUBMITTED          FORM SUB.        SUPPLIER            MANUFACTURER
                    ~GQ18 ~ZQ19                    ~~Q20              ~~8                0    0    0  II          I    Q23        ~~Q24            ~NQ26            W      I  2    Q26 33          34      4          35                36              37                    40      41                42              43              44              47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS Q27 o              DESIGN CHANGE l'JAS COMPLETED REMOVING THESE BISTA 1
IV., AND INSTALLING THEM IN SETS I AND                                      II.      TEMP                                                        ADDING THESE BISTABLES TO THE APPROPRI'AT
 
==E. PROCEDURE==
S. 'THESE TEMPORARY CHANGE SHEETS WERE 3            I SPLACE0          AND NOT PLACED                I NTO    EFFECT    ~    CONSEQUENTLY, THE B I STABLES WERE NOT FUN CT I ON-LLY TESTED IN FEBRUARY AND MARCH                                      (SEE ATTACHED SUPPLEMENT) 7        8      9                                                                                                                                                                  80 1, FACILITY STATUS GQ ~UA0 Q
                                        % POWER                        OTHERSTATUS "A
                                                                                          ~ ''
                                                                                          ~3p      METHOD OF DISCOVERY LJQ" DISCOVERY DESCRIPTION Q32 ROUTINE REVIEW 7        8      9              10              12      13                              44      45          46                                                                    80 ACTIVITY        CONTENT RELEASED OF RELEASE Q33        Z  Q34 AMOUNTQF ACTIVITY NA
                                                                                        ~                                      NA LOCATION OF RELEASE        Q 7        8      9            10            II                                          44            45                                                                          80 PERSONNEL EXPOSURES NUMBER              TYPE          DESCRIPTION Q39 7        ~00          0      Q37    Z    Q38                NA 7        8      9                11      12          13                                                                                                                          80 PERSONNEL INJURIES          .
7        8      9                11      12                                                                                                                                        80 LOSS OF OR DAMAGE TO FACILITY ~43
'g-g TYPE z    Q42 DESCRIPTION NA 80 7        8      9          10 PUBLICITY ISSUED      DESCRIPTION      Q                                                                                                                  NRC USE ONLY 07
  '~2O 7        8
                    ~ZO 9          10 N
68    69                        80 O
49 0
NAME DF PREPARFR                      Jack        ischl in                                                              616-465-5901                      a
 
I tq
 
ATTACHMENT TO LICENSEE EVENT REPORT g 7B O~3/O3L  I Cause Description E
THESE HAVE BEEN ADDED TO THE APPROPRIATE PROCEDURES  AND i
FUNCTIONALLY TESTED. TO PREVENT,. RECURRENCE, ADMINISTRATIVE CONTROLS HAVE BEEN ESTABLISHED TO INSURE TEMPORARY CHANGES ARE APPROVED AND INCORPORATED INTO THE APPLICABLE PROCEDURES.}}

Latest revision as of 20:22, 2 February 2020

Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Reports (RO 78-019/03L-1 and RO 78-023/03L-1)
ML18219B569
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 07/21/1978
From: Shaller D
American Electrtic Power System, Indiana Michigan Power Co
To: James Keppler
NRC/RGN-III
References
LER 1978-019-03L, LER 1978-023-03L
Download: ML18219B569 (9)


Text

9 ucAv/et',

REGULATORY INFORMATION DISTRIBUTIQN SYSTEM (RIDS)

DISTRIBUTION FOR INCOMING MATERIAL 50-316 REC: KEPPLER J G ORG: SHALLER D V DQCDATE: 07/21/78 NRC IN 5 MI PWR DATE RCVD: 07/26/78 DQCTYPE: LETTER NOTARIZED: NO COPIES RECEIVED

SUBJECT:

LTR 1 ENCL 1 FORWARDING LICENSEE EVENT REPT (RO 50-316/78-019) ON 04/04/78 CONCERNING DURING NORMAL OPERATIONS ACCUMULATOR 0 is 2 AND 3 WERE FILLED... SAMPLING SURVEILLANCE REQUIREMENTS OF TECH SPEC 4. 5. 1 WERE NOT MET WITHIN THE 6 HOUR TIME LIMIT... W/ATT LER 78-023.

