ML17069A405: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:APPLICANT: | {{#Wiki_filter:APPLICANT: | ||
CALVERT CLIFFS NUCLEAR POWER PLANT 2017NRC Initial Licensed Operator Exam JPM SRO/ADMIN-1 Rev. 1 | |||
Calvert Cliffs 1 & 2 Job Performance Measure SRO/ADMIN-1 Task Title: Perform review of completed Surveillance Test. Task Number: 210.003 Perform the initial review of a completed STP. KIA | |||
Rev. 0 New JPM. | |||
Rev. 1 Integrate validation comments Rev. 1 Page 2 of9 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: Calvert Cliffs 1 & 2 Job Performance Measure SRO/ADMIN-1 Task | |||
==Title:== | |||
Perform review of completed Surveillance Test. | |||
Task Number: 210.003 Perform the initial review of a completed STP. | |||
KIA | |||
==Reference:== | ==Reference:== | ||
2.1.7 (4.7) | |||
2.1.7 (4.7) Method of Testing: Simulated Performance: | Method of Testing: | ||
D | Simulated Performance: D Actual Performance: [gj Classroom: [gl Simulator: D Plant: D Read to the examinee: | ||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | |||
Actual Performance: | Initial Conditions: | ||
[gj Simulator: | : 1. Unit-I is in Mode 1 with normal electrical and system lineups. | ||
D Plant: D I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | : 2. Bay temperature is 72°F. | ||
Initial Conditions: | : 3. U-1 Control Room Operator just completed STP 0-73C-1 "Component Cooling Pump Quarterly Test" on 11 Component Cooling Pump as scheduled surveillance. | ||
: 1. Unit-I is in Mode 1 with normal electrical and system lineups. 2. Bay temperature is 72°F. 3. U-1 Control Room Operator just completed STP 0-73C-1 "Component Cooling Pump Quarterly Test" on 11 Component Cooling Pump as scheduled surveillance. | |||
: 4. You are performing the duties of the U-1 Unit Supervisor. | : 4. You are performing the duties of the U-1 Unit Supervisor. | ||
Initiating Cue: You are directed to perform the Acceptance Criteria for the completed STP IA W Step 6.1.AB. Are there any questions? | Initiating Cue: | ||
You may begin. Task Standard: | You are directed to perform the Acceptance Criteria for the completed STP IA W Step 6.1.AB. | ||
Are there any questions? You may begin. | |||
Task Standard: | |||
This JPM is complete when STP 0-73C-1 Acceptance Criteria is completed and any required actions identified. | This JPM is complete when STP 0-73C-1 Acceptance Criteria is completed and any required actions identified. | ||
Rev. 1 Page 3 of9 Appendix C Job Performance Measure Worksheet Form ES-C-1 Evaluation Criteria: | Rev. 1 Page 3 of9 | ||
: 1. All critical steps completed (denoted by shading). | |||
: 2. All sequential steps completed in order. 3. All time-critical steps completed within allotted time. 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. Critical Step Basis: Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task. Required Materials: | Appendix C Job Performance Measure Worksheet Form ES-C-1 Evaluation Criteria: | ||
: 1. Prepared STP 0-73C-1 2. U-1 Tech Specs General | : 1. All critical steps completed (denoted by shading). | ||
: 2. All sequential steps completed in order. | |||
: 3. All time-critical steps completed within allotted time. | |||
: 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. | |||
Critical Step Basis: | |||
Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task. | |||
Required Materials: | |||
: 1. Prepared STP 0- 73C-1 | |||
: 2. U-1 Tech Specs General | |||
==References:== | ==References:== | ||
: 1. WC-AA-111 (EN4-104 replacement) | : 1. WC-AA-111 (EN4-104 replacement) | ||
Time critical task: No Validation Time: 10 minutes Setup: 1. None Rev. 1 Page 4 of9 Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) STANDARD TIME START: ----CUE: Provide the Operator with the prepared STP 0-73A-l. | Time critical task: | ||
D Step 6.1.AB.l Was 11 CC Pump corrected between 33.2 and 40.5 PSID in step 6.1.N? D Step 6.1.AB.2 Were 11 CC PP INBD AND OUTBD bearing vibration readings less than the ACTION RANGE limit as recorded in Step 6.1.N? D Step 6.1.AB.3 Was CC Flow greater than or equal to 5160 GPM in step 6.1.R? D Step 6.1.AB.4 IF 1-CC-115 is being tested for full stroke closed, THEN perform the following. | No Validation Time: | ||
D Step 6.1.AB.4.a Was 11 CC Pump reverse rotation absent in | 10 minutes Setup: | ||
: 1. None Rev. 1 Page 4 of9 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) STANDARD TIME START: - - - - | |||
CUE: Provide the Operator with the prepared STP 0-73A-l. | |||
Inform Operator that Sect. 6.1 was completed and requires SRO review of Acceptance CUE: | |||
Criteria. | |||
D Step 6.1.AB.l Was 11 CC Pump corrected ~p between 33.2 and 40.5 PSID in step 6.1.N? | |||
D Step 6.1.AB.2 Were 11 CC PP INBD AND OUTBD bearing vibration readings less than the ACTION RANGE limit as recorded in Step 6.1.N? | |||
D Step 6.1.AB.3 Was CC Flow greater than or equal to 5160 GPM in step 6.1.R? | |||
D Step 6.1.AB.4 IF 1-CC-115 is being tested for full stroke Determines step is applicable. | |||
closed, THEN perform the following. | |||
D Step 6.1.AB.4.a Determines the following: | |||
Was 11 CC Pump reverse rotation absent in | |||
* No reverse rotation noted. | * No reverse rotation noted. | ||
* Circles YES and initials step 6.1.AB.4.a Determines the following: | step 6.1.V? | ||
* Circles YES and initials step 6.1.AB.4.a D Step 6.1.AB.4.b Determines the following: | |||
Was 12 or 13 CC Pump flow greater than or | |||
* Flow was > 5160 GPM. | * Flow was > 5160 GPM. | ||
* Circles YES and initials step 6.1.AB.4.b Rev. 1 Page 5 of9 Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) STANDARD If asked, the 13 CC pump is electrically aligned to 14 480V bus (normal alignment). | equal to 5160 GPM in step 6.1.U? | ||
* Circles YES and initials step 6.1.AB.4.b D Step 6.1.AB.5 This test section is considered satisfactory if YES or NIA was answered in all steps above. | |||
Rev. 1 Page 5 of9 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) STANDARD If asked, the 13 CC pump is electrically aligned to 14 480V bus (normal alignment). | |||
When operator notifies SM of the inoperable equipment, acknowledge report, ask for CUE: recommendation. | |||
If candidate asks to review EN-4-104, supply him with attached copy of WC-AA-111 and inform him that it is the Exelon Procedure replacement. | If candidate asks to review EN-4-104, supply him with attached copy of WC-AA-111 and inform him that it is the Exelon Procedure replacement. | ||
* References WC-AA-111 (EN-4-104 D Step 6.1.AB.5.a IF unsat, THEN notify SM, declare the affected equipment inoperable and take actions as required by administrative actions stated in EN-4-104 (NIA if NOT UNSAT). | * References WC-AA-111 (EN-4-104 re lacement). | ||
D Step 6.1.AB.5.a IF unsat, THEN notify SM, declare the affected equipment inoperable and take actions as required by administrative actions stated in EN-4-104 (NIA if NOT UNSAT). | |||
(candidate should note that shifting to 11 480V bus would allow exiting the LCO) | |||
When CRO directed to write Condition Report for failed pump flow, acknowledge CUE: | |||
direction. | |||
D Step 6.1.AB.5.b Initiate a Condition Report for any equipment | D Step 6.1.AB.5.b Initiate a Condition Report for any equipment | ||
* deficiencies (NIA if NO equipment | * Direct CRO to write Condition Report. | ||
* deficiencies). | deficiencies (NIA if NO equipment | ||
* Initials step. | |||
deficiencies). | |||
When CRO directed to write Condition Report for vibration in Alert Range, CUE: | |||
acknowledge direction. | |||
D Step 6.1.AB.5.c Initiate a Condition Report for components tested in this section that exceeded the ALERT RANGE to evaluate pump conditions and include the need to be placed in the Supplemental Program for increased testing frequency. (NIA if NO components tested in | D Step 6.1.AB.5.c Initiate a Condition Report for components tested in this section that exceeded the ALERT RANGE to evaluate pump conditions and include the need to be placed in the Supplemental Program for increased testing frequency. (NIA if NO components tested in | ||
* Initials step this section exceeded the ALERT RANGE). Rev. 1 Page 6 of9 Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded = CRITICAL STEP) STANDARD | * Initials step this section exceeded the ALERT RANGE). | ||
Rev. 1 Page 6 of9 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded = CRITICAL STEP) STANDARD When CRO directed to call the IST Engineer for vibration in Alert Range, CUE: | |||
acknowledge direction. | |||
D Step 6.1.AB.5.c.(1) | D Step 6.1.AB.5.c.(1) | ||
Inform the IST Engineer of any components Directs CRO to call /or state intention to | Inform the IST Engineer of any components that exceed the ALERT RANGE. | ||
* Directs CRO to call /or state intention to call IST Engineer. | |||
* Initials step . (NIA ifNO components in this section exceed the ALERT Range). TERMINATING CUE: This JPM is complete when Sect 6.1 of STP-73C-1 is completed. | (Voicemail is Acceptable). | ||
The evaluator is expected to end the JPM. TIME STOP: Rev. 1 Page 7 of9 Appendix C Job Performance Measure Worksheet Form ES-C-1 Verification of Completion Job Performance Measure SRO/ADMIN-1 Examinee: | * Initials step . | ||
(NIA ifNO components in this section exceed the ALERT Range). | |||
TERMINATING CUE: This JPM is complete when Sect 6.1 of STP-73C-1 is completed. The evaluator is expected to end the JPM. | |||
TIME STOP: | |||
Rev. 1 Page 7 of9 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Verification of Completion Job Performance Measure SRO/ADMIN-1 Examinee: | |||
NRC Examiner: | NRC Examiner: | ||
Date Performed: | Date Performed: | ||
Facility Evaluator: | Facility Evaluator: | ||
Number of Attempts: | Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Time to Complete: | |||
Follow up Question(s): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | |||
Follow up Question(s): | Applicant R e s p o n s e : - - - - - - - - - - - - - - - - - - - - - - - - | ||
Result: SAT UNSAT Examiner's Signature and Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | |||
Rev. 1 Page 8 of9 | |||
Result: SAT UNSAT Examiner's Signature and Date: | |||
Appendix C Job Performance Measure Form ES-C-1 Worksheet EXAMINEE'S CUE SHEET Initial Conditions: | |||
Job Performance Measure Worksheet EXAMINEE'S CUE SHEET 1. Unit-I is in Mode 1 with normal electrical and system lineups. 2. Bay temperature is 72°F. | : 1. Unit-I is in Mode 1 with normal electrical and system lineups. | ||
: 2. Bay temperature is 72°F. | |||
: 3. U-1 Control Room Operator just completed STP 0-73C-1 "Component Cooling Pump Quarterly Test" on 11 Component Cooling Pump as scheduled surveillance. | |||
: 4. You are performing the duties of the U-1 Unit Supervisor. | : 4. You are performing the duties of the U-1 Unit Supervisor. | ||
Initiating Cue: You are directed to perform the Acceptance Criteria for the completed STP IA W Step 6.1.AB. Are there any questions? | Initiating Cue: | ||
You may begin. Rev. 1 Page 9 of9 APPLICANT: | You are directed to perform the Acceptance Criteria for the completed STP IA W Step 6.1.AB. Are there any questions? You may begin. | ||
Rev. 1 Page 9 of9 | |||
APPLICANT: | |||
CALVERT CLIFFS NUCLEAR POWER PLANT 2017 NRC Initial Licensed Operator Exam JPM SRO/ADMIN-2 Rev. 2 | |||
Rev 1 Modified & updated JPM to 2017 Format using revised procedures. | |||
Rev. 2 Integrated validation comments. | Rev. 2 Integrated validation comments. | ||
Rev. 2 Page 2 of8 Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: | Rev. 2 Page 2 of8 | ||
Calvert Cliffs 1 & 2 Job Performance Measure SRO/ADMIN-2 Task Title: Verify an Estimated Critical Condition Calculation Task Number: 202.247 KIA | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: Calvert Cliffs 1 & 2 Job Performance Measure SRO/ADMIN-2 Task | |||
==Title:== | |||
Verify an Estimated Critical Condition Calculation Task Number: 202.247 KIA | |||
==Reference:== | ==Reference:== | ||
2.1.25 (4.2) | |||
Method of Testing: | |||
Simulated Performance: ~ Actual Performance: ~ | |||
Classroom: ~ Simulator: D Plant: D Read to the examinee: | |||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | |||
Initial Conditions: | |||
: 1. Unit-2 is in MODE 3 at normal operating temperature and pressure. Current time is 0800. | |||
: 2. The reactor tripped while performing RPS testing 32 hours ago. Preparations are underway for a quick trip recovery startup to begin within the next 30 minutes with criticality anticipated in 2 hours at 1Oam. | |||
: 3. The following conditions exist: | |||
: a. Unit-2 tripped from 100% power 32 hours ago. | |||
: b. Power history: Prior to the trip, Unit-2 operated at 100% for the previous 68 days. | |||
: c. Bumup from the plant computer point "CEBURNUP" is 14,400 MWD/MTU. | |||
: d. Nuclear Fuels has provided a Xenon Worth Calculation and a B-10 Correction factor of 0.971. | |||
: 4. An ECC has been prepared by an extra licensed operator. | |||
Initiating Cue: | |||
The Shift Manager has directed you to Verify the Estimated Critical Condition calculation per NEOP-302 Section 4 of Attachment 2, Step 6.3.2. Consider the evaluator as the preparer. | |||
Verify the ECC's from 0800 to 1200. | |||
Task Standard: | |||
This JPM is complete when ECC review is completed. | |||
Rev. 2 Page 3of8 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Evaluation Criteria: | |||
: 1. All critical steps completed (denoted by shading). | |||
: 2. All sequential steps completed in order. | |||
: 3. All time-critical steps completed within allotted time. | |||
: 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. | |||
Critical Step Basis: | |||
Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task. | |||
Required Materials: | |||
: 1. All critical steps completed (denoted by shading). | |||
: 2. All sequential steps completed in order. 3. All time-critical steps completed within allotted time. 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. Critical Step Basis: Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task. Required Materials: | |||
: 1. Procedures and manuals normally available in the plant General | : 1. Procedures and manuals normally available in the plant General | ||
==References:== | ==References:== | ||
: 1. NEOP302, Estimated Critical Condition | : 1. NEOP302, Estimated Critical Condition | ||
: 2. NEOP-23, Technical Data Book (Unit-2) Time critical task: No Validation Time: 30 minutes Setup: 1. None Rev. 2 Page 4of8 Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) STANDARD TIME START: ----D Locates NEOP-302 Step 6.3.2 D 6.3.2 Submit Section 2 to a licensed SRO for review. Prior to performing the review, the SRO shall review Step 4.5.2 D Step 4.5.2 Some calculations performed in this procedure are originated by Reactor Engineering (RE) and then reviewed by a Senior Reactor Operator (SRO) ........ . D Step 4.5.2.1 Verify that the previous critical condition is correct if not previously reviewed D Step 4.5.2.2 INDEPENDENTLY VERIFY that all recorded data and calculations in the section being reviewed are accurate D Step 4.5.2.3 VERIFY that the ECC Upper and Lower Bounds are calculated correctly AND the | : 2. NEOP-23, Technical Data Book (Unit-2) | ||
Time critical task: | |||
* 1100 Lower Bound Gp 4 level | No Validation Time: | ||
* 1100 Upper Bound Gp 4 & Gp5 level | 30 minutes Setup: | ||
* 1200 Lower Bound Gp 3 <ZPDIL Rev. 2 Page 5of8 Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) STANDARD | : 1. None Rev. 2 Page 4of8 | ||
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) STANDARD TIME START: - - - - | |||
D Locates NEOP-302 Step 6.3.2 Same as Element D 6.3.2 Submit Section 2 to a licensed SRO for Same as Element review. Prior to performing the review, the SRO shall review Step 4.5.2 D Step 4.5.2 Some calculations performed in this procedure are originated by Reactor Same as Element Engineering (RE) and then reviewed by a Senior Reactor Operator (SRO) ........ . | |||
D Step 4.5.2.1 Determines previous critical condition was previously reviewed by an SRO as Verify that the previous critical condition is shown by SRO signature on Attachment 2 correct if not previously reviewed Section 1 D Step 4.5.2.2 INDEPENDENTLY VERIFY that all recorded data and calculations in the section being reviewed are accurate D Step 4.5.2.3 VERIFY that the ECC Upper and Lower Identifies following errors: | |||
Bounds are calculated correctly AND the | |||
* 1100 Lower Bound Gp 4 level established bounds are between 135 inches | |||
* 1100 Upper Bound Gp 4 & Gp5 level withdrawn on Reg Grp 5 and Zero Power | |||
* 1200 Lower Bound Gp 3 <ZPDIL PDIL, if reviewing an estimated critical condition. | |||
Rev. 2 Page 5of8 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) STANDARD When student instructs preparer to make necessary corrections to Attachment 2 CUE: | |||
Section 4, tell him to determine and document corrections on a blank line on form. | |||
Instructs the preparer (Evaluator) to make necessary corrections. | |||
After Cue given, the following changes should be made: | After Cue given, the following changes should be made: | ||
* 1200 Lower Bound not valid TERMINATING CUE: This JPM is corrected values are inserted into blank line on | CJ Step 4.5.2.4 IF an error is found, THEN INSTRUCT the preparer to make the necessary corrections, AND REPEAT the review | ||
* 1200 Lower Bound not valid TERMINATING CUE: This JPM is corrected values are inserted into blank line on Section 4. The evaluator is expected to end the JPM. | |||
TIME STOP: - - - | |||
Rev. 2 Page 6of8 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Verification of Completion Job Performance Measure SRO/ADMIN-2 Examinee: | |||
NRC Examiner: | NRC Examiner: | ||
Date Performed: | Date Performed: | ||
Facility Evaluator: | Facility Evaluator: | ||
Number of Attempts: | Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Time to Complete: | |||
Follow up Question(s): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | |||
Follow up Question(s): | Applicant R e s p o n s e : - - - - - - - - - - - - - - - - - - - - - - - - - | ||
Result: SAT UNSAT Examiner's Signature and Date: | |||
Rev. 2 Page 7 of8 | |||
Result: SAT UNSAT Examiner's Signature and Date: Rev. 2 Page 7 of8 Appendix C | |||
Job Performance Measure Worksheet EXAMINEE'S CUE SHEET | Appendix C Job Performance Measure Form ES-C-1 Worksheet EXAMINEE'S CUE SHEET Initial Conditions: | ||
Current time is 0800. 2. The reactor tripped while performing RPS testing 32 hours ago. Preparations are underway for a quick trip recovery startup to begin within the next 30 minutes with criticality anticipated in 2 hours at | : 1. Unit-2 is in MODE 3 at normal operating temperature and pressure. Current time is 0800. | ||
Initiating Cue: The Shift Manager has directed you to Verify the Estimated Critical Condition calculation per NEOP-302 Section 4 of Attachment 2, Step 6.3.2. Consider the evaluator as the preparer. | : 2. The reactor tripped while performing RPS testing 32 hours ago. Preparations are underway for a quick trip recovery startup to begin within the next 30 minutes with criticality anticipated in 2 hours at 1Oam. | ||
Verify the ECC's from 0800 to 1200. Task Standard: | : 3. The following conditions exist: | ||
: a. Unit-2 tripped from 100% power 32 hours ago. | |||
: b. Power history: Prior to the trip, Unit-2 operated at 100% for the previous 68 days. | |||
: c. Bumup from the plant computer point "CEBURNUP" is 14,400 MWD/MTU. | |||
: d. Nuclear Fuels has provided a Xenon Worth Calculation and a B-10 Correction factor of0.971. | |||
: 4. An ECC has been prepared by an extra licensed operator. | |||
Initiating Cue: | |||
The Shift Manager has directed you to Verify the Estimated Critical Condition calculation per NEOP-302 Section 4 of Attachment 2, Step 6.3.2. Consider the evaluator as the preparer. | |||
Verify the ECC's from 0800 to 1200. | |||
Task Standard: | |||
This JPM is complete when ECC review is completed. | This JPM is complete when ECC review is completed. | ||
Rev. 2 Page 8of8 APPLICANT: | Rev. 2 Page 8of8 | ||
Rev. 2 Page 2of10 Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: | APPLICANT: _ _ __ | ||
Calvert Cliffs 1 & 2 Job Performance Measure SRO/ADMIN-3 Task Title: Establish initial plant conditions for and approve performance of an STP. Task Number: 210.001 KIA | CALVERT CLIFFS NUCLEAR POWER PLANT 2017 NRC Initial Licensed Operator Exam JPM SRO/ADMIN-3 Rev. 2 | ||
Rev 1 Revised 2011 NRC ADMIN-3 to new format, using latest procedures Rev.2 Integrated validation comments. | |||
Rev. 2 Page 2of10 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: Calvert Cliffs 1 & 2 Job Performance Measure SRO/ADMIN-3 Task | |||
==Title:== | |||
Establish initial plant conditions for and approve performance of an STP. | |||
Task Number: 210.001 KIA | |||
==Reference:== | ==Reference:== | ||
2.2.40 (4.7) | |||
2.2.40 (4.7) Method of Testing: Simulated Performance: | Method of Testing: | ||
D | Simulated Performance: D Actual Performance: IZ! | ||
IZ! | Classroom: IZ! Simulator: D Plant: D Read to the examinee: | ||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | |||
IZ! Simulator: | Initial Conditions: | ||
D Plant: D I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | : 1) Unit-1 is at 100% reactor power. | ||
Initial Conditions: | : 2) STP 0-8A-1 is scheduled today. | ||
: 1) Unit-1 is at 100% reactor power. 2) STP 0-8A-1 is scheduled today. 3) Ops FSTC has indicated that monthly and quarterly surveillances are due. 4) No maintenance was performed on the lA DG. 5) STP M-651C-1A is not required. | : 3) Ops FSTC has indicated that monthly and quarterly surveillances are due. | ||
: 6) All D/G's are operable and available | : 4) No maintenance was performed on the lA DG. | ||
: 7) You are performing the duties of the CRS. Initiating Cue: 1) The Shift Manager directs you to prepare STP 0-8A-1 for performance by completing SRO portions of step 4.0.A 2) List sections of the test that will be performed. | : 5) STP M-651C-1A is not required. | ||
: 6) All D/G's are operable and available | |||
: 7) You are performing the duties of the CRS. | |||
Initiating Cue: | |||
: 1) The Shift Manager directs you to prepare STP 0-8A-1 for performance by completing SRO portions of step 4.0.A | |||
: 2) List sections of the test that will be performed. | |||
Task Standard: | Task Standard: | ||
This JPM is complete when the SRO portion of the STP preliminary section using the given information and Technical Specifications. | This JPM is complete when the SRO portion of the STP preliminary section using the given information and Technical Specifications. | ||
Rev. 2 Page 3of10 Appendix C Job Performance Measure Worksheet Form ES-C-1 Evaluation Criteria: | Rev. 2 Page 3of10 | ||
: 1. All critical steps completed (denoted by shading). | |||
: 2. All sequential steps completed in order. 3. All time-critical steps completed within allotted time. 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. Critical Step Basis: Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task. Required Materials: | Appendix C Job Performance Measure Worksheet Form ES-C-1 Evaluation Criteria: | ||
: 1. All critical steps completed (denoted by shading). | |||
: 2. All sequential steps completed in order. | |||
: 3. All time-critical steps completed within allotted time. | |||
: 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. | |||
Critical Step Basis: | |||
Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task. | |||
Required Materials: | |||
: 1. Blank copy of STP 0-8A-1 General | : 1. Blank copy of STP 0-8A-1 General | ||
==References:== | ==References:== | ||
: 2. U-1 Tech Specs Time critical task: No Validation Time: 30 minutes Setup: 1. None Rev. 2 Page 4of10 Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) STANDARD TIME START: ---- | : 2. U-1 Tech Specs Time critical task: | ||
SIAS A-10 Lo D Step 4.0.A.2 INDICATE ESFAS test requirements: | No Validation Time: | ||
D SIAS/UV test required: (check required tests) | 30 minutes Setup: | ||
D | : 1. None Rev. 2 Page 4of10 | ||
This minimizes unloaded run time during ESFAS testing AND is the preferred alignment. | Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) STANDARD TIME START: - - - - | ||
Rev. 2 Page 5of10 Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded = CRITICAL STEP) STANDARD D Step 4.0A.3 IF performing ESF AS testing, THEN REVIEW equipment availability AND INDICATE lA DG alignment during test: (NIA if NOT testing ESFAS) 0 lA DG in LOCAL during ESF AS test: | The Shift Manager directs you to prepare STP 0-8A-l for performance by completing CUE: | ||
* LEA VE Sections 6.2 AND 6.3 Blank. 0 lA DG in AUTO during ESFAS test: | SRO portions of up through section 4.0. | ||
* Required if performing STP M-651C- | D Step 4.0.A. l IF STP M-651C-IA is to be performed Determines this step is N/A from given cues concurrently with this test THEN NOTIFY and either writes NIA with initial or just E&C to perform STP M-65IC-IA initials the block. | ||
prerequisites. | |||
NOTE SIAS A-10 Lo D Step 4.0.A.2 INDICATE ESFAS test requirements: | |||
D SIAS/UV test required: | |||
(check required tests) 0 PERFORM Sect. 6.4, QUARTERLY SIAS A-10 LOGIC AND UV-4 LOGIC TEST. | |||
*Required if performing STP M-65IC-IA. | |||
D ESF AS testing NOT required: | |||
Student leaves the ESF AS testing NOT D LEAVE Sections 6.4 through 6.6 required: box blank. | |||
blank. | |||
NOTE Taking 1A DG to LOCAL makes the DG inoperable. This minimizes unloaded run time during ESFAS testing AND is the preferred alignment. | |||
Rev. 2 Page 5of10 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded = CRITICAL STEP) STANDARD D Step 4.0A.3 IF performing ESF AS testing, THEN REVIEW equipment availability AND | |||
* Student checks the lA DG in LOCAL INDICATE lA DG alignment during test: during ESF AS test: box. | |||
(NIA if NOT testing ESFAS) | |||
* Student initials the step. | |||
0 lA DG in LOCAL during ESF AS test: | |||
* LEA VE Sections 6.2 AND 6.3 Blank. | |||
0 lA DG in AUTO during ESFAS test: | |||
* Required if performing STP M-651C- Student leaves the lA DG in AUTO 1A during ESFAS test: box blank. | |||
0 LEAVE Sections 6.5 AND 6.6 blank NOTE 1A DG remains operable when performing a Slow Speed start from 1C18A. | |||
If asked by candidate about Slow or Fast start preferred, inform him "POD says slow CUE: | |||
speed start". | |||
D Step 4.0.A.4 REVIEW PMT requirements, Surveillance Schedule AND INDICATE IA DG start requirements: | |||
* Slow start of lA DG: | * Slow start of lA DG: | ||
* Required if performing STP M-651C-1A. | * Required if performing STP M-651C- | ||
* Student checks the Slow Speed Start of 1A. | |||
lADG: box. | |||
* LEA VE Sections 6.2 AND 6.5 blank. | * LEA VE Sections 6.2 AND 6.5 blank. | ||
* IF | * Student initials step. | ||
* IF | * IF 1A DG will be LOCAL during ESF AS testing, THEN LEA VE Section 6.3 blank. | ||
* IF 1A DG will be started before ESF AS testing, THEN LEA VE Section 6.6 blank. | |||
Rev.2 Page 6of10 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) STANDARD | |||
* Emergency start of lA DG: | * Emergency start of lA DG: | ||
* | * LEAVE Sections 6.3 AND 6.6 blank: | ||
* IF | Student leaves the Emergency start of lA | ||
* IF 1A DG will be in LOCAL during DG: box blank. | |||
ESF AS testing, THEN LEA VE Section 6.2 blank. | |||
* Start of lA DG NOT required: | * Start of lA DG NOT required: | ||
* LEAVE Sections 6.2, 6.3, AND 6.5 through 6.7 blank: 0 Step 4.0.A.5 REVIEW the Surveillance Schedule OR PMT to determine if Section 6.1 is required to be performed. | * LEAVE Sections 6.2, 6.3, AND 6.5 Student leaves the Start of lA DG NOT through 6.7 blank: required: box blank. | ||
0 YES -Performance of Sect 6.1 is required 0 Monthly FO TRANSFER PP Automatic Start test is required. | 0 Step 4.0.A.5 REVIEW the Surveillance Schedule OR PMT to determine if Section 6.1 is required to be performed. | ||
D Quarterly IST FO TRANSFER PP Performance Capacity test is required. | 0 YES - Performance of Sect 6.1 is required 0 Monthly FO TRANSFER PP Automatic Start test is required. | ||
D NO -Performance is NOT required; | D Quarterly IST FO TRANSFER PP Performance Capacity test is required. | ||
D YES -Performance of Sect. 6.8 is required. | D NO -Performance is NOT required; Student leaves the Performance is NOT LEAVE Sect. 6.1 blank. required; LEAVE Sect. 6.1 blank box blank 0 Step 4.0.A.6 REVIEW the Surveillance Schedule OR PMT to determine if Section 6.8 is required to be performed. | ||
D NO -Performance is NOT required; | D YES - Performance of Sect. 6.8 is required. | ||
* Student leaves the Performance is NOT D NO - Performance is NOT required; required; LEA VE Sect.6.8 blank box LEA VE Sect.6.8 blank. | |||
blank Rev.2 Page 7of10 | |||
D YES -Quarterly air receiver check valve testing is required. | |||
D NO -Quarterly air receiver check valve testing is NOT required. | Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) STANDARD CUE: If FSTC called inform student that no maintenance was performed on lA DG D Step 4.0.A. 7 IF this the first performance of this test after EDG-13 has been performed on lA DG, THEN INDICATE minimum lA DG loaded Determines this step is NIA from given cues run time for Sect. 6. 7. and either writes NIA with initial or just (NIA if NOT first test after EDG-13) initials the block. | ||
D 1 hour minimum loaded run time. | |||
D 4 hour minimum loaded run time. | |||
D Step 4.0.A.8 REVIEW the Surveillance Schedule OR PMT to determine if the Quarterly air receiver check valve testing is required. | |||
D YES - Quarterly air receiver check valve testing is required. | |||
D NO - Quarterly air receiver check valve testing is NOT required. | |||
TERMINATING CUE: This JPM is complete when all SRO steps are complete in Sect. 4.0.A The evaluator is expected to end the JPM. | |||
TIME STOP: - - - | |||
Rev. 2 Page 8of10 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Verification of Completion Job Performance Measure SRO/ADMIN-3 Examinee: | |||
NRC Examiner: | NRC Examiner: | ||
Date Performed: | Date Performed: | ||
Facility Evaluator: | Facility Evaluator: | ||
Number of Attempts: | Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Time to Complete: | |||
Follow up Question(s): - - - - - - - - - - - - - - - - - - - - - - - | |||
Follow up Question(s): | Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
----------------------- | Result: SAT UNSAT Examiner's Signature and Date: | ||
Applicant Response: | Rev. 2 Page 9of10 | ||
Appendix C Job Performance Measure Form ES-C-1 Worksheet EXAMINEE'S CUE SHEET Initial Conditions: | |||
Job Performance Measure Worksheet EXAMINEE'S CUE SHEET I) Unit-I is at I 00% reactor power. 2) STP 0-8A-l is scheduled today. | I) Unit- I is at I 00% reactor power. | ||
: 6) All D/G's are operable and available. | : 2) STP 0-8A-l is scheduled today. | ||
: 7) You are performing the duties of the CRS. Initiating Cue: I) The Shift Manager directs you to prepare STP 0-8A-1 for performance by completing SRO portions of step 4.0.A 2) List sections of the test that will be performed. | : 3) Ops FSTC has indicated that monthly and quarterly surveillances are due. | ||
Rev. 2 Page 10of10 | : 4) No maintenance was performed on the I A DG. | ||
\ ' APPLICANT: | : 5) STP M-651C-IA is not required. | ||
: 6) All D/G's are operable and available. | |||
Rev. 1 Page 2 of9 Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: | : 7) You are performing the duties of the CRS. | ||
Calvert Cliffs 1 & 2 Job Performance Measure SRO/ ADMIN-4 Task Title: Review and approve a gaseous waste discharge permit. Task Number: None KIA | Initiating Cue: | ||
I) The Shift Manager directs you to prepare STP 0-8A-1 for performance by completing SRO portions of step 4.0.A | |||
: 2) List sections of the test that will be performed. | |||
Rev. 2 Page 10of10 | |||
\ ' | |||
APPLICANT: _ _ __ | |||
CALVERT CLIFFS NUCLEAR POWER PLANT 2017NRC Initial Licensed Operator Exam JPM SRO/ADMIN-4 Rev. 1 | |||
Rev. 0 New JPM. | |||
Rev. 1 Integrated validation comments. | |||
Rev. 1 Page 2 of9 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: Calvert Cliffs 1 & 2 Job Performance Measure SRO/ADMIN-4 Task | |||
==Title:== | |||
Review and approve a gaseous waste discharge permit. | |||
Task Number: None KIA | |||
==Reference:== | ==Reference:== | ||
2.3.11 (4.3) | |||
Method of Testing: | |||
Simulated Performance: D Actual Performance:~ | |||
Classroom: ~ Simulator: D Plant: D Read to the examinee: | |||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | |||
Initial Conditions: | |||
: 1) Unit-I is at 100% reactor power, Unit-2 is defueled. | |||
: 2) Discharge of 13 WGDT is scheduled for today. | |||
: 3) Access Control Area Ventilation is secured due to U-2 Main Exhaust fan being secured. | |||
: 4) You are performing the duties of the CRS. | |||
Initiating Cue: | |||
: 1) The Shift Manager directs you to review and approve the gaseous waste discharge permit. | |||
Task Standard: | |||
This JPM is complete when the gaseous waste discharge permit is reviewed, and candidate has identified actions required. | |||
Rev. 1 Page 3 of9 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Evaluation Criteria: | |||
: 1. All critical steps completed (denoted by shading). | |||
: 2. All sequential steps completed in order. | |||
: 3. All time-critical steps completed within allotted time. | |||
: 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. | |||
Critical Step Basis: | |||
Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task. | |||
Required Materials: | |||
: 1. Prepared gaseous waste permits | |||
: 1. All critical steps completed (denoted by shading). | : 2. Prepared copy of OI-17B | ||
: 2. All sequential steps completed in order. 3. All time-critical steps completed within allotted time. 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. Critical Step Basis: Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task. Required Materials: | : 3. List of plant conditions General | ||
: 1. Prepared gaseous waste permits 2. Prepared copy of OI-17B 3. List of plant conditions General | |||
==References:== | ==References:== | ||
: 1. OI-17B Waste Gas System 2. OI-22A Main Exhaust Fan System Time critical task: No Validation Time: 15 minutes Setup: 1. None Rev. 1 Page 4 of9 Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) STANDARD TIME START: ---- | : 1. OI-17B Waste Gas System | ||
: 2. OI-22A Main Exhaust Fan System Time critical task: | |||
No Validation Time: | |||
15 minutes Setup: | |||
: 1. None Rev. 1 Page 4 of9 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) STANDARD TIME START: - - - - | |||
The Shift Manager directs you to review and approve the gaseous waste discharge permit CUE: If candidate asks for Attachment 2, tell him "CRO has Attachment 2 and will log RMS readings" D Gaseous Waste Permit OPERATIONS AUTHORIZATION AND RELEASE DATA SECTION Reviews Note 5. | |||
Shift Manager/SRO Release Criteria Reviewed (Note 5). | |||
Reviews Gaseous Waste Discharge Permit D Note 5 | |||
* Notes setpoints for Rad Monitor alarms are identified. | * Notes setpoints for Rad Monitor alarms are identified. | ||
* Contacts Chemistry directly or directs Chemistry to be contacted to change the permit for discharge to U-1 Main Vent. | The Shift Manager/SRO review signature acknowledges that the release criteria required is understood and that required plant systems are in operation AND required plant configuration for | ||
* Contacts Chemistry directly or directs conducting the release has been Chemistry to be contacted to change established. the permit for discharge to U-1 Main Vent. | |||
