ML18101A193: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 07/31/1994
| issue date = 07/31/1994
| title = Corrected Monthly Operating Rept for Jul 1994 for Salem Generating Station Unit 2,correcting Gross Thermal Energy Value
| title = Corrected Monthly Operating Rept for Jul 1994 for Salem Generating Station Unit 2,correcting Gross Thermal Energy Value
| author name = MORRONI M
| author name = Morroni M
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:CORRECTED COPY ,., OPERATING DATA REPORT Docket No: Date: Completed by: Mike Morroni Telephone:
{{#Wiki_filter:~          CORRECTED COPY     ~
Operating Status 1. Unit Name Salem No. 2 Notes 2. Reporting Period July 1994 3. Licensed Thermal Power {MWt) 3411 4. Nameplate Rating {Gross MWe) 1170 5. Design Electrical Rating {Net MWe) 1115 6. Maximum Dependable Capacity{Gross MWe) 1149 7. Maximum Dependable Capacity {Net MWe) 1106 8. If Changes Occur in Capacity Ratings {items 3 through 7) Report, Give Reason NA 9. Power Level to Which Restricted, if any {Net MWe) 10. Reasons for Restrictions, if any 11. Hours in Reporting Period 12. No. of Hrs. Rx. was Critical 13. Reactor Reserve Shutdown Hrs. 14. Hours Generator On-Line 15. Unit Reserve Shutdown Hours 16. Gross Thermal Energy Generated
                        ,.,   OPERATING DATA REPORT ~
{MWH) Gross Elec. Energy Generated
Docket No:   50-311 Date:         08/10/94 Completed by:     Mike Morroni                       Telephone:   339-2122 Operating Status
{MWH) 18. Net Elec. Energy Gen. {MWH) 19. Unit Service Factor 20. Unit Availability Factor 21. Unit capacity Factor {using MDC Net) 22. Unit Capacity Factor {using DER Net) 23. Unit Forced Outage Rate N/A. This Month 744 525.08 0 477.77 0 1582257.6 495560 466128 64.2 64.2 56.6 56.2 35.8 Year to Date 5087 4723.76 0 4517.07 0 *13498728.0 4332880 4116463 88.8 88.8 73.2 72.6 9.4 50-311 08/10/94 339-2122 since Last N/A Cumulative 112200 74003.32 0 71406.59 0 *175961667.4 74879398 71243740 63.6 63.6 57.4 56.9 21.9 24. Shutdowns scheduled over next 6 months {type, date and duration of each) Refueling outage scheduled to start October 15. 1994 and last 60 da s. 25. If shutdown at end of Report Period, Estimated Date of Startup: 8-1-7.R2 NA 9408260301 940818 PDR ADOCK 05000311 R PDR}}
: 1. Unit Name                           Salem No. 2     Notes
: 2. Reporting Period                 July       1994
: 3. Licensed Thermal Power {MWt)                 3411
: 4. Nameplate Rating {Gross MWe)                 1170
: 5. Design Electrical Rating {Net MWe)           1115
: 6. Maximum Dependable Capacity{Gross MWe) 1149
: 7. Maximum Dependable Capacity {Net MWe) 1106
: 8. If Changes Occur in Capacity Ratings {items 3 through 7) since Last Report, Give Reason       NA
: 9. Power Level to Which Restricted, if any {Net MWe)             N/A
: 10. Reasons for Restrictions, if any             N/A.
This Month    Year to Date    Cumulative
: 11. Hours in Reporting Period               744          5087        112200
: 12. No. of Hrs. Rx. was Critical             525.08      4723.76      74003.32
: 13. Reactor Reserve Shutdown Hrs.             0              0            0
: 14. Hours Generator On-Line                 477.77      4517.07      71406.59
: 15. Unit Reserve Shutdown Hours               0              0            0
: 16. Gross Thermal Energy Generated
{MWH)                     1582257.6    *13498728.0  *175961667.4 Gross Elec. Energy Generated
{MWH)                       495560      4332880      74879398
: 18. Net Elec. Energy Gen. {MWH)           466128      4116463      71243740
: 19. Unit Service Factor                     64.2        88.8            63.6
: 20. Unit Availability Factor                 64.2        88.8            63.6
: 21. Unit capacity Factor
{using MDC Net)                     56.6        73.2            57.4
: 22. Unit Capacity Factor
{using DER Net)                     56.2          72.6          56.9
: 23. Unit Forced Outage Rate                 35.8           9.4         21.9
: 24. Shutdowns scheduled over next 6 months {type, date and duration of each)
Refueling outage scheduled to start October 15. 1994 and last 60 da s.
: 25. If shutdown at end of Report Period, Estimated Date of Startup:
NA 8-1-7.R2 9408260301 940818 PDR   ADOCK 05000311 R               PDR}}

Latest revision as of 10:22, 21 October 2019

Corrected Monthly Operating Rept for Jul 1994 for Salem Generating Station Unit 2,correcting Gross Thermal Energy Value
ML18101A193
Person / Time
Site: Salem PSEG icon.png
Issue date: 07/31/1994
From: Morroni M
Public Service Enterprise Group
To:
Shared Package
ML18101A190 List:
References
NUDOCS 9408260301
Download: ML18101A193 (1)


Text

~ CORRECTED COPY ~

,., OPERATING DATA REPORT ~

Docket No: 50-311 Date: 08/10/94 Completed by: Mike Morroni Telephone: 339-2122 Operating Status

1. Unit Name Salem No. 2 Notes
2. Reporting Period July 1994
3. Licensed Thermal Power {MWt) 3411
4. Nameplate Rating {Gross MWe) 1170
5. Design Electrical Rating {Net MWe) 1115
6. Maximum Dependable Capacity{Gross MWe) 1149
7. Maximum Dependable Capacity {Net MWe) 1106
8. If Changes Occur in Capacity Ratings {items 3 through 7) since Last Report, Give Reason NA
9. Power Level to Which Restricted, if any {Net MWe) N/A
10. Reasons for Restrictions, if any N/A.

This Month Year to Date Cumulative

11. Hours in Reporting Period 744 5087 112200
12. No. of Hrs. Rx. was Critical 525.08 4723.76 74003.32
13. Reactor Reserve Shutdown Hrs. 0 0 0
14. Hours Generator On-Line 477.77 4517.07 71406.59
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated

{MWH) 1582257.6 *13498728.0 *175961667.4 Gross Elec. Energy Generated

{MWH) 495560 4332880 74879398

18. Net Elec. Energy Gen. {MWH) 466128 4116463 71243740
19. Unit Service Factor 64.2 88.8 63.6
20. Unit Availability Factor 64.2 88.8 63.6
21. Unit capacity Factor

{using MDC Net) 56.6 73.2 57.4

22. Unit Capacity Factor

{using DER Net) 56.2 72.6 56.9

23. Unit Forced Outage Rate 35.8 9.4 21.9
24. Shutdowns scheduled over next 6 months {type, date and duration of each)

Refueling outage scheduled to start October 15. 1994 and last 60 da s.

25. If shutdown at end of Report Period, Estimated Date of Startup:

NA 8-1-7.R2 9408260301 940818 PDR ADOCK 05000311 R PDR