REVIEWER INITIAL: X JM DISTRIBUTOR INITIAL: ~

<<'<<<<<<<<+<<<<<<<<<<<<<<<<<<+<<DISTRIBUTION GF THIS MATERIAL IS AS FOLLOWS <<<<<<<<<<<<<<<<<<<<<<%<<<<<<<<<<<<

NOTES:

l. SEND 3 COPIES OF ALL MATERIAL TO IhE ED REEVFS-1 CY ALL MATERIAL INCIDENT REPORTS (DISTRIBUTION CODE A002)

FGR ACTION: B~U ORBSi BC<<<<W/4 ENCL INTERNAL: REG FILk<<<<W NCL NRC PDR<<<<W/ENCL

-NCL MIPC<<<<W/3 ENCL I 5 C SYSTEMS BR<<<<W/ENCL EMERGENCY PLAN BR<<<<M/ENCL NOVAK/CHECK<<<<W/ENCL EEB<<<<W/ENCL AD FOR ENG<<<<W/ENCL PLANT SYSTEMS BR<<<<M/ENCL HANAUER<<<<W/ENCL AD FOR PLANT SYSTEMS<<<<W/ENCL AD FOR SYS 8( PROJ<<<<W/ENCL REACTOR SAFETY BR<<<<W/ENCL ENGINEERING BR<<<<W/ENCL VOLLMER/BUNCH<<+W/ENCL KREGER/J. COLLINS<<<<M/ENCL POWER SYS BR<<<<W/ENCL K SEYFR IT/IE<<<<W/ENCL EXTERNAL: LPDR'8 ST. JOSEPH'I <<<<W/ENCL TICI LIZ CARTER<<<<W/ENCL NSI C<<<<W/ENCL ACRS CAT B<<<<W/16 ENCL DISTRIBUTION: LTR 45 ENCL 45 CONTROL NBR: 7820101 3 SI ZE: iP+1 P+2P THE END g

I) (

I 0

W P

li

Op C ericen yzpp INDIANA &'I/IICIIIGANPDNER COII/IPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 July 21, 1978 rcpt tg LFI

~C>

";,","~c> C,.'M Ql Mr. J.G. Keppler, Regional Director Office of Inspection and Enforcement V7 CD United States Nuclear Regulatory Coranission Region III 799 Roosevel t Road Glen Ellyn, IL 60137 Operating License DPR-74 Docket No. 50-316

Dear Mr. Keppler:

Pursuant to the requirements of the Appendix A Technical Specifications the following reports are submitted:

RO 78-019/03L-1 RO 78-023/03L-1.

Sincerely, D.V. Shaller Plant Manager

/bab cc: J.E. Dolan R.W. Jurgensen R.F. Kroeger R. Ki lburn R.J. Vollen BPI K.R Baker RO:

~ III R.C. Callen MPSC P.W. Steketee, Esq.

R. Walsh, Esq.

G. Charnoff, Esq.

G. Olson J.M. Hennigan PNSRC J.F. Stietzel JUL 8 I 1S78 R.S. Keith Dir., IE (30 copies)

Dir., IE (3 copies)

r, '

I h I

'i I

~ 'V

NRC FORM 366 (7.77) "UPDATE REP T - PREVIOUS REPORT DATE 5/3/78 EVENT REPORT 'ICENSEE CONTROL BLOCK:

I 6 0

'1 (PLEASE PRINT OR TYPE ALI. REQUIRED INFORMATION)

~0 M I D C C 2 Q20 0 0 0 0 0'0 0 0 0 0Q34 1 1.1 1QE~QE 7 8 9 LICENSEE CODE 14 15 LICENSE NUMBER 25 26 LICENSE TYPE 30 57 CAT 58 CON'T

~01 7 8 RE'QRT

~LQB 0 60 61 5 0 0 0 DPCKET NVMBFR 3 1 6 68 QO 69 4 0 4 EVENT DATE 7 8 74 Qs0 75 7 2 1 REPORT DATE 7 8 80 Q

EVENT DESCRIPTION AND PROBABLE CONSEQUENCES ~10 DURING NORIIAL OPERATION, ACCUMULATOR7 1, 2 AND 3 WERE FILLED. THE SAflPLING

~03 SURVEILLANCE REQUIREI'lENTS OF T. S. 4.5.1. b WERE NOT MET WITHIN THE 6 HOUR TIME

~04 LIMIT. ON APRIL 5, 1978 IT WAS REALIZED THAT THE ACCUMULATOR SAMPLES WERE MISSED,

~OS THESE WERE OBTAINED AND ANALYZED AT THAT TIME:

~07

~os 80 7 8 SYSTEM CAUSE CAUSE COMP VALVE ~

CODE CODE SUBCODE COMPONENT CODE SUBCODE SVBCODE 9

~SF Q>> A QT2 ~XQTR Z Z Z Z Z Z Q14 ~ZQTE ~Z 20 QT.

7 8 10 11 12 13 18 19 QTT LERIRP REPoRT ACTION FUTURE TAKEN ACTION EVENT YEAR L278J 21 22 EFFECT ON PLANT Q

23 SHUTDOWN METHOD

~01 24 SEQUENTIAL REPORT NO.

9 26 HOURS O22 U~

27 M

OCCURRENCE 28 ATTACHMENT SUBMITTED CODE 29 NPRDQ FORM SUB.

REPORT TYPE UL 30 PRIME COMP.

SUPPLIER U U 31 REVISION NO.

32 COMPONENT MANUFACTURER

~ZGR ~ZQER ~ZQET 0 0 0 ~NQ33 ~NQ34 2 QEE Z 9 9 9 Qss QTR 33 34 35 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS Q27 3 INVESTIGATION REVEALED THAT THE CHEMICAL LAB HAD BEEN NOTIFIED. A CHEMICAL SUPERVISOR HAD ASSIGNED THE SAMPLING TO AN INDIVIDUAL. DUE TO TIME PROBLEMS THE SAMPLE WAS NOT OBTAINED AND WAS NOT RE-ASSIGNED BY THE SUPERVISOR. TO PREVENT RECURRENCE, ALL 3

CHEMICAL PERSONNEL WERE RETRAINED IN THE ACCUMULATOR SAMPLING REQUIREMENTS.

~14 7,8 9 80 FACILITY STATUS 99 POWER OTHER STATUS Q 'ZQRT

~30 METHOD OF DISCOVERY DISCOVERY DESCRIPTION Q32 E Q>> ~03 0 Qs NA NA 7 8 9 10 12 13 44 45 46 80 ACTIVITY Z Q33 CONTENT RELEASED OF RELEASE

~ZQ34 AMOUNT OF ACTIVITY NA

~ NA LOCATION OF RELEASE Q3 7 8 9 10 11 44 45 80 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION Q39 7 ~00 0 Q ZQss NA 80 7 8 9 11 12 13 PERSONNEL INJURIES NUMBER DESCRIPTIONQ41

[ll~] ~00 7 8 9 0

11 Q40 12 NA 80 LOSS OF OR DAMAGE TO FACILITY TYPE DESCRIPTION Q43 9 Z Q42 NA

'7 8 9 10 80 PUBLICITY O

ISSUED

~ZQ44 DESCRIPTION Q NA NRC USE ONI Y OE O

7 8 9 10 68 69 80 Ts JaCk RiSChling 1 6 465 5901 0 NAME OF PREPARER PHDNE6

P 7'RC FORM 366 (7-74> 7

' "UPDATE~PORT - PREVIOUS REPORT DATE 5/~8" 3

LICENSEE EVENT REPORT CONTROL BLOCK: Q1 (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 7 8 9 N I 0 LICENSEE CODE 0

I 0 2 14 000 15 o o '

6 LICENSE NUMBER

' ' Q' 25 26 LICENSE TYPE 30 Q~S 57 CAT 58 CON'T o 0 0 0 3 1 6 Q70 4 0 8 7 8QBO 7 2 ] 7 8 7 8

~Q6 60 61 DOCKET NUMBER 68 69 EVENT DATE 74 75 REPORT DATE 80 Qg EVENT DESCRIPTION AND PROBABLE CONSEQUENCES +10 DURING STARTUP AND POWER ASCENSION PROGRAM THE STEAM PRESSURE BISTABLES, PB-51 6A, 526A, 536A and 546A ( LOlJ PRESSURE-STEAN LINE ISOLATION) WERE NOT

~p4 FUNCTIONALLY TESTED PER T.S. TABLE 4. 3-2 P4. e.

~OS

~ps

~O7

~OB 80 7 8 9 SYSTEM CAUSE CAUSE COMP. VALVE ~

CODE CODE SUBCODE COMPONENT CODE SUBCODE SUBCODE

~OB 7 8

~IB 9 10 Q11 11 A Q>> ~CQ>>

12 13 I N 3 T R 0 18 Q4 ~Q>>

19.

~ZQ16 20 SEQUENTIAL OCCURRENCE REPORT. REVISION Q>>

LERIRp

<<70>>

ACTION FUTURE EVENT YEAR

~78 21 22 EFFECT

+

23 SHUTDOWN

~02 24 REPORT NO.

3 26 Qa 27

~03 28 ATTACHMENT CODE 29 NPRDQ

+L 30 TYPE PRIME COMP.

[J 31 Ql NO.

32 COMPONENT TAKEN ACTION ON PLANT ~

METHOD HOURS +22 SUBMITTED FORM SUB. SUPPLIER MANUFACTURER

~GQ18 ~ZQ19 ~~Q20 ~~8 0 0 0 II I Q23 ~~Q24 ~NQ26 W I 2 Q26 33 34 4 35 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS Q27 o DESIGN CHANGE l'JAS COMPLETED REMOVING THESE BISTA 1

IV., AND INSTALLING THEM IN SETS I AND II. TEMP ADDING THESE BISTABLES TO THE APPROPRI'AT

E. PROCEDURE

S. 'THESE TEMPORARY CHANGE SHEETS WERE 3 I SPLACE0 AND NOT PLACED I NTO EFFECT ~ CONSEQUENTLY, THE B I STABLES WERE NOT FUN CT I ON-LLY TESTED IN FEBRUARY AND MARCH (SEE ATTACHED SUPPLEMENT) 7 8 9 80 1, FACILITY STATUS GQ ~UA0 Q

% POWER OTHERSTATUS "A

~

~3p METHOD OF DISCOVERY LJQ" DISCOVERY DESCRIPTION Q32 ROUTINE REVIEW 7 8 9 10 12 13 44 45 46 80 ACTIVITY CONTENT RELEASED OF RELEASE Q33 Z Q34 AMOUNTQF ACTIVITY NA

~ NA LOCATION OF RELEASE Q 7 8 9 10 II 44 45 80 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION Q39 7 ~00 0 Q37 Z Q38 NA 7 8 9 11 12 13 80 PERSONNEL INJURIES .

7 8 9 11 12 80 LOSS OF OR DAMAGE TO FACILITY ~43

'g-g TYPE z Q42 DESCRIPTION NA 80 7 8 9 10 PUBLICITY ISSUED DESCRIPTION Q NRC USE ONLY 07

'~2O 7 8

~ZO 9 10 N

68 69 80 O

49 0

NAME DF PREPARFR Jack ischl in 616-465-5901 a

I tq

ATTACHMENT TO LICENSEE EVENT REPORT g 7B O~3/O3L I Cause Description E

THESE HAVE BEEN ADDED TO THE APPROPRIATE PROCEDURES AND i

FUNCTIONALLY TESTED. TO PREVENT,. RECURRENCE, ADMINISTRATIVE CONTROLS HAVE BEEN ESTABLISHED TO INSURE TEMPORARY CHANGES ARE APPROVED AND INCORPORATED INTO THE APPLICABLE PROCEDURES.