When candidate calls Chemistry to change permit for U-1 Main Vent Fans, acknowledge CUE: | |||
Rev. 1 Page 5 of9 Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) STANDARD When candidate signs the permit as complete, initial and date permit to complete the OPERATION AUTHORIZATION AND RELEASE DATA SECTION. CUE: Inform candidate that the discharge is now in progress IA W OI-17B, once the candidate finds the correct section of OI-17B hand give him the signed off section and give him the attached parameter page and ask if any new actions are required. | request and give candidate the corrected permit. | ||
D OI-17B Sect. 6.4 NOTE above step 6.4.B.19 D If at any time during the release the RMS Critical Setpoint is exceeded, the release should IMMEDIATELY be SECURED | Reviews Gaseous Waste Discharge Permit D Note 5 | ||
* Contacts Chemistry directly or directs Chemistry to be contacted regarding the exceeding of Main Vent RMS critical setpoint. | * Notes setpoints for Rad Monitor alarms The Shift Manager/SRO review are identified. | ||
TERMINATING CUE: This JPM is complete when candidate determines the discharge should be terminated. | signature acknowledges that the release criteria required is understood and that required plant systems are in operation AND required plant configuration for conducting the release has been established. | ||
The evaluator is expected to end the JPM. TIME STOP: ---Rev. 1 Page 6 of9 Appendix C Job Performance Measure Worksheet Form ES-C-1 Verification of Completion Job Performance Measure SRO/ADMIN-4 Examinee: | Rev. 1 Page 5 of9 | ||
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) STANDARD When candidate signs the permit as complete, initial and date permit to complete the OPERATION AUTHORIZATION AND RELEASE DATA SECTION. | |||
CUE: | |||
Inform candidate that the discharge is now in progress IA W OI-17B, once the candidate finds the correct section of OI-17B hand give him the signed off section and give him the attached parameter page and ask if any new actions are required. | |||
Reviews the parameters given and recognizes that Main Vent RMS RI-5415 has exceeded D OI-17B Sect. 6.4 NOTE above step 6.4.B.19 the critical alarm setpoint. | |||
D If at any time during the release the RMS Critical Setpoint is exceeded, the release should IMMEDIATELY be SECURED | |||
* Contacts Chemistry directly or directs and Plant Chemistry contacted Chemistry to be contacted regarding the exceeding of Main Vent RMS critical setpoint. | |||
TERMINATING CUE: This JPM is complete when candidate determines the discharge should be terminated. The evaluator is expected to end the JPM. | |||
TIME STOP: - - - | |||
Rev. 1 Page 6 of9 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Verification of Completion Job Performance Measure SRO/ADMIN-4 Examinee: | |||
NRC Examiner: | NRC Examiner: | ||
Date Performed: | Date Performed: | ||
Facility Evaluator: | Facility Evaluator: | ||
Number of Attempts: | Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Time to Complete: | |||
Follow up Question(s): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | |||
Follow up Question(s): | Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Result: SAT UNSAT Examiner's Signature and Date: | |||
Rev. 1 Page 7of9 | |||
Appendix C Job Performance Measure Form ES-C-1 Worksheet EXAMINEE'S CUE SHEET Initial Conditions: | |||
Job Performance Measure Worksheet EXAMINEE'S CUE SHEET 1) Unit-1 is at 100% reactor power, Unit-2 is defueled. | : 1) Unit-1 is at 100% reactor power, Unit-2 is defueled. | ||
: 2) Discharge of 13 WGDT is scheduled for today. | : 2) Discharge of 13 WGDT is scheduled for today. | ||
: 3) Access Control Area Ventilation is secured due to U-2 Main Exhaust fan being secured. | |||
: 4) You are performing the duties of the CRS. | |||
Initiating Cue: | |||
: 1) The Shift Manager directs you to review and approve the gaseous waste discharge permit. | |||
Rev. 1 Page 8 of9 | |||
13 WGDT discharge data 13 WGDT Pressure 75 psig Discharge flow rate 48 scfm RI-2191 OOS U-1 WRNGM 7.0E2 µCi/sec U-1 Main Vent RMS 5.15E02 cpm Gaseous Waste Discharge Filter 5.0 inches of water Rev. 1 Page 9 of9 | |||
APPLICANT: _ _ __ | |||
CALVERT CLIFFS NUCLEAR POWER PLANT 2017 NRC Initial Licensed Operator Exam JPM SRO/ADMIN-5 Rev.2 | |||
Rev 1 Revised 2011 NRC ADMIN-5 to new format, using latest procedures. | |||
Rev 2 Integrated validation comments. | Rev 2 Integrated validation comments. | ||
Rev. 2 Page 2of12 Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: | Rev. 2 Page 2of12 | ||
Calvert Cliffs 1 & 2 Job Performance Measure SRO/ADMIN-5 Task Title: Determine Appropriate Emergency Response Actions. Task Number: 204.097 Determine appropriate emergency response actions per the ERPIP while maintaining an overview of plant conditions. | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: Calvert Cliffs 1 & 2 Job Performance Measure SRO/ADMIN-5 Task | |||
==Title:== | |||
Determine Appropriate Emergency Response Actions. | |||
Task Number: 204.097 Determine appropriate emergency response actions per the ERPIP while maintaining an overview of plant conditions. | |||
KIA | KIA | ||
==Reference:== | ==Reference:== | ||
2.4.38 (4.4) | |||
Method of Testing: | |||
Simulated Performance: D Actual Performance: IZ! | |||
Classroom: IZ! Simulator: D Plant: D Read to the examinee: | |||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | |||
Initial Conditions: | |||
: 1. Unit-1 was at 100% power with lA DG tagged out and OC DG pre-aligned to 11 4KV bus IAW OI-21A-1. | |||
: 2. Security has reported a credible threat to CCNPP from the FBI. | |||
: 3. Severe thunderstorms in progress with wind gusts of 50mph. | |||
: 4. A loss of offsite power has occurred resulting in a reactor trip. | |||
: 5. IB DG failed to start on the undervoltage condition; subsequent attempts to start the lB DG have been unsuccessful. | |||
: 6. CRO completed the Vital Auxiliaries Safety Function and reported it as complete to the Unit Supervisor 5 minutes after the trip. | |||
: 7. You are performing the duties of the Shift Manager. | |||
: 8. This JPM is TIME CRITICAL. | |||
Initiating Cue: | |||
You have been requested to determine appropriate Emergency Response Actions, per the ERPIP, based on the current plant conditions provided. | |||
Task Standard: | |||
Determines EAL classification, Protective Action Recommendations and completes the initial notification form within prescribed time limits. | |||
Rev.2 Page 3of12 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Evaluation Criteria: | |||
: 1. All critical steps completed (denoted by shading). | |||
: 2. All sequential steps completed in order. | |||
: 3. All time-critical steps completed within allotted time. | |||
: 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. | |||
Critical Step Basis: | |||
Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task. | |||
General | |||
: 1. All critical steps completed (denoted by shading). | |||
: 2. All sequential steps completed in order. 3. All time-critical steps completed within allotted time. 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. Critical Step Basis: Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task. General | |||
==References:== | ==References:== | ||
: 1. Procedures and manuals normally available in the Control Room Time critical task: Yes Validation Time: 12 minutes Setup: 1. None Rev.2 Page 4of12 Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) STANDARD EVALUATOR NOTE: The "EAL CLOCK" starts after candidate reads "Initial Conditions" CUE sheet. CUE: I Inform candidate that all initial conditions just occurred at time now. TIME START: EAL CLOCK TIME START: 0 Identify and locate Shift Manager Candidate locates Shift Manager Checklist Checklist. | : 1. Procedures and manuals normally available in the Control Room Time critical task: | ||
from provided book. 0 1.1 -Entry into the Emergency Plan. 0 1.1.1 -Print your name and today's date. Candidate correctly prints name and current date on checklist. | Yes Validation Time: | ||
CUE: | 12 minutes Setup: | ||
0 1.1.2 -Call or direct an available Candidate calls, or directs you to call Shift individual to call the Shift Communicator and Dose Assessor to the Communicator and Dose Assessor to the Control Room. Control Room. NOTE: The following step is applicable only to those Units that have implemented FLEX 0 1.1.3 -If SAFER FLEX equipment is deemed necessary, then DIRECT that the Nuclear Duty Officer be contacted at Determines step is NOT applicable. | : 1. None Rev.2 Page 4of12 | ||
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) STANDARD EVALUATOR NOTE: | |||
The "EAL CLOCK" starts after candidate reads "Initial Conditions" CUE sheet. | |||
CUE: I Inform candidate that all initial conditions just occurred at time now. | |||
TIME START: | |||
EAL CLOCK TIME START: | |||
0 Identify and locate Shift Manager Candidate locates Shift Manager Checklist Checklist. from provided book. | |||
0 1.1 - Entry into the Emergency Plan. | |||
0 1.1.1 - Print your name and today's date. Candidate correctly prints name and current date on checklist. | |||
CUE: Inform candidate that you will be acting as Shift Communicator and Dose Assessor. | |||
I 0 1.1.2 - Call or direct an available Candidate calls, or directs you to call Shift individual to call the Shift Communicator and Dose Assessor to the Communicator and Dose Assessor to the Control Room. | |||
Control Room. | |||
NOTE: | |||
The following step is applicable only to those Units that have implemented FLEX 0 1.1.3 - If SAFER FLEX equipment is deemed necessary, then DIRECT that the Nuclear Duty Officer be contacted at Determines step is NOT applicable. | |||
(630) 657-2202 and DIRECT SAFER response organization activation. | (630) 657-2202 and DIRECT SAFER response organization activation. | ||
0 1.1.4 -If SAFER FLEX equipment is deemed necessary, then REFER to Determines step is NOT applicable. | 0 1.1.4 - If SAFER FLEX equipment is deemed necessary, then REFER to Determines step is NOT applicable. | ||
Sections 2.5 and 3.3 for additional actions. 0 1.2 -Emergency Classification and PAR and Notifications. | Sections 2.5 and 3.3 for additional actions. | ||
NOTE: Emergency Classification and declaration shall be completed as soon as possible but no later than 15 minutes from the time indications an EAL threshold being met or exceeded are available in the Control Room. Rev. 2 Page 5of12 Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded = CRITICAL STEP) STANDARD D 1.2.1 -If entry is due to a security event, THEN perform the appropriate actions in the station specific procedure in parallel with completing this checklist. | 0 1.2 - Emergency Classification and PAR and Notifications. | ||
D 1.2.2 -Classify the events in progress using EP-CE-111, Emergency | NOTE: | ||
Emergency Classification and declaration shall be completed as soon as possible but no later than 15 minutes from the time indications an EAL threshold being met or exceeded are available in the Control Room. | |||
Reference Tab 2, EAL Wall Chart. Evaluator Note Examinee should review the EAL Wall Chart and determine SAl .1 and determine Tab 2 is NOT necessary at this time since no Protective Action Recommendations required. | Rev. 2 Page 5of12 | ||
D Determining if one or more EAL thresholds in the EAL matrix have been matched or exceeded. | |||
D Classifying the event at the highest level emergency classification for which an EAL is currently being met or exceeded. | Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded = CRITICAL STEP) STANDARD D 1.2.1 - If entry is due to a security event, THEN perform the appropriate actions Determines step is NOT applicable. | ||
Note: Unit was in a Station Blackout for a couple of minutes but Initial Conditions given clearly state OC DG was aligned to 11 | in the station specific procedure in parallel with completing this checklist. | ||
D 1.2.2 - Classify the events in progress using EP-CE-111, Emergency Reference Tab 2, EAL Wall Chart. | |||
Classification and Protective Action Recommendations. | |||
Evaluator Note Examinee should review the EAL Wall Chart and determine SAl .1 and determine Tab 2 is NOT necessary at this time since no Protective Action Recommendations required. | |||
D Determining if one or more EAL thresholds in the EAL matrix have been matched or exceeded. | |||
D Classifying the event at the highest level emergency classification for which an EAL is currently being met or exceeded. Note: Unit was in a Station Blackout for a couple of minutes but Initial Conditions given clearly state OC DG was aligned to 11 4KV bus in <5 min. | |||
Evaluator Note: Student should move back to previous procedure to complete following steps. | |||
CUE: When a Peer Check of the EAL call is requested, acknowledge the request. | |||
D 1.2.2.A - IF time permits, THEN validate the emergency classification with the STA (peer check), if Requests Peer Check from STA. | |||
available. | |||
Fills out checklist: | Fills out checklist: | ||
Rev. 2 Page 6of12 Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) STANDARD D 1.2.3 -DETERMINE if protective | D 1.2.2.B - Declare the event by announcing the following: | ||
References Tab 3 (EP-AA-113-F-53) and determines flowchart calls for "Consider Implementing protected area Evacuation and Accountability". | "I am declaring a(n) (EAL) at (time) due to - - - - | ||
(brief reason) and assuming the role as Emergency Director. | |||
D 1.2.4 -ANNOUNCE, or DIRECT PA announcements, for station personnel as necessary. | Rev. 2 Page 6of12 | ||
0 1.2.5 -DETERMINE the appropriate PAR | |||
per EP-CE-111, Emergency Classification Determines step is NOT applicable. | Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) STANDARD D 1.2.3 - DETERMINE if protective References Tab 3 (EP-AA-113-F-53) and actions for onsite personnel are determines flowchart calls for "Consider necessary using EP-AA-113-F-53, Implementing protected area Evacuation Onsite Protective Measures Flowchart. and Accountability". | ||
IF Operator elects to perform PA Announcements, acknowledge that the Unit Supervisor CUE: | |||
will perform the announcements per EP-AA-112-F-57. | |||
D 1.2.4 - ANNOUNCE, or DIRECT PA announcements, for station personnel as Operator will not perform per CUE provided. | |||
necessary. | |||
0 1.2.5 - DETERMINE the appropriate PAR per EP-CE-111, Emergency Classification Determines step is NOT applicable. | |||
and Protective Action Recommendations. | and Protective Action Recommendations. | ||
D 1.3 Notifications for Change in Classification or PAR D | D 1.3 Notifications for Change in Classification or PAR D 1.3 .1 - If the classification is an Unusual Event, then COMPLETE ERO Determines step is NOT applicable. | ||
notification/activation per EP-AA-112-1OO-F-57, ERONS Notification Details. | |||
D 1.3.2-GINNA Only ... Determines step is NOT applicable. | |||
D 1.3 .3 - If the classification is an Alert or higher and the ERO has not been Determines step is applicable activated, then DIRECT activation per EP-AA-112-100-F-57 (Tab 5) | |||
Notifications to the state and local are required within 15 minutes of Emergency Declaration or a change in PAR. D 1.3.4 State and Local Notification. | Evaluator Note: Student should move to Tab 5 to complete following steps D 1 - INITIATE PRIMARY ACTIVATION OF NOTIFICATION SYSTEM USING THE INTERNET D 1.1 - CIRCLE the appropriate station from the table below. | ||
D 1.3.4.A-COMPLETE station specific notification form Tab 7 | 0 1.2 - CIRCLE the appropriate Activation/Termination for the event from the table below. | ||
Evaluator Note: Student should move to Tab 7 to complete following steps D CCNPP INITIAL NOTIFICATION FORM D A.1 D A.2 D A.3 D A.4 Rev. 2 Page 8of12 Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) D A.5 D A.5.a D A.5.b D A.6 Protective Action Recommendations D A.6.a D A.7 D Shift ED/Corporate ED Name: | Rev. 2 Page 7of12 | ||
-GINN A Only ... Determines step is NOT applicable. | |||
When a Peer Check of the EAL call is requested, acknowledge the request. D 1.3.4.B -If time permits, then OBTAIN a peer check of completed Requests Peer Check from | Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded = CRITICAL STEP) STANDARD Evaluator Note: Student should move back to previous procedure to complete following steps. | ||
Rev.2 Page 9 of12 Appendix C Job Performance Measure Worksheet Form ES-C-1 | 0 1.3.3.A-NMP Only ... Determines step is NOT applicable. | ||
No further actions are required. | Ensure student knows you are performing the duties of the Emergency CUE: | ||
The operator is expected to end the JPM. TIME STOP: ---Rev. 2 Page 10of12 Appendix C Job Performance Measure Worksheet Form ES-C-1 Verification of Completion Job Performance Measure SRO/ADMIN-5 Examinee: | Communicator, acknowledge order to notify ERO. | ||
0 1.3.3.B-PROVIDE completed Hands the Tab 5 (EP-AA-112-100-F-57) to ERONS form to the shift the Emergency Communicator and directs communicator and DIRECT them notification of the ERO. | |||
to notify/activate ERO. | |||
D 1.3.1.C -If no one is available to Determines step is NOT applicable. | |||
notify ERO ..... | |||
NOTE: | |||
Notifications to the state and local are required within 15 minutes of Emergency Declaration or a change in PAR. | |||
D 1.3.4 State and Local Notification. | |||
D 1.3.4.A-COMPLETE station Determines step is applicable. | |||
specific notification form Tab 7. | |||
Evaluator Note: Student should move to Tab 7 to complete following steps D CCNPP INITIAL NOTIFICATION FORM D A.1 D A.2 D A.3 D A.4 Rev. 2 Page 8of12 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) | |||
D A.5 Radioactivity released is /was monitored D A.5.a NIA D A.5.b Type of Release NIA D A.6 Protective Action Recommendations D A.6.a D A.7 D Shift ED/Corporate ED Name: Prints name and signs form. | |||
Evaluator Note: Student should move back to previous procedure to complete following steps. | |||
D 1.3.4.A.l - GINN A Only ... Determines step is NOT applicable. | |||
CUE: When a Peer Check of the EAL call is requested, acknowledge the request. | |||
D 1.3.4.B - If time permits, then OBTAIN a peer check of completed Requests Peer Check from STA. | |||
form information. | |||
Rev.2 Page 9 of12 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded = CRITICAL STEP) STANDARD Ensure student knows you are performing the duties of the Emergency CUE: | |||
Communicator; acknowledge order to notify State and Local. | |||
Hands the Tab 7 (Initial Notification Form) to the Emergency Communicator and directs notification of State and Local. | |||
0 1.3.4.C-PROVIDE completed form to Shift Communication and DIRECT them to notify State and Local. | |||
TERMINATING CUE: The JPM is complete when an EAL classification is determined and declared within time requirements and the Initial Notification form is completed and given to the communicator within time requirements. No further actions are required. The operator is expected to end the JPM. | |||
TIME STOP: - - - | |||
Rev. 2 Page 10of12 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Verification of Completion Job Performance Measure SRO/ADMIN-5 Examinee: | |||
NRC Examiner: | NRC Examiner: | ||
Date Performed: | Date Performed: | ||
Facility Evaluator: | Facility Evaluator: | ||
Number of Attempts: | Number of Attempts: - - - - - - - - - - - - - - - - | ||
---------------- | |||
Time to Complete: | Time to Complete: | ||
Follow up Question(s): | Follow up Question(s): - - - - - - - - - - - - - - - - - - - - - - - | ||
----------------------- | Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Applicant Response: | Result: SAT UNSAT Examiner's Signature and Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Rev. 2 Page 11of12 | |||
Appendix C Job Performance Measure Form ES-C-I Worksheet EXAMINEE'S CUE SHEET Initial Conditions: | |||
I. Unit-I was at IOO% power with IA DG tagged out and OC DG pre-aligned to I I 4KV bus IAW OI-2IA-1. | |||
Job Performance Measure Worksheet EXAMINEE'S CUE SHEET | : 2. Security has reported a credible threat to CCNPP from the FBI. | ||
: 2. Security has reported a credible threat to CCNPP from the FBI. 3. Severe thunderstorms in progress with wind gusts of 50mph. 4. A loss of offsite power has occurred resulting in a reactor trip. 5. IB DG failed to start on the undervoltage condition; subsequent attempts to start the IB DG have been unsuccessful. | : 3. Severe thunderstorms in progress with wind gusts of 50mph. | ||
: 6. CRO completed the Vital Auxiliaries Safety Function and reported it as complete to the Unit Supervisor 5 minutes after the trip. 7. You are performing the duties of the Shift Manager. 8. This JPM is TIME CRITICAL. | : 4. A loss of offsite power has occurred resulting in a reactor trip. | ||
Initiating Cue: You have been requested to determine appropriate Emergency Response Actions, per the ERP IP, based on the current plant conditions provided. | : 5. IB DG failed to start on the undervoltage condition; subsequent attempts to start the IB DG have been unsuccessful. | ||
Rev. 2 Page 12of12 APPLICANT: | : 6. CRO completed the Vital Auxiliaries Safety Function and reported it as complete to the Unit Supervisor 5 minutes after the trip. | ||
: 7. You are performing the duties of the Shift Manager. | |||
Calvert Cliffs 1 & 2 Job Performance Measure Sim-I (Alt Path) Task Title: Dropped CEA during startup. Task Number: 055.003 Operate the Regulating CEAs 202.008 Respond to CEA(s) misaligned by >I5" KIA | : 8. This JPM is TIME CRITICAL. | ||
Initiating Cue: | |||
You have been requested to determine appropriate Emergency Response Actions, per the ERP IP, based on the current plant conditions provided. | |||
Rev. 2 Page 12of12 | |||
APPLICANT: _ _ __ | |||
CALVERT CLIFFS NUCLEAR POWER PLANT 2017NRC Initial Licensed Operator Exam JPM SIMULATOR-I Rev. 1 | |||
Rev. 0 New JPM. | |||
Rev I Incorporate comments from validations Rev. I Page 2of13 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: Calvert Cliffs 1 & 2 Job Performance Measure Sim-I (Alt Path) | |||
Task | |||
==Title:== | |||
Dropped CEA during startup. | |||
Task Number: 055.003 Operate the Regulating CEAs 202.008 Respond to CEA(s) misaligned by >I5" KIA | |||
==Reference:== | ==Reference:== | ||
001.A2.03 (3.5,4.2) | |||
Method of Testing: | |||
Simulated Performance: D Actual Performance: ~ | |||
Classroom: D Simulator: [8] Plant: D Read to the examinee: | |||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | |||
Initial Conditions: | |||
: 1. U-I is currently performing a startup IAW OP-2 Section 6.7 | |||
: 2. Unit-I has just been called critical. | |||
: 3. Critical data was just taken with power at :::::I x I o-5%. | |||
: 4. You are performing the duties of the Reactor Operator. | |||
Initiating Cue: | |||
You have been directed to raise reactor power to : : : 1% power IAW OP-2 Step 6. 7.S Task Standard: | |||
Recognize dropped CEA during startup and takes correct action IA W OP-2. | |||
Rev. I Page 3of13 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Evaluation Criteria: | |||
: 1. All critical steps completed (denoted by shading). | |||
: 2. All sequential steps completed in order. | |||
: 3. All time-critical steps completed within allotted time. | |||
: 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. | |||
Critical Step Basis: | |||
Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task. | |||
General | |||
: 1. All critical steps completed (denoted by shading). | |||
: 2. All sequential steps completed in order. 3. All time-critical steps completed within allotted time. 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. Critical Step Basis: Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task. General | |||
==References:== | ==References:== | ||
: 1. Procedures and manuals normally available in Control Room Time critical task: No Validation Time: 25 minutes Setup: 1. Reset simulator to IC-009 U-1 critical approximately lE-5% Power MOC 2. Ensure CEDS is Off 3. CEAPDS selected to display all CEAs 4. Event Trigger 1 PlC05_PWRJIOOl_MT | : 1. Procedures and manuals normally available in Control Room Time critical task: | ||
>.001 (WRNI Power reaches lE-2%) 5. CEA 6 drop cedsO | No Validation Time: | ||
: 1. CHECK ALL WRNI channels indicating less than 2%. 0 OI-42 Sect. 6.7 REGULATING CEA OPERATION | 25 minutes Setup: | ||
0 B.1 -IF CEAs are inserted less than 130 inches. THEN INFORM Chemistry to ensure requirements of CP-204, SPECIFICATION AND SURVEILLANCE PRIMARY SYSTEMS, related to C0-58 are met. NOTE | : 1. Reset simulator to IC-009 U-1 critical approximately lE-5% Power MOC | ||
If any CEA is moved greater than 7 .5 inches in modes 1 or 2, then within one hour TS SR 3.1.4.l should be performed. | : 2. Ensure CEDS is Off | ||
0 | : 3. CEAPDS selected to display all CEAs | ||
B.3 -Ensure the desired CEA in the | : 4. Event Trigger 1 PlC05_PWRJIOOl_MT >.001 (WRNI Power reaches lE-2%) | ||
: 5. CEA 6 drop cedsO 12_ 06 on Event 1 | |||
Any CEA in Group 4 can be selected. | : 6. 1C05 - D40- LTON to On at time zero | ||
Rev. 1 Page 5of13 Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded = CRITICAL STEP) NOTE To prevent challenging CEA interlocks, Manual Sequential should not be used for CEA withdrawal ifthe CEAs are in an abnormal alignment for ASI control PER Section 6.16, ASI CONTROL USING REGULATING CEAs (i.e. groups 1,2 and/or 3 partially inserted), until the associated groups are at the upper computer stop. CUE: If candidate asks US (Unit Supervisor) if Manual Sequential or Manual Group should be used, direct use of Manual Sequential. | : 7. Place NRRHOl & NRRH02 on trend on plant computer screen near 1C05 Rev. 1 Page 4of13 | ||
D B.4 -SELECT AND DEPRESS one of the following mode control pushbuttons: | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded= CRITICAL STEP) | |||
TIME START: | |||
0 OP-2 Section 6.7 TAKE THE REACTOR CRITICAL CAUTION Do NOT exceed a sustained one DPM startup rate CUE: US (Unit Supervisor) suggests target of 0.5 DPM startup rate for power ascension to 1% | |||
0 S - Raise Reactor power to approximately 1% by LRNI AND PERFORM the When raising power by withdrawing following: Regulating CEA's sustained startup rate | |||
: 1. CHECK ALL WRNI channels does not exceed 1 DPM. | |||
indicating less than 2%. | |||
0 OI-42 Sect. 6.7 REGULATING CEA OPERATION CUE: If asked by candidate if Chemistry has been informed, tell them this notification has already been completed. | |||
0 B.1 - IF CEAs are inserted less than 130 inches. THEN INFORM Chemistry to Either asks US (Unit Supervisor) if this has ensure requirements of CP-204, already been done or calls Chemistry SPECIFICATION AND directly. | |||
SURVEILLANCE PRIMARY SYSTEMS, related to C0-58 are met. | |||
NOTE If any CEA is moved greater than 7 .5 inches in modes 1 or 2, then within one hour TS SR 3.1.4.l should be performed. | |||
0 B.2 - ENSURE desired regulating group Ensures Group 4 is selected. | |||
(1,2,3,4,5) is selected. | |||
0 B.3 - Ensure the desired CEA in the Any CEA in Group 4 can be selected. | |||
group is selected. | |||
Rev. 1 Page 5of13 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded = CRITICAL STEP) | |||
NOTE To prevent challenging CEA interlocks, Manual Sequential should not be used for CEA withdrawal ifthe CEAs are in an abnormal alignment for ASI control PER Section 6.16, ASI CONTROL USING REGULATING CEAs (i.e. groups 1,2 and/or 3 partially inserted), until the associated groups are at the upper computer stop. | |||
CUE: If candidate asks US (Unit Supervisor) if Manual Sequential or Manual Group should be used, direct use of Manual Sequential. | |||
D B.4 - SELECT AND DEPRESS one of the following mode control pushbuttons: | |||
* MANUAL SEQUENTIAL | * MANUAL SEQUENTIAL | ||
* MANUAL GROUP | * MANUAL GROUP | ||
* MANUAL INDIVIDUAL D B.5 -IF necessary to bypass CMI, THEN REFER to Section 6.8, USE OF Determines step is N/ A CEA MOTION INHIBIT BYPASS. NOTE | * MANUAL INDIVIDUAL D B.5 - IF necessary to bypass CMI, THEN REFER to Section 6.8, USE OF Determines step is N/A CEA MOTION INHIBIT BYPASS. | ||
NOTE | |||
* Group sequencing must be accomplished by the Reactor Operator when Plant Computer, OR DAS Bis OOS .... | * Group sequencing must be accomplished by the Reactor Operator when Plant Computer, OR DAS Bis OOS .... | ||
* Unit-1 CEA-18 will NOT move while jumpered PER ECP-15-000409. | * Unit-1 CEA-18 will NOT move while jumpered PER ECP-15-000409. | ||
Line 359: | Line 703: | ||
* RAISE/HOLD/LOWER switch operation should be accomplished with positive ... | * RAISE/HOLD/LOWER switch operation should be accomplished with positive ... | ||
* Withdraw and insert CEAs only in a deliberate and carefully controlled manner ... | * Withdraw and insert CEAs only in a deliberate and carefully controlled manner ... | ||
* Primary lant anomalies caused by secondar 0 B.6 -INSERT OR WITHDRAW selected CEA(s) using the RAISE/HOLD/LOWER switch while observing the following limits. Rev. 1 Page 6of13 Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded= CRITICAL STEP) 0 a. -IF withdrawing CEA(s) in Manual Group OR Manual Sequential Mode, THEN STOP withdrawal at Determines step is | * Primary lant anomalies caused by secondar 0 B.6 - INSERT OR WITHDRAW selected CEA(s) using the RAISE/HOLD/LOWER switch while observing the following limits. | ||
0 b. -IF inserting CEA(s) in Manual Group OR Manual Sequential Mode, THEN STOP insertion at Lower Determines step is | Rev. 1 Page 6of13 | ||
0 B. 7 -ENSURE at least 5 seconds has | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded= CRITICAL STEP) 0 a. - IF withdrawing CEA(s) in Manual Group OR Manual Sequential Mode, THEN STOP withdrawal at Determines step is NIA. | |||
BEGIN ALTERNATE PATH 0 AOP-lB A.-CONTROL CEA MOVEMENT AND STABILIZE THE UNIT 0 A. I -IF the CEAs are moving without operator action, THEN ensure the CEDS Determines step is | Upper Computer Stop OR a maximum height of 130.5 inches when computer is NOT available. | ||
0 b. -IF inserting CEA(s) in Manual Group OR Manual Sequential Mode, THEN STOP insertion at Lower Determines step is NIA. | |||
Computer Stop or a minimum height of 6.0 inches when computer is NOT available. | |||
After stopping CEA motion candidate 0 B. 7 - ENSURE at least 5 seconds has should ensure at least 5 seconds has elapsed elapsed once CEA motion is completed. | |||
before movement initiated again. | |||
0 B.8 - IF other CEA manipulations are Candidate may or may not use additional desired, THEN REPEAT steps 1 CEA movements to achieve desired SUR. | |||
through 7. | |||
Once a stable SUR is achieved and power is rising toward 1% the dropped CEA malfunction will be entered. Once the candidate recognizes and announces the CUE: | |||
dropped CEA to Control Room, direct candidate to implement AOP-lB Section IV Preliminary. | |||
BEGIN ALTERNATE PATH 0 AOP-lB A.-CONTROL CEA MOVEMENT AND STABILIZE THE UNIT 0 A. I - IF the CEAs are moving without operator action, THEN ensure the CEDS Determines step is NIA. | |||
Control System is turned off. | |||
CAUTION If CEA misalignment causes power to be reduced, power shall not be raised until the CEA is within it alignment requirements or until Reactor Engineering is consulted. | |||
CAUTION Do NOT use CEAs to control RCS temperature. | CAUTION Do NOT use CEAs to control RCS temperature. | ||
Rev. 1 Page 7of13 Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded = CRITICAL STEP) CUE: Inform candidate that the CRO will perform this step. D A.2-Maintain Tcold on programmed value by performing ANY of the following actions as applicable: | Rev. 1 Page 7of13 | ||
D Adjust Turbine Load 0 Adjust TBV s or ADV s D Initiate boration D A.3 -Verify Pressurizer pressure is between 2225 and 2275 psia, and | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded = CRITICAL STEP) | |||
Recognizes only 1 CEA is misaligned. | CUE: Inform candidate that the CRO will perform this step. | ||
D A.2-Maintain Tcold on programmed value by performing ANY of the Requests CRO to perform this step. | |||
D A.5 -IF the CEA malfunction causes a critical reactor to become subcritical, THEN perform the following: | following actions as applicable: | ||
(No change in temperature is expected since D Adjust Turbine Load below POAH). | |||
0 Adjust TBV s or ADV s D Initiate boration D A.3 - Verify Pressurizer pressure is between 2225 and 2275 psia, and Verifies pressure is ::::::2250 psia. | |||
trending toward 2250 psia. | |||
Verifies all CEAs using CEAPDS 0 A.4 - Verify position of ALL CEAs indication. Recognizes only 1 CEA is using reed switch position indication. | |||
misaligned. | |||
IF NRRHOI & NRRH02 trends are not working sue pointer to indicate that reactivity CUE: | |||
is negative on these trend screen to reinforce that reactor is subcritical. | |||
D A.5 - IF the CEA malfunction causes a critical reactor to become subcritical, THEN perform the following: | |||
CAUTION The affected CEA(s) should not be inserted/withdrawn until ALL unaffected Regulating CEAs are inserted. | CAUTION The affected CEA(s) should not be inserted/withdrawn until ALL unaffected Regulating CEAs are inserted. | ||
D A.5.a-Fully insert ALL unaffected Regulating CEAs. 0 OI-42 Sect. 6.7 REGULATING CEA OPERATION | Refers to OI-42 Section 6.7 REGULATING D A.5.a-Fully insert ALL unaffected CEA OPERATION or properly performs all Regulating CEAs. | ||
0 B.1 -IF CEAs are inserted less than 130 inches. THEN INFORM Chemistry to ensure requirements of CP-204, SPECIFICATION AND SURVEILLANCE PRIMARY SYSTEMS, related to C0-58 are met. NOTE | steps necessary to insert Regulating CEAs. | ||
If any CEA is moved greater than 7 .5 inches in modes 1 or 2, then within one hour TS SR 3 .1.4.1 should be performed. | 0 OI-42 Sect. 6.7 REGULATING CEA OPERATION Rev. 1 Page 8of13 | ||
0 | |||
B.3 -Ensure the desired CEA in the | Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded = CRITICAL STEP) | ||
CUE: If asked by candidate if Chemistry has been informed, tell them this notification has already been completed. | |||
Any CEA in Group 4 can be selected. | 0 B.1 - IF CEAs are inserted less than 130 inches. THEN INFORM Chemistry to ensure requirements of CP-204, Either asks US if this has already been done SPECIFICATION AND or calls Chemistry directly. | ||
To prevent challenging CEA interlocks, Manual Sequential should not be used for CEA withdrawal if the CEAs are in an abnormal alignment for ASI control PER Section 6.16, ASI CONTROL USING REGULATING CEAs (i.e. groups 1,2 and/or 3 partially inserted), until the associated froups are at the upper computer stop. CUE: If candidate asks US if Manual Sequential or Manual Group should be used, direct use of Manual Sequential. | SURVEILLANCE PRIMARY SYSTEMS, related to C0-58 are met. | ||
0 B.4 -SELECT AND DEPRESS one of the following mode control pushbuttons: | NOTE If any CEA is moved greater than 7 .5 inches in modes 1 or 2, then within one hour TS SR 3.1.4.1 should be performed. | ||
0 B.2 - ENSURE desired regulating group Ensures Group 4 is selected. | |||
(1,2,3,4,5) is selected. | |||
0 B.3 - Ensure the desired CEA in the Any CEA in Group 4 can be selected. | |||
group is selected. | |||
NOTE To prevent challenging CEA interlocks, Manual Sequential should not be used for CEA withdrawal if the CEAs are in an abnormal alignment for ASI control PER Section 6.16, ASI CONTROL USING REGULATING CEAs (i.e. groups 1,2 and/or 3 partially inserted), until the associated froups are at the upper computer stop. | |||
CUE: If candidate asks US if Manual Sequential or Manual Group should be used, direct use of Manual Sequential. | |||
0 B.4 - SELECT AND DEPRESS one of the following mode control pushbuttons: | |||
* MANUAL SEQUENTIAL | * MANUAL SEQUENTIAL | ||
* MANUAL GROUP | * MANUAL GROUP | ||
* MANUAL INDIVIDUAL 0 B.5 -IF necessary to bypass CMI, THEN REFER to Section 6.8, USE OF Determines step is applicable. | * MANUAL INDIVIDUAL 0 B.5 - IF necessary to bypass CMI, THEN REFER to Section 6.8, USE OF Determines step is applicable. | ||
CEA MOTION INHIBIT BYPASS. Rev. 1 Page 9of13 Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT | CEA MOTION INHIBIT BYPASS. | ||
0 B.2 -DEPRESS AND HOLD MOTION INHIBIT BYPASS pushbutton on CEDS Control Panel. D B.3 -WHEN at least 5 seconds have elapsed, THEN INITIATE group OR Individual CEA Motion. 0 OI-42 Section 6.7 REGULATING CEA OPERATION NOTE | Rev. 1 Page 9of13 | ||
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STAND ARD (shaded = CRITICAL STEP) | |||
D OI-42 Section 6.8 USE OF CEA MOTION INHIBIT (CMI) BYPASS. | |||
NOTE D CMI MAY be bypassed to more than one CEA group at a time. | |||
D Steps 1 and 2 will bypass CMI to selected group and apply CMI to all other groups. | |||
0 CEA MOTION INHIBIT BYPASS annunciator on 1(2)C05 will alarm. | |||
D B.1 - DEPRESS GROUP BYPASS pushbutton(s) on CEDS Control Panel for the CEA groups( s) needing alignment. | |||
0 B.2 - DEPRESS AND HOLD MOTION INHIBIT BYPASS pushbutton on CEDS Control Panel. | |||
D B.3 - WHEN at least 5 seconds have Waits at least 5 seconds before inserting elapsed, THEN INITIATE group OR Regulating CEAs. | |||
Individual CEA Motion. | |||
0 OI-42 Section 6.7 REGULATING CEA OPERATION NOTE | |||
* Group sequencing must be accomplished by the Reactor Operator when Plant Computer, OR DAS Bis OOS .... | * Group sequencing must be accomplished by the Reactor Operator when Plant Computer, OR DAS Bis OOS .... | ||
* Unit-I CEA-18 will NOT move while jumpered PER ECP-15-000409. | * Unit-I CEA-18 will NOT move while jumpered PER ECP-15-000409. | ||
Line 391: | Line 772: | ||
* RAISE/HOLD/LOWER switch operation should be accomplished with positive ... | * RAISE/HOLD/LOWER switch operation should be accomplished with positive ... | ||
* Withdraw and insert CEAs only in a deliberate and carefully controlled manner. .. | * Withdraw and insert CEAs only in a deliberate and carefully controlled manner. .. | ||
* Primary plant anomalies caused by secondary plant transients are rarely, if ever, ... Rev. 1 Page 10of13 Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded = CRITICAL STEP) CUE: Once CEA insertion has begun the evaluator can terminate the JPM. D B.6 -INSERT OR WITHDRAW selected CEA(s) using the RAISE/HOLD/LOWER switch while observing the following limits. TERMINATING CUE: The JPM is complete when Regulating CEAs are being inserted to comply with AOP-lB. No further actions are required. | * Primary plant anomalies caused by secondary plant transients are rarely, if ever, ... | ||
The evaluator is expected to end the JPM. TIME STOP: ---Rev. 1 Page 11of13 Appendix C Job Performance Measure Worksheet Form ES-C-1 Verification of Completion Job Performance Measure SIMULA TOR-1 Examinee: | Rev. 1 Page 10of13 | ||
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded = CRITICAL STEP) | |||
CUE: Once CEA insertion has begun the evaluator can terminate the JPM. | |||
D B.6 - INSERT OR WITHDRAW selected CEA(s) using the RAISE/HOLD/LOWER switch while observing the following limits. | |||
TERMINATING CUE: The JPM is complete when Regulating CEAs are being inserted to comply with AOP-lB. No further actions are required. The evaluator is expected to end the JPM. | |||
TIME STOP: - - - | |||
Rev. 1 Page 11of13 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Verification of Completion Job Performance Measure SIMULA TOR-1 Examinee: | |||
NRC Examiner: | NRC Examiner: | ||
Date Performed: | Date Performed: | ||
Facility Evaluator: | Facility Evaluator: | ||
Number of Attempts: | Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Time to Complete: | |||
Follow up Question(s): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | |||
Follow up Question(s): | Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Result: SAT UNSAT Examiner's Signature and Date: -------------------~ | |||
Rev. 1 Page 12of13 | |||
Appendix C Job Performance Measure Form ES-C-1 Worksheet EXAMINEE'S CUE SHEET Initial Conditions: | |||
Rev. 1 Page 12of13 | : 1. U-1 is currently performing a startup IAW OP-2 Section 6.7. | ||
: 2. Unit-1 has just been called critical. | |||
Job Performance Measure Worksheet EXAMINEE'S CUE SHEET 1. U-1 is currently performing a startup IAW OP-2 Section 6.7. 2. Unit-1 has just been called critical. | : 3. Critical data was just taken with power at ::::1 x 10-5%. | ||
: 3. Critical data was just taken with power at ::::1 x 10-5%. 4. You are performing the duties of the Reactor Operator. | : 4. You are performing the duties of the Reactor Operator. | ||
Initiating Cue: | Initiating Cue: | ||
You have been directed to raise reactor power to ::::::1 % power IA W OP-2 Step 6. 7 .S. | |||
Rev. 2 Page 2 of9 Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: | Rev. 1 Page 13of13 | ||
Calvert Cliffs 1 & 2 | |||
APPLICANT: _ _ __ | |||
CALVERT CLIFFS NUCLEAR POWER PLANT 2017 NRC Initial Licensed Operator Exam JPM SIMULATOR-2 Rev. 2 | |||
Rev. 1 Update procedures since last given in 2011 Rev 2 Incorporate comments from validations. | |||
Rev. 2 Page 2 of9 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: Calvert Cliffs 1 & 2 Job Performance Measure Sim-2 (Alt Path) | |||
Task | |||
==Title:== | |||
Override shut a PORV Task Number: 064.035 Override shut a PORV KIA | |||
==Reference:== | ==Reference:== | ||
002.A2.01 (3.9, 4.2) | |||
Method of Testing: | |||
Simulated Performance: D Actual Performance: ~ | |||
Classroom: D Simulator: ~ Plant: D Read to the examinee: | |||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | |||
Initial Conditions: | |||
: 1. Unit 1 is stable in Mode 4. | |||
: 2. Temperature band of250°F +/-10° established and controlled by CRO. | |||
: 3. Pressure band of 400 psia +/-10 psia established and controlled by RO. | |||
: 4. All General Precautions and Initial Conditions are met. | |||
: 5. You are performing duties of the Reactor Operator. | |||
Initiating Cue: | |||
The Unit Supervisor directs aligning Low Pressure Pressurizer control IA W 01-lH Sect. 6.3. | |||
Task Standard: | |||
The candidate will diagnose that the PORV is open due to equipment malfunction and shut the associated PORV block valve. | |||
Rev. 2 Page 3 of9 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Evaluation Criteria: | |||
: 1. All critical steps completed (denoted by shading). | |||
: 2. All sequential steps completed in order. | |||
: 3. All time-critical steps completed within allotted time. | |||
: 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. | |||
Critical Step Basis: | |||
Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task. | |||
General | |||
: 1. All critical steps completed (denoted by shading). | |||
: 2. All sequential steps completed in order. 3. All time-critical steps completed within allotted time. 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. Critical Step Basis: Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task. General | |||
==References:== | ==References:== | ||
: 1. Procedures and manuals normally available in Control Room 2. ALM-1C06, RCS Control Alarm Manual 3. OI-lH Pressurizer Pressure Control Time critical task: No Validation Time: 10 minutes Setup: 1. Reset to IC-1. 2. Place simulator in run. 3. Override l-PI-103-1 to 1533# (P1C06_1PI103 l_MT to 1533) on Event 1. 4. Override PORV 402 handswitch (P1C06_1HS1402) to "manopen on Event 1. 5. Override PORV HS not in auto alarm (P1C06_E23_LTON) to OFF at time zero. 6. Ensure PZR level deviation is <4" 7. Insert PORV MPT keys 47 & 48 in panel. 8. Insert SIT outlet valve keys 25-28 in panel. 9. Insert PORV Block MOV keys 45 & 46 in panel. 10. Initiate Event 1 when directed by the examiner Rev. 2 Page 4 of9 Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded= CRITICAL STEP) TIME START: 0 OI-lH Section 6.3 LOW PRESSURE PRESSURIZER CONTROL. 0 B.1 -IF controlling U-1 pressure, Determines step is applicable. | : 1. Procedures and manuals normally available in Control Room | ||
: 2. ALM-1C06, RCS Control Alarm Manual | |||
: 3. OI-lH Pressurizer Pressure Control Time critical task: | |||
No Validation Time: | |||
10 minutes Setup: | |||
: 1. Reset to IC-1. | |||
: 2. Place simulator in run. | |||
: 3. Override l-PI-103-1 to 1533# (P1C06_1PI103 l_MT to 1533) on Event 1. | |||
: 4. Override PORV 402 handswitch (P1C06_1HS1402) to "manopen on Event 1. | |||
: 5. Override PORV HS not in auto alarm (P1C06_E23_LTON) to OFF at time zero. | |||
: 6. Ensure PZR level deviation is <4" | |||
: 7. Insert PORV MPT keys 47 & 48 in panel. | |||
: 8. Insert SIT outlet valve keys 25-28 in panel. | |||
: 9. Insert PORV Block MOV keys 45 & 46 in panel. | |||
: 10. Initiate Event 1 when directed by the examiner Rev. 2 Page 4 of9 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded= CRITICAL STEP) | |||
TIME START: | |||
0 OI-lH Section 6.3 LOW PRESSURE PRESSURIZER CONTROL. | |||
0 B.1 - IF controlling U-1 pressure, Determines step is applicable. | |||
THEN PERFORM the following: | THEN PERFORM the following: | ||
0 a. -ENSURE PRESSURIZER SPRAY VL V CONTROLLER, Verifies that l-HIC-100 is in manual with 1-HIC-100 is in MANUAL with 0% or negative output. zero output. CUE: IF candidate does not energize heaters to raise pressure, US should direct raising pressure into assigned band. 0 b. -CYCLE Pressurizer Heaters Since pressure is low out of assigned band while lowering Pressurizer level to the candidate should energize additional maintain pressure. | 0 a. - ENSURE PRESSURIZER SPRAY VL V CONTROLLER, Verifies that l-HIC-100 is in manual with 1-HIC-100 is in MANUAL with 0% or negative output. | ||
heaters to raise pressure. | zero output. | ||
0 c. -CHECK deviation less than 4 inches between Pressurizer level and programmed setpoint using 1-LT-Checks deviation is <4". l lOX and 1-LT-l lOY as read on PZR | CUE: IF candidate does not energize heaters to raise pressure, US should direct raising pressure into assigned band. | ||
0 d. -IF the deviation between Pressurizer level and Pressurizer Determines step is NOT applicable. | 0 b. - CYCLE Pressurizer Heaters Since pressure is low out of assigned band while lowering Pressurizer level to the candidate should energize additional maintain pressure. heaters to raise pressure. | ||
programmed setpoint is greater than 4 inches ... 0 e. -PLACE the selected Pressurizer Pressure Controller 11 PZR PRESS CONTR CHAN X, 1-PIC-lOOX OR Places 1-PIC-lOOY in Manual with 50% 11 PZR PRESS CONTR CHAN Y, output. 1-PIC-lOOY, in MANUAL with 50% output signal. CUE: Initiate Event 1 to cause faulted PORV BEGIN ALTERNATE PATH 0 Locates the | 0 c. - CHECK deviation less than 4 inches between Pressurizer level and programmed setpoint using 1-LT- Checks deviation is <4". | ||
0 1. -PERFORM the following: | l lOX and 1-LT-l lOY as read on PZR LVL recorder 1-LR-110. | ||
0 a. -IF reactor trip occurs, THEN IMPLEMENT EOP-0, Post-Trip | 0 d. - IF the deviation between Pressurizer level and Pressurizer Determines step is NOT applicable. | ||
CUE: The shift manager will contact the electric shop. 0 | programmed setpoint is greater than 4 inches ... | ||
[B0034] c. -IF the PORVs are in NORMAL, THEN: ... d. -IF the PORVs are in MPT ENABLE, THEN: 0 ( 1) -TRIP any RCPs operating in the NON-OPERATING AREA of the RCP curve | 0 e. - PLACE the selected Pressurizer Pressure Controller 11 PZR PRESS CONTR CHAN X, 1-PIC-lOOX OR Places 1-PIC-lOOY in Manual with 50% | ||
11 PZR PRESS CONTR CHAN Y, output. | |||
The candidate may perform step (2) since there is no actual high pressure condition, these actions will be unsuccessful in shutting the PORV. 0 (2) -WHEN the cause of the | 1-PIC-lOOY, in MANUAL with 50% output signal. | ||
Candidate determines the PORV is open due to equipment malfunction and not high RCS pressure. | CUE: Initiate Event 1 to cause faulted PORV BEGIN ALTERNATE PATH 0 Locates the 1C06 alarm manual and Locates 1C06 ARM and refers to E-21. | ||
refers to E-21. | |||
Rev.2 Page 5 of9 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STAND ARD (shaded = CRITICAL STEP) | |||
The candidate determines the step is 0 1. - The PORVs are energized. applicable since PORV 402 is open with red light lit. | |||
0 1. - PERFORM the following: | |||
0 a. - IF reactor trip occurs, THEN The candidate determines the reactor is shut IMPLEMENT EOP-0, Post-Trip down and step is NOT applicable. | |||
Immediate Actions. | |||
CUE: The shift manager will contact the electric shop. | |||
0 b. - NOTIFY the electric shop to Candidate informs US of step and is verify the trip status of the PORV informed that the Shift Manager will call thermal overloads to ensure PORV electric shop. | |||
operability. [B0034] | |||
0 c. - IF the PORVs are in The candidate determines PORVs are in NORMAL, THEN: ... variable MPT and step is NOT applicable. | |||
0 d. - IF the PORVs are in MPT The candidate determines PORVs are in ENABLE, THEN: variable MPT and step is applicable. | |||
0 ( 1) - TRIP any RCPs operating in the NON-OPERATING AREA of the RCP curve. | |||
The candidate may perform step (2) since there is no actual high pressure condition, CUE: these actions will be unsuccessful in shutting the PORV. | |||
0 (2) - WHEN the cause of the Candidate determines the PORV is open high pressure condition has been due to equipment malfunction and not high corrected, THEN: [B0064] RCS pressure. | |||
Determines step is NOT applicable. | Determines step is NOT applicable. | ||
Rev. 2 Page 6 of9 Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded= CRITICAL STEP) CUE: \ The CRO will perform step 1.d.(4). 0 (4) -DRAIN the PORV US informs the candidate that the CRO will discharge piping to the Quench perform this step. Tank as follows: 0 e. -MONITOR computer points Candidate uses plant computer to monitor T106, T107, and Tl08 for leak-off leak-off temperatures. | 0 (3) - IF a PORV fails to shut or is open due to a failed transmitter, THEN SHUT the applicable PORV Block, l-RC-403-MOV or 1-RC-405-MOV. | ||
Rev. 2 Page 6 of9 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded= CRITICAL STEP) | |||
CUE: \ The CRO will perform step 1.d.(4). | |||
0 (4) - DRAIN the PORV US informs the candidate that the CRO will discharge piping to the Quench perform this step. | |||
Tank as follows: | |||
0 e. - MONITOR computer points Candidate uses plant computer to monitor T106, T107, and Tl08 for leak-off leak-off temperatures. | |||
temperatures. | temperatures. | ||
Terminating Cue: This JPM is complete when the candidate isolates the open PORV flow path. No further actions are required. | Terminating Cue: This JPM is complete when the candidate isolates the open PORV flow path. No further actions are required. The evaluator is expected to end the JPM. | ||
The evaluator is expected to end the JPM. TIME STOP: Rev.2 Page 7 of9 Appendix C Job Performance Measure Worksheet Form ES-C-1 Verification of Completion Job Performance Measure SIMULATOR-2 Examinee: | TIME STOP: | ||
Rev.2 Page 7 of9 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Verification of Completion Job Performance Measure SIMULATOR-2 Examinee: | |||
NRC Examiner: | NRC Examiner: | ||
Date Performed: | Date Performed: | ||
Facility Evaluator: | Facility Evaluator: | ||
Number of Attempts: | Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Time to Complete: | |||
Follow up Question(s): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | |||
Follow up Question(s): | Applicant R e s p o n s e : - - - - - - - - - - - - - - - - - - - - - - - - | ||
Result: SAT UNSAT Examiner's Signature and Date: - - - - - - - - - - - - - - - - - - - - | |||
Rev.2 Page 8 of9 | |||
Result: SAT UNSAT Examiner's Signature and Date: -------------------- | |||
Rev.2 Page 8 of9 Appendix C | Appendix C Job Performance Measure Form ES-C-1 Worksheet EXAMINEE'S CUE SHEET Initial Conditions: | ||
Job Performance Measure Worksheet EXAMINEE'S CUE SHEET 1. Unit 1 is stable in Mode 4. 2. Temperature band of250°F +/-10° established and controlled by CRO. 3. Pressure band of 400 psia +/-10 psia established and controlled by RO. 4. All General Precautions and Initial Conditions are met. 5. You are performing duties of the Reactor Operator. | : 1. Unit 1 is stable in Mode 4. | ||
Initiating Cue: | : 2. Temperature band of250°F +/-10° established and controlled by CRO. | ||
: 3. Pressure band of 400 psia +/-10 psia established and controlled by RO. | |||
Rev. 1 Page 2of10 Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: | : 4. All General Precautions and Initial Conditions are met. | ||
Calvert Cliffs 1 & 2 Job Performance Measure Sim-3 (Alt Path) Task Title: Depressurize RCS to fill PZR in EOP-5. Task Number: 202.015 Respond to RCS leakage exceeding capacity of one charging pump, modes 1 & 2. KIA | : 5. You are performing duties of the Reactor Operator. | ||
Initiating Cue: | |||
The Unit Supervisor directs aligning Low Pressure Pressurizer control IA W OI-IH Sect. 6.3. | |||
Rev. 2 Page 9 of9 | |||
APPLICANT: _ _ __ | |||
CALVERT CLIFFS NUCLEAR POWER PLANT 2017 NRC Initial Licensed Operator Exam JPM SIMULATOR-3 Rev. 1 | |||
Rev. 0 New JPM. | |||
Rev 1 Incorporate comments from validation. | |||
Rev. 1 Page 2of10 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: Calvert Cliffs 1 & 2 Job Performance Measure Sim-3 (Alt Path) | |||
Task | |||
==Title:== | |||
Depressurize RCS to fill PZR in EOP-5. | |||
Task Number: 202.015 Respond to RCS leakage exceeding capacity of one charging pump, modes 1 & 2. | |||
KIA | |||
==Reference:== | ==Reference:== | ||
010.A4.01 (3.7,3.5) | 010.A4.01 (3.7,3.5) | ||
Method of Testing: Simulated Performance: | Method of Testing: | ||
D | Simulated Performance: D Actual Performance: ~ | ||
D Read to the examinee: | Classroom: D Simulator: ~ Plant: D Read to the examinee: | ||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | |||
Initial Conditions: | Initial Conditions: | ||
: 1. Unit-1 has experienced a LOCA from 100% power. 2. Unit-I has tripped, EOP-0 has been completed and EOP-5 has been implemented. | : 1. Unit-1 has experienced a LOCA from 100% power. | ||
: 2. Unit-I has tripped, EOP-0 has been completed and EOP-5 has been implemented. | |||
: 3. You are performing the duties of the Reactor Operator. | : 3. You are performing the duties of the Reactor Operator. | ||
Initiating Cue: You have been directed to depressurize the RCS IA W EOP-5 Step K, and Throttle HPSI flow IA W EOP-5 Step L. Task Standard: | Initiating Cue: | ||
Initiate Aux Spray to depressurize RCS and throttle HPSI flow to control Pressurizer level. Rev. 1 Page 3of10 Appendix C Job Performance Measure Worksheet Form ES-C-1 Evaluation Criteria: | You have been directed to depressurize the RCS IA W EOP-5 Step K, and Throttle HPSI flow IA W EOP-5 Step L. | ||
: 1. All critical steps completed (denoted by shading). | Task Standard: | ||
: 2. All sequential steps completed in order. 3. All time-critical steps completed within allotted time. 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. Critical Step Basis: Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task. General | Initiate Aux Spray to depressurize RCS and throttle HPSI flow to control Pressurizer level. | ||
Rev. 1 Page 3of10 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Evaluation Criteria: | |||
: 1. All critical steps completed (denoted by shading). | |||
: 2. All sequential steps completed in order. | |||
: 3. All time-critical steps completed within allotted time. | |||
: 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. | |||
Critical Step Basis: | |||
Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task. | |||
General | |||
==References:== | ==References:== | ||
: 1. Procedures and manuals normally available in Control Room Time critical task: No Validation Time: 20 minutes Setup: 1. Reset simulator to IC-24 U-1 at 100% Power MOC. 2. RCS leak of 700 gpm (rcs002 to 700gpm) at Time Zero. 3. Trip Reactor and complete EOP-0. 4. Ensure SIAS initiates. | : 1. Procedures and manuals normally available in Control Room Time critical task: | ||
: 5. Manually insert CIS with panel pushbuttons. | No Validation Time: | ||
: 6. Secure all RCP's. 7. Control plant until subcooling | 20 minutes Setup: | ||
:::::50°F. | : 1. Reset simulator to IC-24 U-1 at 100% Power MOC. | ||
: 8. Ensure key 41 inserted in Aux Spray CV. 9. Ensure Key 20 inserted in 1-HS-2080A. | : 2. RCS leak of 700 gpm (rcs002 to 700gpm) at Time Zero. | ||
: 10. Prepared to modify rcs002 to | : 3. Trip Reactor and complete EOP-0. | ||
Rev. 1 Page 4of10 Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded= CRITICAL STEP) TIME START: D EOP-5 Step K DEPRESSURIZE THE RCS TO REDUCE SUBCOOLING AND MAINTAIN PRESSURIZER LEVEL NOTE If rapid pressure excursions due to RCS inventory or temperature changes have occurred, consider the RCS solid. CUE: I Direct a subcooling band between 30 and 60° subcooling. | : 4. Ensure SIAS initiates. | ||
D 1 -IF a bubble exists in the Pressurizer OR the Reactor Vessel Head, THEN maintain subcooling as low as possible AND within the following limits: | : 5. Manually insert CIS with panel pushbuttons. | ||
* Between 30 and 140° based on CET temperatures. | : 6. Secure all RCP's. | ||
* RCS pressure greater than the NPSH limits PER ATTACHMENT (1), RCS PRESSURE TEMPERATURE LIMITS. D 1.a -Lower subcooling by ANY of the following methods: D ( 1) -De-energize Pressurizer HTR(s). D (2) -IF ALL RCPs are operating, THEN ... CUE: I CRO will control the cooldown rate. D (3)-Lower the RCS cooldown rate. D (4)-IF the overpressurization is due to HPSI/Charging flow AND HPSI throttle criteria are met. .. D (5)-Initiate AUX SPRAY as | : 7. Control plant until subcooling :::::50°F. | ||
Determines step is | : 8. Ensure key 41 inserted in Aux Spray CV. | ||
: 9. Ensure Key 20 inserted in 1-HS-2080A. | |||
: 10. Prepared to modify rcs002 to 1O,OOOgpm once throttling complete. | |||
Rev. 1 Page 5of10 Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT 0 (a) -Place the 1-IA-2080-MOV CIS OVERRIDE switch, 1-HS-2080A, in OVERRIDE. | Rev. 1 Page 4of10 | ||
D (b) -Open the IA CNTMT ISOL | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded= CRITICAL STEP) | |||
TIME START: | |||
D EOP-5 Step K DEPRESSURIZE THE RCS TO REDUCE SUBCOOLING AND MAINTAIN PRESSURIZER LEVEL NOTE If rapid pressure excursions due to RCS inventory or temperature changes have occurred, consider the RCS solid. | |||
CUE: I Direct a subcooling band between 30 and 60° subcooling. | |||
D 1 - IF a bubble exists in the Pressurizer OR the Reactor Vessel Head, THEN maintain subcooling as low as possible AND within the following limits: Subcooling band of 30-60° subcooling, is | |||
* Between 30 and 140° based on CET given, critical task will only require temperatures. maintaining between 30-140° subcooling per the procedure step. | |||
* RCS pressure greater than the NPSH limits PER ATTACHMENT (1), RCS PRESSURE TEMPERATURE LIMITS. | |||
D 1.a - Lower subcooling by ANY of the following methods: Ensures all Pressurizer HTR( s) are de-D ( 1) - De-energize Pressurizer energized. | |||
HTR(s). | |||
D (2) - IF ALL RCPs are operating, Determines step is NOT applicable. | |||
THEN ... | |||
CUE: I CRO will control the cooldown rate. | |||
D (3)- Lower the RCS cooldown CRO will control the cooldown rate. | |||
rate. | |||
D (4)- IF the overpressurization is due to HPSI/Charging flow AND Determines step is NOT applicable. | |||
HPSI throttle criteria are met. .. | |||
D (5)- Initiate AUX SPRAY as Determines step is applicable. | |||
follows: | |||
Rev. 1 Page 5of10 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded= CRITICAL STEP) 0 (a) - Place the 1-IA-2080-MOV CIS OVERRIDE switch, 1-HS- Places 1-HS-2080A in OVERRIDE. | |||
2080A, in OVERRIDE. | |||
D (b) - Open the IA CNTMT ISOL Verifies 1-IA-2080-MOV is open. | |||
valve, 1-IA-2080-MOV. | |||
CAUTION If the difference between the PZR WTR TEMP and CHG OUT TEMP is greater than 400°, then TRM 15.4.2 must be complied with. | |||
D (c) - Record the following information: Records the temperatures and informs CRS if>400° and directs US to enter TRM | |||
* PZR WTR TEMP (1-TI-101). | * PZR WTR TEMP (1-TI-101). | ||
15.4.2. | |||
* CHG OUT TEMP (1-TI-229). | * CHG OUT TEMP (1-TI-229). | ||
D (d)-Open the AUX SPRAY valve, 1-CVC-517-CV. | D (d)-Open the AUX SPRAY valve, 1-CVC-517-CV. | ||
0 (e)-Operate the LOOP CHG valves as necessary to adjust AUX SPRAY flow: | 0 (e)- Operate the LOOP CHG valves as necessary to adjust AUX SPRAY flow: | ||
* 1-CVC-518-CV | * 1-CVC-518-CV | ||
* 1-CVC-519-CV 0 (f) -Shift the PRESSURIZER | * 1-CVC-519-CV 0 (f) - Shift the PRESSURIZER SPRAY VL V CONTROLLER, Shifts l-HIC-100 to Manual. | ||
l-HIC-100, to MANUAL. | |||
D (g) - Shut the PRZR SPRAY VLVs by adjusting the output of l-HIC-100 to 0%: Places l-HIC-100 output to 0%. | |||
* 1-RC-lOOE-CV | * 1-RC-lOOE-CV | ||
* 1-RC-lOOF-CV 0 Maintain the pressurizer cooldown rate less than 200°F/hour. | * 1-RC-lOOF-CV 0 Maintain the pressurizer Monitors PZR cooldown rate to ensure cooldown rate less than | ||
<200°F/hour. | |||
Rev. 1 Page 6of10 Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT | 200°F/hour. | ||
Rev. 1 Page 6of10 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STAND ARD (shaded= CRITICAL STEP) | |||
When HPSI throttling criteria is achieved the candidate should re-open Loop Chg CUE: valves to slow the depressurization and prevent overfill of PZR. Step (e) above allows operation of these valves to control Aux Spray Flow. | |||
0 EOP-5 Step LEV ALU ATE THE NEED FOR HPSI OR LPSI THROTTLING/TERMINATION 0 1. - IF HPSI PPs are operating AND ALL of the following conditions can be maintained: | |||
* At least 30° subcooling based on CET temperatures. | * At least 30° subcooling based on CET temperatures. | ||
* Pressurizer level greater than 101 inches { 141 } . | * Pressurizer level greater than 101 inches {141 }. | ||
* At least ONE S/G available for heat removal. | * At least ONE S/G available for heat removal. | ||
* S/G level greater than (-) 170 inches. | * S/G level greater than (-) 170 inches. | ||
* Capable of being supplied with feedwater. | * Capable of being supplied with feedwater. | ||
* Capable of being steamed. | * Capable of being steamed. | ||
* Reactor Vessel level above the top of the hot leg. THEN HPSI flow may be reduced by throttling the HPSI HDR valves, or stopping the HPSI PPs one at a time, as desired, to maintain the following: | * Reactor Vessel level above the top of the hot leg. | ||
THEN HPSI flow may be reduced by throttling the HPSI HDR valves, or stopping the HPSI PPs one at a time, as desired, to maintain the following: | |||
* RCS subcooling between 30 and 140°F based on CET temperatures. | * RCS subcooling between 30 and 140°F based on CET temperatures. | ||
* Pressurizer level between 101 inches { 141 } and 180 inches { 190}. Rev. 1 Page 7of10 Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded= CRITICAL STEP) CUE: IF asked by candidate if stopping LPSI PPs is desired, then direct the securing of LPSI PPs. D 2. -IF pressurizer pressure is greater than 200 PSIA and constant OR rising, THEN the operating LPSI PPs may be stopped. | * Pressurizer level between 101 inches | ||
{141 } and 180 inches {190}. | |||
Rev. 1 Page 7of10 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded= CRITICAL STEP) | |||
CUE: IF asked by candidate if stopping LPSI PPs is desired, then direct the securing of LPSI PPs. | |||
D 2. - IF pressurizer pressure is greater than 200 PSIA and constant OR rising, Candidate may or may not secure LPSI PPs. | |||
THEN the operating LPSI PPs may be stopped. | |||
When evaluator has determined that candidate has control of subcooling and PZR CUE: level direct simulator driver to increase RCS leak to 10,000 gpm. | |||
IF CSAS actuates inform the candidate that the CRO will verify CSAS. | |||
BEGIN ALTERNATE PATH D 3. - IF HPSI or LPSI throttle criteria can NOT be maintained after the pumps are throttled or secured, THEN restart the appropriate pumps AND restore full flow. | |||
TERMINATING CUE: The JPM is complete when 11 & 13 HPSI, 11 & 12 LPSI are running and all 8 HPSI Header Valves are full open. The evaluator is expected to end the JPM. | |||
TIME STOP: - - - | |||
Rev. 1 Page 8of10 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Verification of Completion Job Performance Measure SIMULATOR-3 Examinee: | |||
NRC Examiner: | NRC Examiner: | ||
Date Performed: | Date Performed: | ||
Facility Evaluator: | Facility Evaluator: | ||
Number of Attempts: | Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Time to Complete: | |||
Follow up Question(s): - - - - - - - - - - - - - - - - - - - - - - - - | |||
Follow up Question(s): | Applicant Response: - - - - - - - - - - - - - - - - - - - - - - - - - | ||
------------------------ | Result: SAT UNSAT Examiner's Signature and Date: | ||
Applicant Response: | Rev. 1 Page 9of10 | ||
------------------------- | |||
Result: SAT UNSAT Examiner's Signature and Date: Rev. 1 Page 9of10 Appendix C | Appendix C Job Performance Measure Form ES-C-1 Worksheet EXAMINEE'S CUE SHEET Initial Conditions: | ||
Job Performance Measure Worksheet EXAMINEE'S CUE SHEET 1. Unit-I has experienced a LOCA from 100% power. | : 1. Unit-I has experienced a LOCA from 100% power. | ||
: 2. Unit-I has tripped, EOP-0 has been completed and EOP-5 has been implemented. | |||
: 3. You are performing the duties of the Reactor Operator. | : 3. You are performing the duties of the Reactor Operator. | ||
Initiating Cue: You have been directed to depressurize the RCS IA W EOP-5 Step K, and Throttle HPSI flow IA W EOP-5 Step L. Rev. 1 Page 10of10 APPLICANT: | Initiating Cue: | ||
You have been directed to depressurize the RCS IA W EOP-5 Step K, and Throttle HPSI flow IA W EOP-5 Step L. | |||
Rev. 1 Page 2of11 Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: | Rev. 1 Page 10of10 | ||
Calvert Cliffs 1 & 2 Job Performance Measure Sim-4 (Alt Path) Task Title: Restore from loss of SRW Pump. Task Number: 202.065 Respond to loss of Service Water in mode 1 or 2. KIA | |||
APPLICANT: | |||
CALVERT CLIFFS NUCLEAR POWER PLANT 2017NRC Initial Licensed Operator Exam JPM SIMULATOR-4 Rev. 1 | |||
Rev. 0 New JPM. | |||
Rev. 1 Incorporate comments from validation. | |||
Rev. 1 Page 2of11 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: Calvert Cliffs 1 & 2 Job Performance Measure Sim-4 (Alt Path) | |||
Task | |||
==Title:== | |||
Restore from loss of SRW Pump. | |||
Task Number: 202.065 Respond to loss of Service Water in mode 1 or 2. | |||
KIA | |||
==Reference:== | ==Reference:== | ||
076.A4.01 (2.9,2.9) | |||
Method of Testing: | |||
Simulated Performance: D Actual Performance: ~ | |||
Classroom: D Simulator: ~ Plant: D Read to the examinee: | |||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | |||
Initial Conditions: | |||
: 1. U-1 is operating at 100% power MOC. | |||
: 2. All systems in normal lineup. | |||
: 3. All General Precautions and Initial Conditions are met. | |||
: 4. You are performing duties of Control Room Operator. | |||
Initiating Cue: | |||
You have been directed to shift to 12 Component Cooling Pump IAW OI-16 Sect. 6.2. | |||
Task Standard: | |||
Restore a Service Water Pump to 11 header. | |||
Rev. 1 Page 3of11 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Evaluation Criteria: | |||
: 1. All critical steps completed (denoted by shading). | |||
: 2. All sequential steps completed in order. | |||
: 3. All time-critical steps completed within allotted time. | |||
: 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. | |||
Critical Step Basis: | |||
Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task. | |||
General | |||
: 1. All critical steps completed (denoted by shading). | |||
: 2. All sequential steps completed in order. 3. All time-critical steps completed within allotted time. 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. Critical Step Basis: Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task. General | |||
==References:== | ==References:== | ||
: 1. Procedures and manuals normally available in Control Room Time critical task: No Validation Time: 15 minutes Setup: 1. Reset simulator to IC-24 U-1at100% | : 1. Procedures and manuals normally available in Control Room Time critical task: | ||
Power MOC. 2. Loss of 11 SRW pump (srw003_01) on Event 1. 3. Shut 13 SRW pump to 12 SR W header valves ( 1-srw-119 | No Validation Time: | ||
& 1-srw-124) on Event 2. 4. Open 13 SRW pump to 11 SRW header valves (l-srw-117 | 15 minutes Setup: | ||
& 1-srw-122 on Event 3. 5. Ensure orange tags hanging for 13 | : 1. Reset simulator to IC-24 U-1at100% Power MOC. | ||
CAUTION Two CC Pumps SHALL NOT be operating with only one CCHX aligned for service, unless for a very short period of time as in bumping a pump or momentary pump shifting CUE: IF candidate calls ABO to check 12 CC PP ready for start inform him it is ready after short delay. After pump starts inform candidate that pump is running normally. | : 2. Loss of 11 SRW pump (srw003_01) on Event 1. | ||
0 B.2 -Start the Component Cooling pump to be placed in service. CUE: When informed oflow amps on 12 CC PP tell candidate to continue with procedure. | : 3. Shut 13 SRW pump to 12 SR W header valves ( 1-srw-119 & 1-srw-124) on Event 2. | ||
0 B.3 -CHECK the following parameters: | : 4. Open 13 SRW pump to 11 SRW header valves (l-srw-117 & 1-srw-122 on Event 3. | ||
: 5. Ensure orange tags hanging for 13 SRW PP aligned to 12 header. | |||
Rev. 1 Page 4of11 | |||
Rev. 1 Page 5of11 Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT | |||
this section. 0 B-REDUCE SRW HEAT LOAD. Determines this section is applicable. | Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded = CRITICAL STEP) | ||
TIME START: - - - - - | |||
0 OI-16 Section 6.2 SHIFTING OPERATING PUMPS 0 B.1 - IF 13 Component Cooling Pump Determines step is NOT applicable. | |||
will be started ... | |||
CAUTION Two CC Pumps SHALL NOT be operating with only one CCHX aligned for service, unless for a very short period of time as in bumping a pump or momentary pump shifting CUE: IF candidate calls ABO to check 12 CC PP ready for start inform him it is ready after short delay. After pump starts inform candidate that pump is running normally. | |||
0 B.2 - Start the Component Cooling pump to be placed in service. | |||
CUE: When informed oflow amps on 12 CC PP tell candidate to continue with procedure. | |||
0 B.3 - CHECK the following parameters: Checks 11 & 12 CC PPs ammeters 150-160 amps and CC PPS DISCH PRESS LO clear | |||
* Component Cooling Pump motor ammeters ... 150-160 amps 12 CC PP amps are low at 120, candidate should inform US. (This condition is | |||
* (1C13)"CC PPS DISCH PRESS expected, amps will rise after 11 CC PP is LO" ... clear secured) 0 B.4 - STOP the Component Cooling Pump to be removed from service CAUTION When 13 Component Cooling Pump is running, the associated Component Cooling Pump aligned to the same power supply shall be placed in PTL. This is to prevent all three pumps from running on a SIAS signal without a UV signal, which could damage the tubes ... | |||
0 B.5 - IF 13 Component Cooling Pump is Determines step is NOT applicable. | |||
runnmg ... | |||
0 B.6 - IF 13 Component Cooling Pump is Determines step is NOT applicable. | |||
runnmg ... | |||
Rev. 1 Page 5of11 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STAND ARD (shaded = CRITICAL STEP) 0 B. 7 - IF 13 Component Cooling Pump is NOT running, THEN ENSURE all Verifies no Component Cooling Pump available Component Cooling Pumps are handswitches are in PTL. | |||
in AUTO. | |||
0 B.8 - CHECK (1Cl3)"CC PPS DISCH Verifies annunciator clear. | |||
PRESS LO" annunciator clear. | |||
CUE: Once 11 CC pump is secured initiate Event 1 to trip 11 Service Water Pump. | |||
Direct candidate to diagnose cause of alarm. | |||
Direct candidate to recommend procedure, including proper section. | |||
BEGIN ALTERNATE PATH 0 1C13 alarm Window K-04 11 SRW Candidate determines 11 SRW pump has HDR PRESS LO and Kl5 SRW PPS tripped. Candidate recommends AOP-7B SIAS BLOCKED AUTO START. Section V MODES 1 OR 2. | |||
CUE: After candidate recommends AOP-7B, direct candidate to perform AOP-7B Section V. | |||
When candidate starts Section V .A inform him that the RO will perform step A. | |||
0 A. - DETERMINE IF A REACTOR Candidate informed the RO will perform TRIP IS REQUIRED. this section. | |||
0 B-REDUCE SRW HEAT LOAD. Determines this section is applicable. | |||
NOTE Reducing Main Generator Reactive Load will reduce Main Generator heating CAUTION Reducing Reactive Load on Unit 1 may cause Unit 2 Main Generator or DG limits to be exceeded. | NOTE Reducing Main Generator Reactive Load will reduce Main Generator heating CAUTION Reducing Reactive Load on Unit 1 may cause Unit 2 Main Generator or DG limits to be exceeded. | ||
CAUTION Rapid changes in Main Generator Reactive Load require coordination with the SO-TSO to minimize Electric System perturbations and alarms. Rev. 1 Page 6of11 Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded = CRITICAL STEP) CUE: When candidate calls SO-TSO to request reducing VARS on U-1 grant permission to do so. D B.1 -IF the Main Generator is paralleled, THEN coordinate with the SO-TSO to reduce the Main Generator MV ARS to zero. D B.2 -IF | CAUTION Rapid changes in Main Generator Reactive Load require coordination with the SO-TSO to minimize Electric System perturbations and alarms. | ||
Rev. 1 Page 6of11 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded = CRITICAL STEP) | |||
CUE: When candidate calls SO-TSO to request reducing VARS on U-1 grant permission to do so. | |||
D B.1 - IF the Main Generator is paralleled, THEN coordinate with the SO-TSO to reduce the Main Generator MV ARS to zero. | |||
D B.2 - IF 1B DG is affected by loss of its associated SRW header, THEN with the SM/US permission, shutdown the DG Determines step is NOT applicable. | |||
PER the appropriate procedure being used at the time of event initiation. | PER the appropriate procedure being used at the time of event initiation. | ||
CUE: When/If candidate suggests a power reduction PER OP-3, tell him it is not required at this time. D B.3 Commence power reduction PER OP-3, NORMAL POWER OPERATION, as required. | CUE: When/If candidate suggests a power reduction PER OP-3, tell him it is not required at this time. | ||
0 C-ATTEMPT TO RESTORE SRW FLOW. D C.1. -IF the loss of SRW is due to a system leak or rupture, THEN PROCEED to step D (page 13). D C.2. -IF an operating SRW PP has failed, THEN perform the following | D B.3 Commence power reduction PER OP-3, NORMAL POWER Determines step is NOT applicable. | ||
OPERATION, as required. | |||
D a. -Place the handswitch for the failed SRW pp in PULL TO LOCK. Takes 11 SRW pp HS to PTL. D b. -IF a Saltwater header is removed from service, THEN Determines step is NOT applicable. | 0 C-ATTEMPT TO RESTORE SRW FLOW. | ||
D C.1. -IF the loss of SRW is due to a Determines step is NOT applicable. | |||
system leak or rupture, THEN PROCEED to step D (page 13). (SR W Head tank levels normal) | |||
D C.2. - IF an operating SRW PP has failed, THEN perform the following Determines step is applicable. | |||
actions. | |||
D a. - Place the handswitch for the failed SRW pp in PULL TO LOCK. Takes 11 SRW pp HS to PTL. | |||
D b. - IF a Saltwater header is removed from service, THEN Determines step is NOT applicable. | |||
PROCEED to step C.2.d (pagelO). | PROCEED to step C.2.d (pagelO). | ||
Rev. 1 Page 7of11 Appendix C Job Performance Measure Worksheet Form ES-C-1 | Rev. 1 Page 7of11 | ||
When candidate calls TBO to lock shut 12 | Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded= CRITICAL STEP) | ||
* l-SRW-119 | D c. - IF the backup SRW PP is available, THEN ensure that the Determines step is applicable. | ||
backup SRW PP is mechanically aligned to the affected header. | |||
D c.l - IF 13 SRW PP needs to be Determines step is applicable. | |||
aligned to 11 SRW header, ... | |||
D ( 1) - Place the handswitch for 13 SRW PP in PULL TO LOCK. | |||
When candidate calls TBO to lock shut 12 SRW Header valves initiate Event 2 and CUE: | |||
inform candidate step is complete after 2 minute delay. | |||
D (2)-Lock shut 13 SRW Suction and Discharge valves to 11 SRW Header. | |||
Contacts the Turbine Building watch and | |||
* l-SRW-119 directs locking shut 11 SRW Header valves. | |||
* l-SRW-120 | * l-SRW-120 | ||
* l-SRW-123 | * l-SRW-123 | ||
* l-SRW-124 | * l-SRW-124 When candidate calls TBO to lock open 11 SRW Header valves initiate Event 3 and CUE: | ||
* 1-SRW-117 | inform candidate step is complete after 2 minute delay. | ||
* 1-SRW-118 | D (3)- Lock open 13 SRW Suction and Discharge valves to 11 SRW Header. Contacts the Turbine Building watch and | ||
* 1-SRW-117 directs locking open 11 SRW Header | |||
* 1-SRW-118 valves. | |||
* 1-SRW-121 | * 1-SRW-121 | ||
* 1-SRW-122 D c.2-IF 13 SRW PP needs to be aligned to 12 | * 1-SRW-122 D c.2-IF 13 SRW PP needs to be aligned to 12 SRW Header, Determines step is NOT applicable. | ||
THEN perform the following actions. | |||
Rev. 1 Page 8of11 Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT | D d. - IF 13 SRW PP is the backup SRW PP, AND POWER is NOT Determines step is NOT applicable. | ||
available to 13 SRW PP .... | |||
TERMINATING CUE: The JPM is complete when 12 SRW header press is >80 psig and candidate is checking temperatures to be stable or lowering. | Rev. 1 Page 8of11 | ||
No further actions are required. | |||
The evaluator is expected to end the JPM. TIME STOP: ---Rev. 1 Page 9of11 Appendix C Job Performance Measure Worksheet Form ES-C-1 Verification of Completion Job Performance Measure SIMULATOR-4 Examinee: | Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STAND ARD (shaded = CRITICAL STEP) | ||
CAUTION Starting a backup SRW PP without determining the cause of the failure could initiate a common mode failure D e. - Start the backup SR W PP D C.3 -IF the affected HDR PRESS is greater than or equal to 80 psig, THEN Determines step is applicable. | |||
PROCEED to step C.& (Page 12). | |||
D C.7 - WHEN BOTH HDR PRESSs are Candidate should check both board greater than 80 psig, AND component indications and the plant computer to verify temperatures are stable or lowering, temperatures are restoring. | |||
THEN restore plant systems to normal. | |||
TERMINATING CUE: The JPM is complete when 12 SRW header press is >80 psig and candidate is checking temperatures to be stable or lowering. No further actions are required. | |||
The evaluator is expected to end the JPM. | |||
TIME STOP: - - - | |||
Rev. 1 Page 9of11 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Verification of Completion Job Performance Measure SIMULATOR-4 Examinee: | |||
NRC Examiner: | NRC Examiner: | ||
Date Performed: | Date Performed: | ||
Facility Evaluator: | Facility Evaluator: | ||
Number of Attempts: | Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Time to Complete: | |||
Follow up Question(s): - - - - - - - - - - - - - - - - - - - - - - - | |||
Follow up Question(s): | Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
----------------------- | Result: SAT UNSAT Examiner's Signature and Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Applicant Response: | Rev. 1 Page 10of11 | ||
Appendix C Job Performance Measure Form ES-C-1 Worksheet EXAMINEE'S CUE SHEET Initial Conditions: | |||
: 1. U-1 is operating at 100% power MOC. | |||
Job Performance Measure Worksheet EXAMINEE'S CUE SHEET 1. U-1 is operating at 100% power MOC. 2. All systems in normal lineup. 3. All General Precautions and Initial Conditions are met. 4. You are performing duties of Control Room Operator. | : 2. All systems in normal lineup. | ||
Initiating Cue: | : 3. All General Precautions and Initial Conditions are met. | ||
: 4. You are performing duties of Control Room Operator. | |||
Initiating Cue: | |||
Rev. 2 Page 2of10 Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: | You have been directed to shift to 12 Component Cooling Pump IAW 01-16 Sect. 6.2. | ||
Calvert Cliffs 1 & 2 Job Performance Measure Sim-5 Task Title: Respond to a faulted S/G. Task Number: 201.065 Identify, Isolate and Confirm the affected Steam Generator. | Rev. 1 Page 11of11 | ||
APPLICANT: | |||
CALVERT CLIFFS NUCLEAR POWER PLANT 2017NRC Initial Licensed Operator Exam JPM SIMULATOR-5 Rev. 2 | |||
Rev. 1 Update procedures since last used in 2011. | |||
Rev. 2 Incorporate comments from validation. | |||
Rev. 2 Page 2of10 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: Calvert Cliffs 1 & 2 Job Performance Measure Sim-5 Task | |||
==Title:== | |||
Respond to a faulted S/G. | |||
Task Number: 201.065 Identify, Isolate and Confirm the affected Steam Generator. | |||
KIA | KIA | ||
==Reference:== | ==Reference:== | ||
035.A2.01 (4.5,4.6) | 035.A2.01 (4.5,4.6) | ||
Method of Testing: Simulated Performance: | Method of Testing: | ||
D | Simulated Performance: D Actual Performance:~ | ||
D Read to the examinee: | Classroom: D Simulator: ~ Plant: D Read to the examinee: | ||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | |||
Initial Conditions: | Initial Conditions: | ||
: 1. U-1 was operating at 100% power MOC. 2. A plant transient and manual Reactor trip have occurred. | : 1. U-1 was operating at 100% power MOC. | ||
: 3. EOP-4 has been implemented. | : 2. A plant transient and manual Reactor trip have occurred. | ||
: 3. EOP-4 has been implemented. | |||
: 4. You are performing the duties of the Reactor Operator. | : 4. You are performing the duties of the Reactor Operator. | ||
Initiating Cue: The CRS directs you to perform RCP Trip Strategy IA W EOP-4 step E. Task Standard: | Initiating Cue: | ||
Determines wrong SIG was isolated, restores feeding and steaming to 11 S/G, and isolates 12 S/G. Rev. 2 Page 3of10 Appendix C Job Performance Measure Worksheet Form ES-C-1 Evaluation Criteria: | The CRS directs you to perform RCP Trip Strategy IA W EOP-4 step E. | ||
: 1. All critical steps completed (denoted by shading). | Task Standard: | ||
: 2. All sequential steps completed in order. 3. All time-critical steps completed within allotted time. 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. Critical Step Basis: Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task. General | Determines wrong SIG was isolated, restores feeding and steaming to 11 S/G, and isolates 12 S/G. | ||
Rev. 2 Page 3of10 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Evaluation Criteria: | |||
: 1. All critical steps completed (denoted by shading). | |||
: 2. All sequential steps completed in order. | |||
: 3. All time-critical steps completed within allotted time. | |||
: 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. | |||
Critical Step Basis: | |||
Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task. | |||
General | |||
==References:== | ==References:== | ||
: 1. Procedures and manuals normally available in Control Room Time critical task: No Validation Time: 15 minutes Setup: 1. Reset simulator to IC-24 U-1 at 100% Power MOC. 2. Place an off-normal pink ring next to the '11 Steam Generator' sign (under 11 S/G level safety channels). | : 1. Procedures and manuals normally available in Control Room Time critical task: | ||
: 3. Enter following malfunctions at time zero: a) MS010_02 10% leak, 12 Steam generator rupture in containment. | No Validation Time: | ||
b) AFW006-01, Failure of AFAS block. c) AFW006-02, Failure of AFAS block. d) AFW006-03, Failure of AFAS block. e) AFW006-04, Failure of AF AS block. 4. Place simulator in Run. 5. When containment pressure high pre-trip alarm actuates, manually trip the unit. 6. Stop all RCPs. 7. Isolate Letdown. 8. Start 13 AFW pump. 9. Isolate 11 S/G per EOP-4 step H. Rev.2 Page 4of10 Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT TIME START: ----D EOP-4 Step E. -PERFORM THE RCP TRIP STRATEGY NOTE | 15 minutes Setup: | ||
: 1. Reset simulator to IC-24 U-1 at 100% Power MOC. | |||
: 2. Place an off-normal pink ring next to the '11 Steam Generator' sign (under 11 S/G level safety channels). | |||
: 3. Enter following malfunctions at time zero: | |||
a) MS010_02 10% leak, 12 Steam generator rupture in containment. | |||
b) AFW006-01, Failure of AFAS block. | |||
c) AFW006-02, Failure of AFAS block. | |||
d) AFW006-03, Failure of AFAS block. | |||
e) AFW006-04, Failure of AF AS block. | |||
: 4. Place simulator in Run. | |||
: 5. When containment pressure high pre-trip alarm actuates, manually trip the unit. | |||
: 6. Stop all RCPs. | |||
: 7. Isolate Letdown. | |||
: 8. Start 13 AFW pump. | |||
: 9. Isolate 11 S/G per EOP-4 step H. | |||
Rev.2 Page 4of10 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded= CRITICAL STEP) | |||
TIME START: - - - - | |||
D EOP-4 Step E. - PERFORM THE RCP TRIP STRATEGY NOTE Subsequent operations to depressurize the plant under control are NOT considered a result of the event. | |||
D E.1 - IF RCS pressure drops to 1725 PSIA as a result of the event, THEN trip RCPs so EITHER of the following pairs are Determines step is NOT applicable. | |||
remaining: | |||
* 1 lA and 12B RCPs. | * 1 lA and 12B RCPs. | ||
* 1 lB and 12A RCPs. E.2 -IF CIS has actuated, OR Component Cooling flow can NOT be verified to the RCPs, THEN trip ALL RCPs. E.3 -IF RCS pressure drops below the minimum pump operating limits PER ATTACHMENT (1 ), RCS PRESSURE | * 1 lB and 12A RCPs. | ||
D E.2 - IF CIS has actuated, OR Component Determines step is applicable. | |||
Cooling flow can NOT be verified to the RCPs, THEN trip ALL RCPs. Verifies all RCP's are secured. | |||
CUE: The CRS directs you to peer check the CRO by verifying the most affected SIG was isolated per EOP-4 Block Step H.3. D H.3 -Verify the most affected SIG was isolated by checking the following: | D E.3 - IF RCS pressure drops below the minimum pump operating limits PER ATTACHMENT (1 ), RCS PRESSURE Determines step is NOT applicable. | ||
TEMPERATURE LIMITS, THEN trip ALLRCPs. | |||
CUE: The CRS directs you to peer check the CRO by verifying the most affected SIG was isolated per EOP-4 Block Step H.3. | |||
D H.3 - Verify the most affected SIG was isolated by checking the following: | |||
* SIG pressure lower for the affected SIG. | * SIG pressure lower for the affected SIG. | ||
* SIG level lowering for the affected SIG and stabilized for the unaffected SIG. | * SIG level lowering for the affected SIG and stabilized for the unaffected SIG. | ||
* RCS loop Tcold lower in the affected loop. Rev. 2 Page 5of10 Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded = CRITICAL STEP) CUE: The candidate may report that the wrong S/G was isolated. | * RCS loop Tcold lower in the affected loop. | ||
The evaluator should acknowledge the report and give cue to "continue with the procedure". | Rev. 2 Page 5of10 | ||
0 3 .1 -IF the wrong S/G was isolated, THEN perform the following actions: | |||
CAUTION Severe waterhammer may result if Main Feedwater is restored after it has been stopped for greater than 80 minutes. CUE: If asked how long main feed water flow has been lost tell the candidate "The plant was tripped 20 minutes ago". 0 a. -Restore feeding and steaming capability to the least affected S/G. 0 H.2 -Isolate the affected S/G. 0 a. -IF 11 S/G is the affected S/G, THEN isolate 11 S/G by performing the following actions | Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded = CRITICAL STEP) | ||
CUE: The candidate may report that the wrong S/G was isolated. The evaluator should acknowledge the report and give cue to "continue with the procedure". | |||
Rev. 2 Page 6of10 Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT D b. -IF 12 S/G is the affected S/G, THEN isolate 12 S/G by performing the following actions: D (1) -Shut 12 ADV using the Hand Transfer Valves on the West wall of the Unit 1 45 ft Switchgear Room as follows: (a) IF 12 ADV was locally operated, THEN remove the manual override. (b) Verify 12 ADV controller, 1-HC-4056B, at | 0 3 .1 - IF the wrong S/G was isolated, Determines step is applicable. | ||
THEN perform the following actions: | |||
CAUTION Severe waterhammer may result if Main Feedwater is restored after it has been stopped for greater than 80 minutes. | |||
CUE: If asked how long main feed water flow has been lost tell the candidate "The plant was tripped 20 minutes ago". | |||
0 a. - Restore feeding and steaming The candidate will at a minimum: | |||
capability to the least affected S/G. Restore Steaming: | |||
Restore feeding: | |||
1 Place 1-MS-4070-CV HS in Open or Auto. | |||
0 H.2 - Isolate the affected S/G. | |||
0 a. - IF 11 S/G is the affected S/G, Determines step is NOT applicable. | |||
THEN isolate 11 S/G by performing the following actions: | |||
Rev. 2 Page 6of10 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded= CRITICAL STEP) | |||
D b. - IF 12 S/G is the affected S/G, THEN isolate 12 S/G by performing Determines step is applicable. | |||
the following actions: | |||
D (1) - Shut 12 ADV using the Hand Transfer Valves on the West wall of the Unit 1 45 ft Switchgear Room as follows: | |||
(a) IF 12 ADV was locally operated, THEN remove the Candidate directs the TBO to 'Align 12 manual override. ADV to 1C43 with a zero percent output' or similar. | |||
(b) Verify 12 ADV controller, 1-HC-4056B, at 1C43 is set at The candidate may alternatively direct 0% output. EOP-4 step numbers. | |||
(c) Align 12 S/G Hand Transfer Valves to 1C43 (POSITION 2): | |||
* 1-HV-3939A | * 1-HV-3939A | ||
* 1-HV-3939B | * 1-HV-3939B D (2)- Verify 12 SG FW ISOL valve Verifies 1-FW-4517-MOV is shut. | ||
1-FW-4517-MOV, is shut. (Valve may be shut at this point due to ESF AS actuations) 0 (3)- Verify 12 MSIV BYP valve, Verifies 1-MS-4052-MOV is shut. | |||
1-MS-4052-MOV, is shut. | |||
0 (4) - Shut 12 S/G BID valves: | |||
* 1-BD-4012-CV | * 1-BD-4012-CV | ||
* 1-BD-4013-CV 0 (5)-Shut 12 SG AFW STM SUPP & BYPASS valves, 1-MS-4071-CV and 1-MS-4071A-CV. | * 1-BD-4013-CV 0 (5)- Shut 12 SG AFW STM SUPP | ||
& BYPASS valves, 1-MS-4071-CV and 1-MS-4071A-CV. | |||
Rev. 2 Page 7of10 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT 0 (6)- Shut 12 SIG AFW BLOCK valves by placing the handswitches in SHUT: | |||
* l-AFW-4530-CV | * l-AFW-4530-CV | ||
* l-AFW-4531-CV | * l-AFW-4531-CV | ||
* 1-AFW-4532-CV | * 1-AFW-4532-CV | ||
* 1-AFW-4533-CV (7) -Shut the MS UPSTREAM DRN ISOL VL VS by placing handswitch l-HS-6622 in CLOSE. (8) -Observe locally, the SIG | * 1-AFW-4533-CV 0 (7) - Shut the MS UPSTREAM Checks 1-HS-6622 in close. | ||
DRN ISOL VL VS by placing handswitch l-HS-6622 in CLOSE. (valve closed from isolation of 11 SIG) 0 (8) - Observe locally, the SIG Candidate directs an operator to check for Safety Valves are NOT leaking. leaking SIG safety valves. | |||
TERMINATING CUE: This JPM is complete when the operator determines the wrong SIG was isolated, restores feeding and steaming to 11 SIG, and isolates 12 SIG. The evaluator is expected to end this JPM. | |||
TIME STOP: - - - | |||
Rev. 2 Page 8of10 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Verification of Completion Job Performance Measure SIMULATOR-5 Examinee: | |||
NRC Examiner: | NRC Examiner: | ||
Date Performed: | Date Performed: | ||
Facility Evaluator: | Facility Evaluator: | ||
Number of Attempts: | Number of Attempts: - - - - - - - - - - - - - - - - | ||
---------------- | |||
Time to Complete: | Time to Complete: | ||
Applicant | Applicant R e s p o n s e : - - - - - - - - - - - - - - - - - - - - - - - - | ||
Result: SAT UNSAT Examiner's Signature and Date: -------------------- | Result: SAT UNSAT Examiner's Signature and Date: - - - - - - - - - - - - - - - - - - - - | ||
Rev. 2 Page 9of10 Appendix C | Rev. 2 Page 9of10 | ||
Job Performance Measure Worksheet EXAMINEE'S CUE SHEET 1. U-1 was operating at 100% power MOC 2. A plant transient and manual Reactor trip have occurred. | |||
: 3. EOP-4 has been implemented. | Appendix C Job Performance Measure Form ES-C-1 Worksheet EXAMINEE'S CUE SHEET Initial Conditions: | ||
: 1. U-1 was operating at 100% power MOC | |||
: 2. A plant transient and manual Reactor trip have occurred. | |||
: 3. EOP-4 has been implemented. | |||
: 4. You are performing the duties of the Reactor Operator. | : 4. You are performing the duties of the Reactor Operator. | ||
Initiating Cue: The CRS directs you to perform RCP Trip Strategy IA W EOP-4 step E. | Initiating Cue: | ||
The CRS directs you to perform RCP Trip Strategy IA W EOP-4 step E. | |||
Rev. 1 Page 2of10 Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: | Rev. 2 Page 10of10 | ||
Calvert Cliffs 1 & 2 Job Performance Measure Sim-6 Task Title: Shift 13 IRU Power Supply. Task Number: 004.012 Transfer power supplies. | |||
APPLICANT: _ _ __ | |||
CALVERT CLIFFS NUCLEAR POWER PLANT 2017NRC Initial Licensed Operator Exam JPM SIMULATOR-6 Rev. 1 | |||
Rev. 0 New JPM Rev. 1 Incorporated comments from validation. | |||
Rev. 1 Page 2of10 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: Calvert Cliffs 1 & 2 Job Performance Measure Sim-6 Task | |||
==Title:== | |||
Shift 13 IRU Power Supply. | |||
Task Number: 004.012 Transfer power supplies. | |||
KIA | KIA | ||
==Reference:== | ==Reference:== | ||
027.A4.01 (3.3, 3.3) | |||
Method of Testing: | |||
Simulated Performance: D Actual Performance:~ | |||
Classroom: D Simulator: ~ Plant: D Read to the examinee: | |||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | |||
Initial Conditions: | |||
: 1. Unit 1 is in Mode 1 100 % MOC. | |||
: 2. Maintenance completed on 13 IRU 11 B 480V breaker. | |||
: 3. All General Precautions and Initial Conditions are met. | |||
: 4. You are performing duties as the Control Room Operator. | |||
Initiating Cue: | |||
The CRS directs shifting 13 IRU tol lB 480V bus IAW OI-5B Section 6.3and performance of a breaker operation check IA W OI-5B Section 6.1. | |||
Task Standard: | |||
The candidate will shift power supplies for 13 IRU, then start and stop 13 IRU. | |||
Rev. 1 Page 3of10 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Evaluation Criteria: | |||
: 1. All critical steps completed (denoted by shading). | |||
: 2. All sequential steps completed in order. | |||
: 3. All time-critical steps completed within allotted time. | |||
: 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. | |||
Critical Step Basis: | |||
Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task. | |||
General | |||
: 1. All critical steps completed (denoted by shading). | |||
: 2. All sequential steps completed in order. 3. All time-critical steps completed within allotted time. 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. Critical Step Basis: Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task. General | |||
==References:== | ==References:== | ||
: 1. Procedures and manuals normally available in Control Room Time critical task: No Validation Time: 10 minutes Setup: 1. Reset to IC-24 2. Place simulator in run 3. Ensure 13 IRU is aligned to 14B 480V bus. Rev. 1 Page 4of10 Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT TIME START: ---0 OI-5B Section 6.3 SHIFTING 13 CONTAINMENT IODINE REMOVAL UNIT POWER SUPPLY FROM 14B 480V BUS TO 1lB480V BUS. | : 1. Procedures and manuals normally available in Control Room Time critical task: | ||
0 B.5 -INSERT key from step 3 in 11 BUS DISC IODINE FIL T !# keyswitch 1-HS-5297A at lClO AND PLACE keyswitch to CLOSE. | No Validation Time: | ||
Rev. 1 Page 5of10 Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded= CRITICAL STEP) D B.6-PLACE 13 IODINE FILT FAN handswitch in normal, AND CHECK the following: | 10 minutes Setup: | ||
* "13 CNTME FILT SIAS D Place 13 IRU Handswitch in normal BLOCKED AUTO START" and verifies alarm clears and green alarm is clear. light is lit. | : 1. Reset to IC-24 | ||
: 2. Place simulator in run | |||
: 3. Ensure 13 IRU is aligned to 14B 480V bus. | |||
Rev. 1 Page 4of10 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded= CRITICAL STEP) | |||
TIME START: - - - | |||
0 OI-5B Section 6.3 SHIFTING 13 CONTAINMENT IODINE REMOVAL 0 Identifies correct section of UNIT POWER SUPPLY FROM 14B procedure to use. | |||
480V BUS TO 1lB480V BUS. | |||
NOTE The preferred lineup for 13 CNTMT Iodine Removal Unit is 1lB480V Bus. | |||
Candidate should notify CRS to enter Tech Spec 3.6.8. Acknowledge report and CUE: | |||
confirm entering TS. | |||
0 B.1. - IF plant is in Mode 1,2,3,4, 0 Notifies CRS to enter TS 3.6.8. | |||
THEN ENTER TS 3.6.8. | |||
0 B.2-PLACE 13 IODINE FILT FAN handswitch l-HS-5297 in PULL-TO- 0 Places 1-HS-5297 in PTL and checks LOCK at lClO, AND CHECK that "13 alarm at 1C09. | |||
CNTMT FILT SIAS BLOCK AUTO START" alarm is present on 1C09 0 B.3 - PLACE 14 BUS DISC IODINE FILT !# keyswitch 1-HS-5297B in OPEN at 1 ClO AND REMOVE key. | |||
0 B.4- CHECK 14 BUS green light is off above 13 IODINE FILT FAN handswitch. | |||
0 B.5 - INSERT key from step 3 in 11 BUS DISC IODINE FIL T !# keyswitch 1-HS-5297A at lClO AND PLACE keyswitch to CLOSE. | |||
NOTE Fan handswitches spring return to "normal" from either START or STOP. The "normal" position is unmarked and lies between START and STOP on each handswitch. | |||
Rev. 1 Page 5of10 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded= CRITICAL STEP) | |||
D B.6-PLACE 13 IODINE FILT FAN handswitch in normal, AND CHECK the following: | |||
* "13 CNTME FILT SIAS D Place 13 IRU Handswitch in normal BLOCKED AUTO START" and verifies alarm clears and green alarm is clear. light is lit. | |||
* 11 BUS green light is on above 13 IODINE FILT FAN handswitch. | * 11 BUS green light is on above 13 IODINE FILT FAN handswitch. | ||
CUE: When notified to exit TS 3.6.8 acknowledge the report. D B.7 -IF plant is in Mode 1,2,3,4, D Notifies CRS to exit TS 3.6.8. THEN EXIT TS 3.6.8. D OI-5B Section 6.1 MANUAL D Identifies correct section of OPERATION OF CONTAINMENT procedure to use. IODINE REMOVAL UNITS. CAUTION Containment Iodine Removal Unit operation is undesirable whenever paint fumes are present in containment, due to the effect these have on the charcoal filters. | CUE: When notified to exit TS 3.6.8 acknowledge the report. | ||
D B.7 -IF plant is in Mode 1,2,3,4, D Notifies CRS to exit TS 3.6.8. | |||
Rev. 1 Page 6of10 Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded= CRITICAL STEP) NOTE Fan handswitches spring return to "normal" from either START or STOP. The "normal" position is unmarked and lies between START and STOP on each handswitch. | THEN EXIT TS 3.6.8. | ||
0 B.3 -MOMENTARILY PLACE handswitch for selected unit in START, AND ENSURE that it returns to normal when released: | D OI-5B Section 6.1 MANUAL D Identifies correct section of OPERATION OF CONTAINMENT procedure to use. | ||
* 13 IODINE FILT FAN (at 1C10) ...... l-HS-5297 0 B.4 -CHECK that red light is on above selected fan handswitch (indicating that fan is energized). | IODINE REMOVAL UNITS. | ||
CAUTION Containment Iodine Removal Unit operation is undesirable whenever paint fumes are present in containment, due to the effect these have on the charcoal filters. | |||
0 B.5 -RECORD date and time filter was started in the Charcoal Filter Log for unit placed in service. NOTE | IF candidate asks if any painting has taken place in containment tell him that CUE: U-1 has been at 100% power for past 3 months. | ||
0 C.1 -MOMENTARILY PLACE handswitch for selected unit in STOP, AND ENSUREthat it returns to normal when released: | D B.l - IF paint fumes are present from Minor Painting PER MN-3-100, Safety Related and Controlled D Determines this step is NOT Protective Coatings, THEN applicable. | ||
* 13 IODINE FILT FAN (at lClO) ...... l-HS-5297 0 C.2 -CHECK that green light is on above selected fan handswitch. (indicating that fan is de-energized). | CONSIDER NOT running any Containment Iodine Removal Unit. | ||
D B.2 - IF paint fumes are present from Major Painting PER MN-3-100, Safety Related and Controlled D Determines this step is NOT Protective Coatings, THEN applicable. | |||
D C.3 -RECORD date and time filter D Candidate ensures date and time is was started in the Charcoal Filter Log logged in Charcoal Filter log. for unit placed in service. D C.4 -IF any units just secured were operated while paint fumes were D Determines this step is NOT | DECLARE any Containment Iodine Removal Unit to be started inoperable, PER TS 3.6.8. | ||
tested PER TS 3.6.8 on any affected units. Terminating Cue: This JPM is complete when the candidate shifts power supply and performs break operation check for 13 IRU. The candidate is expected to end the JPM. TIME STOP: Rev. 1 Page 8of10 Appendix C Job Performance Measure Worksheet Form ES-C-1 Verification of Completion Job Performance Measure SIMULATOR-6 Examinee: | Rev. 1 Page 6of10 | ||
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded= CRITICAL STEP) | |||
NOTE Fan handswitches spring return to "normal" from either START or STOP. The "normal" position is unmarked and lies between START and STOP on each handswitch. | |||
0 B.3 - MOMENTARILY PLACE handswitch for selected unit in START, AND ENSURE that it returns to normal when released: | |||
* 13 IODINE FILT FAN (at 1C10) ...... l-HS-5297 0 B.4 - CHECK that red light is on above selected fan handswitch 0 Checks red light is lit. | |||
(indicating that fan is energized). | |||
When candidate prepares to log in service time to Charcoal Filter log inform CUE: candidate that extra licensed operator will take care of the logging requirement. | |||
0 B.5 - RECORD date and time filter 0 Candidate ensures date and time is was started in the Charcoal Filter Log logged in Charcoal Filter log. | |||
for unit placed in service. | |||
NOTE Fan handswitches spring return to "normal" from either START or STOP. The "normal" position is unmarked and lies between START and STOP on each handswitch. | |||
0 C.1 - MOMENTARILY PLACE handswitch for selected unit in STOP, AND ENSUREthat it returns to normal when released: | |||
* 13 IODINE FILT FAN (at lClO) ...... l-HS-5297 0 C.2 - CHECK that green light is on above selected fan handswitch. 0 Checks green light is lit. | |||
(indicating that fan is de-energized). | |||
Rev. 1 Page 7of10 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STAND ARD (shaded = CRITICAL STEP) | |||
When candidate prepares to log in service time to Charcoal Filter log inform CUE: candidate that extra licensed operator will take care of the logging requirement. | |||
D C.3 - RECORD date and time filter D Candidate ensures date and time is was started in the Charcoal Filter Log logged in Charcoal Filter log. | |||
for unit placed in service. | |||
D C.4 - IF any units just secured were operated while paint fumes were present from Major Painting, THEN D Determines this step is NOT DIRECT that charcoal filters be applicable. | |||
tested PER TS 3.6.8 on any affected units. | |||
Terminating Cue: This JPM is complete when the candidate shifts power supply and performs break operation check for 13 IRU. The candidate is expected to end the JPM. | |||
TIME STOP: | |||
Rev. 1 Page 8of10 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Verification of Completion Job Performance Measure SIMULATOR-6 Examinee: | |||
NRC Examiner: | NRC Examiner: | ||
Date Performed: | Date Performed: | ||
Facility Evaluator: | Facility Evaluator: | ||
Number of Attempts: | Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Time to Complete: | |||
Follow up Question(s): ----------------------~ | |||
Follow up Question(s): | Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Applicant Response: | Result: SAT UNSAT Examiner's Signature and Date: - - - - - - - - - - - - - - - - - - - - | ||
Rev. 1 Page 9of10 | |||
Rev. 1 Page 9of10 Appendix C | Appendix C Job Performance Measure Form ES-C-1 Worksheet EXAMINEE'S CUE SHEET Initial Conditions: | ||
Job Performance Measure Worksheet EXAMINEE'S CUE SHEET 1. Unit 1 is in Mode 1 100 % MOC. 2. Maintenance completed on 13 IRU 11 B 480V breaker. 3. All General Precautions and Initial Conditions are met. 4. You are performing duties as the Control Room Operator. | : 1. Unit 1 is in Mode 1 100 % MOC. | ||
Initiating Cue: | : 2. Maintenance completed on 13 IRU 11 B 480V breaker. | ||
: 3. All General Precautions and Initial Conditions are met. | |||
Calvert Cliffs 1 & 2 Job Performance Measure Sim-7 Task Title: Energize a 480V Load Center. Task Number: 005/006.002 Energize double ended load center from a service transformer. | : 4. You are performing duties as the Control Room Operator. | ||
Initiating Cue: | |||
The CRS directs shifting 13 IRU tol lB 480V bus IA W OI-5B Section 6.3and performance of a breaker operation check IA W OI-5B Section 6.1. | |||
Rev. 1 Page 10of10 | |||
APPLICANT: | |||
CALVERT CLIFFS NUCLEAR POWER PLANT 2017NRC Initial Licensed Operator Exam JPM SIMULATOR-7 Rev. 1 | |||
Rev. 0 New JPM Rev. 1 Incorporate comments from validation Rev. 1 Page 2of8 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: Calvert Cliffs 1 & 2 Job Performance Measure Sim-7 Task | |||
==Title:== | |||
Energize a 480V Load Center. | |||
Task Number: 005/006.002 Energize double ended load center from a service transformer. | |||
KIA | KIA | ||
==Reference:== | ==Reference:== | ||
062.A4.0l (3.1, 3.4) | |||
Method of Testing: | |||
Simulated Performance: 0 Actual Performance:~ | |||
Classroom: 0 Simulator: ~ Plant: 0 Read to the examinee: | |||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | |||
Initial Conditions: | |||
: 1. Unit 1 is in Mode 1 100 % MOC. | |||
: 2. Maintenance/Testing completed on U440-l 3A. | |||
: 3. General Precautions and Initial Conditions are met. | |||
: 4. All required briefs have been performed. | |||
: 5. You are performing duties as the Control Room Operator. | |||
Initiating Cue: | |||
The US directs energizing 13A 480V bus from its service transformer IA W OI 27C Section 6.12 and OI-27-D-l Section 6.7. | |||
Task Standard: | |||
The candidate will energize bus from its service transformer and open tie breaker. | |||
Rev. 1 Page 3 of8 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Evaluation Criteria: | |||
: 1. All critical steps completed (denoted by shading). | |||
: 2. All sequential steps completed in order. | |||
: 3. All time-critical steps completed within allotted time. | |||
: 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. | |||
Critical Step Basis: | |||
Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task. | |||
General | |||
: 1. All critical steps completed (denoted by shading). | |||
: 2. All sequential steps completed in order. 3. All time-critical steps completed within allotted time. 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. Critical Step Basis: Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task. General | |||
==References:== | ==References:== | ||
: 1. Procedures and manuals normally available in Control Room 2. OI-27D-1 Station Power 480 Volt System Time critical task: No Validation Time: 15 minutes Setup: 1. Reset to IC-24. 2. Place simulator in run. 3. Shut 13A-13B Bus Tie Breaker using l-CS-1312. | : 1. Procedures and manuals normally available in Control Room | ||
: 4. Open 13A 480V Bus Feeder breaker using 1-CS-1301, leave H/S not in PTL with "off normal" pink ring on H/S. 5. Open U440-13A 4KV feeder using 1-CS-152-1310, leave H/S not in PTL with "off normal" pink ring on H/S. Rev. 1 Page 4of8 Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded= CRITICAL STEP) TIME START: ---0 OI-27C Section 6.12 ENERGIZING A 4160/480N TRANSFORMER. | : 2. OI-27D-1 Station Power 480 Volt System Time critical task: | ||
No Validation Time: | |||
15 minutes Setup: | |||
: 1. Reset to IC-24. | |||
: 2. Place simulator in run. | |||
: 3. Shut 13A-13B Bus Tie Breaker using l-CS-1312. | |||
: 4. Open 13A 480V Bus Feeder breaker using 1-CS-1301, leave H/S not in PTL with "off normal" pink ring on H/S. | |||
: 5. Open U440-13A 4KV feeder using 1-CS-152-1310, leave H/S not in PTL with "off normal" pink ring on H/S. | |||
Rev. 1 Page 4of8 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded= CRITICAL STEP) | |||
TIME START: - - - | |||
0 OI-27C Section 6.12 ENERGIZING A I~entifies correct section of procedure to 4160/480N TRANSFORMER. use. | |||
0 B.1-Momentarily PLACE the 4160/480V transformer feeder breaker control switch in the CLOSE position. | 0 B.1-Momentarily PLACE the 4160/480V transformer feeder breaker control switch in the CLOSE position. | ||
IF candidate calls TBO to check on transformer, report that transformer appears CUE: | |||
0 OI-27D-1 Section 6.7 -ENERGIZING A DOUBLE ENDED LOAD CENTER FROM ITS ASSOCIATED SERVICE TRANSFORMER. | normal, 0 B.2 - OBSERVE breaker CLOSED Observes red light lit for breaker 152-indication. 1310. | ||
CAUTION | 0 OI-27D-1 Section 6.7 - ENERGIZING A DOUBLE ENDED LOAD CENTER Identifies correct section of procedure to FROM ITS ASSOCIATED SERVICE use. | ||
0 B.1. -IF power is NOT available, THEN REFER to OI-27C, 4.16KV SYSTEM. 0 B.2 -CHECK the associated transformer supply breaker is SHUT AND all alarms clear on that transformer. | TRANSFORMER. | ||
0 B.3 -CLOSE the normal feeder breaker with the control switch. 0 B.4 -VERIFY normal breaker closed | CAUTION Attempts should NOT be made to re-energize a bus if a fault is suspected. | ||
0 B.1. - IF power is NOT available, THEN REFER to OI-27C, 4.16KV Determines step is NOT applicable. | |||
SYSTEM. | |||
D B.6 -Verify potential indicating light is illuminated. | 0 B.2 - CHECK the associated transformer supply breaker is SHUT Checks breaker 152-1310, previously AND all alarms clear on that shut in OI-27C is shut. | ||
D B.7 -IF bus voltage is NOT between 445 and 510 volts on each phase, THEN REFER to OI-28, | transformer. | ||
Total current drawn must be maintained less than 1200 amps. | 0 B.3 - CLOSE the normal feeder breaker with the control switch. | ||
D B.8 -RESTORE_loads which may have been shed while the Load Center was tied. D B.8.a -Close out the associated | 0 B.4 - VERIFY normal breaker closed Checks red light is on. | ||
indication. | |||
Terminating Cue: This JPM is complete when the candidate energizes 13A 480V Bus from normal feed with tie breaker opened. The candidate is expected to end the JPM. TIME STOP: ---Rev. 1 Page 6of8 Appendix C Job Performance Measure Worksheet Form ES-C-1 Verification of Completion Job Performance Measure SIMULATOR-7 Examinee: | NOTE There are two bus tie breakers between Load Centers 15 and 25. | ||
Rev. 1 Page 5of8 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT D B.5 - VERIFY OPEN the bus tie breaker(s). | |||
D B.6 - Verify potential indicating light Checks white light on. | |||
is illuminated. | |||
D B.7 -IF bus voltage is NOT between 445 and 510 volts on each phase, THEN REFER to OI-28, Determines step is NOT applicable. | |||
OPERATION OF 500 KV SWITCHYARD. | |||
NOTE Total current drawn must be maintained less than 1200 amps. | |||
Inform candidate that no loads were shed when tying the busses and no CUE: Control Manipulation Form (now known as an Abnormal Component Position Sheet) was generated. | |||
D B.8 - RESTORE_loads which may have been shed while the Load Determines step is NOT applicable. | |||
Center was tied. | |||
D B.8.a - Close out the associated Determines step is NOT applicable. | |||
Control Manipulation Form. | |||
Terminating Cue: This JPM is complete when the candidate energizes 13A 480V Bus from normal feed with tie breaker opened. The candidate is expected to end the JPM. | |||
TIME STOP: - - - | |||
Rev. 1 Page 6of8 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Verification of Completion Job Performance Measure SIMULATOR-7 Examinee: | |||
NRC Examiner: | NRC Examiner: | ||
Date Performed: | Date Performed: | ||
Facility Evaluator: | Facility Evaluator: | ||
Number of Attempts: | Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Time to Complete: | |||
Follow up Question(s): - - - - - - - - - - - - - - - - - - - - - - - | |||
Follow up Question(s): | Applicant R e s p o n s e : - - - - - - - - - - - - - - - - - - - - - - - - | ||
----------------------- | Result: SAT UNSAT Examiner's Signature and Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Applicant | Rev. 1 Page 7 of8 | ||
Result: SAT UNSAT Examiner's Signature and Date: | |||
Appendix C Job Performance Measure Form ES-C-1 Worksheet EXAMINEE'S CUE SHEET Initial Conditions: | |||
Job Performance Measure Worksheet EXAMINEE'S CUE SHEET 1. Unit 1 is in Mode 1 100 % MOC 2. Maintenance/Testing completed on U440-13A. | : 1. Unit 1 is in Mode 1 100 % MOC | ||
: 3. General Precautions and Initial Conditions are met. 4. All required briefs have been performed. | : 2. Maintenance/Testing completed on U440-13A. | ||
: 3. General Precautions and Initial Conditions are met. | |||
: 4. All required briefs have been performed. | |||
: 5. You are performing duties as the Control Room Operator. | : 5. You are performing duties as the Control Room Operator. | ||
Initiating Cue: | Initiating Cue: | ||
The US directs energizing 13A 480V bus from its service transformer IA W OI 27C Section 6.12 and OI-27-D-1 Section 6.7. | |||
Calvert Cliffs 1 & 2 Job Performance Measure Plant-I Task Title: Control Steam Flow from ADV's locally. Task Number: 204.097 KIA | Rev. 1 Page 8 of8 | ||
APPLICANT: | |||
CALVERT CLIFFS NUCLEAR POWER PLANT 2017NRC Initial Licensed Operator Exam JPM Plant-1 Rev. 0 | |||
I Rev. 0 I New JPM. | |||
Rev. 0 Page 2of8 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: Calvert Cliffs 1 & 2 Job Performance Measure Plant-I Task | |||
==Title:== | |||
Control Steam Flow from ADV's locally. | |||
Task Number: 204.097 KIA | |||
==Reference:== | ==Reference:== | ||
039.A2.04 (3.4,3.7) | 039.A2.04 (3.4,3.7) | ||
Method of Testing: Simulated Performance: Classroom: | Method of Testing: | ||
Simulated Performance: ~ Actual Performance: D Classroom: D Simulator: D Plant: ~ | |||
Read to the examinee: | |||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | |||
Initial Conditions: | Initial Conditions: | ||
I. Unit-I was at 100% power. 2. 11 Atmospheric Dump Valves has failed open. 3. Control Room staff has implemented AOP-7K Overcooling Event. 4. Manual operation of 1C03 ADV Controller did not shut the ADV. 5. You are performing the duties of an extra licensed operator. | I. Unit-I was at 100% power. | ||
Initiating Cue: You have been directed to shut 11 ADV in controlled fashion from | : 2. 11 Atmospheric Dump Valves has failed open. | ||
Correctly takes local control of 11 ADV and shuts it as directed by Control Room. Rev.O Page 3of8 Appendix C Job Performance Measure Worksheet Form ES-C-1 Evaluation Criteria: | : 3. Control Room staff has implemented AOP-7K Overcooling Event. | ||
: 1. All critical steps completed (denoted by shading). | : 4. Manual operation of 1C03 ADV Controller did not shut the ADV. | ||
: 2. All sequential steps completed in order. 3. All time-critical steps completed within allotted time. 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. Critical Step Basis: Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task. General | : 5. You are performing the duties of an extra licensed operator. | ||
Initiating Cue: | |||
You have been directed to shut 11 ADV in controlled fashion from 1C43 IA W AOP-7K Step D.3 Task Standard: | |||
Correctly takes local control of 11 ADV and shuts it as directed by Control Room. | |||
Rev.O Page 3of8 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Evaluation Criteria: | |||
: 1. All critical steps completed (denoted by shading). | |||
: 2. All sequential steps completed in order. | |||
: 3. All time-critical steps completed within allotted time. | |||
: 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. | |||
Critical Step Basis: | |||
Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task. | |||
General | |||
==References:== | ==References:== | ||
: 1. Procedures and manuals normally available in Plant Time critical task: Yes Validation Time: 15 minutes Setup: 1. None Rev. 0 Page 4of8 Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded = CRITICAL STEP) STANDARD | : 1. Procedures and manuals normally available in Plant Time critical task: | ||
Yes Validation Time: | |||
15 minutes Setup: | |||
: 1. None Rev. 0 Page 4of8 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded = CRITICAL STEP) STANDARD | |||
* AOP-7K Overcooling Event. | * AOP-7K Overcooling Event. | ||
* D.3 -IF an ADV has failed, THEN perform ANY of the following as necessary. | * D.3 - IF an ADV has failed, THEN perform ANY of the following as necessary. | ||
* D.3 1st Bullet - Shut any failed open ADV's by shifting ATMOSPHERIC Determines step is NOT applicable. | |||
* D.3 1st Bullet -Shut any failed open ADV's by shifting ATMOSPHERIC STEAM DUMP CONT, 1-HIC-4056 to MANUAL and adjusting as necessary. | STEAM DUMP CONT, 1-HIC-4056 to (already performed by Control Room Staff). | ||
D.3 2nd Bullet -Locally shut the affected ADV isolation valve: D.3 2nd Bullet -Shut the affected ADV from 1C43. a. -IF 11 ADV is affected, THEN shut 11 ADV using the Hand Transfer Valves on the West wall of the U-1 45 ft Switchgear Room as follows: | MANUAL and adjusting as necessary. | ||
* D.3 2nd Bullet - Locally shut the Determines step is NOT applicable. | |||
CUE: Control Room directs controller to be initially set at 100% during transfer allowing controlled shutting of 11 ADV. When student simulates moving lever to right to raise output use a pointing device to show output rising. | affected ADV isolation valve: | ||
* a.1 -Verfiyll ADV controller, 1-HC-4056A at 1C43 is set as necessary to perform a controlled recovery. | * D.3 2nd Bullet - Shut the affected ADV Determines step is applicable based on from 1C43. Initiating Cue. | ||
Rev. 0 Page 5of8 | * a. - IF 11 ADV is affected, THEN shut 11 ADV using the Hand Transfer Valves on the West wall of Determines step is applicable. | ||
the U-1 45 ft Switchgear Room as follows: | |||
CUE: Control Room directs controller to be initially set at 100% during transfer allowing controlled shutting of 11 ADV. | |||
When student simulates moving lever to right to raise output use a pointing device to show output rising. | |||
* a.1 - Verfiyll ADV controller, 1-HC-4056A at 1C43 is set as necessary to perform a controlled recovery. | |||
Rev. 0 Page 5of8 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded = CRITICAL STEP) STANDARD When student simulates opening Hand Transfer box cover hand, show him a picture of CUE: | |||
the valves inside and have him simulate operation on the picture. | |||
D a.2 - Align 11 S/G Hand Transfer Valves to 1C43 (Position 2). | |||
* 1-HV-3938A | * 1-HV-3938A | ||
* 1-HV-3938B Control Room directs 11 ADV position of::::;66% | * 1-HV-3938B Control Room directs 11 ADV position of::::;66% initially. | ||
initially. | CUE: When student simulates moving lever to left to lower output use a pointing device to show output lowering. | ||
CUE: When student simulates moving lever to left to lower output use a pointing device to show output lowering. | D a.3 - Adjust 11 ADV controller, 1-HIC-4056A as necessary. | ||
D a.3 -Adjust 11 ADV controller, 1-HIC-4056A as necessary. | Control Room directs 11 ADV position of ::::;33% after approx 30 seconds. | ||
Control Room directs 11 ADV position of ::::;33% after approx 30 seconds. CUE: When student simulates moving lever to left to lower output use a pointing device to show output lowering. | CUE: When student simulates moving lever to left to lower output use a pointing device to show output lowering. | ||
D a.3 -Adjust 11 ADV controller, 1-HIC-4056A as necessary. | D a.3 - Adjust 11 ADV controller, 1-HIC-4056A as necessary. | ||
Control Room directs 11 ADV position of 0% after approx 30 seconds. CUE: When student simulates moving lever to left to lower output use a pointing device to show output lowering. | Control Room directs 11 ADV position of 0% after approx 30 seconds. | ||
D a.3 -Adjust 11 ADV controller, 1-HIC-4056A as necessary. | CUE: When student simulates moving lever to left to lower output use a pointing device to show output lowering. | ||
TERMINATING CUE: The JPM is complete when 11 ADV is shut. No further actions are required. | D a.3 - Adjust 11 ADV controller, 1-HIC-4056A as necessary. | ||
The operator is expected to end the JPM. TIME STOP: ---Rev. 0 Page 6of8 Appendix C Job Performance Measure Worksheet Form ES-C-1 Verification of Completion Job Performance Measure IN-PLANT-1 Examinee: | TERMINATING CUE: The JPM is complete when 11 ADV is shut. No further actions are required. The operator is expected to end the JPM. | ||
TIME STOP: - - - | |||
Rev. 0 Page 6of8 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Verification of Completion Job Performance Measure IN-PLANT-1 Examinee: | |||
NRC Examiner: | NRC Examiner: | ||
Date Performed: | Date Performed: | ||
Facility Evaluator: | Facility Evaluator: | ||
Number of Attempts: | Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Time to Complete: | |||
Follow up Question(s): ----------------------~ | |||
Follow up Question(s): | Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Applicant Response: | Result: SAT UNSAT Examiner's Signature and Date: | ||
Rev. 0 Page 7of8 | |||
Appendix C Job Performance Measure Form ES-C-1 Worksheet EXAMINEE'S CUE SHEET Initial Conditions: | |||
Job Performance Measure Worksheet EXAMINEE'S CUE SHEET 1. Unit-1 was at 100% power. 2. 11 Atmospheric Dump Valves has failed open. 3. Control Room staff has implemented AOP-7K Overcooling Event 4. Manual operation of | : 1. Unit-1 was at 100% power. | ||
Initiating Cue: | : 2. 11 Atmospheric Dump Valves has failed open. | ||
: 3. Control Room staff has implemented AOP-7K Overcooling Event | |||
Calvert Cliffs 1 & 2 Job Performance Measure Plant-2 Task Title: Locally control AFW flow during EOP-7. Task Number: 204.097 KIA | : 4. Manual operation of 1C03 ADV Controller did not shut the ADV | ||
: 5. You are performing the duties of an extra licensed operator. | |||
Initiating Cue: | |||
You have been directed to shut 11 ADV in controlled fashion from 1C43 IA W AOP-7K Step D.3 Rev. 0 Page 8 of8 | |||
i\PPLICANT: | |||
CALVERT CLIFFS NUCLEAR POWER PLANT 2017 NRC Initial Licensed Operator Exam JPM Plant-2 Rev. 1 | |||
Rev. 0 New JPM. | |||
Rev. 1 Integrate OTPS comments Rev. 1 Page 2of8 | |||
Rev. 0 New JPM. | |||
Rev. 1 Integrate OTPS comments Rev. 1 Page 2 of8 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: Calvert Cliffs 1 & 2 Job Performance Measure Plant-2 Task | |||
==Title:== | |||
Locally control AFW flow during EOP-7. | |||
Task Number: 204.097 KIA | |||
==Reference:== | ==Reference:== | ||
E06 EAi.I (4.0, 3.9) | |||
Method of Testing: | |||
Simulated Performance: ~ Actual Performance: D Classroom: D Simulator: D Plant: ~ | |||
Read to the examinee: | |||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | |||
Initial Conditions: | |||
: 1. Unit-2 was at 100% power. | |||
: 2. A Station Blackout has occurred. | |||
: 3. Control Room staff has implemented EOP-7 Station Blackout | |||
: 4. 22 AFW is running, supply water to S/G's | |||
: 5. AFW flow control valves are starting to fail open on loss of air. | |||
: 6. You are performing the duties of an extra licensed operator. | |||
Initiating Cue: | |||
You have been directed to locally control AFW flow IAW EOP-7 Step F.2.c. | |||
Task Standard: | |||
Correctly takes local control of 22 AFW PP speed. | |||
Rev. I Page 3 of8 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Evaluation Criteria: | |||
: 1. All critical steps completed (denoted by shading). | |||
: 2. All sequential steps completed in order. | |||
: 3. All time-critical steps completed within allotted time. | |||
: 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. | |||
Critical Step Basis: | |||
Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task. | |||
General | |||
: 1. All critical steps completed (denoted by shading). | |||
: 2. All sequential steps completed in order. 3. All time-critical steps completed within allotted time. 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. Critical Step Basis: Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task. General | |||
==References:== | ==References:== | ||
: 1. Procedures and manuals normally available in Plant Time critical task: Yes Validation Time: 15 minutes Setup: 1. None Rev. 1 Page 4 of8 Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded = CRITICAL STEP) STANDARD 0 EOP-7 Station Blackout NOTE: The AFW Air Accumulators are designed for 2 hours of available air: WARNING The use of | : 1. Procedures and manuals normally available in Plant Time critical task: | ||
* N1 SUPPLY TO U-2 AFW AMP AIR SYS B/U ISOLATION VAL VE, N2-l 07 (located SR W RM upper level, overhead of air amplifier). | Yes Validation Time: | ||
* AFW AMPLIFIER AIR SYSTEMN2 BACKUP SUPPLY VALVE, 2-IA-390 (located SRW RM lower level, west of 21 SRW PP). CUE: Inform student he is the assigned operator. | 15 minutes Setup: | ||
0 F.2.d -Assign an operator to locally control AFW discharge pressure locally Acknowledges he is the assigned operator. | : 1. None Rev. 1 Page 4 of8 | ||
as follows: CUE: When student contacts control room to establish communication, acknowledge that communication is established. | |||
0 D.(1). -Establish communications between the operator and the control room. | Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded = CRITICAL STEP) STANDARD 0 EOP-7 Station Blackout NOTE: | ||
22 AFWPP | The AFW Air Accumulators are designed for 2 hours of available air: | ||
WARNING The use of N2 to operate AFW may result in the depletion of oxygen levels in some rooms due to system venting. | |||
0 F.2.c - When the SIG FLOW CONTR valves begin to fail OPEN, THEN align Liquid N 2 System to supply SG FLOW CONTR valves by opening the following valves located in SRW Room. | |||
CUE: When candidate simulates opening O-N2-107, give feedback that handwheel rotates counter-clockwise until it stops. | |||
* N1 SUPPLY TO U-2 AFW AMP AIR SYS B/U ISOLATION VAL VE, O-N2-l 07 (located SR W RM upper level, overhead of air amplifier). | |||
CUE: | |||
* AFW AMPLIFIER AIR SYSTEMN2 BACKUP SUPPLY VALVE, 2-IA-390 (located SRW RM lower level, west of 21 SRW PP). | |||
CUE: Inform student he is the assigned operator. | |||
0 F.2.d - Assign an operator to locally control AFW discharge pressure locally Acknowledges he is the assigned operator. | |||
as follows: | |||
CUE: When student contacts control room to establish communication, acknowledge that communication is established. | |||
0 D.(1). - Establish communications Verifies communications established with between the operator and the control the control room. | |||
room. | |||
Rev. 1 Page 5 of8 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) STANDARD D D.(2) - Isolate the Instrument Air to the Turbine Governor. | |||
22 AFWPP CUE: When candidate simulates shutting O-IA-509 & 510, give feedback that handwheel rotates clockwise until it stops. | |||
* 2-AFW-39871/P A ISOL, 2-IA-509. | * 2-AFW-39871/P A ISOL, 2-IA-509. | ||
* 2-AFW-39871/P B ISOL, 2-IA-510. CUE: Filters are just upstream of the controllers, straight ahead after going in door. The filter drain is the small petcock on bottom of filter. | * 2-AFW-39871/P B ISOL, 2-IA-510. | ||
CUE: Filters are just upstream of the controllers, straight ahead after going in door. The filter drain is the small petcock on bottom of filter. | |||
Student either locates the following gauges and recognizes | When candidate simulates opening petcock, give feedback that handwheel rotates counter-clockwise until it stops and air flow noise is heard, which slowly stops. | ||
> 100 psia or asks control room for pressures: | D D.(3)- Open the filter drains on controllers to allow local control. | ||
* 22 AFW PP Discharge Pressure 2-MS-4502-PI | If student calls the control room for the S/G press and AFW PP discharge pressure then inform him S/G press is 870 psia and AFW discharge press is 1050 psia. | ||
CUE: | |||
If student looks at gauges in AFW PP room then indicate 870 psia for S/G Press (Steam Inlet Press) and 1050 psia for AFW discharge pressure. | |||
Student either locates the following gauges and recognizes > 100 psia or asks control D D,(4)-Adjust 21 AFW PP governor room for pressures: | |||
control knob to maintain discharge | |||
* 22 AFW PP Discharge Pressure pressure at least I 00 PSI greater than 2-MS-4502-PI S/G pressure. | |||
* S/G Pressure (Steam Inlet Press) 2-MS-3988-PI. | * S/G Pressure (Steam Inlet Press) 2-MS-3988-PI. | ||
TERMINATING CUE: The JPM is complete when student has local control of22 AFW PP speed and recognizes | TERMINATING CUE: The JPM is complete when student has local control of22 AFW PP speed and recognizes >I 00 psid. The evaluator is expected to end the JPM. | ||
>I 00 psid. The evaluator is expected to end the JPM. TIME STOP: ---Rev. 1 Page 6of8 Appendix C Job Performance Measure Worksheet Form ES-C-1 Verification of Completion Job Performance Measure IN-PLANT-2 Examinee: | TIME STOP: - - - | ||
Rev. 1 Page 6of8 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Verification of Completion Job Performance Measure IN-PLANT-2 Examinee: | |||
NRC Examiner: | NRC Examiner: | ||
Date Performed: | Date Performed: | ||
Facility Evaluator: | Facility Evaluator: | ||
Number of Attempts: | Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Time to Complete: | |||
Follow up Question(s): - - - - - - - - - - - - - - - - - - - - - - - | |||
Follow up Question(s): | Applicant R e s p o n s e : - - - - - - - - - - - - - - - - - - - - - - - - - | ||
----------------------- | Result: SAT UNSAT Examiner's Signature and Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Applicant | Rev. 1 Page 7of8 | ||
Result: SAT UNSAT Examiner's Signature and Date: | |||
Appendix C Job Performance Measure Form ES-C-1 Worksheet EXAMINEE'S CUE SHEET Initial Conditions: | |||
: 1. Unit-2 was at 100% power. | |||
: 1. Unit-2 was at 100% power. 2. A Station Blackout has occurred. | : 2. A Station Blackout has occurred. | ||
: 3. Control Room staff has implemented EOP-7 Station Blackout 4. 22 AFW is running, supply water to S/G's 5. AFW flow control valves are starting to fail open on loss of air. 6. You are performing the duties of an extra licensed operator. | : 3. Control Room staff has implemented EOP-7 Station Blackout | ||
Initiating Cue: You have been directed to locally control AFW flow IAW EOP-7 Step F.2.c | : 4. 22 AFW is running, supply water to S/G's | ||
: 5. AFW flow control valves are starting to fail open on loss of air. | |||
Calvert Cliffs 1 & 2 Job Performance Measure Plant-3 Task Title: Fill the SRW and CC head tanks during loss of AC power. Task Number: 011.025, 015.008 KIA | : 6. You are performing the duties of an extra licensed operator. | ||
Initiating Cue: | |||
You have been directed to locally control AFW flow IAW EOP-7 Step F.2.c Rev. 1 Page 8 of8 | |||
APPLICANT: _ _ __ | |||
CALVERT CLIFFS NUCLEAR POWER PLANT 2017 NRC Initial Licensed Operator Exam JPM Plant-3 Rev. 2 | |||
Rev. 1 Updated with procedure changes since 2011 exam Rev. 2 Integrated OTPS comments Rev. 2 Page 2of10 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: Calvert Cliffs 1 & 2 Job Performance Measure Plant-3 Task | |||
==Title:== | |||
Fill the SRW and CC head tanks during loss of AC power. | |||
Task Number: 011.025, 015.008 KIA | |||
==Reference:== | ==Reference:== | ||
008.A4.07 (2.9, 2.9) | |||
Method of Testing: | |||
Simulated Performance: ~ Actual Performance: D Classroom: D Simulator: D Plant: ~ | |||
Read to the examinee: | |||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | |||
Initial Conditions: | |||
: 1. A severe fire has resulted in Control Room evacuation. AOP-9A has been implemented. | |||
: 2. You are performing the duties of the Unit-2 ABO. | |||
Initiating Cue: | |||
You have just completed Step CH, ESTABLISH SALTWATER FLOW THROUGH THE COMPONENT COOLING HEAT EXCHANGERS which directs you to "Go to the 69' Aux Building to perform Step CI". | |||
Task Standard: | |||
Correctly aligns makeup to the Service Water and Component Cooling Head Tanks Rev. 2 Page 3of10 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Evaluation Criteria: | |||
: 1. All critical steps completed (denoted by shading). | |||
: 2. All sequential steps completed in order. | |||
: 3. All time-critical steps completed within allotted time. | |||
: 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. | |||
Critical Step Basis: | |||
Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task. | |||
General | |||
: 1. All critical steps completed (denoted by shading). | |||
: 2. All sequential steps completed in order. 3. All time-critical steps completed within allotted time. 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. Critical Step Basis: Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task. General | |||
==References:== | ==References:== | ||
: 1. Procedures and manuals normally available in Plant 2. AOP-9A, CONTROL ROOM EVACUATION AND SAFE SHUTDOWN DUE TO A SEVERE CONTROL ROOM FIRE Time critical task: No Validation Time: 20 minutes Setup: 1. None Rev. 2 Page 4of10 Appendix C Job Performance Measure Worksheet Form ES-C-1 | : 1. Procedures and manuals normally available in Plant | ||
: 2. AOP-9A, CONTROL ROOM EVACUATION AND SAFE SHUTDOWN DUE TO A SEVERE CONTROL ROOM FIRE Time critical task: | |||
No Validation Time: | |||
When candidate simulates opening 2-CD-144, give feedback that handwheel rotates counter-clockwise until it stops. Open SRW Head Tank Condensate | 20 minutes Setup: | ||
: 1. None Rev. 2 Page 4of10 | |||
Rev.2 Page 5of10 Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) STANDARD CUE: The component cooling head tank level is below the sight glass. When candidate simulates opening 2-CC-108, give feedback that handwheel rotates counter-clockwise until it stops. When candidate simulates shutting 2-CC-107, give feedback that handwheel rotates clockwise until it stops. D CH.2 -Operate, as necessary, to maintain level indication for the | |||
* a. -Component Cooling Head Tank * ( 1) -Open Component Cooling Head Tank Makeup Bypass, 2-CC-Simulates shutting 2-CC-107. | Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) STANDARD CUE You have just completed Step CH, ESTABLISH SALTWATER FLOW THROUGH THE COMPONENT COOLING HEAT EXCHANGERS which directs you to "Go to the 69' Aux Building to perform Step CI". | ||
108. * (2) -Shut 2-CC-3820-CV Inlet Isol, 2-CC-107. | D Locate AOP-9A, Step CI Same as element D Candidate proceeds to the Unit 2 69' Same as element CUE 2C43 notifies you that makeup has been restored to fill the Service Water and Component Cooling Head Tanks. | ||
CC Head tank level is rising and after minutes simulate that the level is midway in sightglass. | When candidate simulates opening 2-CD-145, give feedback that handwheel rotates counter-clockwise until it stops. | ||
When candidate simulates shutting 2-CC-108, give feedback that handwheel rotates -clockwise until it stops. When candidate simulates opening 2-CC-107, give feedback that hand wheel rotates counter-clockwise until it stops. CH.2 -Operate, as necessary, to maintain level indication for the Component Cooling and Service Water Head Tanks: | D CH.1 - WHEN notified that makeup has been restored to fill the Service Water and Component Cooling Head Tanks, THEN: Simulates opening 2-CD-145. | ||
* a. -Component Cooling Head Tank * (1) -Open Component Cooling Head Tank Makeup Bypass, 2-CC-Simulates opening 2-CC-107. | * Open Component Cooling Head Tank Condensate Supply, 2-CD-145. | ||
108. * (2) -Shut 2-CC-3820-CV Inlet Isol, 2-CC-107. | CUE: When candidate simulates opening 2-CD-144, give feedback that handwheel rotates counter-clockwise until it stops. | ||
Rev. 2 Page 6of10 Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) STANDARD CUE: 21 SRW head tank level is normal, 22 SRW head tank level is below the sight glass. 0 CH.2 -Operate, as necessary, to maintain level indication for the Component Cooling and Service Water Head Tanks: | * Open SRW Head Tank Condensate Simulates opening 2-CD-144. | ||
* b. -21 Service Water Heat Tank Determines this step is NOT applicable | Supply, 2-CD-144. | ||
* ( 1) -Open 21 Service Water Head Tank Makeup Bypass, 2-SRW-106. | Rev.2 Page 5of10 | ||
* (2) -Shut 21 Service Water Head Tank LCV Inlet Isol, 2-SRW-104. | |||
CUE: When candidate simulates opening 2-SRW-114, give feedback that handwheel rotates counter-clockwise until it stops. When candidate simulates shutting 2- | Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) STANDARD CUE: The component cooling head tank level is below the sight glass. | ||
* b. -22 Service Water Heat Tank * ( 1) -Open 22 Service Water Head Tank Makeup Bypass, 2-SRW-114. | When candidate simulates opening 2-CC-108, give feedback that handwheel rotates counter-clockwise until it stops. | ||
* (2) -Shut 22 Service Water Head Tank LCV Inlet Isol, | When candidate simulates shutting 2-CC-107, give feedback that handwheel rotates clockwise until it stops. | ||
D CH.2 - Operate, as necessary, to maintain level indication for the Component Cooling and Service Water Head Tanks: | |||
Rev. 2 Page 7of10 Appendix C Job Performance Measure Worksheet Form ES-C-1 | * a. - Component Cooling Head Tank | ||
When candidate simulates shutting 2-SRW-114, give feedback that handwheel rotates -clockwise until it stops. When candidate simulates opening 2-SRW-112, give feedback that handwheel rotates counter-clockwise until it stops. CH.2 -Operate, as necessary, to maintain level indication for the Component Cooling and Service Water Head Tanks: | * ( 1) - Open Component Cooling Head Tank Makeup Bypass, 2-CC- Simulates shutting 2-CC-107. | ||
* b. -22 Service Water Heat Tank * (1) -Open 22 Service Water Head Simulates opening 2-SRW-112. | 108. | ||
Tank Makeup Bypass, 2-SRW-114. | * (2) - Shut 2-CC-3820-CV Inlet Isol, 2-CC-107. | ||
* (2) -Shut 22 Service Water Head Tank LCV Inlet Isol, 2-SRW-112. | CC Head tank level is rising and after ~2 minutes simulate that the level is midway in sightglass. | ||
CH.3 -Periodically monitor Component Cooling and Service Water Head Tanks levels and fill as necessary | When candidate simulates shutting 2-CC-108, give feedback that handwheel rotates - | ||
CUE: | |||
TERMINATING CUE: This JPM is complete when the Component Cooling and 22 Service Water Head Tanks are in the normal band. No further actions are required. | clockwise until it stops. | ||
The evaluator is expected to end the JPM TIME STOP: ---Rev. 2 Page 8of10 Appendix C Job Performance Measure Worksheet Form ES-C-1 Verification of Completion Job Performance Measure IN-PLANT-3 Examinee: | When candidate simulates opening 2-CC-107, give feedback that hand wheel rotates counter-clockwise until it stops. | ||
D CH.2 - Operate, as necessary, to maintain level indication for the Component Cooling and Service Water Head Tanks: | |||
* a. - Component Cooling Head Tank | |||
* (1) - Open Component Cooling Head Tank Makeup Bypass, 2-CC- Simulates opening 2-CC-107. | |||
108. | |||
* (2) - Shut 2-CC-3820-CV Inlet Isol, 2-CC-107. | |||
Rev. 2 Page 6of10 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) STANDARD CUE: 21 SRW head tank level is normal, 22 SRW head tank level is below the sight glass. | |||
0 CH.2 - Operate, as necessary, to maintain level indication for the Component Cooling and Service Water Head Tanks: | |||
* b. - 21 Service Water Heat Tank Determines this step is NOT applicable | |||
* ( 1) - Open 21 Service Water Head Tank Makeup Bypass, 2-SRW-106. | |||
* (2) - Shut 21 Service Water Head Tank LCV Inlet Isol, 2-SRW-104. | |||
CUE: When candidate simulates opening 2-SRW-114, give feedback that handwheel rotates counter-clockwise until it stops. | |||
When candidate simulates shutting 2-SRW-112, give feedback that handwheel rotates clockwise until it stops. | |||
0 CH.2 - Operate, as necessary, to maintain level indication for the Component Cooling and Service Water Head Tanks: | |||
* b. - 22 Service Water Heat Tank | |||
* ( 1) - Open 22 Service Water Head Simulates shutting 2-SRW-112. | |||
Tank Makeup Bypass, 2-SRW-114. | |||
* (2) - Shut 22 Service Water Head Tank LCV Inlet Isol, 2-SRW-112. | |||
Rev. 2 Page 7of10 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded = CRITICAL STEP) STANDARD 22 SRW Head tank level is rising and after ::::::2 minutes simulate that the level is midway in sightglass. | |||
When candidate simulates shutting 2-SRW-114, give feedback that handwheel rotates - | |||
CUE: | |||
clockwise until it stops. | |||
When candidate simulates opening 2-SRW-112, give feedback that handwheel rotates counter-clockwise until it stops. | |||
D CH.2 - Operate, as necessary, to maintain level indication for the Component Cooling and Service Water Head Tanks: | |||
* b. - 22 Service Water Heat Tank | |||
* (1) - Open 22 Service Water Head Simulates opening 2-SRW-112. | |||
Tank Makeup Bypass, 2-SRW-114. | |||
* (2) - Shut 22 Service Water Head Tank LCV Inlet Isol, 2-SRW-112. | |||
D CH.3 - Periodically monitor Component Student should voice that this step is Cooling and Service Water Head Tanks continuously applicable. | |||
levels and fill as necessary. | |||
TERMINATING CUE: This JPM is complete when the Component Cooling and 22 Service Water Head Tanks are in the normal band. No further actions are required. The evaluator is expected to end the JPM TIME STOP: - - - | |||
Rev. 2 Page 8of10 | |||
Appendix C Job Performance Measure Worksheet Form ES-C-1 Verification of Completion Job Performance Measure IN-PLANT-3 Examinee: | |||
NRC Examiner: | NRC Examiner: | ||
Date Performed: | Date Performed: | ||
Facility Evaluator: | Facility Evaluator: | ||
Number of Attempts: | Number of Attempts: - - - - - - - - - - - - - - - - - | ||
----------------- | |||
Time to Complete: | Time to Complete: | ||
Follow up Question(s): | Follow up Question(s): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | |||
Result: SAT UNSAT Examiner's Signature and Date: | |||
Rev. 2 Page 9of10 | |||
Job Performance Measure Worksheet EXAMINEE'S CUE SHEET | Appendix C Job Performance Measure Form ES-C-1 Worksheet EXAMINEE'S CUE SHEET Initial Conditions: | ||
AOP-9A has been implemented. | : 1. A severe fire has resulted in Control Room evacuation. AOP-9A has been implemented. | ||
: 2. You are performing the duties of the Unit-2 ABO. Initiating Cue: You have just completed Step CH, ESTABLISH SALTWATER FLOW THROUGH THE COMPONENT COOLING HEAT EXCHANGERS which directs you to "Go to the 69' Aux Building to perform Step CI". Rev.2 Page 10of10}} | : 2. You are performing the duties of the Unit-2 ABO. | ||
Initiating Cue: | |||
You have just completed Step CH, ESTABLISH SALTWATER FLOW THROUGH THE COMPONENT COOLING HEAT EXCHANGERS which directs you to "Go to the 69' Aux Building to perform Step CI". | |||
Rev.2 Page 10of10}} |
Latest revision as of 18:42, 4 February 2020
ML17069A405 | |
Person / Time | |
---|---|
Site: | Calvert Cliffs |
Issue date: | 02/09/2017 |
From: | NRC Region 1 |
To: | |
Shared Package | |
ML16326A203 | List: |
References | |
U01967 | |
Download: ML17069A405 (146) | |
Text
APPLICANT:
CALVERT CLIFFS NUCLEAR POWER PLANT 2017NRC Initial Licensed Operator Exam JPM SRO/ADMIN-1 Rev. 1
Rev. 0 New JPM.
Rev. 1 Integrate validation comments Rev. 1 Page 2 of9
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: Calvert Cliffs 1 & 2 Job Performance Measure SRO/ADMIN-1 Task
Title:
Perform review of completed Surveillance Test.
Task Number: 210.003 Perform the initial review of a completed STP.
KIA
Reference:
2.1.7 (4.7)
Method of Testing:
Simulated Performance: D Actual Performance: [gj Classroom: [gl Simulator: D Plant: D Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
- 1. Unit-I is in Mode 1 with normal electrical and system lineups.
- 2. Bay temperature is 72°F.
- 3. U-1 Control Room Operator just completed STP 0-73C-1 "Component Cooling Pump Quarterly Test" on 11 Component Cooling Pump as scheduled surveillance.
- 4. You are performing the duties of the U-1 Unit Supervisor.
Initiating Cue:
You are directed to perform the Acceptance Criteria for the completed STP IA W Step 6.1.AB.
Are there any questions? You may begin.
Task Standard:
This JPM is complete when STP 0-73C-1 Acceptance Criteria is completed and any required actions identified.
Rev. 1 Page 3 of9
Appendix C Job Performance Measure Worksheet Form ES-C-1 Evaluation Criteria:
- 1. All critical steps completed (denoted by shading).
- 2. All sequential steps completed in order.
- 3. All time-critical steps completed within allotted time.
- 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.
Critical Step Basis:
Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task.
Required Materials:
- 2. U-1 Tech Specs General
References:
- 1. WC-AA-111 (EN4-104 replacement)
Time critical task:
No Validation Time:
10 minutes Setup:
- 1. None Rev. 1 Page 4 of9
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) STANDARD TIME START: - - - -
CUE: Provide the Operator with the prepared STP 0-73A-l.
Inform Operator that Sect. 6.1 was completed and requires SRO review of Acceptance CUE:
Criteria.
D Step 6.1.AB.l Was 11 CC Pump corrected ~p between 33.2 and 40.5 PSID in step 6.1.N?
D Step 6.1.AB.2 Were 11 CC PP INBD AND OUTBD bearing vibration readings less than the ACTION RANGE limit as recorded in Step 6.1.N?
D Step 6.1.AB.3 Was CC Flow greater than or equal to 5160 GPM in step 6.1.R?
D Step 6.1.AB.4 IF 1-CC-115 is being tested for full stroke Determines step is applicable.
closed, THEN perform the following.
D Step 6.1.AB.4.a Determines the following:
Was 11 CC Pump reverse rotation absent in
- No reverse rotation noted.
step 6.1.V?
Was 12 or 13 CC Pump flow greater than or
- Flow was > 5160 GPM.
equal to 5160 GPM in step 6.1.U?
- Circles YES and initials step 6.1.AB.4.b D Step 6.1.AB.5 This test section is considered satisfactory if YES or NIA was answered in all steps above.
Rev. 1 Page 5 of9
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) STANDARD If asked, the 13 CC pump is electrically aligned to 14 480V bus (normal alignment).
When operator notifies SM of the inoperable equipment, acknowledge report, ask for CUE: recommendation.
If candidate asks to review EN-4-104, supply him with attached copy of WC-AA-111 and inform him that it is the Exelon Procedure replacement.
- References WC-AA-111 (EN-4-104 re lacement).
D Step 6.1.AB.5.a IF unsat, THEN notify SM, declare the affected equipment inoperable and take actions as required by administrative actions stated in EN-4-104 (NIA if NOT UNSAT).
(candidate should note that shifting to 11 480V bus would allow exiting the LCO)
When CRO directed to write Condition Report for failed pump flow, acknowledge CUE:
direction.
D Step 6.1.AB.5.b Initiate a Condition Report for any equipment
- Direct CRO to write Condition Report.
deficiencies (NIA if NO equipment
- Initials step.
deficiencies).
When CRO directed to write Condition Report for vibration in Alert Range, CUE:
acknowledge direction.
D Step 6.1.AB.5.c Initiate a Condition Report for components tested in this section that exceeded the ALERT RANGE to evaluate pump conditions and include the need to be placed in the Supplemental Program for increased testing frequency. (NIA if NO components tested in
- Initials step this section exceeded the ALERT RANGE).
Rev. 1 Page 6 of9
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded = CRITICAL STEP) STANDARD When CRO directed to call the IST Engineer for vibration in Alert Range, CUE:
acknowledge direction.
D Step 6.1.AB.5.c.(1)
Inform the IST Engineer of any components that exceed the ALERT RANGE.
- Directs CRO to call /or state intention to call IST Engineer.
(Voicemail is Acceptable).
- Initials step .
(NIA ifNO components in this section exceed the ALERT Range).
TERMINATING CUE: This JPM is complete when Sect 6.1 of STP-73C-1 is completed. The evaluator is expected to end the JPM.
TIME STOP:
Rev. 1 Page 7 of9
Appendix C Job Performance Measure Worksheet Form ES-C-1 Verification of Completion Job Performance Measure SRO/ADMIN-1 Examinee:
NRC Examiner:
Date Performed:
Facility Evaluator:
Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Time to Complete:
Follow up Question(s): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Applicant R e s p o n s e : - - - - - - - - - - - - - - - - - - - - - - - -
Result: SAT UNSAT Examiner's Signature and Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Rev. 1 Page 8 of9
Appendix C Job Performance Measure Form ES-C-1 Worksheet EXAMINEE'S CUE SHEET Initial Conditions:
- 1. Unit-I is in Mode 1 with normal electrical and system lineups.
- 2. Bay temperature is 72°F.
- 3. U-1 Control Room Operator just completed STP 0-73C-1 "Component Cooling Pump Quarterly Test" on 11 Component Cooling Pump as scheduled surveillance.
- 4. You are performing the duties of the U-1 Unit Supervisor.
Initiating Cue:
You are directed to perform the Acceptance Criteria for the completed STP IA W Step 6.1.AB. Are there any questions? You may begin.
Rev. 1 Page 9 of9
APPLICANT:
CALVERT CLIFFS NUCLEAR POWER PLANT 2017 NRC Initial Licensed Operator Exam JPM SRO/ADMIN-2 Rev. 2
Rev 1 Modified & updated JPM to 2017 Format using revised procedures.
Rev. 2 Integrated validation comments.
Rev. 2 Page 2 of8
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: Calvert Cliffs 1 & 2 Job Performance Measure SRO/ADMIN-2 Task
Title:
Verify an Estimated Critical Condition Calculation Task Number: 202.247 KIA
Reference:
2.1.25 (4.2)
Method of Testing:
Simulated Performance: ~ Actual Performance: ~
Classroom: ~ Simulator: D Plant: D Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
- 1. Unit-2 is in MODE 3 at normal operating temperature and pressure. Current time is 0800.
- 2. The reactor tripped while performing RPS testing 32 hours3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br /> ago. Preparations are underway for a quick trip recovery startup to begin within the next 30 minutes with criticality anticipated in 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> at 1Oam.
- 3. The following conditions exist:
- a. Unit-2 tripped from 100% power 32 hours3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br /> ago.
- b. Power history: Prior to the trip, Unit-2 operated at 100% for the previous 68 days.
- c. Bumup from the plant computer point "CEBURNUP" is 14,400 MWD/MTU.
- d. Nuclear Fuels has provided a Xenon Worth Calculation and a B-10 Correction factor of 0.971.
- 4. An ECC has been prepared by an extra licensed operator.
Initiating Cue:
The Shift Manager has directed you to Verify the Estimated Critical Condition calculation per NEOP-302 Section 4 of Attachment 2, Step 6.3.2. Consider the evaluator as the preparer.
Verify the ECC's from 0800 to 1200.
Task Standard:
This JPM is complete when ECC review is completed.
Rev. 2 Page 3of8
Appendix C Job Performance Measure Worksheet Form ES-C-1 Evaluation Criteria:
- 1. All critical steps completed (denoted by shading).
- 2. All sequential steps completed in order.
- 3. All time-critical steps completed within allotted time.
- 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.
Critical Step Basis:
Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task.
Required Materials:
- 1. Procedures and manuals normally available in the plant General
References:
- 1. NEOP302, Estimated Critical Condition
- 2. NEOP-23, Technical Data Book (Unit-2)
Time critical task:
No Validation Time:
30 minutes Setup:
- 1. None Rev. 2 Page 4of8
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) STANDARD TIME START: - - - -
D Locates NEOP-302 Step 6.3.2 Same as Element D 6.3.2 Submit Section 2 to a licensed SRO for Same as Element review. Prior to performing the review, the SRO shall review Step 4.5.2 D Step 4.5.2 Some calculations performed in this procedure are originated by Reactor Same as Element Engineering (RE) and then reviewed by a Senior Reactor Operator (SRO) ........ .
D Step 4.5.2.1 Determines previous critical condition was previously reviewed by an SRO as Verify that the previous critical condition is shown by SRO signature on Attachment 2 correct if not previously reviewed Section 1 D Step 4.5.2.2 INDEPENDENTLY VERIFY that all recorded data and calculations in the section being reviewed are accurate D Step 4.5.2.3 VERIFY that the ECC Upper and Lower Identifies following errors:
Bounds are calculated correctly AND the
- 1100 Lower Bound Gp 4 level established bounds are between 135 inches
- 1100 Upper Bound Gp 4 & Gp5 level withdrawn on Reg Grp 5 and Zero Power
- 1200 Lower Bound Gp 3 <ZPDIL PDIL, if reviewing an estimated critical condition.
Rev. 2 Page 5of8
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) STANDARD When student instructs preparer to make necessary corrections to Attachment 2 CUE:
Section 4, tell him to determine and document corrections on a blank line on form.
Instructs the preparer (Evaluator) to make necessary corrections.
After Cue given, the following changes should be made:
CJ Step 4.5.2.4 IF an error is found, THEN INSTRUCT the preparer to make the necessary corrections, AND REPEAT the review
- 1200 Lower Bound not valid TERMINATING CUE: This JPM is corrected values are inserted into blank line on Section 4. The evaluator is expected to end the JPM.
TIME STOP: - - -
Rev. 2 Page 6of8
Appendix C Job Performance Measure Worksheet Form ES-C-1 Verification of Completion Job Performance Measure SRO/ADMIN-2 Examinee:
NRC Examiner:
Date Performed:
Facility Evaluator:
Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Time to Complete:
Follow up Question(s): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Applicant R e s p o n s e : - - - - - - - - - - - - - - - - - - - - - - - - -
Result: SAT UNSAT Examiner's Signature and Date:
Rev. 2 Page 7 of8
Appendix C Job Performance Measure Form ES-C-1 Worksheet EXAMINEE'S CUE SHEET Initial Conditions:
- 1. Unit-2 is in MODE 3 at normal operating temperature and pressure. Current time is 0800.
- 2. The reactor tripped while performing RPS testing 32 hours3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br /> ago. Preparations are underway for a quick trip recovery startup to begin within the next 30 minutes with criticality anticipated in 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> at 1Oam.
- 3. The following conditions exist:
- a. Unit-2 tripped from 100% power 32 hours3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br /> ago.
- b. Power history: Prior to the trip, Unit-2 operated at 100% for the previous 68 days.
- c. Bumup from the plant computer point "CEBURNUP" is 14,400 MWD/MTU.
- d. Nuclear Fuels has provided a Xenon Worth Calculation and a B-10 Correction factor of0.971.
- 4. An ECC has been prepared by an extra licensed operator.
Initiating Cue:
The Shift Manager has directed you to Verify the Estimated Critical Condition calculation per NEOP-302 Section 4 of Attachment 2, Step 6.3.2. Consider the evaluator as the preparer.
Verify the ECC's from 0800 to 1200.
Task Standard:
This JPM is complete when ECC review is completed.
Rev. 2 Page 8of8
APPLICANT: _ _ __
CALVERT CLIFFS NUCLEAR POWER PLANT 2017 NRC Initial Licensed Operator Exam JPM SRO/ADMIN-3 Rev. 2
Rev 1 Revised 2011 NRC ADMIN-3 to new format, using latest procedures Rev.2 Integrated validation comments.
Rev. 2 Page 2of10
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: Calvert Cliffs 1 & 2 Job Performance Measure SRO/ADMIN-3 Task
Title:
Establish initial plant conditions for and approve performance of an STP.
Task Number: 210.001 KIA
Reference:
2.2.40 (4.7)
Method of Testing:
Simulated Performance: D Actual Performance: IZ!
Classroom: IZ! Simulator: D Plant: D Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
- 1) Unit-1 is at 100% reactor power.
- 2) STP 0-8A-1 is scheduled today.
- 3) Ops FSTC has indicated that monthly and quarterly surveillances are due.
- 4) No maintenance was performed on the lA DG.
- 5) STP M-651C-1A is not required.
- 6) All D/G's are operable and available
- 7) You are performing the duties of the CRS.
Initiating Cue:
- 1) The Shift Manager directs you to prepare STP 0-8A-1 for performance by completing SRO portions of step 4.0.A
- 2) List sections of the test that will be performed.
Task Standard:
This JPM is complete when the SRO portion of the STP preliminary section using the given information and Technical Specifications.
Rev. 2 Page 3of10
Appendix C Job Performance Measure Worksheet Form ES-C-1 Evaluation Criteria:
- 1. All critical steps completed (denoted by shading).
- 2. All sequential steps completed in order.
- 3. All time-critical steps completed within allotted time.
- 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.
Critical Step Basis:
Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task.
Required Materials:
- 1. Blank copy of STP 0-8A-1 General
References:
- 2. U-1 Tech Specs Time critical task:
No Validation Time:
30 minutes Setup:
- 1. None Rev. 2 Page 4of10
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) STANDARD TIME START: - - - -
The Shift Manager directs you to prepare STP 0-8A-l for performance by completing CUE:
SRO portions of up through section 4.0.
D Step 4.0.A. l IF STP M-651C-IA is to be performed Determines this step is N/A from given cues concurrently with this test THEN NOTIFY and either writes NIA with initial or just E&C to perform STP M-65IC-IA initials the block.
prerequisites.
NOTE SIAS A-10 Lo D Step 4.0.A.2 INDICATE ESFAS test requirements:
D SIAS/UV test required:
(check required tests) 0 PERFORM Sect. 6.4, QUARTERLY SIAS A-10 LOGIC AND UV-4 LOGIC TEST.
- Required if performing STP M-65IC-IA.
D ESF AS testing NOT required:
Student leaves the ESF AS testing NOT D LEAVE Sections 6.4 through 6.6 required: box blank.
blank.
NOTE Taking 1A DG to LOCAL makes the DG inoperable. This minimizes unloaded run time during ESFAS testing AND is the preferred alignment.
Rev. 2 Page 5of10
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded = CRITICAL STEP) STANDARD D Step 4.0A.3 IF performing ESF AS testing, THEN REVIEW equipment availability AND
- Student initials the step.
0 lA DG in LOCAL during ESF AS test:
- LEA VE Sections 6.2 AND 6.3 Blank.
0 lA DG in AUTO during ESFAS test:
- Required if performing STP M-651C- Student leaves the lA DG in AUTO 1A during ESFAS test: box blank.
0 LEAVE Sections 6.5 AND 6.6 blank NOTE 1A DG remains operable when performing a Slow Speed start from 1C18A.
If asked by candidate about Slow or Fast start preferred, inform him "POD says slow CUE:
speed start".
D Step 4.0.A.4 REVIEW PMT requirements, Surveillance Schedule AND INDICATE IA DG start requirements:
- Slow start of lA DG:
- Required if performing STP M-651C-
- Student checks the Slow Speed Start of 1A.
lADG: box.
- LEA VE Sections 6.2 AND 6.5 blank.
- Student initials step.
Rev.2 Page 6of10
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) STANDARD
- Emergency start of lA DG:
- LEAVE Sections 6.3 AND 6.6 blank:
Student leaves the Emergency start of lA
- IF 1A DG will be in LOCAL during DG: box blank.
ESF AS testing, THEN LEA VE Section 6.2 blank.
- Start of lA DG NOT required:
- LEAVE Sections 6.2, 6.3, AND 6.5 Student leaves the Start of lA DG NOT through 6.7 blank: required: box blank.
0 Step 4.0.A.5 REVIEW the Surveillance Schedule OR PMT to determine if Section 6.1 is required to be performed.
0 YES - Performance of Sect 6.1 is required 0 Monthly FO TRANSFER PP Automatic Start test is required.
D Quarterly IST FO TRANSFER PP Performance Capacity test is required.
D NO -Performance is NOT required; Student leaves the Performance is NOT LEAVE Sect. 6.1 blank. required; LEAVE Sect. 6.1 blank box blank 0 Step 4.0.A.6 REVIEW the Surveillance Schedule OR PMT to determine if Section 6.8 is required to be performed.
D YES - Performance of Sect. 6.8 is required.
- Student leaves the Performance is NOT D NO - Performance is NOT required; required; LEA VE Sect.6.8 blank box LEA VE Sect.6.8 blank.
blank Rev.2 Page 7of10
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) STANDARD CUE: If FSTC called inform student that no maintenance was performed on lA DG D Step 4.0.A. 7 IF this the first performance of this test after EDG-13 has been performed on lA DG, THEN INDICATE minimum lA DG loaded Determines this step is NIA from given cues run time for Sect. 6. 7. and either writes NIA with initial or just (NIA if NOT first test after EDG-13) initials the block.
D 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> minimum loaded run time.
D 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> minimum loaded run time.
D Step 4.0.A.8 REVIEW the Surveillance Schedule OR PMT to determine if the Quarterly air receiver check valve testing is required.
D YES - Quarterly air receiver check valve testing is required.
D NO - Quarterly air receiver check valve testing is NOT required.
TERMINATING CUE: This JPM is complete when all SRO steps are complete in Sect. 4.0.A The evaluator is expected to end the JPM.
TIME STOP: - - -
Rev. 2 Page 8of10
Appendix C Job Performance Measure Worksheet Form ES-C-1 Verification of Completion Job Performance Measure SRO/ADMIN-3 Examinee:
NRC Examiner:
Date Performed:
Facility Evaluator:
Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Time to Complete:
Follow up Question(s): - - - - - - - - - - - - - - - - - - - - - - -
Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Result: SAT UNSAT Examiner's Signature and Date:
Rev. 2 Page 9of10
Appendix C Job Performance Measure Form ES-C-1 Worksheet EXAMINEE'S CUE SHEET Initial Conditions:
I) Unit- I is at I 00% reactor power.
- 2) STP 0-8A-l is scheduled today.
- 3) Ops FSTC has indicated that monthly and quarterly surveillances are due.
- 4) No maintenance was performed on the I A DG.
- 5) STP M-651C-IA is not required.
- 6) All D/G's are operable and available.
- 7) You are performing the duties of the CRS.
Initiating Cue:
I) The Shift Manager directs you to prepare STP 0-8A-1 for performance by completing SRO portions of step 4.0.A
- 2) List sections of the test that will be performed.
Rev. 2 Page 10of10
\ '
APPLICANT: _ _ __
CALVERT CLIFFS NUCLEAR POWER PLANT 2017NRC Initial Licensed Operator Exam JPM SRO/ADMIN-4 Rev. 1
Rev. 0 New JPM.
Rev. 1 Integrated validation comments.
Rev. 1 Page 2 of9
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: Calvert Cliffs 1 & 2 Job Performance Measure SRO/ADMIN-4 Task
Title:
Review and approve a gaseous waste discharge permit.
Task Number: None KIA
Reference:
2.3.11 (4.3)
Method of Testing:
Simulated Performance: D Actual Performance:~
Classroom: ~ Simulator: D Plant: D Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
- 1) Unit-I is at 100% reactor power, Unit-2 is defueled.
- 2) Discharge of 13 WGDT is scheduled for today.
- 3) Access Control Area Ventilation is secured due to U-2 Main Exhaust fan being secured.
- 4) You are performing the duties of the CRS.
Initiating Cue:
- 1) The Shift Manager directs you to review and approve the gaseous waste discharge permit.
Task Standard:
This JPM is complete when the gaseous waste discharge permit is reviewed, and candidate has identified actions required.
Rev. 1 Page 3 of9
Appendix C Job Performance Measure Worksheet Form ES-C-1 Evaluation Criteria:
- 1. All critical steps completed (denoted by shading).
- 2. All sequential steps completed in order.
- 3. All time-critical steps completed within allotted time.
- 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.
Critical Step Basis:
Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task.
Required Materials:
- 1. Prepared gaseous waste permits
- 2. Prepared copy of OI-17B
- 3. List of plant conditions General
References:
- 1. OI-17B Waste Gas System
- 2. OI-22A Main Exhaust Fan System Time critical task:
No Validation Time:
15 minutes Setup:
- 1. None Rev. 1 Page 4 of9
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) STANDARD TIME START: - - - -
The Shift Manager directs you to review and approve the gaseous waste discharge permit CUE: If candidate asks for Attachment 2, tell him "CRO has Attachment 2 and will log RMS readings" D Gaseous Waste Permit OPERATIONS AUTHORIZATION AND RELEASE DATA SECTION Reviews Note 5.
Shift Manager/SRO Release Criteria Reviewed (Note 5).
Reviews Gaseous Waste Discharge Permit D Note 5
- Notes setpoints for Rad Monitor alarms are identified.
The Shift Manager/SRO review signature acknowledges that the release criteria required is understood and that required plant systems are in operation AND required plant configuration for
- Contacts Chemistry directly or directs conducting the release has been Chemistry to be contacted to change established. the permit for discharge to U-1 Main Vent.
When candidate calls Chemistry to change permit for U-1 Main Vent Fans, acknowledge CUE:
request and give candidate the corrected permit.
Reviews Gaseous Waste Discharge Permit D Note 5
- Notes setpoints for Rad Monitor alarms The Shift Manager/SRO review are identified.
signature acknowledges that the release criteria required is understood and that required plant systems are in operation AND required plant configuration for conducting the release has been established.
Rev. 1 Page 5 of9
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) STANDARD When candidate signs the permit as complete, initial and date permit to complete the OPERATION AUTHORIZATION AND RELEASE DATA SECTION.
CUE:
Inform candidate that the discharge is now in progress IA W OI-17B, once the candidate finds the correct section of OI-17B hand give him the signed off section and give him the attached parameter page and ask if any new actions are required.
Reviews the parameters given and recognizes that Main Vent RMS RI-5415 has exceeded D OI-17B Sect. 6.4 NOTE above step 6.4.B.19 the critical alarm setpoint.
D If at any time during the release the RMS Critical Setpoint is exceeded, the release should IMMEDIATELY be SECURED
- Contacts Chemistry directly or directs and Plant Chemistry contacted Chemistry to be contacted regarding the exceeding of Main Vent RMS critical setpoint.
TERMINATING CUE: This JPM is complete when candidate determines the discharge should be terminated. The evaluator is expected to end the JPM.
TIME STOP: - - -
Rev. 1 Page 6 of9
Appendix C Job Performance Measure Worksheet Form ES-C-1 Verification of Completion Job Performance Measure SRO/ADMIN-4 Examinee:
NRC Examiner:
Date Performed:
Facility Evaluator:
Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Time to Complete:
Follow up Question(s): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Result: SAT UNSAT Examiner's Signature and Date:
Rev. 1 Page 7of9
Appendix C Job Performance Measure Form ES-C-1 Worksheet EXAMINEE'S CUE SHEET Initial Conditions:
- 1) Unit-1 is at 100% reactor power, Unit-2 is defueled.
- 2) Discharge of 13 WGDT is scheduled for today.
- 3) Access Control Area Ventilation is secured due to U-2 Main Exhaust fan being secured.
- 4) You are performing the duties of the CRS.
Initiating Cue:
- 1) The Shift Manager directs you to review and approve the gaseous waste discharge permit.
Rev. 1 Page 8 of9
13 WGDT discharge data 13 WGDT Pressure 75 psig Discharge flow rate 48 scfm RI-2191 OOS U-1 WRNGM 7.0E2 µCi/sec U-1 Main Vent RMS 5.15E02 cpm Gaseous Waste Discharge Filter 5.0 inches of water Rev. 1 Page 9 of9
APPLICANT: _ _ __
CALVERT CLIFFS NUCLEAR POWER PLANT 2017 NRC Initial Licensed Operator Exam JPM SRO/ADMIN-5 Rev.2
Rev 1 Revised 2011 NRC ADMIN-5 to new format, using latest procedures.
Rev 2 Integrated validation comments.
Rev. 2 Page 2of12
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: Calvert Cliffs 1 & 2 Job Performance Measure SRO/ADMIN-5 Task
Title:
Determine Appropriate Emergency Response Actions.
Task Number: 204.097 Determine appropriate emergency response actions per the ERPIP while maintaining an overview of plant conditions.
KIA
Reference:
2.4.38 (4.4)
Method of Testing:
Simulated Performance: D Actual Performance: IZ!
Classroom: IZ! Simulator: D Plant: D Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
- 2. Security has reported a credible threat to CCNPP from the FBI.
- 3. Severe thunderstorms in progress with wind gusts of 50mph.
- 4. A loss of offsite power has occurred resulting in a reactor trip.
- 5. IB DG failed to start on the undervoltage condition; subsequent attempts to start the lB DG have been unsuccessful.
- 6. CRO completed the Vital Auxiliaries Safety Function and reported it as complete to the Unit Supervisor 5 minutes after the trip.
- 7. You are performing the duties of the Shift Manager.
- 8. This JPM is TIME CRITICAL.
Initiating Cue:
You have been requested to determine appropriate Emergency Response Actions, per the ERPIP, based on the current plant conditions provided.
Task Standard:
Determines EAL classification, Protective Action Recommendations and completes the initial notification form within prescribed time limits.
Rev.2 Page 3of12
Appendix C Job Performance Measure Worksheet Form ES-C-1 Evaluation Criteria:
- 1. All critical steps completed (denoted by shading).
- 2. All sequential steps completed in order.
- 3. All time-critical steps completed within allotted time.
- 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.
Critical Step Basis:
Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task.
General
References:
- 1. Procedures and manuals normally available in the Control Room Time critical task:
Yes Validation Time:
12 minutes Setup:
- 1. None Rev.2 Page 4of12
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) STANDARD EVALUATOR NOTE:
The "EAL CLOCK" starts after candidate reads "Initial Conditions" CUE sheet.
CUE: I Inform candidate that all initial conditions just occurred at time now.
TIME START:
EAL CLOCK TIME START:
0 Identify and locate Shift Manager Candidate locates Shift Manager Checklist Checklist. from provided book.
0 1.1 - Entry into the Emergency Plan.
0 1.1.1 - Print your name and today's date. Candidate correctly prints name and current date on checklist.
CUE: Inform candidate that you will be acting as Shift Communicator and Dose Assessor.
I 0 1.1.2 - Call or direct an available Candidate calls, or directs you to call Shift individual to call the Shift Communicator and Dose Assessor to the Communicator and Dose Assessor to the Control Room.
Control Room.
NOTE:
The following step is applicable only to those Units that have implemented FLEX 0 1.1.3 - If SAFER FLEX equipment is deemed necessary, then DIRECT that the Nuclear Duty Officer be contacted at Determines step is NOT applicable.
(630) 657-2202 and DIRECT SAFER response organization activation.
0 1.1.4 - If SAFER FLEX equipment is deemed necessary, then REFER to Determines step is NOT applicable.
Sections 2.5 and 3.3 for additional actions.
0 1.2 - Emergency Classification and PAR and Notifications.
NOTE:
Emergency Classification and declaration shall be completed as soon as possible but no later than 15 minutes from the time indications an EAL threshold being met or exceeded are available in the Control Room.
Rev. 2 Page 5of12
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded = CRITICAL STEP) STANDARD D 1.2.1 - If entry is due to a security event, THEN perform the appropriate actions Determines step is NOT applicable.
in the station specific procedure in parallel with completing this checklist.
D 1.2.2 - Classify the events in progress using EP-CE-111, Emergency Reference Tab 2, EAL Wall Chart.
Classification and Protective Action Recommendations.
Evaluator Note Examinee should review the EAL Wall Chart and determine SAl .1 and determine Tab 2 is NOT necessary at this time since no Protective Action Recommendations required.
D Determining if one or more EAL thresholds in the EAL matrix have been matched or exceeded.
D Classifying the event at the highest level emergency classification for which an EAL is currently being met or exceeded. Note: Unit was in a Station Blackout for a couple of minutes but Initial Conditions given clearly state OC DG was aligned to 11 4KV bus in <5 min.
Evaluator Note: Student should move back to previous procedure to complete following steps.
CUE: When a Peer Check of the EAL call is requested, acknowledge the request.
D 1.2.2.A - IF time permits, THEN validate the emergency classification with the STA (peer check), if Requests Peer Check from STA.
available.
Fills out checklist:
D 1.2.2.B - Declare the event by announcing the following:
"I am declaring a(n) (EAL) at (time) due to - - - -
(brief reason) and assuming the role as Emergency Director.
Rev. 2 Page 6of12
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) STANDARD D 1.2.3 - DETERMINE if protective References Tab 3 (EP-AA-113-F-53) and actions for onsite personnel are determines flowchart calls for "Consider necessary using EP-AA-113-F-53, Implementing protected area Evacuation Onsite Protective Measures Flowchart. and Accountability".
IF Operator elects to perform PA Announcements, acknowledge that the Unit Supervisor CUE:
will perform the announcements per EP-AA-112-F-57.
D 1.2.4 - ANNOUNCE, or DIRECT PA announcements, for station personnel as Operator will not perform per CUE provided.
necessary.
0 1.2.5 - DETERMINE the appropriate PAR per EP-CE-111, Emergency Classification Determines step is NOT applicable.
and Protective Action Recommendations.
D 1.3 Notifications for Change in Classification or PAR D 1.3 .1 - If the classification is an Unusual Event, then COMPLETE ERO Determines step is NOT applicable.
notification/activation per EP-AA-112-1OO-F-57, ERONS Notification Details.
D 1.3.2-GINNA Only ... Determines step is NOT applicable.
D 1.3 .3 - If the classification is an Alert or higher and the ERO has not been Determines step is applicable activated, then DIRECT activation per EP-AA-112-100-F-57 (Tab 5)
Evaluator Note: Student should move to Tab 5 to complete following steps D 1 - INITIATE PRIMARY ACTIVATION OF NOTIFICATION SYSTEM USING THE INTERNET D 1.1 - CIRCLE the appropriate station from the table below.
0 1.2 - CIRCLE the appropriate Activation/Termination for the event from the table below.
Rev. 2 Page 7of12
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded = CRITICAL STEP) STANDARD Evaluator Note: Student should move back to previous procedure to complete following steps.
0 1.3.3.A-NMP Only ... Determines step is NOT applicable.
Ensure student knows you are performing the duties of the Emergency CUE:
Communicator, acknowledge order to notify ERO.
0 1.3.3.B-PROVIDE completed Hands the Tab 5 (EP-AA-112-100-F-57) to ERONS form to the shift the Emergency Communicator and directs communicator and DIRECT them notification of the ERO.
to notify/activate ERO.
D 1.3.1.C -If no one is available to Determines step is NOT applicable.
notify ERO .....
NOTE:
Notifications to the state and local are required within 15 minutes of Emergency Declaration or a change in PAR.
D 1.3.4 State and Local Notification.
D 1.3.4.A-COMPLETE station Determines step is applicable.
specific notification form Tab 7.
Evaluator Note: Student should move to Tab 7 to complete following steps D CCNPP INITIAL NOTIFICATION FORM D A.1 D A.2 D A.3 D A.4 Rev. 2 Page 8of12
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP)
D A.5 Radioactivity released is /was monitored D A.5.a NIA D A.5.b Type of Release NIA D A.6 Protective Action Recommendations D A.6.a D A.7 D Shift ED/Corporate ED Name: Prints name and signs form.
Evaluator Note: Student should move back to previous procedure to complete following steps.
D 1.3.4.A.l - GINN A Only ... Determines step is NOT applicable.
CUE: When a Peer Check of the EAL call is requested, acknowledge the request.
D 1.3.4.B - If time permits, then OBTAIN a peer check of completed Requests Peer Check from STA.
form information.
Rev.2 Page 9 of12
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded = CRITICAL STEP) STANDARD Ensure student knows you are performing the duties of the Emergency CUE:
Communicator; acknowledge order to notify State and Local.
Hands the Tab 7 (Initial Notification Form) to the Emergency Communicator and directs notification of State and Local.
0 1.3.4.C-PROVIDE completed form to Shift Communication and DIRECT them to notify State and Local.
TERMINATING CUE: The JPM is complete when an EAL classification is determined and declared within time requirements and the Initial Notification form is completed and given to the communicator within time requirements. No further actions are required. The operator is expected to end the JPM.
TIME STOP: - - -
Rev. 2 Page 10of12
Appendix C Job Performance Measure Worksheet Form ES-C-1 Verification of Completion Job Performance Measure SRO/ADMIN-5 Examinee:
NRC Examiner:
Date Performed:
Facility Evaluator:
Number of Attempts: - - - - - - - - - - - - - - - -
Time to Complete:
Follow up Question(s): - - - - - - - - - - - - - - - - - - - - - - -
Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Result: SAT UNSAT Examiner's Signature and Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Rev. 2 Page 11of12
Appendix C Job Performance Measure Form ES-C-I Worksheet EXAMINEE'S CUE SHEET Initial Conditions:
I. Unit-I was at IOO% power with IA DG tagged out and OC DG pre-aligned to I I 4KV bus IAW OI-2IA-1.
- 2. Security has reported a credible threat to CCNPP from the FBI.
- 3. Severe thunderstorms in progress with wind gusts of 50mph.
- 4. A loss of offsite power has occurred resulting in a reactor trip.
- 5. IB DG failed to start on the undervoltage condition; subsequent attempts to start the IB DG have been unsuccessful.
- 6. CRO completed the Vital Auxiliaries Safety Function and reported it as complete to the Unit Supervisor 5 minutes after the trip.
- 7. You are performing the duties of the Shift Manager.
- 8. This JPM is TIME CRITICAL.
Initiating Cue:
You have been requested to determine appropriate Emergency Response Actions, per the ERP IP, based on the current plant conditions provided.
Rev. 2 Page 12of12
APPLICANT: _ _ __
CALVERT CLIFFS NUCLEAR POWER PLANT 2017NRC Initial Licensed Operator Exam JPM SIMULATOR-I Rev. 1
Rev. 0 New JPM.
Rev I Incorporate comments from validations Rev. I Page 2of13
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: Calvert Cliffs 1 & 2 Job Performance Measure Sim-I (Alt Path)
Task
Title:
Dropped CEA during startup.
Task Number: 055.003 Operate the Regulating CEAs 202.008 Respond to CEA(s) misaligned by >I5" KIA
Reference:
001.A2.03 (3.5,4.2)
Method of Testing:
Simulated Performance: D Actual Performance: ~
Classroom: D Simulator: [8] Plant: D Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
- 2. Unit-I has just been called critical.
- 3. Critical data was just taken with power at :::::I x I o-5%.
- 4. You are performing the duties of the Reactor Operator.
Initiating Cue:
You have been directed to raise reactor power to : : : 1% power IAW OP-2 Step 6. 7.S Task Standard:
Recognize dropped CEA during startup and takes correct action IA W OP-2.
Rev. I Page 3of13
Appendix C Job Performance Measure Worksheet Form ES-C-1 Evaluation Criteria:
- 1. All critical steps completed (denoted by shading).
- 2. All sequential steps completed in order.
- 3. All time-critical steps completed within allotted time.
- 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.
Critical Step Basis:
Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task.
General
References:
- 1. Procedures and manuals normally available in Control Room Time critical task:
No Validation Time:
25 minutes Setup:
- 1. Reset simulator to IC-009 U-1 critical approximately lE-5% Power MOC
- 2. Ensure CEDS is Off
- 3. CEAPDS selected to display all CEAs
- 4. Event Trigger 1 PlC05_PWRJIOOl_MT >.001 (WRNI Power reaches lE-2%)
- 5. CEA 6 drop cedsO 12_ 06 on Event 1
- 6. 1C05 - D40- LTON to On at time zero
- 7. Place NRRHOl & NRRH02 on trend on plant computer screen near 1C05 Rev. 1 Page 4of13
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded= CRITICAL STEP)
TIME START:
0 OP-2 Section 6.7 TAKE THE REACTOR CRITICAL CAUTION Do NOT exceed a sustained one DPM startup rate CUE: US (Unit Supervisor) suggests target of 0.5 DPM startup rate for power ascension to 1%
0 S - Raise Reactor power to approximately 1% by LRNI AND PERFORM the When raising power by withdrawing following: Regulating CEA's sustained startup rate
- 1. CHECK ALL WRNI channels does not exceed 1 DPM.
indicating less than 2%.
0 OI-42 Sect. 6.7 REGULATING CEA OPERATION CUE: If asked by candidate if Chemistry has been informed, tell them this notification has already been completed.
0 B.1 - IF CEAs are inserted less than 130 inches. THEN INFORM Chemistry to Either asks US (Unit Supervisor) if this has ensure requirements of CP-204, already been done or calls Chemistry SPECIFICATION AND directly.
SURVEILLANCE PRIMARY SYSTEMS, related to C0-58 are met.
NOTE If any CEA is moved greater than 7 .5 inches in modes 1 or 2, then within one hour TS SR 3.1.4.l should be performed.
0 B.2 - ENSURE desired regulating group Ensures Group 4 is selected.
(1,2,3,4,5) is selected.
0 B.3 - Ensure the desired CEA in the Any CEA in Group 4 can be selected.
group is selected.
Rev. 1 Page 5of13
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded = CRITICAL STEP)
NOTE To prevent challenging CEA interlocks, Manual Sequential should not be used for CEA withdrawal ifthe CEAs are in an abnormal alignment for ASI control PER Section 6.16, ASI CONTROL USING REGULATING CEAs (i.e. groups 1,2 and/or 3 partially inserted), until the associated groups are at the upper computer stop.
CUE: If candidate asks US (Unit Supervisor) if Manual Sequential or Manual Group should be used, direct use of Manual Sequential.
D B.4 - SELECT AND DEPRESS one of the following mode control pushbuttons:
- MANUAL SEQUENTIAL
- MANUAL GROUP
- MANUAL INDIVIDUAL D B.5 - IF necessary to bypass CMI, THEN REFER to Section 6.8, USE OF Determines step is N/A CEA MOTION INHIBIT BYPASS.
NOTE
- Group sequencing must be accomplished by the Reactor Operator when Plant Computer, OR DAS Bis OOS ....
- Unit-1 CEA-18 will NOT move while jumpered PER ECP-15-000409.
CAUTION
- RAISE/HOLD/LOWER switch operation should be accomplished with positive ...
- Withdraw and insert CEAs only in a deliberate and carefully controlled manner ...
- Primary lant anomalies caused by secondar 0 B.6 - INSERT OR WITHDRAW selected CEA(s) using the RAISE/HOLD/LOWER switch while observing the following limits.
Rev. 1 Page 6of13
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded= CRITICAL STEP) 0 a. - IF withdrawing CEA(s) in Manual Group OR Manual Sequential Mode, THEN STOP withdrawal at Determines step is NIA.
Upper Computer Stop OR a maximum height of 130.5 inches when computer is NOT available.
0 b. -IF inserting CEA(s) in Manual Group OR Manual Sequential Mode, THEN STOP insertion at Lower Determines step is NIA.
Computer Stop or a minimum height of 6.0 inches when computer is NOT available.
After stopping CEA motion candidate 0 B. 7 - ENSURE at least 5 seconds has should ensure at least 5 seconds has elapsed elapsed once CEA motion is completed.
before movement initiated again.
0 B.8 - IF other CEA manipulations are Candidate may or may not use additional desired, THEN REPEAT steps 1 CEA movements to achieve desired SUR.
through 7.
Once a stable SUR is achieved and power is rising toward 1% the dropped CEA malfunction will be entered. Once the candidate recognizes and announces the CUE:
dropped CEA to Control Room, direct candidate to implement AOP-lB Section IV Preliminary.
BEGIN ALTERNATE PATH 0 AOP-lB A.-CONTROL CEA MOVEMENT AND STABILIZE THE UNIT 0 A. I - IF the CEAs are moving without operator action, THEN ensure the CEDS Determines step is NIA.
Control System is turned off.
CAUTION If CEA misalignment causes power to be reduced, power shall not be raised until the CEA is within it alignment requirements or until Reactor Engineering is consulted.
CAUTION Do NOT use CEAs to control RCS temperature.
Rev. 1 Page 7of13
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded = CRITICAL STEP)
CUE: Inform candidate that the CRO will perform this step.
D A.2-Maintain Tcold on programmed value by performing ANY of the Requests CRO to perform this step.
following actions as applicable:
(No change in temperature is expected since D Adjust Turbine Load below POAH).
0 Adjust TBV s or ADV s D Initiate boration D A.3 - Verify Pressurizer pressure is between 2225 and 2275 psia, and Verifies pressure is ::::::2250 psia.
trending toward 2250 psia.
Verifies all CEAs using CEAPDS 0 A.4 - Verify position of ALL CEAs indication. Recognizes only 1 CEA is using reed switch position indication.
misaligned.
IF NRRHOI & NRRH02 trends are not working sue pointer to indicate that reactivity CUE:
is negative on these trend screen to reinforce that reactor is subcritical.
D A.5 - IF the CEA malfunction causes a critical reactor to become subcritical, THEN perform the following:
CAUTION The affected CEA(s) should not be inserted/withdrawn until ALL unaffected Regulating CEAs are inserted.
Refers to OI-42 Section 6.7 REGULATING D A.5.a-Fully insert ALL unaffected CEA OPERATION or properly performs all Regulating CEAs.
steps necessary to insert Regulating CEAs.
0 OI-42 Sect. 6.7 REGULATING CEA OPERATION Rev. 1 Page 8of13
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded = CRITICAL STEP)
CUE: If asked by candidate if Chemistry has been informed, tell them this notification has already been completed.
0 B.1 - IF CEAs are inserted less than 130 inches. THEN INFORM Chemistry to ensure requirements of CP-204, Either asks US if this has already been done SPECIFICATION AND or calls Chemistry directly.
SURVEILLANCE PRIMARY SYSTEMS, related to C0-58 are met.
NOTE If any CEA is moved greater than 7 .5 inches in modes 1 or 2, then within one hour TS SR 3.1.4.1 should be performed.
0 B.2 - ENSURE desired regulating group Ensures Group 4 is selected.
(1,2,3,4,5) is selected.
0 B.3 - Ensure the desired CEA in the Any CEA in Group 4 can be selected.
group is selected.
NOTE To prevent challenging CEA interlocks, Manual Sequential should not be used for CEA withdrawal if the CEAs are in an abnormal alignment for ASI control PER Section 6.16, ASI CONTROL USING REGULATING CEAs (i.e. groups 1,2 and/or 3 partially inserted), until the associated froups are at the upper computer stop.
CUE: If candidate asks US if Manual Sequential or Manual Group should be used, direct use of Manual Sequential.
0 B.4 - SELECT AND DEPRESS one of the following mode control pushbuttons:
- MANUAL SEQUENTIAL
- MANUAL GROUP
- MANUAL INDIVIDUAL 0 B.5 - IF necessary to bypass CMI, THEN REFER to Section 6.8, USE OF Determines step is applicable.
CEA MOTION INHIBIT BYPASS.
Rev. 1 Page 9of13
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STAND ARD (shaded = CRITICAL STEP)
D OI-42 Section 6.8 USE OF CEA MOTION INHIBIT (CMI) BYPASS.
NOTE D CMI MAY be bypassed to more than one CEA group at a time.
D Steps 1 and 2 will bypass CMI to selected group and apply CMI to all other groups.
0 CEA MOTION INHIBIT BYPASS annunciator on 1(2)C05 will alarm.
D B.1 - DEPRESS GROUP BYPASS pushbutton(s) on CEDS Control Panel for the CEA groups( s) needing alignment.
0 B.2 - DEPRESS AND HOLD MOTION INHIBIT BYPASS pushbutton on CEDS Control Panel.
D B.3 - WHEN at least 5 seconds have Waits at least 5 seconds before inserting elapsed, THEN INITIATE group OR Regulating CEAs.
Individual CEA Motion.
0 OI-42 Section 6.7 REGULATING CEA OPERATION NOTE
- Group sequencing must be accomplished by the Reactor Operator when Plant Computer, OR DAS Bis OOS ....
- Unit-I CEA-18 will NOT move while jumpered PER ECP-15-000409.
CAUTION
- RAISE/HOLD/LOWER switch operation should be accomplished with positive ...
- Withdraw and insert CEAs only in a deliberate and carefully controlled manner. ..
- Primary plant anomalies caused by secondary plant transients are rarely, if ever, ...
Rev. 1 Page 10of13
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded = CRITICAL STEP)
CUE: Once CEA insertion has begun the evaluator can terminate the JPM.
D B.6 - INSERT OR WITHDRAW selected CEA(s) using the RAISE/HOLD/LOWER switch while observing the following limits.
TERMINATING CUE: The JPM is complete when Regulating CEAs are being inserted to comply with AOP-lB. No further actions are required. The evaluator is expected to end the JPM.
TIME STOP: - - -
Rev. 1 Page 11of13
Appendix C Job Performance Measure Worksheet Form ES-C-1 Verification of Completion Job Performance Measure SIMULA TOR-1 Examinee:
NRC Examiner:
Date Performed:
Facility Evaluator:
Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Time to Complete:
Follow up Question(s): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Result: SAT UNSAT Examiner's Signature and Date: -------------------~
Rev. 1 Page 12of13
Appendix C Job Performance Measure Form ES-C-1 Worksheet EXAMINEE'S CUE SHEET Initial Conditions:
- 2. Unit-1 has just been called critical.
- 3. Critical data was just taken with power at ::::1 x 10-5%.
- 4. You are performing the duties of the Reactor Operator.
Initiating Cue:
You have been directed to raise reactor power to ::::::1 % power IA W OP-2 Step 6. 7 .S.
Rev. 1 Page 13of13
APPLICANT: _ _ __
CALVERT CLIFFS NUCLEAR POWER PLANT 2017 NRC Initial Licensed Operator Exam JPM SIMULATOR-2 Rev. 2
Rev. 1 Update procedures since last given in 2011 Rev 2 Incorporate comments from validations.
Rev. 2 Page 2 of9
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: Calvert Cliffs 1 & 2 Job Performance Measure Sim-2 (Alt Path)
Task
Title:
Override shut a PORV Task Number: 064.035 Override shut a PORV KIA
Reference:
002.A2.01 (3.9, 4.2)
Method of Testing:
Simulated Performance: D Actual Performance: ~
Classroom: D Simulator: ~ Plant: D Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
- 1. Unit 1 is stable in Mode 4.
- 2. Temperature band of250°F +/-10° established and controlled by CRO.
- 3. Pressure band of 400 psia +/-10 psia established and controlled by RO.
- 4. All General Precautions and Initial Conditions are met.
- 5. You are performing duties of the Reactor Operator.
Initiating Cue:
The Unit Supervisor directs aligning Low Pressure Pressurizer control IA W 01-lH Sect. 6.3.
Task Standard:
The candidate will diagnose that the PORV is open due to equipment malfunction and shut the associated PORV block valve.
Rev. 2 Page 3 of9
Appendix C Job Performance Measure Worksheet Form ES-C-1 Evaluation Criteria:
- 1. All critical steps completed (denoted by shading).
- 2. All sequential steps completed in order.
- 3. All time-critical steps completed within allotted time.
- 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.
Critical Step Basis:
Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task.
General
References:
- 1. Procedures and manuals normally available in Control Room
- 2. ALM-1C06, RCS Control Alarm Manual
- 3. OI-lH Pressurizer Pressure Control Time critical task:
No Validation Time:
10 minutes Setup:
- 1. Reset to IC-1.
- 2. Place simulator in run.
- 3. Override l-PI-103-1 to 1533# (P1C06_1PI103 l_MT to 1533) on Event 1.
- 4. Override PORV 402 handswitch (P1C06_1HS1402) to "manopen on Event 1.
- 5. Override PORV HS not in auto alarm (P1C06_E23_LTON) to OFF at time zero.
- 6. Ensure PZR level deviation is <4"
- 7. Insert PORV MPT keys 47 & 48 in panel.
- 8. Insert SIT outlet valve keys 25-28 in panel.
- 10. Initiate Event 1 when directed by the examiner Rev. 2 Page 4 of9
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded= CRITICAL STEP)
TIME START:
0 OI-lH Section 6.3 LOW PRESSURE PRESSURIZER CONTROL.
0 B.1 - IF controlling U-1 pressure, Determines step is applicable.
THEN PERFORM the following:
0 a. - ENSURE PRESSURIZER SPRAY VL V CONTROLLER, Verifies that l-HIC-100 is in manual with 1-HIC-100 is in MANUAL with 0% or negative output.
zero output.
CUE: IF candidate does not energize heaters to raise pressure, US should direct raising pressure into assigned band.
0 b. - CYCLE Pressurizer Heaters Since pressure is low out of assigned band while lowering Pressurizer level to the candidate should energize additional maintain pressure. heaters to raise pressure.
0 c. - CHECK deviation less than 4 inches between Pressurizer level and programmed setpoint using 1-LT- Checks deviation is <4".
l lOX and 1-LT-l lOY as read on PZR LVL recorder 1-LR-110.
0 d. - IF the deviation between Pressurizer level and Pressurizer Determines step is NOT applicable.
programmed setpoint is greater than 4 inches ...
0 e. - PLACE the selected Pressurizer Pressure Controller 11 PZR PRESS CONTR CHAN X, 1-PIC-lOOX OR Places 1-PIC-lOOY in Manual with 50%
11 PZR PRESS CONTR CHAN Y, output.
1-PIC-lOOY, in MANUAL with 50% output signal.
CUE: Initiate Event 1 to cause faulted PORV BEGIN ALTERNATE PATH 0 Locates the 1C06 alarm manual and Locates 1C06 ARM and refers to E-21.
refers to E-21.
Rev.2 Page 5 of9
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STAND ARD (shaded = CRITICAL STEP)
The candidate determines the step is 0 1. - The PORVs are energized. applicable since PORV 402 is open with red light lit.
0 1. - PERFORM the following:
0 a. - IF reactor trip occurs, THEN The candidate determines the reactor is shut IMPLEMENT EOP-0, Post-Trip down and step is NOT applicable.
Immediate Actions.
CUE: The shift manager will contact the electric shop.
0 b. - NOTIFY the electric shop to Candidate informs US of step and is verify the trip status of the PORV informed that the Shift Manager will call thermal overloads to ensure PORV electric shop.
operability. [B0034]
0 c. - IF the PORVs are in The candidate determines PORVs are in NORMAL, THEN: ... variable MPT and step is NOT applicable.
0 d. - IF the PORVs are in MPT The candidate determines PORVs are in ENABLE, THEN: variable MPT and step is applicable.
0 ( 1) - TRIP any RCPs operating in the NON-OPERATING AREA of the RCP curve.
The candidate may perform step (2) since there is no actual high pressure condition, CUE: these actions will be unsuccessful in shutting the PORV.
0 (2) - WHEN the cause of the Candidate determines the PORV is open high pressure condition has been due to equipment malfunction and not high corrected, THEN: [B0064] RCS pressure.
Determines step is NOT applicable.
0 (3) - IF a PORV fails to shut or is open due to a failed transmitter, THEN SHUT the applicable PORV Block, l-RC-403-MOV or 1-RC-405-MOV.
Rev. 2 Page 6 of9
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded= CRITICAL STEP)
CUE: \ The CRO will perform step 1.d.(4).
0 (4) - DRAIN the PORV US informs the candidate that the CRO will discharge piping to the Quench perform this step.
Tank as follows:
0 e. - MONITOR computer points Candidate uses plant computer to monitor T106, T107, and Tl08 for leak-off leak-off temperatures.
temperatures.
Terminating Cue: This JPM is complete when the candidate isolates the open PORV flow path. No further actions are required. The evaluator is expected to end the JPM.
TIME STOP:
Rev.2 Page 7 of9
Appendix C Job Performance Measure Worksheet Form ES-C-1 Verification of Completion Job Performance Measure SIMULATOR-2 Examinee:
NRC Examiner:
Date Performed:
Facility Evaluator:
Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Time to Complete:
Follow up Question(s): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Applicant R e s p o n s e : - - - - - - - - - - - - - - - - - - - - - - - -
Result: SAT UNSAT Examiner's Signature and Date: - - - - - - - - - - - - - - - - - - - -
Rev.2 Page 8 of9
Appendix C Job Performance Measure Form ES-C-1 Worksheet EXAMINEE'S CUE SHEET Initial Conditions:
- 1. Unit 1 is stable in Mode 4.
- 2. Temperature band of250°F +/-10° established and controlled by CRO.
- 3. Pressure band of 400 psia +/-10 psia established and controlled by RO.
- 4. All General Precautions and Initial Conditions are met.
- 5. You are performing duties of the Reactor Operator.
Initiating Cue:
The Unit Supervisor directs aligning Low Pressure Pressurizer control IA W OI-IH Sect. 6.3.
Rev. 2 Page 9 of9
APPLICANT: _ _ __
CALVERT CLIFFS NUCLEAR POWER PLANT 2017 NRC Initial Licensed Operator Exam JPM SIMULATOR-3 Rev. 1
Rev. 0 New JPM.
Rev 1 Incorporate comments from validation.
Rev. 1 Page 2of10
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: Calvert Cliffs 1 & 2 Job Performance Measure Sim-3 (Alt Path)
Task
Title:
Depressurize RCS to fill PZR in EOP-5.
Task Number: 202.015 Respond to RCS leakage exceeding capacity of one charging pump, modes 1 & 2.
KIA
Reference:
010.A4.01 (3.7,3.5)
Method of Testing:
Simulated Performance: D Actual Performance: ~
Classroom: D Simulator: ~ Plant: D Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
- 1. Unit-1 has experienced a LOCA from 100% power.
- 3. You are performing the duties of the Reactor Operator.
Initiating Cue:
You have been directed to depressurize the RCS IA W EOP-5 Step K, and Throttle HPSI flow IA W EOP-5 Step L.
Task Standard:
Initiate Aux Spray to depressurize RCS and throttle HPSI flow to control Pressurizer level.
Rev. 1 Page 3of10
Appendix C Job Performance Measure Worksheet Form ES-C-1 Evaluation Criteria:
- 1. All critical steps completed (denoted by shading).
- 2. All sequential steps completed in order.
- 3. All time-critical steps completed within allotted time.
- 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.
Critical Step Basis:
Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task.
General
References:
- 1. Procedures and manuals normally available in Control Room Time critical task:
No Validation Time:
20 minutes Setup:
- 1. Reset simulator to IC-24 U-1 at 100% Power MOC.
- 2. RCS leak of 700 gpm (rcs002 to 700gpm) at Time Zero.
- 3. Trip Reactor and complete EOP-0.
- 4. Ensure SIAS initiates.
- 5. Manually insert CIS with panel pushbuttons.
- 6. Secure all RCP's.
- 7. Control plant until subcooling :::::50°F.
- 8. Ensure key 41 inserted in Aux Spray CV.
- 9. Ensure Key 20 inserted in 1-HS-2080A.
- 10. Prepared to modify rcs002 to 1O,OOOgpm once throttling complete.
Rev. 1 Page 4of10
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded= CRITICAL STEP)
TIME START:
D EOP-5 Step K DEPRESSURIZE THE RCS TO REDUCE SUBCOOLING AND MAINTAIN PRESSURIZER LEVEL NOTE If rapid pressure excursions due to RCS inventory or temperature changes have occurred, consider the RCS solid.
CUE: I Direct a subcooling band between 30 and 60° subcooling.
D 1 - IF a bubble exists in the Pressurizer OR the Reactor Vessel Head, THEN maintain subcooling as low as possible AND within the following limits: Subcooling band of 30-60° subcooling, is
- Between 30 and 140° based on CET given, critical task will only require temperatures. maintaining between 30-140° subcooling per the procedure step.
D 1.a - Lower subcooling by ANY of the following methods: Ensures all Pressurizer HTR( s) are de-D ( 1) - De-energize Pressurizer energized.
HTR(s).
D (2) - IF ALL RCPs are operating, Determines step is NOT applicable.
THEN ...
CUE: I CRO will control the cooldown rate.
D (3)- Lower the RCS cooldown CRO will control the cooldown rate.
rate.
D (4)- IF the overpressurization is due to HPSI/Charging flow AND Determines step is NOT applicable.
HPSI throttle criteria are met. ..
D (5)- Initiate AUX SPRAY as Determines step is applicable.
follows:
Rev. 1 Page 5of10
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded= CRITICAL STEP) 0 (a) - Place the 1-IA-2080-MOV CIS OVERRIDE switch, 1-HS- Places 1-HS-2080A in OVERRIDE.
2080A, in OVERRIDE.
D (b) - Open the IA CNTMT ISOL Verifies 1-IA-2080-MOV is open.
valve, 1-IA-2080-MOV.
CAUTION If the difference between the PZR WTR TEMP and CHG OUT TEMP is greater than 400°, then TRM 15.4.2 must be complied with.
D (c) - Record the following information: Records the temperatures and informs CRS if>400° and directs US to enter TRM
- PZR WTR TEMP (1-TI-101).
15.4.2.
- CHG OUT TEMP (1-TI-229).
D (d)-Open the AUX SPRAY valve, 1-CVC-517-CV.
0 (e)- Operate the LOOP CHG valves as necessary to adjust AUX SPRAY flow:
- 1-CVC-518-CV
- 1-CVC-519-CV 0 (f) - Shift the PRESSURIZER SPRAY VL V CONTROLLER, Shifts l-HIC-100 to Manual.
l-HIC-100, to MANUAL.
D (g) - Shut the PRZR SPRAY VLVs by adjusting the output of l-HIC-100 to 0%: Places l-HIC-100 output to 0%.
- 1-RC-lOOE-CV
- 1-RC-lOOF-CV 0 Maintain the pressurizer Monitors PZR cooldown rate to ensure cooldown rate less than
<200°F/hour.
200°F/hour.
Rev. 1 Page 6of10
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STAND ARD (shaded= CRITICAL STEP)
When HPSI throttling criteria is achieved the candidate should re-open Loop Chg CUE: valves to slow the depressurization and prevent overfill of PZR. Step (e) above allows operation of these valves to control Aux Spray Flow.
0 EOP-5 Step LEV ALU ATE THE NEED FOR HPSI OR LPSI THROTTLING/TERMINATION 0 1. - IF HPSI PPs are operating AND ALL of the following conditions can be maintained:
- At least 30° subcooling based on CET temperatures.
- Pressurizer level greater than 101 inches {141 }.
- At least ONE S/G available for heat removal.
- S/G level greater than (-) 170 inches.
- Capable of being supplied with feedwater.
- Capable of being steamed.
- Reactor Vessel level above the top of the hot leg.
THEN HPSI flow may be reduced by throttling the HPSI HDR valves, or stopping the HPSI PPs one at a time, as desired, to maintain the following:
- Pressurizer level between 101 inches
{141 } and 180 inches {190}.
Rev. 1 Page 7of10
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded= CRITICAL STEP)
CUE: IF asked by candidate if stopping LPSI PPs is desired, then direct the securing of LPSI PPs.
D 2. - IF pressurizer pressure is greater than 200 PSIA and constant OR rising, Candidate may or may not secure LPSI PPs.
THEN the operating LPSI PPs may be stopped.
When evaluator has determined that candidate has control of subcooling and PZR CUE: level direct simulator driver to increase RCS leak to 10,000 gpm.
IF CSAS actuates inform the candidate that the CRO will verify CSAS.
BEGIN ALTERNATE PATH D 3. - IF HPSI or LPSI throttle criteria can NOT be maintained after the pumps are throttled or secured, THEN restart the appropriate pumps AND restore full flow.
TERMINATING CUE: The JPM is complete when 11 & 13 HPSI, 11 & 12 LPSI are running and all 8 HPSI Header Valves are full open. The evaluator is expected to end the JPM.
TIME STOP: - - -
Rev. 1 Page 8of10
Appendix C Job Performance Measure Worksheet Form ES-C-1 Verification of Completion Job Performance Measure SIMULATOR-3 Examinee:
NRC Examiner:
Date Performed:
Facility Evaluator:
Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Time to Complete:
Follow up Question(s): - - - - - - - - - - - - - - - - - - - - - - - -
Applicant Response: - - - - - - - - - - - - - - - - - - - - - - - - -
Result: SAT UNSAT Examiner's Signature and Date:
Rev. 1 Page 9of10
Appendix C Job Performance Measure Form ES-C-1 Worksheet EXAMINEE'S CUE SHEET Initial Conditions:
- 1. Unit-I has experienced a LOCA from 100% power.
- 3. You are performing the duties of the Reactor Operator.
Initiating Cue:
You have been directed to depressurize the RCS IA W EOP-5 Step K, and Throttle HPSI flow IA W EOP-5 Step L.
Rev. 1 Page 10of10
APPLICANT:
CALVERT CLIFFS NUCLEAR POWER PLANT 2017NRC Initial Licensed Operator Exam JPM SIMULATOR-4 Rev. 1
Rev. 0 New JPM.
Rev. 1 Incorporate comments from validation.
Rev. 1 Page 2of11
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: Calvert Cliffs 1 & 2 Job Performance Measure Sim-4 (Alt Path)
Task
Title:
Restore from loss of SRW Pump.
Task Number: 202.065 Respond to loss of Service Water in mode 1 or 2.
KIA
Reference:
076.A4.01 (2.9,2.9)
Method of Testing:
Simulated Performance: D Actual Performance: ~
Classroom: D Simulator: ~ Plant: D Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
- 1. U-1 is operating at 100% power MOC.
- 2. All systems in normal lineup.
- 3. All General Precautions and Initial Conditions are met.
- 4. You are performing duties of Control Room Operator.
Initiating Cue:
You have been directed to shift to 12 Component Cooling Pump IAW OI-16 Sect. 6.2.
Task Standard:
Restore a Service Water Pump to 11 header.
Rev. 1 Page 3of11
Appendix C Job Performance Measure Worksheet Form ES-C-1 Evaluation Criteria:
- 1. All critical steps completed (denoted by shading).
- 2. All sequential steps completed in order.
- 3. All time-critical steps completed within allotted time.
- 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.
Critical Step Basis:
Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task.
General
References:
- 1. Procedures and manuals normally available in Control Room Time critical task:
No Validation Time:
15 minutes Setup:
- 1. Reset simulator to IC-24 U-1at100% Power MOC.
- 2. Loss of 11 SRW pump (srw003_01) on Event 1.
Rev. 1 Page 4of11
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded = CRITICAL STEP)
TIME START: - - - - -
0 OI-16 Section 6.2 SHIFTING OPERATING PUMPS 0 B.1 - IF 13 Component Cooling Pump Determines step is NOT applicable.
will be started ...
CAUTION Two CC Pumps SHALL NOT be operating with only one CCHX aligned for service, unless for a very short period of time as in bumping a pump or momentary pump shifting CUE: IF candidate calls ABO to check 12 CC PP ready for start inform him it is ready after short delay. After pump starts inform candidate that pump is running normally.
0 B.2 - Start the Component Cooling pump to be placed in service.
CUE: When informed oflow amps on 12 CC PP tell candidate to continue with procedure.
0 B.3 - CHECK the following parameters: Checks 11 & 12 CC PPs ammeters 150-160 amps and CC PPS DISCH PRESS LO clear
- Component Cooling Pump motor ammeters ... 150-160 amps 12 CC PP amps are low at 120, candidate should inform US. (This condition is
- (1C13)"CC PPS DISCH PRESS expected, amps will rise after 11 CC PP is LO" ... clear secured) 0 B.4 - STOP the Component Cooling Pump to be removed from service CAUTION When 13 Component Cooling Pump is running, the associated Component Cooling Pump aligned to the same power supply shall be placed in PTL. This is to prevent all three pumps from running on a SIAS signal without a UV signal, which could damage the tubes ...
0 B.5 - IF 13 Component Cooling Pump is Determines step is NOT applicable.
runnmg ...
0 B.6 - IF 13 Component Cooling Pump is Determines step is NOT applicable.
runnmg ...
Rev. 1 Page 5of11
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STAND ARD (shaded = CRITICAL STEP) 0 B. 7 - IF 13 Component Cooling Pump is NOT running, THEN ENSURE all Verifies no Component Cooling Pump available Component Cooling Pumps are handswitches are in PTL.
in AUTO.
0 B.8 - CHECK (1Cl3)"CC PPS DISCH Verifies annunciator clear.
PRESS LO" annunciator clear.
CUE: Once 11 CC pump is secured initiate Event 1 to trip 11 Service Water Pump.
Direct candidate to diagnose cause of alarm.
Direct candidate to recommend procedure, including proper section.
BEGIN ALTERNATE PATH 0 1C13 alarm Window K-04 11 SRW Candidate determines 11 SRW pump has HDR PRESS LO and Kl5 SRW PPS tripped. Candidate recommends AOP-7B SIAS BLOCKED AUTO START. Section V MODES 1 OR 2.
CUE: After candidate recommends AOP-7B, direct candidate to perform AOP-7B Section V.
When candidate startsSection V .A inform him that the RO will perform step A.
0 A. - DETERMINE IF A REACTOR Candidate informed the RO will perform TRIP IS REQUIRED. this section.
0 B-REDUCE SRW HEAT LOAD. Determines this section is applicable.
NOTE Reducing Main Generator Reactive Load will reduce Main Generator heating CAUTION Reducing Reactive Load on Unit 1 may cause Unit 2 Main Generator or DG limits to be exceeded.
CAUTION Rapid changes in Main Generator Reactive Load require coordination with the SO-TSO to minimize Electric System perturbations and alarms.
Rev. 1 Page 6of11
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded = CRITICAL STEP)
CUE: When candidate calls SO-TSO to request reducing VARS on U-1 grant permission to do so.
D B.1 - IF the Main Generator is paralleled, THEN coordinate with the SO-TSO to reduce the Main Generator MV ARS to zero.
D B.2 - IF 1B DG is affected by loss of its associated SRW header, THEN with the SM/US permission, shutdown the DG Determines step is NOT applicable.
PER the appropriate procedure being used at the time of event initiation.
CUE: When/If candidate suggests a power reduction PER OP-3, tell him it is not required at this time.
D B.3 Commence power reduction PER OP-3, NORMAL POWER Determines step is NOT applicable.
OPERATION, as required.
0 C-ATTEMPT TO RESTORE SRW FLOW.
D C.1. -IF the loss of SRW is due to a Determines step is NOT applicable.
system leak or rupture, THEN PROCEED to step D (page 13). (SR W Head tank levels normal)
D C.2. - IF an operating SRW PP has failed, THEN perform the following Determines step is applicable.
actions.
D a. - Place the handswitch for the failed SRW pp in PULL TO LOCK. Takes 11 SRW pp HS to PTL.
D b. - IF a Saltwater header is removed from service, THEN Determines step is NOT applicable.
PROCEED to step C.2.d (pagelO).
Rev. 1 Page 7of11
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded= CRITICAL STEP)
D c. - IF the backup SRW PP is available, THEN ensure that the Determines step is applicable.
backup SRW PP is mechanically aligned to the affected header.
D c.l - IF 13 SRW PP needs to be Determines step is applicable.
D ( 1) - Place the handswitch for 13 SRW PP in PULL TO LOCK.
When candidate calls TBO to lock shut 12 SRW Header valves initiate Event 2 and CUE:
inform candidate step is complete after 2 minute delay.
D (2)-Lock shut 13 SRW Suction and Discharge valves to 11 SRW Header.
Contacts the Turbine Building watch and
- l-SRW-120
- l-SRW-123
inform candidate step is complete after 2 minute delay.
D (3)- Lock open 13 SRW Suction and Discharge valves to 11 SRW Header. Contacts the Turbine Building watch and
- 1-SRW-118 valves.
- 1-SRW-121
- 1-SRW-122 D c.2-IF 13 SRW PP needs to be aligned to 12 SRW Header, Determines step is NOT applicable.
THEN perform the following actions.
D d. - IF 13 SRW PP is the backup SRW PP, AND POWER is NOT Determines step is NOT applicable.
available to 13 SRW PP ....
Rev. 1 Page 8of11
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STAND ARD (shaded = CRITICAL STEP)
CAUTION Starting a backup SRW PP without determining the cause of the failure could initiate a common mode failure D e. - Start the backup SR W PP D C.3 -IF the affected HDR PRESS is greater than or equal to 80 psig, THEN Determines step is applicable.
PROCEED to step C.& (Page 12).
D C.7 - WHEN BOTH HDR PRESSs are Candidate should check both board greater than 80 psig, AND component indications and the plant computer to verify temperatures are stable or lowering, temperatures are restoring.
THEN restore plant systems to normal.
TERMINATING CUE: The JPM is complete when 12 SRW header press is >80 psig and candidate is checking temperatures to be stable or lowering. No further actions are required.
The evaluator is expected to end the JPM.
TIME STOP: - - -
Rev. 1 Page 9of11
Appendix C Job Performance Measure Worksheet Form ES-C-1 Verification of Completion Job Performance Measure SIMULATOR-4 Examinee:
NRC Examiner:
Date Performed:
Facility Evaluator:
Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Time to Complete:
Follow up Question(s): - - - - - - - - - - - - - - - - - - - - - - -
Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Result: SAT UNSAT Examiner's Signature and Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Rev. 1 Page 10of11
Appendix C Job Performance Measure Form ES-C-1 Worksheet EXAMINEE'S CUE SHEET Initial Conditions:
- 1. U-1 is operating at 100% power MOC.
- 2. All systems in normal lineup.
- 3. All General Precautions and Initial Conditions are met.
- 4. You are performing duties of Control Room Operator.
Initiating Cue:
You have been directed to shift to 12 Component Cooling Pump IAW 01-16 Sect. 6.2.
Rev. 1 Page 11of11
APPLICANT:
CALVERT CLIFFS NUCLEAR POWER PLANT 2017NRC Initial Licensed Operator Exam JPM SIMULATOR-5 Rev. 2
Rev. 1 Update procedures since last used in 2011.
Rev. 2 Incorporate comments from validation.
Rev. 2 Page 2of10
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: Calvert Cliffs 1 & 2 Job Performance Measure Sim-5 Task
Title:
Respond to a faulted S/G.
Task Number: 201.065 Identify, Isolate and Confirm the affected Steam Generator.
KIA
Reference:
035.A2.01 (4.5,4.6)
Method of Testing:
Simulated Performance: D Actual Performance:~
Classroom: D Simulator: ~ Plant: D Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
- 1. U-1 was operating at 100% power MOC.
- 2. A plant transient and manual Reactor trip have occurred.
- 3. EOP-4 has been implemented.
- 4. You are performing the duties of the Reactor Operator.
Initiating Cue:
The CRS directs you to perform RCP Trip Strategy IA W EOP-4 step E.
Task Standard:
Determines wrong SIG was isolated, restores feeding and steaming to 11 S/G, and isolates 12 S/G.
Rev. 2 Page 3of10
Appendix C Job Performance Measure Worksheet Form ES-C-1 Evaluation Criteria:
- 1. All critical steps completed (denoted by shading).
- 2. All sequential steps completed in order.
- 3. All time-critical steps completed within allotted time.
- 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.
Critical Step Basis:
Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task.
General
References:
- 1. Procedures and manuals normally available in Control Room Time critical task:
No Validation Time:
15 minutes Setup:
- 1. Reset simulator to IC-24 U-1 at 100% Power MOC.
