ML090370770: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 01/28/2009
| issue date = 01/28/2009
| title = Email Regarding Need Supplemental Information for AST Acceptance Review from Containment and Ventilation Branch
| title = Email Regarding Need Supplemental Information for AST Acceptance Review from Containment and Ventilation Branch
| author name = Tam P S
| author name = Tam P
| author affiliation = NRC/NRR/DORL/LPLIII-1
| author affiliation = NRC/NRR/DORL/LPLIII-1
| addressee name = Flentje F
| addressee name = Flentje F
Line 14: Line 14:
| page count = 2
| page count = 2
| project = TAC:ME0219, TAC:ME0220
| project = TAC:ME0219, TAC:ME0220
| stage = Supplement
| stage = Acceptance Review
}}
}}


=Text=
=Text=
{{#Wiki_filter:From: Peter Tam Sent: Wednesday, January 28, 2009 12:12 PM To: Fritzie.Flentje@fpl.com Cc: Nageswara Karipineni; Lois James; Justin Poole  
{{#Wiki_filter:From:                       Peter Tam Sent:                       Wednesday, January 28, 2009 12:12 PM To:                         Fritzie.Flentje@fpl.com Cc:                         Nageswara Karipineni; Lois James; Justin Poole


==Subject:==
==Subject:==
Point Beach - need supplemental information for AST acceptance review (TAC ME0219, ME0220)
Point Beach - need supplemental information for AST acceptance review (TAC ME0219, ME0220)
Fritzie: Following is what our reviewer Nageswara Karipineni wrote. He requested a conference call with you on Thursday (1/29), but I am on leave 1/29 - 2/3. Since both I and Justine Poole will not be around, you probably should contact Lois James (301-415-3306) if this phone call is to take place during this period. If it can wait unti 2/4, both Justine and I will be back.
Fritzie:
Following is what our reviewer Nageswara Karipineni wrote. He requested a conference call with you on Thursday (1/29), but I am on leave 1/29 - 2/3. Since both I and Justine Poole will not be around, you probably should contact Lois James (301-415-3306) if this phone call is to take place during this period. If it can wait unti 2/4, both Justine and I will be back.
There are two issues that we want the licensee to address in regards to the Point Beach AST:
There are two issues that we want the licensee to address in regards to the Point Beach AST:
The licensee is crediting the Control Room Ventilation System (VNCR) and the Primary Auxiliary Building Ventilation (VNPAB) System for implementing the AST. However, the licnesee submittal did not make any mention of adding these systems to the scope of the Maintenance Rule program in accordance with 10 CFR 50.65, and to the scope of the license renewal in accordance with 10 CFR 54.37(b).  
The licensee is crediting the Control Room Ventilation System (VNCR) and the Primary Auxiliary Building Ventilation (VNPAB) System for implementing the AST. However, the licnesee submittal did not make any mention of adding these systems to the scope of the Maintenance Rule program in accordance with 10 CFR 50.65, and to the scope of the license renewal in accordance with 10 CFR 54.37(b).
 
The above equipment should also be added to the Technical Specifications (TS) with appropriate Limiting Condition for Operation (LCO) and Surveillance Requirements (SR) because the equipment is required for safe operation of the facility as required by 10 CFR 50.36(d)(2)(ii)( C), Criteria 3, "A structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a design-basis accident or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier."
The above equipment should also be added to the Technical Specifications (TS) with appropriate Limiting Condition for Operation (LCO) and Surveillance Requirements (SR) because the equipment is required for safe operation of the facility as required by 10 CFR 50.36(d)(2)(ii)( C), Criteria 3, "A structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a design-basis accident or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier."   Peter S. Tam Senior Project Manager (for Kewaunee and Monticello) Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Tel. 301-415-1451  
Peter S. Tam Senior Project Manager (for Kewaunee and Monticello)
 
Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Tel. 301-415-1451 E-mail Properties Mail Envelope Properties (C56E360E9D804F4B95BC673F886381E71D44FBABFE)
E-mail Properties Mail Envelope Properties (C56E360E9D804F4B95BC673F886381E71D44FBABFE)  


==Subject:==
==Subject:==
Point Beach - need supplemental information for AST acceptance review (TAC ME0219, ME0220)
Point Beach - need supplemental information for AST acceptance review (TAC ME0219, ME0220)
Sent Date:       1/28/2009 12:12:17 PM Received Date:        1/28/2009 12:12:17 PM From:                Peter Tam
Sent Date:       1/28/2009 12:12:17 PM Received Date:        1/28/2009 12:12:17 PM
 