- 2. Place an off-normal pink ring next to the '11 Steam Generator' sign (under 11 S/G level safety channels).
- 3. Enter following malfunctions at time zero:
a) MS010_02 10% leak, 12 Steam generator rupture in containment.
b) AFW006-01, Failure of AFAS block.
c) AFW006-02, Failure of AFAS block.
d) AFW006-03, Failure of AFAS block.
e) AFW006-04, Failure of AF AS block.
- 4. Place simulator in Run.
- 5. When containment pressure high pre-trip alarm actuates, manually trip the unit.
- 6. Stop all RCPs.
- 7. Isolate Letdown.
- 8. Start 13 AFW pump.
- 9. Isolate 11 S/G per EOP-4 step H.
Rev.2 Page 4of10
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded= CRITICAL STEP)
TIME START: - - - -
D EOP-4 Step E. - PERFORM THE RCP TRIP STRATEGY NOTE Subsequent operations to depressurize the plant under control are NOT considered a result of the event.
D E.1 - IF RCS pressure drops to 1725 PSIA as a result of the event, THEN trip RCPs so EITHER of the following pairs are Determines step is NOT applicable.
remaining:
- 1 lA and 12B RCPs.
- 1 lB and 12A RCPs.
D E.2 - IF CIS has actuated, OR Component Determines step is applicable.
Cooling flow can NOT be verified to the RCPs, THEN trip ALL RCPs. Verifies all RCP's are secured.
D E.3 - IF RCS pressure drops below the minimum pump operating limits PER ATTACHMENT (1 ), RCS PRESSURE Determines step is NOT applicable.
TEMPERATURE LIMITS, THEN trip ALLRCPs.
CUE: The CRS directs you to peer check the CRO by verifying the most affected SIG was isolated per EOP-4 Block Step H.3.
D H.3 - Verify the most affected SIG was isolated by checking the following:
- SIG pressure lower for the affected SIG.
- SIG level lowering for the affected SIG and stabilized for the unaffected SIG.
- RCS loop Tcold lower in the affected loop.
Rev. 2 Page 5of10
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded = CRITICAL STEP)
CUE: The candidate may report that the wrong S/G was isolated. The evaluator should acknowledge the report and give cue to "continue with the procedure".
0 3 .1 - IF the wrong S/G was isolated, Determines step is applicable.
THEN perform the following actions:
CAUTION Severe waterhammer may result if Main Feedwater is restored after it has been stopped for greater than 80 minutes.
CUE: If asked how long main feed water flow has been lost tell the candidate "The plant was tripped 20 minutes ago".
0 a. - Restore feeding and steaming The candidate will at a minimum:
capability to the least affected S/G. Restore Steaming:
Restore feeding:
1 Place 1-MS-4070-CV HS in Open or Auto.
0 H.2 - Isolate the affected S/G.
0 a. - IF 11 S/G is the affected S/G, Determines step is NOT applicable.
THEN isolate 11 S/G by performing the following actions:
Rev. 2 Page 6of10
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded= CRITICAL STEP)
D b. - IF 12 S/G is the affected S/G, THEN isolate 12 S/G by performing Determines step is applicable.
the following actions:
D (1) - Shut 12 ADV using the Hand Transfer Valves on the West wall of the Unit 1 45 ft Switchgear Room as follows:
(a) IF 12 ADV was locally operated, THEN remove the Candidate directs the TBO to 'Align 12 manual override. ADV to 1C43 with a zero percent output' or similar.
(b) Verify 12 ADV controller, 1-HC-4056B, at 1C43 is set at The candidate may alternatively direct 0% output. EOP-4 step numbers.
(c) Align 12 S/G Hand Transfer Valves to 1C43 (POSITION 2):
- 1-HV-3939A
1-FW-4517-MOV, is shut. (Valve may be shut at this point due to ESF AS actuations) 0 (3)- Verify 12 MSIV BYP valve, Verifies 1-MS-4052-MOV is shut.
1-MS-4052-MOV, is shut.
0 (4) - Shut 12 S/G BID valves:
- 1-BD-4012-CV
& BYPASS valves, 1-MS-4071-CV and 1-MS-4071A-CV.
Rev. 2 Page 7of10
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT 0 (6)- Shut 12 SIG AFW BLOCK valves by placing the handswitches in SHUT:
- l-AFW-4530-CV
- l-AFW-4531-CV
- 1-AFW-4532-CV
- 1-AFW-4533-CV 0 (7) - Shut the MS UPSTREAM Checks 1-HS-6622 in close.
DRN ISOL VL VS by placing handswitch l-HS-6622 in CLOSE. (valve closed from isolation of 11 SIG) 0 (8) - Observe locally, the SIG Candidate directs an operator to check for Safety Valves are NOT leaking. leaking SIG safety valves.
TERMINATING CUE: This JPM is complete when the operator determines the wrong SIG was isolated, restores feeding and steaming to 11 SIG, and isolates 12 SIG. The evaluator is expected to end this JPM.
TIME STOP: - - -
Rev. 2 Page 8of10
Appendix C Job Performance Measure Worksheet Form ES-C-1 Verification of Completion Job Performance Measure SIMULATOR-5 Examinee:
NRC Examiner:
Date Performed:
Facility Evaluator:
Number of Attempts: - - - - - - - - - - - - - - - -
Time to Complete:
Applicant R e s p o n s e : - - - - - - - - - - - - - - - - - - - - - - - -
Result: SAT UNSAT Examiner's Signature and Date: - - - - - - - - - - - - - - - - - - - -
Rev. 2 Page 9of10
Appendix C Job Performance Measure Form ES-C-1 Worksheet EXAMINEE'S CUE SHEET Initial Conditions:
- 1. U-1 was operating at 100% power MOC
- 2. A plant transient and manual Reactor trip have occurred.
- 3. EOP-4 has been implemented.
- 4. You are performing the duties of the Reactor Operator.
Initiating Cue:
The CRS directs you to perform RCP Trip Strategy IA W EOP-4 step E.
Rev. 2 Page 10of10
APPLICANT: _ _ __
CALVERT CLIFFS NUCLEAR POWER PLANT 2017NRC Initial Licensed Operator Exam JPM SIMULATOR-6 Rev. 1
Rev. 0 New JPM Rev. 1 Incorporated comments from validation.
Rev. 1 Page 2of10
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: Calvert Cliffs 1 & 2 Job Performance Measure Sim-6 Task
Title:
Shift 13 IRU Power Supply.
Task Number: 004.012 Transfer power supplies.
KIA
Reference:
027.A4.01 (3.3, 3.3)
Method of Testing:
Simulated Performance: D Actual Performance:~
Classroom: D Simulator: ~ Plant: D Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
- 1. Unit 1 is in Mode 1 100 % MOC.
- 2. Maintenance completed on 13 IRU 11 B 480V breaker.
- 3. All General Precautions and Initial Conditions are met.
- 4. You are performing duties as the Control Room Operator.
Initiating Cue:
The CRS directs shifting 13 IRU tol lB 480V bus IAW OI-5B Section 6.3and performance of a breaker operation check IA W OI-5B Section 6.1.
Task Standard:
The candidate will shift power supplies for 13 IRU, then start and stop 13 IRU.
Rev. 1 Page 3of10
Appendix C Job Performance Measure Worksheet Form ES-C-1 Evaluation Criteria:
- 1. All critical steps completed (denoted by shading).
- 2. All sequential steps completed in order.
- 3. All time-critical steps completed within allotted time.
- 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.
Critical Step Basis:
Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task.
General
References:
- 1. Procedures and manuals normally available in Control Room Time critical task:
No Validation Time:
10 minutes Setup:
- 1. Reset to IC-24
- 2. Place simulator in run
- 3. Ensure 13 IRU is aligned to 14B 480V bus.
Rev. 1 Page 4of10
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded= CRITICAL STEP)
TIME START: - - -
0 OI-5B Section 6.3 SHIFTING 13 CONTAINMENT IODINE REMOVAL 0 Identifies correct section of UNIT POWER SUPPLY FROM 14B procedure to use.
480V BUS TO 1lB480V BUS.
NOTE The preferred lineup for 13 CNTMT Iodine Removal Unit is 1lB480V Bus.
Candidate should notify CRS to enter Tech Spec 3.6.8. Acknowledge report and CUE:
confirm entering TS.
0 B.1. - IF plant is in Mode 1,2,3,4, 0 Notifies CRS to enter TS 3.6.8.
THEN ENTER TS 3.6.8.
0 B.2-PLACE 13 IODINE FILT FAN handswitch l-HS-5297 in PULL-TO- 0 Places 1-HS-5297 in PTL and checks LOCK at lClO, AND CHECK that "13 alarm at 1C09.
CNTMT FILT SIAS BLOCK AUTO START" alarm is present on 1C09 0 B.3 - PLACE 14 BUS DISC IODINE FILT !# keyswitch 1-HS-5297B in OPEN at 1 ClO AND REMOVE key.
0 B.4- CHECK 14 BUS green light is off above 13 IODINE FILT FAN handswitch.
0 B.5 - INSERT key from step 3 in 11 BUS DISC IODINE FIL T !# keyswitch 1-HS-5297A at lClO AND PLACE keyswitch to CLOSE.
NOTE Fan handswitches spring return to "normal" from either START or STOP. The "normal" position is unmarked and lies between START and STOP on each handswitch.
Rev. 1 Page 5of10
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded= CRITICAL STEP)
D B.6-PLACE 13 IODINE FILT FAN handswitch in normal, AND CHECK the following:
- "13 CNTME FILT SIAS D Place 13 IRU Handswitch in normal BLOCKED AUTO START" and verifies alarm clears and green alarm is clear. light is lit.
- 11 BUS green light is on above 13 IODINE FILT FAN handswitch.
CUE: When notified to exit TS 3.6.8 acknowledge the report.
D B.7 -IF plant is in Mode 1,2,3,4, D Notifies CRS to exit TS 3.6.8.
THEN EXIT TS 3.6.8.
D OI-5B Section 6.1 MANUAL D Identifies correct section of OPERATION OF CONTAINMENT procedure to use.
IODINE REMOVAL UNITS.
CAUTION Containment Iodine Removal Unit operation is undesirable whenever paint fumes are present in containment, due to the effect these have on the charcoal filters.
IF candidate asks if any painting has taken place in containment tell him that CUE: U-1 has been at 100% power for past 3 months.
D B.l - IF paint fumes are present from Minor Painting PER MN-3-100, Safety Related and Controlled D Determines this step is NOT Protective Coatings, THEN applicable.
CONSIDER NOT running any Containment Iodine Removal Unit.
D B.2 - IF paint fumes are present from Major Painting PER MN-3-100, Safety Related and Controlled D Determines this step is NOT Protective Coatings, THEN applicable.
DECLARE any Containment Iodine Removal Unit to be started inoperable, PER TS 3.6.8.
Rev. 1 Page 6of10
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded= CRITICAL STEP)
NOTE Fan handswitches spring return to "normal" from either START or STOP. The "normal" position is unmarked and lies between START and STOP on each handswitch.
0 B.3 - MOMENTARILY PLACE handswitch for selected unit in START, AND ENSURE that it returns to normal when released:
- 13 IODINE FILT FAN (at 1C10) ...... l-HS-5297 0 B.4 - CHECK that red light is on above selected fan handswitch 0 Checks red light is lit.
(indicating that fan is energized).
When candidate prepares to log in service time to Charcoal Filter log inform CUE: candidate that extra licensed operator will take care of the logging requirement.
0 B.5 - RECORD date and time filter 0 Candidate ensures date and time is was started in the Charcoal Filter Log logged in Charcoal Filter log.
for unit placed in service.
NOTE Fan handswitches spring return to "normal" from either START or STOP. The "normal" position is unmarked and lies between START and STOP on each handswitch.
0 C.1 - MOMENTARILY PLACE handswitch for selected unit in STOP, AND ENSUREthat it returns to normal when released:
- 13 IODINE FILT FAN (at lClO) ...... l-HS-5297 0 C.2 - CHECK that green light is on above selected fan handswitch. 0 Checks green light is lit.
(indicating that fan is de-energized).
Rev. 1 Page 7of10
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STAND ARD (shaded = CRITICAL STEP)
When candidate prepares to log in service time to Charcoal Filter log inform CUE: candidate that extra licensed operator will take care of the logging requirement.
D C.3 - RECORD date and time filter D Candidate ensures date and time is was started in the Charcoal Filter Log logged in Charcoal Filter log.
for unit placed in service.
D C.4 - IF any units just secured were operated while paint fumes were present from Major Painting, THEN D Determines this step is NOT DIRECT that charcoal filters be applicable.
tested PER TS 3.6.8 on any affected units.
Terminating Cue: This JPM is complete when the candidate shifts power supply and performs break operation check for 13 IRU. The candidate is expected to end the JPM.
TIME STOP:
Rev. 1 Page 8of10
Appendix C Job Performance Measure Worksheet Form ES-C-1 Verification of Completion Job Performance Measure SIMULATOR-6 Examinee:
NRC Examiner:
Date Performed:
Facility Evaluator:
Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Time to Complete:
Follow up Question(s): ----------------------~
Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Result: SAT UNSAT Examiner's Signature and Date: - - - - - - - - - - - - - - - - - - - -
Rev. 1 Page 9of10
Appendix C Job Performance Measure Form ES-C-1 Worksheet EXAMINEE'S CUE SHEET Initial Conditions:
- 1. Unit 1 is in Mode 1 100 % MOC.
- 2. Maintenance completed on 13 IRU 11 B 480V breaker.
- 3. All General Precautions and Initial Conditions are met.
- 4. You are performing duties as the Control Room Operator.
Initiating Cue:
The CRS directs shifting 13 IRU tol lB 480V bus IA W OI-5B Section 6.3and performance of a breaker operation check IA W OI-5B Section 6.1.
Rev. 1 Page 10of10
APPLICANT:
CALVERT CLIFFS NUCLEAR POWER PLANT 2017NRC Initial Licensed Operator Exam JPM SIMULATOR-7 Rev. 1
Rev. 0 New JPM Rev. 1 Incorporate comments from validation Rev. 1 Page 2of8
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: Calvert Cliffs 1 & 2 Job Performance Measure Sim-7 Task
Title:
Energize a 480V Load Center.
Task Number: 005/006.002 Energize double ended load center from a service transformer.
KIA
Reference:
062.A4.0l (3.1, 3.4)
Method of Testing:
Simulated Performance: 0 Actual Performance:~
Classroom: 0 Simulator: ~ Plant: 0 Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
- 1. Unit 1 is in Mode 1 100 % MOC.
- 2. Maintenance/Testing completed on U440-l 3A.
- 3. General Precautions and Initial Conditions are met.
- 4. All required briefs have been performed.
- 5. You are performing duties as the Control Room Operator.
Initiating Cue:
The US directs energizing 13A 480V bus from its service transformer IA W OI 27C Section 6.12 and OI-27-D-l Section 6.7.
Task Standard:
The candidate will energize bus from its service transformer and open tie breaker.
Rev. 1 Page 3 of8
Appendix C Job Performance Measure Worksheet Form ES-C-1 Evaluation Criteria:
- 1. All critical steps completed (denoted by shading).
- 2. All sequential steps completed in order.
- 3. All time-critical steps completed within allotted time.
- 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.
Critical Step Basis:
Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task.
General
References:
- 1. Procedures and manuals normally available in Control Room
- 2. OI-27D-1 Station Power 480 Volt System Time critical task:
No Validation Time:
15 minutes Setup:
- 1. Reset to IC-24.
- 2. Place simulator in run.
- 3. Shut 13A-13B Bus Tie Breaker using l-CS-1312.
- 4. Open 13A 480V Bus Feeder breaker using 1-CS-1301, leave H/S not in PTL with "off normal" pink ring on H/S.
- 5. Open U440-13A 4KV feeder using 1-CS-152-1310, leave H/S not in PTL with "off normal" pink ring on H/S.
Rev. 1 Page 4of8
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT STANDARD (shaded= CRITICAL STEP)
TIME START: - - -
0 OI-27C Section 6.12 ENERGIZING A I~entifies correct section of procedure to 4160/480N TRANSFORMER. use.
0 B.1-Momentarily PLACE the 4160/480V transformer feeder breaker control switch in the CLOSE position.
IF candidate calls TBO to check on transformer, report that transformer appears CUE:
normal, 0 B.2 - OBSERVE breaker CLOSED Observes red light lit for breaker 152-indication. 1310.
0 OI-27D-1 Section 6.7 - ENERGIZING A DOUBLE ENDED LOAD CENTER Identifies correct section of procedure to FROM ITS ASSOCIATED SERVICE use.
TRANSFORMER.
CAUTION Attempts should NOT be made to re-energize a bus if a fault is suspected.
0 B.1. - IF power is NOT available, THEN REFER to OI-27C, 4.16KV Determines step is NOT applicable.
SYSTEM.
0 B.2 - CHECK the associated transformer supply breaker is SHUT Checks breaker 152-1310, previously AND all alarms clear on that shut in OI-27C is shut.
transformer.
0 B.3 - CLOSE the normal feeder breaker with the control switch.
0 B.4 - VERIFY normal breaker closed Checks red light is on.
indication.
NOTE There are two bus tie breakers between Load Centers 15 and 25.
Rev. 1 Page 5of8
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT D B.5 - VERIFY OPEN the bus tie breaker(s).
D B.6 - Verify potential indicating light Checks white light on.
is illuminated.
D B.7 -IF bus voltage is NOT between 445 and 510 volts on each phase, THEN REFER to OI-28, Determines step is NOT applicable.
OPERATION OF 500 KV SWITCHYARD.
NOTE Total current drawn must be maintained less than 1200 amps.
Inform candidate that no loads were shed when tying the busses and no CUE: Control Manipulation Form (now known as an Abnormal Component Position Sheet) was generated.
D B.8 - RESTORE_loads which may have been shed while the Load Determines step is NOT applicable.
Center was tied.
D B.8.a - Close out the associated Determines step is NOT applicable.
Control Manipulation Form.
Terminating Cue: This JPM is complete when the candidate energizes 13A 480V Bus from normal feed with tie breaker opened. The candidate is expected to end the JPM.
TIME STOP: - - -
Rev. 1 Page 6of8
Appendix C Job Performance Measure Worksheet Form ES-C-1 Verification of Completion Job Performance Measure SIMULATOR-7 Examinee:
NRC Examiner:
Date Performed:
Facility Evaluator:
Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Time to Complete:
Follow up Question(s): - - - - - - - - - - - - - - - - - - - - - - -
Applicant R e s p o n s e : - - - - - - - - - - - - - - - - - - - - - - - -
Result: SAT UNSAT Examiner's Signature and Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Rev. 1 Page 7 of8
Appendix C Job Performance Measure Form ES-C-1 Worksheet EXAMINEE'S CUE SHEET Initial Conditions:
- 1. Unit 1 is in Mode 1 100 % MOC
- 2. Maintenance/Testing completed on U440-13A.
- 3. General Precautions and Initial Conditions are met.
- 4. All required briefs have been performed.
- 5. You are performing duties as the Control Room Operator.
Initiating Cue:
The US directs energizing 13A 480V bus from its service transformer IA W OI 27C Section 6.12 and OI-27-D-1 Section 6.7.
Rev. 1 Page 8 of8
APPLICANT:
CALVERT CLIFFS NUCLEAR POWER PLANT 2017NRC Initial Licensed Operator Exam JPM Plant-1 Rev. 0
I Rev. 0 I New JPM.
Rev. 0 Page 2of8
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: Calvert Cliffs 1 & 2 Job Performance Measure Plant-I Task
Title:
Control Steam Flow from ADV's locally.
Task Number: 204.097 KIA
Reference:
039.A2.04 (3.4,3.7)
Method of Testing:
Simulated Performance: ~ Actual Performance: D Classroom: D Simulator: D Plant: ~
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
I. Unit-I was at 100% power.
- 2. 11 Atmospheric Dump Valves has failed open.
- 3. Control Room staff has implemented AOP-7K Overcooling Event.
- 4. Manual operation of 1C03 ADV Controller did not shut the ADV.
- 5. You are performing the duties of an extra licensed operator.
Initiating Cue:
You have been directed to shut 11 ADV in controlled fashion from 1C43 IA W AOP-7K Step D.3 Task Standard:
Correctly takes local control of 11 ADV and shuts it as directed by Control Room.
Rev.O Page 3of8
Appendix C Job Performance Measure Worksheet Form ES-C-1 Evaluation Criteria:
- 1. All critical steps completed (denoted by shading).
- 2. All sequential steps completed in order.
- 3. All time-critical steps completed within allotted time.
- 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.
Critical Step Basis:
Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task.
General
References:
- 1. Procedures and manuals normally available in Plant Time critical task:
Yes Validation Time:
15 minutes Setup:
- 1. None Rev. 0 Page 4of8
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded = CRITICAL STEP) STANDARD
- AOP-7K Overcooling Event.
- D.3 - IF an ADV has failed, THEN perform ANY of the following as necessary.
- D.3 1st Bullet - Shut any failed open ADV's by shifting ATMOSPHERIC Determines step is NOT applicable.
STEAM DUMP CONT, 1-HIC-4056 to (already performed by Control Room Staff).
MANUAL and adjusting as necessary.
- D.3 2nd Bullet - Locally shut the Determines step is NOT applicable.
affected ADV isolation valve:
- D.3 2nd Bullet - Shut the affected ADV Determines step is applicable based on from 1C43. Initiating Cue.
- a. - IF 11 ADV is affected, THEN shut 11 ADV using the Hand Transfer Valves on the West wall of Determines step is applicable.
the U-1 45 ft Switchgear Room as follows:
CUE: Control Room directs controller to be initially set at 100% during transfer allowing controlled shutting of 11 ADV.
When student simulates moving lever to right to raise output use a pointing device to show output rising.
- a.1 - Verfiyll ADV controller, 1-HC-4056A at 1C43 is set as necessary to perform a controlled recovery.
Rev. 0 Page 5of8
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded = CRITICAL STEP) STANDARD When student simulates opening Hand Transfer box cover hand, show him a picture of CUE:
the valves inside and have him simulate operation on the picture.
D a.2 - Align 11 S/G Hand Transfer Valves to 1C43 (Position 2).
- 1-HV-3938A
- 1-HV-3938B Control Room directs 11 ADV position of::::;66% initially.
CUE: When student simulates moving lever to left to lower output use a pointing device to show output lowering.
D a.3 - Adjust 11 ADV controller, 1-HIC-4056A as necessary.
Control Room directs 11 ADV position of ::::;33% after approx 30 seconds.
CUE: When student simulates moving lever to left to lower output use a pointing device to show output lowering.
D a.3 - Adjust 11 ADV controller, 1-HIC-4056A as necessary.
Control Room directs 11 ADV position of 0% after approx 30 seconds.
CUE: When student simulates moving lever to left to lower output use a pointing device to show output lowering.
D a.3 - Adjust 11 ADV controller, 1-HIC-4056A as necessary.
TERMINATING CUE: The JPM is complete when 11 ADV is shut. No further actions are required. The operator is expected to end the JPM.
TIME STOP: - - -
Rev. 0 Page 6of8
Appendix C Job Performance Measure Worksheet Form ES-C-1 Verification of Completion Job Performance Measure IN-PLANT-1 Examinee:
NRC Examiner:
Date Performed:
Facility Evaluator:
Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Time to Complete:
Follow up Question(s): ----------------------~
Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Result: SAT UNSAT Examiner's Signature and Date:
Rev. 0 Page 7of8
Appendix C Job Performance Measure Form ES-C-1 Worksheet EXAMINEE'S CUE SHEET Initial Conditions:
- 1. Unit-1 was at 100% power.
- 2. 11 Atmospheric Dump Valves has failed open.
- 3. Control Room staff has implemented AOP-7K Overcooling Event
- 4. Manual operation of 1C03 ADV Controller did not shut the ADV
- 5. You are performing the duties of an extra licensed operator.
Initiating Cue:
You have been directed to shut 11 ADV in controlled fashion from 1C43 IA W AOP-7K Step D.3 Rev. 0 Page 8 of8
i\PPLICANT:
CALVERT CLIFFS NUCLEAR POWER PLANT 2017 NRC Initial Licensed Operator Exam JPM Plant-2 Rev. 1
Rev. 0 New JPM.
Rev. 1 Integrate OTPS comments Rev. 1 Page 2of8
Rev. 0 New JPM.
Rev. 1 Integrate OTPS comments Rev. 1 Page 2 of8
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: Calvert Cliffs 1 & 2 Job Performance Measure Plant-2 Task
Title:
Locally control AFW flow during EOP-7.
Task Number: 204.097 KIA
Reference:
E06 EAi.I (4.0, 3.9)
Method of Testing:
Simulated Performance: ~ Actual Performance: D Classroom: D Simulator: D Plant: ~
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
- 1. Unit-2 was at 100% power.
- 2. A Station Blackout has occurred.
- 3. Control Room staff has implemented EOP-7 Station Blackout
- 4. 22 AFW is running, supply water to S/G's
- 5. AFW flow control valves are starting to fail open on loss of air.
- 6. You are performing the duties of an extra licensed operator.
Initiating Cue:
You have been directed to locally control AFW flow IAW EOP-7 Step F.2.c.
Task Standard:
Correctly takes local control of 22 AFW PP speed.
Rev. I Page 3 of8
Appendix C Job Performance Measure Worksheet Form ES-C-1 Evaluation Criteria:
- 1. All critical steps completed (denoted by shading).
- 2. All sequential steps completed in order.
- 3. All time-critical steps completed within allotted time.
- 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.
Critical Step Basis:
Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task.
General
References:
- 1. Procedures and manuals normally available in Plant Time critical task:
Yes Validation Time:
15 minutes Setup:
- 1. None Rev. 1 Page 4 of8
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded = CRITICAL STEP) STANDARD 0 EOP-7 Station Blackout NOTE:
The AFW Air Accumulators are designed for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of available air:
WARNING The use of N2 to operate AFW may result in the depletion of oxygen levels in some rooms due to system venting.
0 F.2.c - When the SIG FLOW CONTR valves begin to fail OPEN, THEN align Liquid N 2 System to supply SG FLOW CONTR valves by opening the following valves located in SRW Room.
CUE: When candidate simulates opening O-N2-107, give feedback that handwheel rotates counter-clockwise until it stops.
- N1 SUPPLY TO U-2 AFW AMP AIR SYS B/U ISOLATION VAL VE, O-N2-l 07 (located SR W RM upper level, overhead of air amplifier).
CUE:
- AFW AMPLIFIER AIR SYSTEMN2 BACKUP SUPPLY VALVE, 2-IA-390 (located SRW RM lower level, west of 21 SRW PP).
CUE: Inform student he is the assigned operator.
0 F.2.d - Assign an operator to locally control AFW discharge pressure locally Acknowledges he is the assigned operator.
as follows:
CUE: When student contacts control room to establish communication, acknowledge that communication is established.
0 D.(1). - Establish communications Verifies communications established with between the operator and the control the control room.
room.
Rev. 1 Page 5 of8
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) STANDARD D D.(2) - Isolate the Instrument Air to the Turbine Governor.
22 AFWPP CUE: When candidate simulates shutting O-IA-509 & 510, give feedback that handwheel rotates clockwise until it stops.
- 2-AFW-39871/P A ISOL, 2-IA-509.
- 2-AFW-39871/P B ISOL, 2-IA-510.
CUE: Filters are just upstream of the controllers, straight ahead after going in door. The filter drain is the small petcock on bottom of filter.
When candidate simulates opening petcock, give feedback that handwheel rotates counter-clockwise until it stops and air flow noise is heard, which slowly stops.
D D.(3)- Open the filter drains on controllers to allow local control.
If student calls the control room for the S/G press and AFW PP discharge pressure then inform him S/G press is 870 psia and AFW discharge press is 1050 psia.
CUE:
If student looks at gauges in AFW PP room then indicate 870 psia for S/G Press (Steam Inlet Press) and 1050 psia for AFW discharge pressure.
Student either locates the following gauges and recognizes > 100 psia or asks control D D,(4)-Adjust 21 AFW PP governor room for pressures:
control knob to maintain discharge
- S/G Pressure (Steam Inlet Press) 2-MS-3988-PI.
TERMINATING CUE: The JPM is complete when student has local control of22 AFW PP speed and recognizes >I 00 psid. The evaluator is expected to end the JPM.
TIME STOP: - - -
Rev. 1 Page 6of8
Appendix C Job Performance Measure Worksheet Form ES-C-1 Verification of Completion Job Performance Measure IN-PLANT-2 Examinee:
NRC Examiner:
Date Performed:
Facility Evaluator:
Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Time to Complete:
Follow up Question(s): - - - - - - - - - - - - - - - - - - - - - - -
Applicant R e s p o n s e : - - - - - - - - - - - - - - - - - - - - - - - - -
Result: SAT UNSAT Examiner's Signature and Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Rev. 1 Page 7of8
Appendix C Job Performance Measure Form ES-C-1 Worksheet EXAMINEE'S CUE SHEET Initial Conditions:
- 1. Unit-2 was at 100% power.
- 2. A Station Blackout has occurred.
- 3. Control Room staff has implemented EOP-7 Station Blackout
- 4. 22 AFW is running, supply water to S/G's
- 5. AFW flow control valves are starting to fail open on loss of air.
- 6. You are performing the duties of an extra licensed operator.
Initiating Cue:
You have been directed to locally control AFW flow IAW EOP-7 Step F.2.c Rev. 1 Page 8 of8
APPLICANT: _ _ __
CALVERT CLIFFS NUCLEAR POWER PLANT 2017 NRC Initial Licensed Operator Exam JPM Plant-3 Rev. 2
Rev. 1 Updated with procedure changes since 2011 exam Rev. 2 Integrated OTPS comments Rev. 2 Page 2of10
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: Calvert Cliffs 1 & 2 Job Performance Measure Plant-3 Task
Title:
Fill the SRW and CC head tanks during loss of AC power.
Task Number: 011.025, 015.008 KIA
Reference:
008.A4.07 (2.9, 2.9)
Method of Testing:
Simulated Performance: ~ Actual Performance: D Classroom: D Simulator: D Plant: ~
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
- 1. A severe fire has resulted in Control Room evacuation. AOP-9A has been implemented.
- 2. You are performing the duties of the Unit-2 ABO.
Initiating Cue:
You have just completed Step CH, ESTABLISH SALTWATER FLOW THROUGH THE COMPONENT COOLING HEAT EXCHANGERS which directs you to "Go to the 69' Aux Building to perform Step CI".
Task Standard:
Correctly aligns makeup to the Service Water and Component Cooling Head Tanks Rev. 2 Page 3of10
Appendix C Job Performance Measure Worksheet Form ES-C-1 Evaluation Criteria:
- 1. All critical steps completed (denoted by shading).
- 2. All sequential steps completed in order.
- 3. All time-critical steps completed within allotted time.
- 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.
Critical Step Basis:
Critical steps are those that when not performed correctly, in the proper sequence, and/or at the proper time, will prevent the system from functioning properly or preclude successful completion of the task.
General
References:
- 1. Procedures and manuals normally available in Plant
- 2. AOP-9A, CONTROL ROOM EVACUATION AND SAFE SHUTDOWN DUE TO A SEVERE CONTROL ROOM FIRE Time critical task:
No Validation Time:
20 minutes Setup:
- 1. None Rev. 2 Page 4of10
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) STANDARD CUE You have just completed Step CH, ESTABLISH SALTWATER FLOW THROUGH THE COMPONENT COOLING HEAT EXCHANGERS which directs you to "Go to the 69' Aux Building to perform Step CI".
D Locate AOP-9A, Step CI Same as element D Candidate proceeds to the Unit 2 69' Same as element CUE 2C43 notifies you that makeup has been restored to fill the Service Water and Component Cooling Head Tanks.
When candidate simulates opening 2-CD-145, give feedback that handwheel rotates counter-clockwise until it stops.
D CH.1 - WHEN notified that makeup has been restored to fill the Service Water and Component Cooling Head Tanks, THEN: Simulates opening 2-CD-145.
- Open Component Cooling Head Tank Condensate Supply, 2-CD-145.
CUE: When candidate simulates opening 2-CD-144, give feedback that handwheel rotates counter-clockwise until it stops.
- Open SRW Head Tank Condensate Simulates opening 2-CD-144.
Supply, 2-CD-144.
Rev.2 Page 5of10
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) STANDARD CUE: The component cooling head tank level is below the sight glass.
When candidate simulates opening 2-CC-108, give feedback that handwheel rotates counter-clockwise until it stops.
When candidate simulates shutting 2-CC-107, give feedback that handwheel rotates clockwise until it stops.
D CH.2 - Operate, as necessary, to maintain level indication for the Component Cooling and Service Water Head Tanks:
- a. - Component Cooling Head Tank
- ( 1) - Open Component Cooling Head Tank Makeup Bypass, 2-CC- Simulates shutting 2-CC-107.
108.
- (2) - Shut 2-CC-3820-CV Inlet Isol, 2-CC-107.
CC Head tank level is rising and after ~2 minutes simulate that the level is midway in sightglass.
When candidate simulates shutting 2-CC-108, give feedback that handwheel rotates -
CUE:
clockwise until it stops.
When candidate simulates opening 2-CC-107, give feedback that hand wheel rotates counter-clockwise until it stops.
D CH.2 - Operate, as necessary, to maintain level indication for the Component Cooling and Service Water Head Tanks:
- a. - Component Cooling Head Tank
- (1) - Open Component Cooling Head Tank Makeup Bypass, 2-CC- Simulates opening 2-CC-107.
108.
- (2) - Shut 2-CC-3820-CV Inlet Isol, 2-CC-107.
Rev. 2 Page 6of10
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded= CRITICAL STEP) STANDARD CUE: 21 SRW head tank level is normal, 22 SRW head tank level is below the sight glass.
0 CH.2 - Operate, as necessary, to maintain level indication for the Component Cooling and Service Water Head Tanks:
- b. - 21 Service Water Heat Tank Determines this step is NOT applicable
- ( 1) - Open 21 Service Water Head Tank Makeup Bypass, 2-SRW-106.
- (2) - Shut 21 Service Water Head Tank LCV Inlet Isol, 2-SRW-104.
CUE: When candidate simulates opening 2-SRW-114, give feedback that handwheel rotates counter-clockwise until it stops.
When candidate simulates shutting 2-SRW-112, give feedback that handwheel rotates clockwise until it stops.
0 CH.2 - Operate, as necessary, to maintain level indication for the Component Cooling and Service Water Head Tanks:
- b. - 22 Service Water Heat Tank
- ( 1) - Open 22 Service Water Head Simulates shutting 2-SRW-112.
Tank Makeup Bypass, 2-SRW-114.
- (2) - Shut 22 Service Water Head Tank LCV Inlet Isol, 2-SRW-112.
Rev. 2 Page 7of10
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded = CRITICAL STEP) STANDARD 22 SRW Head tank level is rising and after ::::::2 minutes simulate that the level is midway in sightglass.
When candidate simulates shutting 2-SRW-114, give feedback that handwheel rotates -
CUE:
clockwise until it stops.
When candidate simulates opening 2-SRW-112, give feedback that handwheel rotates counter-clockwise until it stops.
D CH.2 - Operate, as necessary, to maintain level indication for the Component Cooling and Service Water Head Tanks:
- b. - 22 Service Water Heat Tank
- (1) - Open 22 Service Water Head Simulates opening 2-SRW-112.
Tank Makeup Bypass, 2-SRW-114.
- (2) - Shut 22 Service Water Head Tank LCV Inlet Isol, 2-SRW-112.
D CH.3 - Periodically monitor Component Student should voice that this step is Cooling and Service Water Head Tanks continuously applicable.
levels and fill as necessary.
TERMINATING CUE: This JPM is complete when the Component Cooling and 22 Service Water Head Tanks are in the normal band. No further actions are required. The evaluator is expected to end the JPM TIME STOP: - - -
Rev. 2 Page 8of10
Appendix C Job Performance Measure Worksheet Form ES-C-1 Verification of Completion Job Performance Measure IN-PLANT-3 Examinee:
NRC Examiner:
Date Performed:
Facility Evaluator:
Number of Attempts: - - - - - - - - - - - - - - - - -
Time to Complete:
Follow up Question(s): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Result: SAT UNSAT Examiner's Signature and Date:
Rev. 2 Page 9of10
Appendix C Job Performance Measure Form ES-C-1 Worksheet EXAMINEE'S CUE SHEET Initial Conditions:
- 1. A severe fire has resulted in Control Room evacuation. AOP-9A has been implemented.
- 2. You are performing the duties of the Unit-2 ABO.
Initiating Cue:
You have just completed Step CH, ESTABLISH SALTWATER FLOW THROUGH THE COMPONENT COOLING HEAT EXCHANGERS which directs you to "Go to the 69' Aux Building to perform Step CI".
Rev.2 Page 10of10