Created By:        Peter.Tam@nrc.gov


Recipients:
From:            Peter Tam Created By:        Peter.Tam@nrc.gov Recipients:
Fritzie.Flentje@fpl.com (Fritzie.Flentje@fpl.com)                 Tracking Status: None Nageswara.Karipineni@nrc.gov (Nageswara Karipineni)                 Tracking Status: None Lois.James@nrc.gov (Lois James)
Fritzie.Flentje@fpl.com (Fritzie.Flentje@fpl.com)
Tracking Status: None Nageswara.Karipineni@nrc.gov (Nageswara Karipineni)
Tracking Status: None Lois.James@nrc.gov (Lois James)
Tracking Status: None Justin.Poole@nrc.gov (Justin Poole)
Tracking Status: None Justin.Poole@nrc.gov (Justin Poole)
Tracking Status: None  
Tracking Status: None Post Office:
 
HQCLSTR02.nrc.gov Files           Size     Date & Time MESSAGE           16065     1/28/2009 Options Expiration Date:
Post Office:
Priority:                 olImportanceNormal ReplyRequested:         False Return Notification:        False Sensitivity:       olNormal Recipients received:}}
HQCLSTR02.nrc.gov  
 
Files               Size       Date & Time  
 
MESSAGE       16065       1/28/2009  
 
Options Expiration Date:
Priority:                       olImportanceNormal ReplyRequested:       False Return Notification:        False  
 
Sensitivity:         olNormal Recipients received:}}

Latest revision as of 10:08, 14 November 2019

Email Regarding Need Supplemental Information for AST Acceptance Review from Containment and Ventilation Branch
ML090370770
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/28/2009
From: Tam P
Plant Licensing Branch III
To: Flentje F
Florida Power & Light Energy Point Beach
References
TAC ME0219, TAC ME0220
Download: ML090370770 (2)


Text

From: Peter Tam Sent: Wednesday, January 28, 2009 12:12 PM To: Fritzie.Flentje@fpl.com Cc: Nageswara Karipineni; Lois James; Justin Poole

Subject:

Point Beach - need supplemental information for AST acceptance review (TAC ME0219, ME0220)

Fritzie:

Following is what our reviewer Nageswara Karipineni wrote. He requested a conference call with you on Thursday (1/29), but I am on leave 1/29 - 2/3. Since both I and Justine Poole will not be around, you probably should contact Lois James (301-415-3306) if this phone call is to take place during this period. If it can wait unti 2/4, both Justine and I will be back.

There are two issues that we want the licensee to address in regards to the Point Beach AST:

The licensee is crediting the Control Room Ventilation System (VNCR) and the Primary Auxiliary Building Ventilation (VNPAB) System for implementing the AST. However, the licnesee submittal did not make any mention of adding these systems to the scope of the Maintenance Rule program in accordance with 10 CFR 50.65, and to the scope of the license renewal in accordance with 10 CFR 54.37(b).

The above equipment should also be added to the Technical Specifications (TS) with appropriate Limiting Condition for Operation (LCO) and Surveillance Requirements (SR) because the equipment is required for safe operation of the facility as required by 10 CFR 50.36(d)(2)(ii)( C), Criteria 3, "A structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a design-basis accident or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier."

Peter S. Tam Senior Project Manager (for Kewaunee and Monticello)

Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Tel. 301-415-1451 E-mail Properties Mail Envelope Properties (C56E360E9D804F4B95BC673F886381E71D44FBABFE)

Subject:

Point Beach - need supplemental information for AST acceptance review (TAC ME0219, ME0220)

Sent Date: 1/28/2009 12:12:17 PM Received Date: 1/28/2009 12:12:17 PM

From: Peter Tam Created By: Peter.Tam@nrc.gov Recipients:

Fritzie.Flentje@fpl.com (Fritzie.Flentje@fpl.com)

Tracking Status: None Nageswara.Karipineni@nrc.gov (Nageswara Karipineni)

Tracking Status: None Lois.James@nrc.gov (Lois James)

Tracking Status: None Justin.Poole@nrc.gov (Justin Poole)

Tracking Status: None Post Office:

HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 16065 1/28/2009 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: